Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

100 METER

U
18 MTR 1 MTR

TANGKI

1
TIMBUN 2

LIMBAH PADAT

12 METER
GUDANG

8,3 mtr
8 mtr

12 mtr
TANGKI GUDANG

19,50 MTR
TANGKI TIMBUN 1 TERTUTUP MESIN SEWA 2
LIMBAH RMH POMPA
BBM 6
(PASCA OPERASI) LAY OUT PLTD NOPI
18 mtr
OIL TRAP 15 mtr
CAT
10 MTR

9 mtr
TRAVO CAT GUDANG
7
TERBUKA KETERANGAN :
1
RENCANA PEMASANGAN FIRE ALARM
RAD. UNIT 2 16,50 MTR 12 MTR
5
2 T. UNIT 2

MESIN SEWA 1 (PASCA OPERASI)


RAD. UNIT 3
T. UNIT 3
3

RAD. UNIT 4 T. UNIT 4


SENTRAL PLN

TRAVO
GEDUNG

RAD. UNIT 5 T. UNIT 5


5

35,50 METER
MESIN SEWA
T. UNIT 6

100 METER
RAD. UNIT 6
62,8 MTR

4 SEWATAMA
100 METER

TRAVO
RAD. UNIT 7 T. UNIT 7
7

BAK OIL T. UNIT 8


8

RAD. UNIT 9
T. UNIT 9 TRAVO

9 METER
9
KONTROL ROOM

RAD. UNIT 10

6 METER
T. UNIT 10
10 3 2
JALAN MOBIL
WATER
SOFTENER

4 mtr
POS
SATPAM
GDG
OLI 20 MTR TAMAN 1 3 mtr
16,50 MTR

7 mtr

20 METER
7 mtr

R. DINAS 7 mtr
R. DINAS R. DINAS
WC/
5,5 mtr

KANTOR
GUDANG KM
3 mtr

PEMBAKARAN PARKIRAN 2
SAMPAH

100 METER

You might also like