Professional Documents
Culture Documents
Bharat Heavy Electricals Limited: Amendment No & Date: Date
Bharat Heavy Electricals Limited: Amendment No & Date: Date
GSTIN : 33AAACB4146P2ZL
VIGILANCE AWARENESS WEEK Email : rvg@bhel.in
Purchase Order No: ECC.No : AAACB4146PXM012
"Eradicate Corruption- Build a New India"
FB-350-7100160090 29th OCT to 3rd NOV 2018 TIN : 33243560005
FOR VIGILANCE RELATED COMPLAINTS, CST No : 239383/DT 11.6.91
CONTACT SDGM/VIGILANCE & DGM/VIGILANCE Contact Ph No: 0431-2574604
Purchaser's Reference:
2017OVM009
Rate Schedule : GFSTR
Dear Supplier, We are pleased to order on you, Fabrication and Supply of Boiler Components as per the
terms and conditions, and attached annexures through VIS. Please send your "Order Acceptance" within 7
days after receipt of the PO. Annexures enclosed shall form an integral part of the contract.
Manufacturer :
Mode of Transport : By Road.
Insurance : By BHEL
Receiving Storage Location : ZACF ( SL for AWAY )
Site
Please quote Purchase Order No, Sl No, Date and Supplier Code in all your future correspondence.
2) Payment Doc : One signed hardcopy of online invoice along with GST Invoice (Original for
receipient) along with applicable documents direct to BHEL(Purchase) and
GST Invoice (Duplicate for transporter) along with Delivery Challan (DC) to
BHEL (Stores)., Original LR, IR and acknowledged DCs are to be submitted
3) Invoicing : Please indicate P.O. Sl.No in all invoices for processing your payment.
Note 1: If materials are dispatched to site proper acknowledgement by authorised BHEL officials
with name and seal is to be obtained.
Note 2: One copy of INVOICE with relevant documents with original signature is to be submitted.
LD Clause: If the Supplier fails to deliver the ordered materials listed in Annexure-A of this Purchase Order
within the delivery period specified in this Contract for the respective item, Purchaser shall deduct Liquidated
Damages of a sum equivalent to 0.5% of the undelivered portion per week of the delay or part thereof
subject to a maximum of 10% of the undelivered portion. The LD shall be reckoned from the Contract
delivery date to Cargo readiness date.
Cargo readiness date means the following:
EX-works/FOB terms: Final inspection Agency's signed date in the Test Certificate in the case of Third Party
Inspection (TPI) is involved. When Third Party Inspection is not involved, date of intimation message regarding
readiness of materials or date of Test Certificate whichever is later.
Other than EX-works/FOB terms including FOR/Destination: Invoice date/Bill of Lading date/Airway Bill
date/Lorry way bill date/Railway Receipt date, whichever is later.
Enclosures:
Sl No Material Description Unit Quantity Dely Qty Dely Date Unit Rate Value
Dely Wt.(Kg) per MT
10 Material Number: F1727138512001 NO 63 10,413.900 25.12.2018 48522.6 505309.5
BC200 LB-101
SGST : 9 %
20 Material Number: F1727138512002 NO 3 329.700 25.12.2018 49019.6 16161.76
BC125 LB-102
SGST : 9 %
30 Material Number: F1727138512003 NO 3 254.400 25.12.2018 48749.8 12401.95
BC125 LB-103
SGST : 9 %
40 Material Number: F1727138512004 NO 2 175.600 25.12.2018 48565.2 8528.05
BC150 LB-105
SGST : 9 %
50 Material Number: F1727138512005 NO 3 281.700 25.12.2018 49019.6 13808.82
BC125 LB-107
SGST : 9 %
60 Material Number: F1727138512006 NO 3 214.800 25.12.2018 48735.6 10468.41
BC125 LB-108
SGST : 9 %
70 Material Number: F1727138512007 NO 1 94.700 25.12.2018 49048 4644.85
BC125 LB-109
SGST : 9 %
80 Material Number: F1727138512008 NO 1 69.800 25.12.2018 48749.8 3402.74
BC125 LB-110
SGST : 9 %
90 Material Number: F1727138512009 NO 6 754.800 25.12.2018 48536.8 36635.58
BC150 LB-111
SGST : 9 %
100 Material Number: F1727138512010 NO 9 1,220.400 25.12.2018 48977 59771.53
BC125 LB-113
SGST : 9 %
110 Material Number: F1727138512011 NO 9 972.900 25.12.2018 48749.8 47428.68
BC125 LB-114
SGST : 9 %
SGST : 9 %
130 Material Number: F1727138512013 NO 10 1,150.000 25.12.2018 49005.4 56356.21
BC125 LB-116
SGST : 9 %
140 Material Number: F1727138512014 NO 3 420.000 25.12.2018 48977 20570.34
BC125 LB-117
SGST : 9 %
150 Material Number: F1727138512015 NO 4 409.200 25.12.2018 48551 19867.07
BC150 LB-119
SGST : 9 %
160 Material Number: F1727138512016 NO 10 1,194.000 25.12.2018 48991.2 58495.49
BC125 LB-120
SGST : 9 %
170 Material Number: F1727138512017 NO 10 935.000 25.12.2018 48749.8 45581.06
BC125 LB-121
SGST : 9 %
180 Material Number: F1727138512018 NO 3 265.200 25.12.2018 48749.8 12928.45
BC125 LB-122
SGST : 9 %
190 Material Number: F1727138512019 NO 3 342.000 25.12.2018 49005.4 16759.85
BC125 LB-123
SGST : 9 %
200 Material Number: F1727138512020 NO 3 428.100 25.12.2018 48962.8 20960.97
BC125 LB-124
SGST : 9 %
210 Material Number: F1727138512021 NO 4 382.000 25.12.2018 48565.2 18551.91
BC150 LB-126
SGST : 9 %
220 Material Number: F1727138512022 NO 3 336.600 25.12.2018 48735.6 16404.4
BC125 LB-127
SGST : 9 %
230 Material Number: F1727138512023 NO 2 264.400 25.12.2018 48536.8 12833.13
BC150 LB-129
SGST : 9 %
240 Material Number: F1727138512024 NO 4 521.600 25.12.2018 48991.2 25553.81
BC125 LB-130
SGST : 9 %
250 Material Number: F1727138512025 NO 4 412.400 25.12.2018 48749.8 20104.42
BC125 LB-131
SGST : 9 %
260 Material Number: F1727138512026 NO 2 187.800 25.12.2018 48565.2 9120.54
BC150 LB-132
SGST : 9 %
270 Material Number: F1727138512027 NO 3 343.200 25.12.2018 48735.6 16726.06
BC125 LB-134
SGST : 9 %
280 Material Number: F1727138512028 NO 2 271.800 25.12.2018 48536.8 13192.3
BC150 LB-136
SGST : 9 %
290 Material Number: F1727138512029 NO 6 775.200 25.12.2018 48991.2 37977.98
BC125 LB-137
SGST : 9 %
300 Material Number: F1727138512030 NO 6 610.200 25.12.2018 48749.8 29747.13
BC125 LB-138
SGST : 9 %
310 Material Number: F1727138512031 NO 4 462.800 25.12.2018 48551 22469.4
BC150 LB-140
SGST : 9 %
320 Material Number: F1727138512032 NO 2 238.200 25.12.2018 48551 11564.85
BC150 LB-142
SGST : 9 %
330 Material Number: F1727138512033 NO 7 917.700 25.12.2018 48977 44946.19
BC125 LB-143
SGST : 9 %
340 Material Number: F1727138512034 NO 7 727.300 25.12.2018 48749.8 35455.73
BC125 LB-144
SGST : 9 %
350 Material Number: F1727138512035 NO 8 904.000 25.12.2018 49005.4 44300.88
BC125 LB-145
SGST : 9 %
360 Material Number: F1727138512036 NO 8 697.600 25.12.2018 48749.8 34007.86
BC125 LB-146
SGST : 9 %
370 Material Number: F1727138512037 NO 4 470.000 25.12.2018 49005.4 23032.54
BC125 LB-147
SGST : 9 %
380 Material Number: F1727138512038 NO 4 365.200 25.12.2018 48749.8 17803.43
BC125 LB-148
SGST : 9 %
390 Material Number: F1727138512039 NO 2 211.200 25.12.2018 48551 10253.97
BC150 LB-149
SGST : 9 %
400 Material Number: F1727138512040 NO 3 366.600 25.12.2018 49005.4 17965.38
BC125 LB-151
SGST : 9 %
410 Material Number: F1727138512041 NO 3 286.800 25.12.2018 48749.8 13981.44
BC125 LB-152
SGST : 9 %
420 Material Number: F1727138512042 NO 4 405.200 25.12.2018 49019.6 19862.74
BC125 LB-153
SGST : 9 %
430 Material Number: F1727138512043 NO 4 309.600 25.12.2018 48749.8 15092.94
BC125 LB-154
SGST : 9 %
440 Material Number: F1727138512044 NO 2 244.800 25.12.2018 48536.8 11881.81
BC150 LB-156
SGST : 9 %
450 Material Number: F1727138512045 NO 7 936.600 25.12.2018 48991.2 45885.16
BC125 LB-157
SGST : 9 %
460 Material Number: F1727138512046 NO 7 742.000 25.12.2018 48749.8 36172.35
BC125 LB-158
SGST : 9 %
470 Material Number: F1727138512047 NO 1 97.612 25.12.2018 49076.4 4790.45
LBR510-101 BC125
SGST : 9 %
480 Material Number: F1727138512048 NO 2 172.542 25.12.2018 49104.8 8472.64
LBR510-102 BC125
SGST : 9 %
490 Material Number: F1727138512049 NO 4 364.648 25.12.2018 49090.6 17900.79
LBR510-103 BC125
SGST : 9 %
500 Material Number: F1727138512050 NO 3 312.150 25.12.2018 49076.4 15319.2
LBR510-104 BC125
SGST : 9 %
510 Material Number: F1727138512051 NO 1 105.194 25.12.2018 49062.2 5161.05
LBR510-105 BC125
SGST : 9 %
520 Material Number: F1727138512052 NO 2 216.148 25.12.2018 49062.2 10604.7
LBR510-106 BC125
SGST : 9 %
530 Material Number: F1727138512053 NO 1 110.484 25.12.2018 49062.2 5420.59
LBR510-107 BC125
SGST : 9 %
540 Material Number: F1727138512054 NO 2 190.814 25.12.2018 49090.6 9367.17
LBR510-108 BC125
SGST : 9 %
550 Material Number: F1727138512055 NO 1 106.059 25.12.2018 49062.2 5203.49
LBR510-109 BC125
SGST : 9 %
560 Material Number: F1727138512056 NO 1 97.609 25.12.2018 49076.4 4790.3
LBR510-110 BC125
SGST : 9 %
570 Material Number: F1727138512057 NO 2 233.426 25.12.2018 49048 11449.08
LBR510-111 BC125
SGST : 9 %
580 Material Number: F1727138512058 NO 4 441.936 25.12.2018 49062.2 21682.35
LBR510-112 BC125
SGST : 9 %
590 Material Number: F1727138512059 NO 2 228.758 25.12.2018 49048 11220.12
LBR510-113 BC125
SGST : 9 %
600 Material Number: F1727138512060 NO 2 180.110 25.12.2018 49090.6 8841.71
LBR510-114 BC125
SGST : 9 %
610 Material Number: F1727138512061 NO 1 95.427 25.12.2018 49090.6 4684.57
LBR510-115 BC125
SGST : 9 %
620 Material Number: F1727138512062 NO 1 95.408 25.12.2018 49090.6 4683.64
LBR510-116 BC125
SGST : 9 %
630 Material Number: F1727138512063 NO 1 104.050 25.12.2018 49076.4 5106.4
LBR510-117 BC125
SGST : 9 %
640 Material Number: F1727138512064 NO 1 110.484 25.12.2018 49062.2 5420.59
LBR510-118 BC125
SGST : 9 %
650 Material Number: F1727138512065 NO 15 670.470 25.12.2018 48622 32599.59
LCB510-101 BC150
SGST : 9 %
660 Material Number: F1727138512066 NO 1 44.666 25.12.2018 48622 2171.75
LCB510-102 BC150
SGST : 9 %
670 Material Number: F1727138512067 NO 1 655.275 25.12.2018 48593.6 31842.17
HBR1-101
SGST : 9 %
680 Material Number: F1727138512068 NO 1 146.200 25.12.2018 48678.8 7116.84
HBR1-102
SGST : 9 %
690 Material Number: F1727138512069 NO 1 156.800 25.12.2018 48792.4 7650.65
HBR1-103
SGST : 9 %
700 Material Number: F1727138512070 NO 1 156.300 25.12.2018 48593.6 7595.18
HTB1-101
SGST : 9 %
710 Material Number: F1727138512072 NO 1 100.200 25.12.2018 48650.4 4874.77
HBL-113
SGST : 9 %
720 Material Number: F1727138512073 NO 2 202.800 25.12.2018 48806.6 9897.98
HBL-120
SGST : 9 %
730 Material Number: F1727138512074 NO 28 4,628.400 25.12.2018 48522.6 224582
BC200 LB-1 01
SGST : 9 %
740 Material Number: F1727138512075 NO 1 655.207 25.12.2018 48593.6 31838.87
HBR2-101
SGST : 9 %
750 Material Number: F1727138512076 NO 1 146.200 25.12.2018 48678.8 7116.84
HBR2-102
SGST : 9 %
760 Material Number: F1727138512077 NO 1 156.900 25.12.2018 48792.4 7655.53
HBR2-103
SGST : 9 %
770 Material Number: F1727138512078 NO 1 156.300 25.12.2018 48593.6 7595.18
HTB2-101
SGST : 9 %
780 Material Number: F1727138512080 NO 1 100.300 25.12.2018 48650.4 4879.64
HBL-192
SGST : 9 %
790 Material Number: F1727138512081 NO 1 648.793 25.12.2018 48593.6 31527.19
HBR3-101
SGST : 9 %
800 Material Number: F1727138512082 NO 1 156.000 25.12.2018 48749.8 7604.97
HBR3-102
SGST : 9 %
810 Material Number: F1727138512083 NO 1 150.700 25.12.2018 48820.8 7357.29
HBR3-103
SGST : 9 %
820 Material Number: F1727138512084 NO 1 156.300 25.12.2018 48593.6 7595.18
HTB3-101
SGST : 9 %
830 Material Number: F1727138512086 NO 1 109.400 25.12.2018 48522.6 5308.37
HBL-133
SGST : 9 %
840 Material Number: F1727138512087 NO 1 120.400 25.12.2018 48494.2 5838.7
HBL-157
SGST : 9 %
850 Material Number: F1727138512088 NO 1 146.200 25.12.2018 48678.8 7116.84
HBR4-101
SGST : 9 %
860 Material Number: F1727138512089 NO 1 156.800 25.12.2018 48792.4 7650.65
HBR4-102
SGST : 9 %
870 Material Number: F1727138512090 NO 1 648.821 25.12.2018 48593.6 31528.55
HTB4-101
SGST : 9 %
880 Material Number: F1727138512091 NO 1 156.300 25.12.2018 48593.6 7595.18
HTB4-102
SGST : 9 %
890 Material Number: F1727138512093 NO 1 101.372 25.12.2018 48806.6 4947.62
HBM-109
SGST : 9 %
900 Material Number: F1727138512094 NO 1 100.303 25.12.2018 48650.4 4879.78
HBM-159
SGST : 9 %
910 Material Number: F1727138512095 NO 1 655.275 25.12.2018 48593.6 31842.17
HBR5-101
SGST : 9 %
920 Material Number: F1727138512096 NO 1 156.400 25.12.2018 48764 7626.69
HBR5-102
SGST : 9 %
930 Material Number: F1727138512097 NO 1 218.101 25.12.2018 48735.6 10629.28
HBR5-103
SGST : 9 %
940 Material Number: F1727138512098 NO 1 193.900 25.12.2018 48593.6 9422.3
HTB5-101
SGST : 9 %
950 Material Number: F1727138512100 NO 1 109.443 25.12.2018 48522.6 5310.46
HBM-129
SGST : 9 %
960 Material Number: F1727138512101 NO 1 120.865 25.12.2018 48494.2 5861.25
HBM-160
SGST : 9 %
970 Material Number: F1727138512102 NO 1 498.200 25.12.2018 48607.8 24216.41
HBR6-101
SGST : 9 %
980 Material Number: F1727138512103 NO 1 229.201 25.12.2018 48707.2 11163.74
HBR6-102
SGST : 9 %
990 Material Number: F1727138512104 NO 1 655.275 25.12.2018 48593.6 31842.17
HTB6-106
SGST : 9 %
1000 Material Number: F1727138512106 NO 1 147.000 25.12.2018 48494.2 7128.65
HTB6-108
SGST : 9 %
1010 Material Number: F1727138512107 NO 2 218.800 25.12.2018 48522.6 10616.74
HBU-102
SGST : 9 %
1020 Material Number: F1727138512108 NO 1 120.300 25.12.2018 48494.2 5833.85
HBU-141
SGST : 9 %
1030 Material Number: F1727138512109 NO 1 120.300 25.12.2018 48494.2 5833.85
HBU-108
SGST : 9 %
----------------------------------------------------------------------------------------------------------------------------------------------------------------
Total Weight : 50,545.326
Total Net Value excl. tax in Indian Rupee 2462414.44
----------------------------------------------------------------------------------------------------------------------------------------------------------------
Paintingcost(Q)(New) 114,340.52
Shot Blast Qty-OVM 130,941.79
Frieght(qty) 0.00
Painting area(SQM) 1,633.436
U6/1727-LU-948-1-38-512
Applicable Quality Documents for the WBS -
GMS: As published in VIS.
Inspection by: AIA/BHEL
Yours faithfully,
For and On behalf of BHEL
Authorised Signatory
( Affix Seal )
29.10.2018 14:21