77) (E

JEBEL ALI INDUSTRIAL AREA


8

JEBEL ALI - LEHBAB RD.


7 6

1 2 3 4 5

SH. MOHAMMAD BIN ZAYED RD. (E 311)

DUBAI INVESTMENTS PARK

NOTES:-
1. ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE STATED.
2. FOR STREET LIGHTING SINGLE LINE DIAGRAM, REFER TO
DRAWING No.NCC/9012/SD/STL/SLD/001 TO 004.
3. FOR STREET LIGHTING LOAD SCHEDULE & VOLTAGE DROP
CALCULATION, REFER TO DRAWING No.NCC/9012/SD/STL/VDC/001
TO 002.
4. ON-OFF SYSTEM FOR INTERNAL ROADS GIVEN AS PER RTA
REQUIREMENT.
5. ALL STREETLIGHTING DUCT ARE 100mmØ uPVC.
6. ALL POLE SHOULD BE ALLOCATED AS SHOWN IN CROSS SECTION
LAYOUTS & AS PER SITE CONDITION.
7. ADDITIONAL FUSE WILL BE PROVIDED ON CUT OUTS FOR FUTURE
ADVERTISEMENT.
8.ALL STREET LIGHTING AS PER RTA STANDARDS &
SPECIFICATIONS.
9.FOR STREETLIGHTING POLE PROTECTION REFER DRAWING
NUMBER:NCC/9012/SD/STL/DT/011.

LEGEND:-
SYMBOL DESCRIPTION QTY
PROPOSED STREET LIGHTING 10M HIGH POLE
WITH 1x89 LED LUMINARIE 328 Nos.

PROPOSED STREET LIGHTING 12M HIGH POLE


WITH 1x127W LED LUMINARIE 40 Nos.

PROPOSED STREET LIGHTING 12M HIGH POLE


32 Nos.
WITH 2x127W LED LUMINARIES

PROPOSED STREET LIGHTING 12M HIGH POLE


02 Nos.
WITH 1x195W LED LUMINARIE

PROPOSED STREET LIGHTING 12M HIGH POLE


WITH 2x195W LED LUMINARIES 09 Nos.

PROPOSED FEEDER PILLAR 7 Nos.

PROPOSED MINI FEEDER PILLAR 1 No.

4C X 25 sqmm Cu. XLPE/SWA/MDPE 5850m.


+1C×16 sqmm CU/G/Y CPC (Earth)

4C X 16 sqmm Cu. XLPE/SWA/MDPE + 15615m.


1C×16 sqmm CU/G/Y CPC (Earth)

4Cx70 sqmm Cu. XLPE/SWA/MDPE 180m.

STREET LIGHTING END OF CIRCUIT EARTHING


POINT - CABLE SIZE 1C X70 sqmm Cu/PVC G/Y CPC 31 Nos.
FEEDER PILLAR STREET LIGHTING EARTHING
POINT - CABLE SIZE 1C X 70 sqmm Cu/PVC G/Y CPC 8 Nos.
STREET LIGHTING DUCTS 314 Nos.
LIMIT OF CONTRACT EXISTING ROAD
PROPOSED R.O.W
EXISTING ASPHALT
PROPOSED ROAD
TO BE REMOVED
PROPOSED 80MM TILED EXISTING PAVEMENT
PROPOSED ROADWAYS TO REMAIN
(BY OTHERS) FUTURE LED LUMINARIE

05 REVISED AS PER DEWA COMMENTS S.L M.S 05-11-18


REVISED FOR PHILIPS LUMINAIRE/RTA
04 APPROVAL S.L M.S 07-10-18
03 SUBMITTED FOR CIVIL WORKS S.L M.S 11-08-18
02 SUBMITTED FOR RTA APPROVAL S.L M.S 26-06-18
01 SUBMITTED FOR APPROVAL S.LM.S 17-03-18
00 SUBMITTED FOR APPROVAL S.LM.S 15-02-18
Rev. Description Ckd Appd Date
Status
SHOP DRAWING
Authority

GOVERNMENT OF DUBAI

Client

P-11
0Y Consultant
2m
40.

Contractor
NAEL CONSTRUCTION & CONTRACTING

P-10
9R Nael Construction & Contracting
Construction, Engineering and Management Solutions
P.O.BOX-29703, DUBAI,U.A.E
0m

TEL-04-3599940, FAX-04-3599941
40.

Electro - Mechanical Contractor

P-10
8B
Envicon Emirates
P.O.BOX-21868, DUBAI,U.A.E
TEL-04 -4567168, FAX-04 -4567054
9m

Project Title
39.

9012;JEBEL ALI LABOUR CITY


P-10
7
ROADS & INFRASTRUCTURE
Y
FP-02/CT-04
4Cx25mm²Cu+
1Cx16mm²Cu.
Drawing Title
1m
40.

STREET LIGHTING LAYOUT PLAN


(SHEET 8 0F 8)
P-10
6R
Drawn: Checked: Approved:
DK ENG.SARATH LAL ENG.MOHAN SAHA
9m

Datum:
39.

Scale (A1) Horiz. Vert.


1:1000
Date Project Code
MATCH LINE SEE DWG # SHEET 6 OF 8 15-02-2018
Contract No. Drawing No. Rev.

9012 NCC/9012/SD/STL/LP/08 05