Professional Documents
Culture Documents
Latest Fyp Group Report
Latest Fyp Group Report
Latest Fyp Group Report
GROUP: MCH 73
Contents
1. Introduction ........................................................................................................................................ 4
2. Problem statement ............................................................................................................................. 5
3. Market study ....................................................................................................................................... 5
3.1 Target market................................................................................................................................ 5
3.2 Current available machine ............................................................................................................ 6
4. Item/Product to be produce/ Process/ Service .................................................................................. 7
4.1 Material ......................................................................................................................................... 7
4.2 Dimension ..................................................................................................................................... 8
4.3 Physical characteristic ................................................................................................................... 8
4.4 Additional valuable info. ............................................................................................................... 9
5 Manual process study ........................................................................................................................ 10
5.1 Methodology............................................................................................................................... 10
5.2 Time taken for each and overall process .................................................................................... 11
5.3 Additional valuable info. ............................................................................................................. 11
6. Current available process study ........................................................................................................ 12
6.1 Mechanism.................................................................................................................................. 12
6.2Technology ................................................................................................................................... 13
6.3 Time taken for each process ....................................................................................................... 13
6.4 Additional valuable info .............................................................................................................. 13
7. Project objective ............................................................................................................................... 14
8. Process flow sequence ...................................................................................................................... 15
9. Design Concept ................................................................................................................................. 16
9.1 First design concept sketch ......................................................................................................... 16
9.2 First design advantage and disadvantage ................................................................................... 16
9.3 Second design concept sketch .................................................................................................... 17
9.4 Second design advantage and disadvantage .............................................................................. 17
9.5 Design Selection .......................................................................................................................... 18
10. Power supply wiring diagram.......................................................................................................... 19
10.1 Device and rating ...................................................................................................................... 19
10.2 Power device symbol ................................................................................................................ 20
11. Main controller wiring diagram ...................................................................................................... 20
11.1 Power supply connection.......................................................................................................... 20
11.2 Input output port ...................................................................................................................... 21
2
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
11.3 Symbol....................................................................................................................................... 22
12. Actuator wiring diagram ................................................................................................................. 23
13 Software ........................................................................................................................................... 23
13.1 Main flowchart .......................................................................................................................... 23
13.2 Sequence step diagram ............................................................................................................. 23
13.3 Human Machine interface ........................................................................................................ 24
14 Selected method .............................................................................................................................. 28
14.1 Method ..................................................................................................................................... 28
14.2Mechanism................................................................................................................................. 29
14.3Technology to be applied........................................................................................................... 29
15. Mechanical design .......................................................................................................................... 30
15.1Overall Machine Isometric diagram........................................................................................... 30
15.2 Station/Parts Assembly drawing ............................................................................................... 30
15.3 Exploded view and BOM ........................................................................................................... 30
16. Actuator sizing ................................................................................................................................ 31
16.1 Free body diagram and Calculation .......................................................................................... 31
17. Process Timing Diagram .................................................................................................................. 37
17.1 Cycle time calculation ............................................................................................................... 37
18 Safety ............................................................................................................................................... 38
18.1 Requirement ............................................................................................................................. 38
18.2 Feature ...................................................................................................................................... 39
19. Estimated cost................................................................................................................................. 40
19.1 Main controller and HMI........................................................................................................... 40
19.2 Power related device ................................................................................................................ 40
19.3 Sensor........................................................................................................................................ 41
19.4 Actuator .................................................................................................................................... 41
19.5 Standard mechanical part ......................................................................................................... 41
19.6 Fabricated part .......................................................................................................................... 42
19.7 Miscellaneous ........................................................................................................................... 43
20. Hazard Analysis Critical Control Point (HACCP) .............................................................................. 44
21. Conclusion ....................................................................................................................................... 45
3
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
1. Introduction
Chocolate is among the most famous food in the world and can be used in many
kinds of dishes and desserts. In Malaysia, bubble rice chocolate is famous for its taste and
presentation. Therefore, automate the process could increase the popularity and fill the
high demands for the product.
In order to do so, our group has decided to design and construct a Bubble rice
chocolate vending machine as our final year project. The Bubble rice chocolate vending
machine consists of 3 processes which is the cup transferring process, the selection process
where the bubble rice and topping will be inserted into cup, and lastly the chocolate pouring
process.
Each process has its own actuator and sensor to carry out the required function for
this machine. The cup transferring process uses a stepper motor and a ball screw to carry
the cup to the respective station. The selection process is equip with a linear actuator that is
connected to several volumetric cups. The actuator will push the volumetric metric cup
containing toppings into the cup. Lastly, the chocolate pouring process uses a peristaltic
pump and a load cell to measure the amount of chocolate poured into the cup.
Bubble rice chocolate machine must be reliable, robust, secured and more
importantly must follow the HACCP seven principles due to involvement of food. Our
machine must also be fast, efficient and safe to be used.
4
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
2. Problem statement
Bubble rice chocolate is one of the popular products sold everyday in Malaysia but
making one manually is challenging and can be quite messy to produce. To make a single
bubble rice chocolate requires 25 seconds manually. Moreover, the entire process can be
hard to clean up and difficult to remove because of the chocolate. There is also the matter
of inconsistency where measurements can be different in each cup and requires more time
to adjust the weight and volume.
3. Market study
Our target market are consist of shopping malls, supermarkets and food courts. This
is because we require an area where there is many people and at a location where food
usually sold. To make this machine profitable, the product is sold in large amount of
quantity.
Next, this bubble rice chocolate machine is easy to handle. It just needs a few
actuators to operate it and maintenance could be a breeze. This machine save energy and
time because we do not need any human to focus on the machine. The operator just needs
to observe and fill the required ingredients if one of them finishes. Other than that, all the
processes will be conducted automatically by the machine.
Last but not least, it can be said that this bubble rice chocolate machine will
be very useful for our target market as it can help them to gain an additional income from
this machine. Furthermore, all the cases they faced before, that did not manage to fulfil
their desire and satisfaction value, can be avoided by using this machine.
5
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
Drinks vending
PRODUCT CNC Machine Drinks filling machine
machine
DESIGN
6
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
4.1 Material
Bubble rice
It is a grain like biscuit with a crispy texture. The bubble rice is the main
ingredient. It is made of processed flour that is already pre packed for
consumer uses.
Chocolate coin
A milk chocolate is the second ingredient that makes the bubble rice
chocolate. The chocolate will be mix with bubble rice and later on with
topping. The chocolate requires some butter to reduce the viscosity of the
chocolate to ease the flow of chocolate.
Toppings
There are 3 toppings for the bubble rice chocolate to compliment the product
even more. Each toppings has different the shape and size for the product.
The amount can always be vary by changing the volume of the volumetric
cup.
Paper cups
The type of cups used is paper is biodegradable and recyclable. The paper
cups are stackable and light in weight.
7
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
4.2 Dimension
The overall dimension bubble, chocolate coin and paper cup is:
Height 10mm
Bubble rice
Width 5mm
Diameter 25mm
Chocolate coin
Thickness 2mm
Height 75mm
Paper cups
Diameter 70mm
Texture Crunchy
8
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
The dimensions for toppings was not included because the size of the toppings are
different and small to measure. To measure the topping, we need a micro meter to measure
because a Vernier calliper was not accurate to measure a small piece. At that time, the only
tool that we have is only a Vernier calliper.
9
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
Product
Scale
10
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
Weight 5g 2g 2g
Ingredients
Total time
Bubble rice Chocolate Toppings
Attempts (seconds):
First attempt 8 13 5 26
Second attempt 7 11 5 23
Third attempt 9 10 6 25
Average time: 25 seconds
. The time taken for each and overall process includes the time to correct the
measurement to it desired weight due to overfill or under fill the measuring scale. The time
also include the time to pick the ingredients out from their respective packages. As for
chocolate, the time does not include to melt the chocolate.
11
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
Transferring process
By using a conveyor belt or a linear guide that is equipped with stepper motor, a
product can go from a single station to the other station to complete the whole
sequence of a production line.
Another mechanism is the 3D printer which has a ball screw and a linear guide to
bring the extruder at the x and y axis along the work table. All movements are
controlled by several stepper motors.
Selection process
Multiple buttons was assigned with an input to each product in a programmed in a
vending machine. The buyer will press a button which gives an input that will be
selected as the wanted product.
12
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
6.2 Technology
Time
Process
(seconds)
Transferring process 12
Selection process 4
Total time: 20 seconds
For the machine, we have set an approximately 30 seconds for the whole process to
finish. This is slower according to the manual process that was carried out before, but speed
of the machine was not our target. Also, we substitute the use of weight as a basic
measurement to volume because lack of actuator to control the input of ingredients into
the cups.
13
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
7. Project objective
1) To make a Bubble rice chocolate vending machine.
Our main target is to produce bubble rice chocolate that produce minimal mess and
accuracy in a short period of time. Our machine can conduct multiple processes at
one time to ensure to utilize the full time required to make a single cup of bubble
rice chocolate.
3) To produce bubble rice chocolate in a 50g of chocolate and 30g of bubble rice.
These days chocolate has become everyone’s favourite. This is one of the reasons
why we chose to make bubble rice chocolate vending machine. We believe that the
output will be satisfying with 50g of chocolate and 30g of bubble rice for the perfect
mix for a single cup.
14
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
START
Transferring process
Selection process
END
15
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
9. Design Concept
9.1 First design concept sketch
ADVANTAGES DISADVANTAGES
The machine is large and can support a lot The size of the machine is big and tall and
of ingredients to make a lot of bubble rice might be expensive to build.
chocolate.
The linear mechanism uses a linear guide to The linear guide can be very expensive and
smooth the process and increase the may be out of our budget.
efficiency of the machine.
The machine has a big display that enables Due for the purpose of display, ergonomics
customers to observe the whole process. was sacrificed to ensure the display is
within eye view level.
16
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
ADVANTAGES DISADVANTAGES
The machine is lowered compared to the It reduces the maximum amount of
previous machine to enable easier refilling ingredients that can be fill in the machine
of the machine. and might require constant refilling.
The linear mechanism uses a linear There is a possibility of misalignment that
bushings instead of a linear guide to reduce that can take time to adjust the position of
the cost of mechanical parts. the liner bushing.
The machine uses a coin acceptor instead Customers need to go to a counter to buy
of bill acceptor so that only a single token the token so that the machine can be use
can be inserted into the machine. by the customer.
17
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
The machine is cheaper compared to the first design because of the reduce size and
cheaper mechanical parts.
The machine fabricated parts are easier to make because the cup moves from a
station to another.
The machine is more compact and more ergonomics than the first design because
easy refill and height of placing cup.
18
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
2. PLC S7-1200 30 W
SIEMENS SIMATIC
3. HMI HMI Basic Panel 9.6 W
KTP400.
Pump chocolate to
4. Peristaltic pump paper cup and acts as 33.6w
valve.
19
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
1. Main switch
4. 3 Pin Socket
5. Power supply
6. DC motor
7. Stepper motor
20
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
Output
21
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
11.3 Symbol
No Device Symbol
5 Proximity Sensor
6 Relay
7 Lamp
22
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
13 Software
13.1 Main flowchart
23
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
24
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
25
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
26
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
27
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
14 Selected method
14.1 Method
For our project, there are 3 important processes that need to be done to make the bubble
rice chocolate.
Transferring process
1. Insert paper cup into the cup holder.
2. The sensor at the cup holder will detect the presence of the paper cup.
3. The stepper motor will turn ON and will start the transferring process from one
station to the other in a sequence.
4. After the sequence is completed, the stepper motor will bring the cup back to home.
Selection process
1. The linear mechanism will turn at several steps to the station that is selected.
2. A linear actuator will start to extend and retract at their respective place depending
on the customer’s choice.
3. The topping at the selected place will be added into the cup.
4. The station will measure the topping by a volumetric cup.
28
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
14.2Mechanism
Types Description
A stepper motor is attached to the ball screw to control the distance
Transferring
travel. The mechanism is supported with a linear rod and bushings. The
mechanism
ball screw will move the paper cup forward and reverse.
The peristaltic pump acts as a pump and a valve. To control the amount
Chocolate filling
of chocolate into the cup, a load cell is used to measure the weight of
mechanism
the chocolate.
The ball screw carries the linear actuator to the designated station.
Selection When the ball screw stops at a station, the linear actuator will extend
mechanism and retract. When extends, it pushes the volumetric cup containing
toppings into the paper cup.
14.3Technology to be applied
29
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
30
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
31
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
32
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
33
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
34
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
35
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
36
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
The timing diagram is divided into 3 parts. This is because the process is different for every
topping. The differences between the 3 toppings is the distance and time for the ball screw to reach
the station.
Time assumption:
1) Ball screw = 1 second to reach the distance of 70mm at a speed of 400mm per rotation.
3) Linear actuator = 4 seconds for extend and another 4 seconds for retract
CHOCOLATE SMARTIES
CHOCOLATE RICE
37
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
ALMOND GRAINS
18 Safety
18.1 Requirement
38
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
18.2 Feature
Name of
No. Image Descriptions
components
39
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
40
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
19.3 Sensor
19.4 Actuator
Unit Price
Item Part Number Quantity Total (RM) Remarks
(RM)
Rexroth
aluminium profile N/A 3 250.00 750.00 RECYCLE
40x40 (6m)
Spring AWA3-25 4 10.40 41.60 PURCHASE
Rolled ball screw BSBR1510-575 1 1451.84 1451.84 PURCHASE
stepper coupling GCO25-5-10 1 45.05 45.05 RECYCLE
Linear rods PSFJW6-570-M3-N3 2 50.50 101.00 PURCHASE
Linear bushings LHBBD6H 2 114.35 228.70 PURCHASE
Support unit BSW12-SET 1 408.88 408.88 PURCHASE
Caster HSMAS12-60 4 77.39 309.56 RECYCLE
Caster bracket CPHAL12A 4 75.99 303.96 RECYCLE
Hinges HHS40 4 8.41 33.64 RECYCLE
Total 3674.23
41
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
42
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
19.7 Miscellaneous
Item Quantity Unit Price Total (RM) Remarks
(RM)
Chocolate coin 4kg 14.10 56.40 Purchase
Bubble rice 2kg 8.50 17 Purchase
Butter 2kg 2.00 4.00 Purchase
Chocolate smarties 1kg 18.00 18.00 Purchase
Chocolate rice 1kg 27.00 27.00 Purchase
Almond grains 1kg 45.00 45.00 Purchase
Cups 70 0.30 21.00 Purchase
Total 188.4
43
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
Potential Hazard
Presence of hazardous extraneous material and poisonous in the chocolate mixing
and extrusion
Example: Diacetyl
Diacetyl is an ingredient that can be found in the butter. Since we use butter
to mix it with chocolate, this might be one of the risks. This poisonous
chemical can lead to someone to get unwanted disease if it is not being
observed carefully.
Control Measures
Check all the ingredients and materials that we get are in good condition.
Make sure that all the incoming ingredients and materials that we get are same with
the specification during purchasing the product.
Neither takes nor use the items if they are not same with what we want.
Do final check before use all the products so that they are in clean and good
condition in order to avoid any unwanted problems.
44
MEC Project proposal- IEP0722MEC
I ND U S T R I AL E L E C T R O N I C S D E P A R T M E NT
21. Conclusion
Previously, basic and simple processes are being used to make a look alike of this
project, which is to put food in a container. There are advantages when using a new system
which is to help the user to improve their productivity value and some income. The main
The main factor and reason why this project are develop is because people are
always have cases where they did not manage to fulfil their desire and satisfaction value.
This machine supposed to bring a new perspective to vending machines and could also show
Other than that, we hope that this machine could help people improve their
business with the least amount of workers and effort needed in order to make a profit from
this machine.
45