The document provides details of construction work for roads in Unit-II of Navanagar, Bagalkot. It lists 36 road sectors and their lengths, widths, and status of work completed. The agreement was signed on November 29, 2013 with M/s. DRN Infrastructures for Rs. 12814.68 lakhs. As of the report date, subgrade work was completed for 18 roads, in progress for 6 roads, and pending for 12 roads. Granular sub-base work was completed for 8 roads and in progress for 5 roads, pending for 23 roads. Wet mix macadam work was pending on all roads.
The document provides details of construction work for roads in Unit-II of Navanagar, Bagalkot. It lists 36 road sectors and their lengths, widths, and status of work completed. The agreement was signed on November 29, 2013 with M/s. DRN Infrastructures for Rs. 12814.68 lakhs. As of the report date, subgrade work was completed for 18 roads, in progress for 6 roads, and pending for 12 roads. Granular sub-base work was completed for 8 roads and in progress for 5 roads, pending for 23 roads. Wet mix macadam work was pending on all roads.
The document provides details of construction work for roads in Unit-II of Navanagar, Bagalkot. It lists 36 road sectors and their lengths, widths, and status of work completed. The agreement was signed on November 29, 2013 with M/s. DRN Infrastructures for Rs. 12814.68 lakhs. As of the report date, subgrade work was completed for 18 roads, in progress for 6 roads, and pending for 12 roads. Granular sub-base work was completed for 8 roads and in progress for 5 roads, pending for 23 roads. Wet mix macadam work was pending on all roads.