Unit Hydrograph

Prepared by
Prof. S. G. Taji
Dept. of Civil Engineering
S.R.E.S’s Sanjivani College of Engineering,
Kopargaon
HYDROGRAPH

 It is a graph showing the rate of


flow (discharge) versus time past a
specific point in a river, or other
channel or conduit carrying flow.
 It can also called as a graph
showing the volume of water
reaching a particular outfall.
 Such hydrographs are commonly used in the
design of sewerage, more specifically, the
design of surface water sewerage systems
and combined sewers.
COMPONENTS OF A HYDROGRAPH

 Rising limb:
 The rising limb of hydro graph, also known as concentration
curve, reflects a prolonged increase in discharge from a catchment
area, typically in response to a rainfall event
 Recession (or falling) limb:
 The recession limb extends from the peak flow rate onward.

 The end of stormflow (aka quickflow or direct runoff) and the


return to groundwater-derived flow (base flow) is often taken as
the point of inflection of the recession limb.
 The recession limb represents the withdrawal of water from the
storage built up in the basin during the earlier phases of the
hydrograph.
 Peak discharge:
 The highest point on the hydro graph when the rate of
discharge is greatest
 Lag time:
 The time interval from the center of mass of rainfall excess
to the peak of the resulting hydrograph
 Time to peak:
 The time interval from the start of the resulting hydro graph

 Discharge:
 The rate of flow (volume per unit time) passing a specific
location in a river or other channel
Unit Hydrograph

Hydrograph usually consists of a fairly regular


lower portion that changes slowly throughout the
year and a rapidly fluctuating component that
represents the immediate response to rainfall.
The lower, slowly changing portion is termed
base flow. The rapidly fluctuating component is
called direct runoff.
UNIT HYDROGRAPH

 The amount of run-off resulting from 1 unit (1cm,


1mm, 1ft, etc.) of rainfall excess.
 is essentially a tool for determining the direct runoff
response to rainfall.
 Once you know the watershed’s response to one
storm, you can predict what its response for another
will look like.
Basic Assumptions of UH
1. The effective rainfall is uniformly distributed within its duration
2. The effective rainfall is uniformly distributed over the whole
drainage basin
3. The base duration of direct runoff hydrograph due to an effective
rainfall of unit duration is constant.
4. The ordinates of DRH are directly proportional to the total
amount of DR of each hydrograph
5. For a given basin, the runoff hydrograph due to a given period of
rainfall reflects all the combined physical characteristics of basin
(time-invariant)

UH
Procedure for Derivation of UH from Hydrograph

Type-I
Derivation of Unit Hydrograph from Given
DRH or Flood Hydrograph

In a typical 6-hr storm, 4 cm excess rainfall is


occurring. The flow recorded in the catchment as
shown below. Derive an unit hydrograph for 6-hr
storm. Assume Base flow is 100 cu.meter/sec.

Time (hr) 0 6 12 18 24 30 36 42 48 54 60 66

Observed
hydrograph(m3 100 100 300 700 1000 800 600 400 300 200 100 100
/s)
Soln:
 Step-1: Compute DRH (Col. 3)
DRH=Ordinates of flood hydrograph – Base flow
 Step-2: Compute 6hr-UH (Col. 4)
Ordinates of UH = Ordinates of DRH / Excess
Rainfall
Observed Hydrograph Direct Runoff Hydrograph
Time (hr) Ordinates of UH
(m3/s) (DRH) (m3/s)
(1) (4)
(2) (3)

0 100 0 0
6 100 0 0
12 300 200 50
18 700 600 150
24 1000 900 225*
30 800 700 175
36 600 500 125
42 400 300 75
48 300 200 50
54 200 100 25
60 100 0 0
66 100 0 0
Type-II

Derivation of DRH or Flood Hydrograph


from Given Unit Hydrograph
Q. The ordinates of 3 hr UH is given below. Assume
Base flow is 15 cu.meter/sec. Derive the DRH for 2
cm, 6 cm and 4 cm excess rainfall.
Time (hr) 0 3 6 9 12 15 18 21 24 27 30 33 36 39
ordinates
of 3 hr
0 12 75 132 180 210 183 156 135 144 96 87 66 54
UH
(m3/s)

42 45 48 51 54 57 60 63

42 33 24 18 12 6 6 0
(1)11 (2) (2)*2=(3) (2)*6=(4) (2)*4=(5)
Time (hr) ordinates of 3 hr DRH due to 2 cm DRH due to 6 cm ER DRH due to 4 cm ER
UH ER
0 0 0 0 0
3 12 24 72 48
6 75 150 450 300
9 132 264 792 528
12 180 360 1080 720
15 210 420 1260 840*
18 183 366 1098 732
21 156 312 936 624
24 135 270 810 540
27 144 288 864 576
30 96 192 576 384
33 87 174 522 348
36 66 132 396 264
39 54 108 324 216
42 42 84 252 168
45 33 66 198 132
48 24 48 144 96
51 18 36 108 72
54 12 24 72 48
57 6 12 36 24
60 6 12 36 24
63 0 0 0 0
Type-III

Derivation of T-hr Unit Hydrograph from


Given D-hr unit Hydrograph
 If UH of specified UH is available, then we can
derive of any other duration UH by using
superposition techniques.
 But, the use of this technique is limited i.e. if
required duration is integral multiple of given
duration UH, then this technique is easy to use
and compute req. UH.
 For ex. Derivation of 16 hr UH from given 4hr
UH, then superposition technique is applicable,
But when it is necessary to derive 4hr UH from
given 16hr UH, then S-curve technique should be
used.
Type-III (A): Derivation of req. T-hr UH from Given
D-hr UH (where T is the multiple integral of D)

Q. The ordinates of 3 hr UH is given below. Assume


Base flow is 15 cu.meter/sec.
Derive the 9 hr UH.

Time (hr) 0 3 6 9 12 15 18 21 24 27 30 33 36 39
ordinates of
3 hr UH 0 12 75 132 180 210 183 156 135 144 96 87 66 54
(m3/s)
4
45 48 51 54 57 60 63
2
4
33 24 18 12 6 6 0
2
Soln:
 Step-1: See the given duration and req. duration.
Given Duration of UH = 3 hr
Req. duration = 9hr
i.e. 9 is the integral multiple of 3. Thus, superposition technique is
applicable.
 Step-2: if we add 3 hr UH by 3 times then we got 9 hr UH
i.e. 3hr + 3hr + 3hr = 9 hr
but, at the same when we adding the 3 UH of 1 cm each, resulted
hydrograph will be DRH of 1+1+1= 3 cm excess rainfall.
Thus, in 2nd step, lag ordinates of given UH by 3 hr and then again
lag by 3 hr (Col. 3 & 4)
 Step-3: Add these lagged UH i.e. Col.6, this will give us DRH of
3cm ER.
 Step-4: Divide col.6/3cm (bcoz we want to plot UH)
(1) (2) (3) (4) (2)+(3)+(4)=(6) (7)

ordinates of 3 hr DRH due to sum of 3 UH i.e 3 cm Ordinates of


Time (hr) lagged by 3 hr lagged by 6 hr
UH (m3/s) ER 9hr UH

0 0 - 0 0
3 12 0 - 12 4
6 75 12 0 87 29
9 132 75 12 219 73
12 180 132 75 387 129
15 210 180 132 522 174
18 183 210 180 573 191*
21 156 183 210 549 183
24 135 156 183 474 158
27 144 135 156 435 145
30 96 144 135 375 125
33 87 96 144 327 109
36 66 87 96 249 83
39 54 66 87 207 69
42 42 54 66 162 54
45 33 42 54 129 43
48 24 33 42 99 33
51 18 24 33 75 25
54 12 18 24 54 18
57 6 12 18 36 12
60 6 6 12 24 8
63 0 6 6 12 4
66 0 6 6 2
69 0 0 0
72 0 0
75 0 0
Thank You…………..