Work Package Allocation

WPA Date: Contract Ref:# Name:


Work Description & Detail
- Work Package Description

- Team Manager or Authorised Persons / Team

- Operational and Maintenance Processes and Procedures

- Existing infrastructure & interfaces

- Problem Escalation and Resolution

- Tolerances and Constraints

- Reporting Requirement

- Authorisation Criteria

- Risk and HSE analysis

Start Date
End Date
Budget Allocation
Quality Parameters
Risk Level: H/M/L
Additional Comments

Blank template ©IACCM 2015 V1.0 062015 In collaboration with DPSS