INDEKS HARGA SATUAN BAHAN/MATERIAL

AHSP BIDANG CIPTA KARYA, KABUPATEN PURWOREJO TA. 2017

HARGA
NO J E N I S B A H A N SATUAN HARGA +PPN HARGA NON PPN KET
(Rp) (Rp)
1 2 3 4 5 6
I BAHAN DASAR
1 BATU KALI Blondon m3 204,500 185,909 1. Harga batu/ pasir
Bulat Belah m3 - - adalah harga
Pecah 15-20 m3 216,400 196,727 basecamp
Pecah 5-7 m3 219,500 199,545 2. Ongkos
Pecah 3-5 m3 260,800 237,091 angkutan per kubik
- jarak dr basecamp:
2 BATU KERIKIL Beton 0,5 - 1 cm (mesin) m3 278,600 253,273 a. Jarak 0-10 Km:
Beton 1 - 2 cm (mesin) m3 280,000 254,545 Rp 45.000,00
Beton 1 - 2 cm (manual) m3 264,300 240,273
Beton 2 - 3 cm (mesin) m3 285,200 259,273 b. jarak 10-20 Km:
Beton 2 - 3 cm (manual) m3 257,300 233,909 Rp 55.000,00
- c. jarak 20-30 Km:
3 PASIR Urug/ timbun m3 234,300 213,000 Rp 75.000,00
Urug (ada unsur lempung AHSP BM) m3 200,700 182,455
Sirtu tidak diayak m3 95,400 86,727
Sirtu diayak m3 105,400 95,818
Pasang m3 274,300 249,364
Beton m3 274,300 249,364
Pasir Halus (untuk HRS) m3 262,400 238,545
-
4 TANAH Padas m3 186,500 169,545
Liat m3 186,500 169,545
5 KAPUR Kapur Pasang zak 13,600 12,364
Kapur Padam kg 9,400 8,545
-
6 PORTLAND CEMENT -
Portland cement ( PC ) 40 Kg zak 65,500 59,545
Portland cement ( PC ) 50 Kg zak 81,000 73,636
Semen Putih 40 kg zak - -
Semen Putih 50 kg zak - -
Semen warna Super Grout kg 18,000 16,364
-
7 BATU ANDESIT belah dengan kekerasan tinggi m3 170,200 154,727
8 BATU ZEOLIT Bongkahan padat 20 kg zak 49,300 44,818
-
9 BATU BATA AT bh 1,200 1,091
Bata Hebel HB-20 bh 14,000 12,727
-
II BAHAN PENUTUP ATAP -
1 SIRAP (100 lbr) pak 548,400 498,545
2 GENTENG BETON Genteng Beton Warna standard m2 127,300 115,727
3 GENTENG KERAMIK Flams bh 2,200 2,000
Genteng Pres Kodok bh 3,000 2,727
Genteng Pres Palentong bh 2,500 2,273
Genteng keramik glazur ex KIA bh 14,100 12,818
Genteng Aluminium m2 49,400 44,909
Genteng metal m2 49,400 44,909
-
4 GENTENG KACA bh 14,400 13,091
-
5 ASBES GELOMBANG - Asbes Gelombang -
1800 x 1080 x 6 mm, Jabesmen bh 52,400 47,636
2100 x 1080 x 6 mm, Jabesmen bh 58,800 53,455
2400 x 1080 x 6 mm, Jabesmen bh 68,100 61,909
2700 x 1080 x 6 mm, Jabesmen bh 78,500 71,364
3000 x 1080 x 6 mm, Jabesmen bh 98,100 89,182
- Asbes Gelombang Kecil -
1500 x 1050 x 4 mm, Jabesmen bh 53,300 48,455

1/135
1500 x 800 x 4 mm, Jabesmen bh 59,500 54,091
1800 x 1050 x 4 mm, Jabesmen bh 68,900 62,636
1800 x 800 x 4 mm, Jabesmen bh 78,800 71,636
2100 x 1050 x 4 mm, Jabesmen bh 87,000 79,091
2100 x 800 x 4 mm, Jabesmen bh 102,900 93,545
2400 x 1050 x 4 mm, Jabesmen bh 84,500 76,818
2400 x 800 x 4 mm, Jabesmen bh 55,000 50,000
2700 x 1050 x 4 mm, Jabesmen bh 96,900 88,091
3000 x 1050 x 4 mm, Jabesmen bh 110,800 100,727
-

2/135
6 NOK Genteng Kerpus plentong besar bh 4,100 3,727
Genteng Kerpus Model 1/2 Lingkaran bh 6,000 5,455
Genteng Kerpus Model Pelana bh 6,000 5,455
Genteng Kerpus Model Segitiga bh 6,000 5,455
Nok Asbes Stel Gelombang 1,05 jabesmen bh 45,700 41,545
Nok Asbes Stel Gelombang 1,08 bh 27,900 25,364
Nok Asbes Stel Gelombang 0,92 jabesmen bh 37,100 33,727
Bubungan keramik glasur ex KIA bh 18,200 16,545
Nok Genteng Aluminium bh 25,000 22,727
Nok Genteng Beton bh 12,100 11,000
Nok Genteng Metal bh 28,600 26,000
Nok Genteng Sirap bh 20,000 18,182
-
7 SENG PLAT BJLS 0,18 lebar 55 cm m' 24,000 21,818
BJLS 0,20 lebar 55 cm m' 27,700 25,182
BJLS 0,28 lebar 55 cm m' 29,000 26,364
BJLS 0,30 lebar 55 cm m' 45,100 41,000
BJLS 0,28 lebar 70 cm m' - -
BJLS 0,28 lebar 70 cm ex gajah m' 31,000 28,182
BJLS 0,28 lebar 80 cm m' - -
BJLS 0,28 lebar 80 cm ex gajah m' 0 -
BJLS 0,28 lebar 90 cm m' 29,600 26,909
BJLS 0,28 lebar 90 cm ex gajah m' 0 -
8 SENG GELOMBANG -
BJLS 0,18 panjang 180 cm lbr 54,900 49,909
BJLS 0,20 panjang 180 cm lbr 60,400 54,909
BJLS 0,30 panjang 180 cm lbr 65,900 59,909
BJLS 0,40 panjang 180 cm lbr 76,800 69,818
-
9 ALUMINIUM FOIL pelapis genteng/atap m2 296,100 269,182
-
10 TALANG KARPET Uk 0.70 m' 17,200 15,636
Uk 0.80 m' 21,300 19,364
Uk 0.90 m' 21,700 19,727
-
11 KALSIPLANG Uk 400 x 20 x 0.8 cm, Kalsirata bh 19,200 17,455
Uk 400 x 30 x 0.8 Cm, Kalsirata bh 153,700 139,727
-
12 WOODPLANG Uk 400 x 30 x 0.8 cm, Kalsirata lembar 119,000 108,182
Uk. 400 x 20 x 0.8 cm, Kalsirata lembar 100,400 91,273
-
III . B A H A N K A Y U -
1 KAYU JATI Papan lembar 411,400 374,000
Balok/pesagen 6/12-400 batang 677,100 615,545
Balok/pesagen 8/12-400 batang 902,800 820,727
Usuk 5/7-400 batang 164,600 149,636
Reng 2/3-400 pak/25bh 493,600 448,727
-
2 KAYU KAMPER Papan 3/20 (4 meter) lembar - -
Balok/pesagen 6/12 batang 329,700 299,727
Balok/pesagen 8/12 batang 435,500 395,909
-
3 KAYU KRUING Papan 2/20-400 lembar 171,000 155,455
Papan 3/20-400 lembar 225,900 205,364
Papan 3/25-400 lembar 252,000 229,091
Balok/pesagen 6/12-400 batang 217,800 198,000
Balok/pesagen 8/12-400 batang 364,000 330,909
Usuk 4/6-400 batang 73,600 66,909
Usuk 5/7-400 batang 104,000 94,545
Reng 2/3-400 pak/25bh 356,100 323,727
Reng 2/3-200 pak/25bh 132,000 120,000
-
4 KAYU MERANTI Papan 2/20-400 lembar 118,300 107,545
Balok/pesagen 6/12-400 batang 183,700 167,000
Balok/pesagen 8/12-400 batang 230,200 209,273
Usuk 4/6-400 batang 62,300 56,636
Usuk 5/7-400 batang 84,200 76,545
Reng 2/3-400 pak/25bh 345,600 314,182

3/135
-
6 KAYU DAMAR LAUT Papan 3/20-400 lembar 360,800 328,000
Papan 3/25-400 lembar 431,400 392,182
Balok/pesagen 6/12-400 batang 398,200 362,000
Balok/pesagen 8/12-400 batang 528,800 480,727
Usuk 5/7-400 batang 167,900 152,636
Reng 2/3-400 pak/25bh 494,700 449,727
-
7 KAYU TAHUN (KERAS) Kayu Mahoni 3/10-400 lembar 54,900 49,909
Kayu Mahoni 3/20-400 lembar 110,000 100,000
Kayu Glugu 6/12-400 batang 152,300 138,455
Kayu Glugu 8/12-400 batang 184,900 168,091
Usuk Glugu 5/7-300 batang 21,000 19,091
Usuk Glugu 4/6-300 batang 38,500 35,000
Usuk Glugu 5/5-300 batang 38,500 35,000
Papan Albasia 2/20-300 lembar 44,000 40,000
Papan cor 2 cm (2m) lembar 13,100 11,909
Usuk Albasia 4/6-300 batang 27,500 25,000
Usuk Albasia 5/5-300 batang 29,300 26,636
Papan Kayu Waru 2/20-200 lembar 43,700 39,727
Papan Kayu Waru 3,5/20-200 lembar - -
Papan Kayu Waru 3/20-200 lembar 56,900 51,727
Reng Kayu Waru 2/3-200 pak/25bh 76,800 69,818
-
8 DOLKEN Sedang 8 x 10 x 400 cm bt 27,500 25,000
Kecil 6 x 7 x 400 cm bt 24,200 22,000
Besar 10 x 12 x 400 cm bt 35,200 32,000
Kayu roset buah 800 727
Kayu perancah (spek AHSP-BM) m3 210,700 191,545
Kayu bakar m3 186,500 169,545
-
9 BAMBU Bambu tali bt 13,200 12,000
Wulung bt 17,600 16,000
diameter 6-8 cm, panjang min 4 m bt 18,100 16,455
diameter 10 cm, panjang 5 m bt 16,600 15,091
Gedhek/Dabag/Kepang (3x3)m lbr 149,600 136,000
-
IV . BAHAN PENUTUP DINDING / LANTAI -
1 KERAMIK Mulia ( 30 x 30 ) polos m2 55,400 50,364
Mulia ( 40 X 40 ) polos m2 58,400 53,091
Mulia ( 30 x 30 ) motif m2 59,200 53,818
Mulia ( 40 X 40 ) motif m2 68,600 62,364
Mulia ( 20 x 20 ) motif m2 61,500 55,909
Mulia ( 20 x 25 ) motif m2 62,300 56,636
Mulia ( 20 x 20 ) tekstur m2 62,800 57,091
Mulia ( 25 x 25 ) tekstur m2 75,200 68,364
List keramik motif ( 8 x 20 ) mulia bh 8,900 8,091
List keramik polos ( 8 x 20 ) mulia dos 82,900 75,364
List keramik motif ( 8 x 25 ) mulia bh 12,800 11,636
List keramik motif ( 8 x 30 ) mulia bh 30,800 28,000
List keramik motif ( 10 x 25 ) mulia bh 15,500 14,091
List keramik motif ( 10 x 30 ) mulia bh 23,200 21,091
List keramik motif ( 10 x 40 ) mulia bh 27,500 25,000
-
2 BATU TEMPEL Batu tempel hitam/ candi m2 154,100 140,091
Batu palimanan/ paras m2 104,200 94,727
-
3 GRANITO 40 x 40 cm m2 230,300 209,364
30 x 30 cm m2 219,400 199,455
-
4 BATU GRANIT 30 x 30 cm m2 163,500 148,636
40 x 40 cm m2 207,400 188,545
100 x 100 cm m2 490,400 445,818
-
5 MARMER 100 x 100 cm m2 866,400 787,636
30 x 30 cm m2 866,400 787,636
40 x 40 cm m2 866,400 787,636
60 x 60 cm m2 866,400 787,636

4/135
Marmer Nama Jembatan lbr 811,600 737,818
-
6 UBIN ABU-ABU 20x20 cm , kualitas utk restorasi BCB m2 92,200 83,818
30X30 cm , kualitas utk restorasi BCB m2 98,800 89,818
40x40 cm , kualitas utk restorasi BCB m2 104,200 94,727
plint 10x20 , kualitas utk restorasi BCB m2 92,900 84,455
plint 10x30 , kualitas utk restorasi BCB m2 93,900 85,364
plint 10x40 , kualitas utk restorasi BCB m2 95,800 87,091
-
7 UBIN WARNA 20x20 cm , kualitas utk restorasi BCB m2 93,300 84,818
30X30 cm , kualitas utk restorasi BCB m2 105,400 95,818
40x40 cm , kualitas utk restorasi BCB m2 111,700 101,545
plint 10x20 , kualitas utk restorasi BCB m2 92,900 84,455
plint 10x30 , kualitas utk restorasi BCB m2 97,900 89,000
plint 10x40 , kualitas utk restorasi BCB m2 99,800 90,727
-
8 LANTAI KAYU/PARQUET Parquet Jati m2 435,500 395,909
Kayu Gymfloor m2 344,500 313,182
-
V.BAHAN CETAK -
1 BUIS BETON -
Ø 20 - 100 cm bh 59,500 54,091
Ø 30 - 100 cm bh 77,900 70,818
Ø 40 - 100 cm bh 93,100 84,636
Ø 60 - 50 cm bh 100,900 91,727
Ø 80 - 50 cm bh 130,700 118,818
Ø 100 - 50 cm bh 156,400 142,182
U 20 cm - 100 cm bh - -
-
2 LUBANG ANGIN (ROSTER) -
Beton 20 X 20 cm bh 6,400 5,818
Beton 15 X 25 cm bh 6,400 5,818
Kayu 20 X 20 cm bh 45,800 41,636
Kayu 15 X 25 cm bh 36,500 33,182
Keramik merah bh 15,100 13,727
-
VI . B A H A N B E S I -
1 BESI BETON besi beton polos (U24) kg 10,000 9,091
besi beton polos (U32) kg 12,000 10,909
besi beton ulir (D33) kg 10,200 9,273
besi beton ulir (D39) kg 14,100 12,818
besi beton ulir (D48) kg 16,000 14,545
Baja Struktur titik leleh 2400 - 2800 kg/cm2 kg - -
Baja Struktur titik leleh 3500 kg/cm2 kg - -
Besi Ø 6 SII kg 33,600 30,545
Besi Ø 8 SNI kg 49,500 45,000
Besi Ø 10 SNI kg 74,800 68,000
Besi Ø 12 SNI kg 106,100 96,455
Besi Ø 16 SII kg 200,200 182,000
Besi Ø 19 SII kg 263,300 239,364
-
2 BESI PLAT Besi Strip kg 42,000 38,182
-
3 BESI PROFIL Besi Profil IWF kg 15,900 14,455
-
4 JARING-2 BAJA Wire Mesh Diameter 4 - 15 kg 10,000 9,091
Wire Mesh Diameter 6 - 15 kg 10,600 9,636
Wire Mesh Diameter 8 - 15 kg 10,600 9,636
-
4 BRONJONG Kawat Bronjong kg 28,600 26,000
uk.2x1x0,5 m' dia.kawat 2,7mm buah 548,500 498,636
uk.2x1x0,5 m' dia.kawat 3mm buah 693,300 630,273
uk.2x1x1 m' dia.kawat 2,7mm buah 759,800 690,727
uk.2x1x1 m' dia.kawat 3mm buah 948,900 862,636
uk.3x1,5x0,5 m' dia.kawat 3mm buah 1,314,100 1,194,636
uk.3x1,5x0,5m'dia.kawat2,7mm buah 1,027,200 933,818
uk.3x1x0,5 m' dia.kawat 2,7mm buah 767,300 697,545
uk.3x1x0,5 m' dia.kawat 3mm buah 971,500 883,182

5/135
uk.3x1x1 m' dia.kawat 2,7mm buah 1,147,700 1,043,364
uk.3x1x1 m' dia.kawat 3mm buah 1,363,800 1,239,818
uk.4x1x0,5 m' dia.kawat 3mm buah 1,455,300 1,323,000
uk.4x1x1 m' dia.kawat 3mm buah 2,050,100 1,863,727
-
5 BESI SIKU L 40 X 40 X 4 btg 112,200 102,000
L 50 X 50 X 4 btg 169,900 154,455
L 50 X 50 X 5 btg 213,500 194,091
L 60 X 60 X 6 btg 324,100 294,636
4x4 (SII) btg 109,700 99,727
-
6 BESI BOX IB/OB 4G btg 38,600 35,091
-
7 Ducting (Kabel prestress) baik m' 242,500 220,455
Standart m' 88,900 80,818
-
8 Kawat Anchorage bh 1,557,200 1,415,636
9 Kawat Bendrat kg 20,000 18,182
10 Kawat Nyamuk Stainless m2 27,500 25,000
11 Kawat Duri rol 603,200 548,364
12 Pagar Galvanis (BRC) Kawat jaring galvanis pagar (240x100) lbr 527,600 479,636
13 Teralis minimalis kg 46,400 42,182
-
VII . B A H A N P I P A -
1 Pipa PVC SII -
Pipa PVC ( ½" ) AW ex wavin btg 18,700 17,000
Pipa PVC ( ¾" ) AW ex wavin btg 25,300 23,000
Pipa PVC ( 1" ) AW ex wavin btg 37,400 34,000
Pipa PVC ( 1" ) D ex wavin btg 349,900 318,091
Pipa PVC ( 1 1/4" ) AW ex wavin btg 53,800 48,909
Pipa PVC ( 1 1/4" ) D ex wavin btg 35,200 32,000
Pipa PVC ( 1½" ) AW ex wavin btg 61,600 56,000
Pipa PVC ( 1½" ) D ex wavin btg 40,600 36,909
Pipa PVC ( 2" ) AW ex wavin btg 76,800 69,818
Pipa PVC ( 2" ) D ex wavin btg 50,600 46,000
Pipa PVC ( 2 ½" ) AW ex wavin btg 115,300 104,818
Pipa PVC ( 2½" ) D ex wavin btg 68,700 62,455
Pipa PVC ( 3" ) AW ex wavin btg 150,200 136,545
Pipa PVC ( 3" ) D ex wavin btg 82,300 74,818
Pipa PVC ( 4" ) AW ex wavin btg 252,400 229,455
Pipa PVC ( 4" ) D ex wavin btg 131,700 119,727
Pipa PVC ( 5" ) AW ex wavin btg 411,300 373,909
Pipa PVC ( 5" ) D ex wavin btg 213,900 194,455
Pipa PVC ( 6" ) AW ex wavin btg 581,400 528,545
Pipa PVC ( 6" ) D ex wavin btg 274,300 249,364
Pipa PVC ( 8" ) AW ex wavin btg 984,900 895,364
Pipa PVC ( 8" ) D ex wavin btg 483,800 439,818
-
2 Pipa PVC SNI -
Pipa PVC Ø ½" AW meter 6,100 5,545
Pipa PVC Ø ¾" AW meter 8,400 7,636
Pipa PVC Ø 1" AW meter 11,300 10,273
Pipa PVC Ø 10" 481,700 meter 481,700 437,909
Pipa PVC Ø 10" SNI S.10 meter 511,200 464,727
Pipa PVC Ø 10" SNI S.12,5 meter 423,200 384,727
Pipa PVC Ø 1½" AW meter 19,300 17,545
Pipa PVC Ø 12" AW meter 678,500 616,818
Pipa PVC Ø 12" SNI S.10 meter 812,600 738,727
Pipa PVC Ø 12" SNI S.12,5 meter 664,400 604,000
Pipa PVC Ø 2" AW meter 24,600 22,364
Pipa PVC Ø 2" SNI S.10 meter 33,200 30,182
Pipa PVC Ø 2" SNI S.12,5 meter 27,100 24,636
Pipa PVC Ø 3" AW meter 48,100 43,727
Pipa PVC Ø 3" SNI S.10 meter 66,600 60,545
Pipa PVC Ø 3" SNI S.12,5 meter 54,700 49,727
Pipa PVC Ø 4" AW meter 52,300 47,545
Pipa PVC Ø 4" SNI S.10 meter 101,300 92,091
Pipa PVC Ø 4" SNI S.12,5 meter 80,600 73,273

6/135
Pipa PVC Ø 6" AW meter 185,000 168,182
Pipa PVC Ø 6" SNI S.10 meter 207,700 188,818
Pipa PVC Ø 6" SNI S.12,5 meter 170,500 155,000
Pipa PVC Ø 8" AW meter 311,600 283,273
Pipa PVC Ø 8" SNI S.10 meter 329,500 299,545
Pipa PVC Ø 8" SNI S.12,5 meter 267,900 243,545
-
3 Pipa HDPE -
Pipa HDPE HDPE Ø 100 mm meter 186,000 169,091
Pipa HDPE HDPE Ø 1000 mm meter 12,367,500 11,243,182
Pipa HDPE HDPE Ø 125 mm meter 194,700 177,000
Pipa HDPE HDPE Ø 150 mm meter 319,700 290,636
Pipa HDPE HDPE Ø 200 mm meter 497,800 452,545
Pipa HDPE HDPE Ø 250 mm meter 770,500 700,455
Pipa HDPE HDPE Ø 300 mm meter 1,222,100 1,111,000
Pipa HDPE HDPE Ø 400 mm meter 1,977,600 1,797,818
Pipa HDPE HDPE Ø 450 mm meter 2,501,400 2,274,000
Pipa HDPE HDPE Ø 500 mm meter 3,086,000 2,805,455
Pipa HDPE HDPE Ø 600 mm meter 4,878,400 4,434,909
Pipa HDPE HDPE Ø 63 mm meter 61,800 56,182
Pipa HDPE HDPE Ø 800 mm meter 7,873,000 7,157,273
Pipa HDPE HDPE Ø 900 mm meter 10,019,900 9,109,000
-
4 Pipa DCI -
Pipa DCI DCI Ø 100 mm meter 521,000 473,636
Pipa DCI DCI Ø 1000 mm meter 11,059,100 10,053,727
Pipa DCI DCI Ø 1100 mm meter 13,005,600 11,823,273
Pipa DCI DCI Ø 1200 mm meter 15,191,800 13,810,727
Pipa DCI DCI Ø 125 mm meter 620,400 564,000
Pipa DCI DCI Ø 150 mm meter 710,700 646,091
Pipa DCI DCI Ø 200 mm meter 959,600 872,364
Pipa DCI DCI Ø 250 mm meter 1,398,300 1,271,182
Pipa DCI DCI Ø 300 mm meter 1,776,500 1,615,000
Pipa DCI DCI Ø 400 mm meter 2,642,900 2,402,636
Pipa DCI DCI Ø 450 mm meter 3,224,100 2,931,000
Pipa DCI DCI Ø 500 mm meter 3,668,200 3,334,727
Pipa DCI DCI Ø 600 mm meter 4,841,600 4,401,455
Pipa DCI DCI Ø 63 mm meter 405,800 368,909
Pipa DCI DCI Ø 800 mm meter 7,643,200 6,948,364
Pipa DCI DCI Ø 900 mm meter 9,266,300 8,423,909
-
5 Pipa Besi / PH -
Pipa Besi / PH Pipa Baja Ø 100 mm meter 174,500 158,636
Pipa Besi / PH Pipa Baja Ø 1000 mm meter -
Pipa Besi / PH Pipa Baja Ø 1100 mm meter -
Pipa Besi / PH Pipa Baja Ø 1200 mm meter -
Pipa Besi / PH Pipa Baja Ø 125 mm meter 233,400 212,182
Pipa Besi / PH Pipa Baja Ø 150 mm meter 294,200 267,455
Pipa Besi / PH Pipa Baja Ø 200 mm meter 373,000 339,091
Pipa Besi / PH Pipa Baja Ø 250 mm meter 593,200 539,273
Pipa Besi / PH Pipa Baja Ø 300 mm meter 767,700 697,909
Pipa Besi / PH Pipa Baja Ø 400 mm meter 1,096,700 997,000
Pipa Besi / PH Pipa Baja Ø 450 mm meter -
Pipa Besi / PH Pipa Baja Ø 500 mm meter -
Pipa Besi / PH Pipa Baja Ø 600 mm meter 1,914,200 1,740,182
Pipa Besi / PH Pipa Baja Ø 63 mm meter -
Pipa Besi / PH Pipa Baja Ø 800 mm meter 3,090,500 2,809,545
Pipa Besi / PH Pipa Baja Ø 900 mm meter -
-
6 Pipa Galvanis -
Pipa Galvanis dia 3", Panjang 6 m batang 323,400 294,000
Pipa Galvanis dia 1 1/2", Panjang 6 m batang 283,600 257,818
Pipa Galvanis dia 1", Panjang 6 m batang 191,200 173,818
Pipa Galvanis dia 1/2", Panjang 6 m batang 123,300 112,091
Pipa Galvanis dia 2", Panjang 6 m batang 389,100 353,727
Pipa Galvanis dia 3/4", Panjang 6 m batang 148,000 134,545
Pipa Galvanis ( ¾" ) btg 54,900 49,909
Pipa Galvanis ( 1" ) btg 65,900 59,909

7/135
Pipa Galvanis ( 1½" ) btg 104,200 94,727
Pipa Galvanis ( 2" ) btg 131,700 119,727
Pipa Galvanis ( 3" ) btg 301,600 274,182
Pipa Galvanis ½" btg 44,000 40,000
Pipa Galvanis 2½" btg 208,400 189,455
Pipa Galvanis Dia 1,5" m' 84,200 76,545
Pipa Galvanis Dia 1,6" m' 87,800 79,818
Pipa Galvanis Dia 3" m' 164,600 149,636
-
7 Pipa Besi - ukuran 1,25" ( 6 Meter ) STR btg 109,000 99,091 panjang 6 m
- ukuran 1,50" ( 6 Meter ) STR btg 127,700 116,091 panjang 6 m
- ukuran 2" ( 6 Meter ) STR btg 160,300 145,727 panjang 6 m
- ukuran 2,50" ( 6 Meter ) STR btg 225,100 204,636 panjang 6 m
- ukuran 3" ( 6 Meter ) STR btg 388,900 353,545 panjang 6 m
-
8 Pipa Porus sesuai spesifikasi AHSP bidang BM m' 49,400 44,909 panjang 6 m
-
9 Bend las Ø 2 x 45º Buah 18,200 16,545
Bend las Ø 2 x 90º Buah 18,200 16,545
Bend las Ø 3 x 45º Buah 42,400 38,545
Bend las Ø 3 x 90º Buah 42,700 38,818
Bend las Ø 4 x 45º Buah 73,400 66,727
Bend las Ø 4 x 90º Buah 73,000 66,364
Bend las Ø 6 x 45º Buah 177,600 161,455
Bend las Ø 6 x 90º Buah 177,600 161,455
Bend las Ø 8 x 45º Buah 404,500 367,727
Bend las Ø 8 x 90º Buah 409,300 372,091
Bend las Ø 10 x 45º Buah 779,500 708,636
Bend las Ø 10 x 90º Buah 787,500 715,909
Bend las Ø 12 x 45º Buah 1,008,800 917,091
Bend las Ø 12 x 90º Buah 1,008,800 917,091
Bend las Ø 16 x 45º Buah 2,705,300 2,459,364
Bend las Ø 16 x 90º Buah 2,705,300 2,459,364
-
10 Boch Ø ½" Buah 10,800 9,818
Boch Ø ¾" Buah 15,300 13,909
Boch Ø 1" Buah 22,000 20,000
Boch Ø 1½" Buah 48,100 43,727
Boch Ø 2" Buah 73,400 66,727
Boch Ø 3" Buah 215,400 195,818
Boch Ø 4" Buah 442,900 402,636
-

8/135
VIII . B A H A N L A N G I T - L A N G I T -
1 LIST PLAFOND -
- List Kayu Profil 4X4 kruing m' 9,300 8,455
- List Kayu Profil 2X4 kruing 4 meter btng 20,800 18,909
- List gipsum Uk 8 - 10 cm m' 19,400 17,636
-
2 SOFT BOARD Gypsum board 120x240x9 elephant lbr 81,800 74,364
Akustik 30x60 cm lbr 20,000 18,182
Akustik 60x120 cm lbr 59,900 54,455
-
3 HARD BOARD 100 x 100 x 0.45 cm, Kalsirata bh 22,900 20,818
240 x 120 x 0.45 cm, Kalsirata bh 71,200 64,727
Eternit pak/10 lbr 163,100 148,273
4 Kasa Gypsum fiber tape rol 17,900 16,273
5 Kompon gypsum kg 58,100 52,818
-
4 PLY WOOD -
Teak wood -
. Jati 120 X 240 X 3 mm lbr 135,300 123,000
. Jati 120 X 240 X 4 mm lbr -
. Sungkai 120 X 240 X 9 mm lbr 167,000 151,818
Tripleks -
. 90 X 220 X 4 mm (ukuran pintu) lbr 55,500 50,455
. 120 X 240 X 3 mm lbr 68,500 62,273
. 120 X 240 X 4 mm lbr 82,900 75,364
. 120 X 240 X 6 mm lbr 92,700 84,273
Multipleks -
. 120 X 240 X 9 mm lbr 166,400 151,273
. 120 X 240 X 10 mm lbr 203,800 185,273
. 120 X 240 X 12 mm lbr 216,900 197,182
Triplek Formika 120x240 3mm lbr 124,000 112,727
-
IX . B A H A N F I N I S H I N G -
1 KAYU/ BESI -
Menie kayu belmas kg 35,100 31,909
Menie besi bunga kg 29,600 26,909
Dempul jadi bola mas kg 36,400 33,091
Plamur besi belmas kg 33,400 30,364
Plamur kayu belmas kg 35,000 31,818
Sending Sealer impra kg 71,500 65,000
Ambril/amplas gulung no. 220 meter 17,500 15,909
Jenis Belt meter 19,400 17,636
bulat no. 120 buah 2,200 2,000
bulat no. 180 buah 2,200 2,000
gulung no. 240 meter 17,500 15,909
No.290 Lembaran Lembar 6,500 5,909
No.P100 gulung Meter 14,300 13,000
amplas bulat buah 4,600 4,182
Batu Apung kg 9,300 8,455
CAT Avian kg 68,800 62,545
Prim Top kg 81,200 73,818
Pilox kg 28,000 25,455
Zincromate kg 53,600 48,727
Kuas 2" bh 9,300 8,455
Kuas 2,5" merk Eterna bh 9,400 8,545
Kuas 3" bh 7,600 6,909
Kuas 4" bh 12,100 11,000
rol cat ex eterna bh 33,100 30,091
Wood Filler impra kaleng 48,300 43,909
Wood Filler Jati galon 239,300 217,545
Wood Stain kg 89,800 81,636
Wood stain cocoa brown kg 91,200 82,909
Wood stain walnut brown kg 91,200 82,909
Melamine galon 271,500 246,818
Melamic clear gloss impra kaleng 87,000 79,091
Melamic sanding sealer impra kaleng 87,000 79,091
Politur jadi kupu-kupu ltr 60,400 54,909
Politur jadi Impra ltr 63,300 57,545

9/135
Thinner impla 5 liter galon 147,200 133,818
Thinner A cobra ltr 30,000 27,273
Thinner Pro cobra galon 111,700 101,545
Vernis bio vernis kg 43,400 39,455
Teer tiger kg 20,900 19,000
Teak Oil tiger ltr 59,200 53,818
Minyak cat ex bunga ltr 26,000 23,636
-
2 TEMBOK -
Kalkarium kg 8,400 7,636
Kapur sirih kg 9,300 8,455
Plamur tembok kg 66,800 60,727
Cat Tembok -
- decolith 5 kg 122,800 111,636
- dulux (eksterior/ wethershield) 2 1/2 kg 287,600 261,455
- matex kg 19,800 18,000
-
3 GENTING/ KOLAM -
Cat genting ex propan kg 52,700 47,909
Cat Kolam ex no drop kg 74,700 67,909
Cat Marka (Non Thermoplas) kg 176,800 160,727
Cat Marka (Thermoplas) kg 79,100 71,909
-
X.BAHAN KACA -
1 KACA BENING/ POLOS 3 mm m2 103,800 94,364
5 mm m2 112,400 102,182
8 mm m2 137,900 125,364
-
2 KACA ES KABUR 3 mm m2 53,900 49,000
5 mm m2 75,500 68,636
12 mm m2 312,300 283,909
-
3 KACA GELAP/ RAY BAND 3 mm m2 109,900 99,909
5 mm m2 118,600 107,818
-
4 KACA PATRI 5 mm m2 1,561,200 1,419,273
8 mm m2 1,814,500 1,649,545
-
5 KACA CERMIN 5 mm m2 168,400 153,091
-
6 Kaca Jendela Nako 5 mm daun 17,400 15,818
7 Kaca Wire glassed 5 mm daun - -
-
XI . BAHAN INSTALASI LISTRIK -
1 KABEL LISTRIK -
N Y A : Eterna, NYA 1x1,5 (100 m) rol 240,400 218,545
. Eterna, NYA 1x2,5 (100 m) rol 402,400 365,818
Eterna, NYA uk. 2,5 rol 400,500 364,091
-
N Y Y : 2,5 mm NYY, Tegnom : 0,6/1 KV, ø rol 788,200
conduktor 1,78 mm, tebal isolasi 0,8 mm, ø
isolasi 3,40 - 3,50 mm, I max dalam tanah
20ºC : 41 A, 30ºC : 36 A (100m)
716,545
-
N Y M : Eterna, NYM 2x1,5 (50 m) rol 416,300 378,455
Eterna, NYM 3x1,5 (50 m) rol 555,900 505,364
Eterna, NYM 3x2,5 (50 m) rol 752,700 684,273
Eterna, NYM 3x4 (50 m) rol 1,128,900 1,026,273
Eterna, NYM 3x4 (50 m) rol 829,900 754,455
Eterna, NYM/NYY HY 2x0,75 (50 m) 336,600 306,000
2 SAKLAR -
Saklar Engkel In Bouw broco bh 14,800 13,455
Saklar Engkel Out Bouw broco bh 13,900 12,636
Saklar Serie In Bouw broco bh 18,600 16,909
Saklar Serie Out Bouw broco bh 18,800 17,091
Saklar IB triple Broco bh 25,100 22,818
-

10/135
3 FUSE BOX (SEKERING KASA) -
Broco, 1 Group bh 47,000 42,727
Broco, 2 Group bh 68,800 62,545
Broco, 3 Group bh 85,300 77,545
-
4 STEKER Dgn Arde Broco Newgee 13310 bh 10,100 9,182
Steker Putih Broco bh 10,100 9,182
Tanpa arde Broco Standard 344 L bh 3,100 2,818
Broco Newgee 13310 bh 12,600 11,455
Broco Standard 344 L 4,200 3,818
-
5 FITING Fitting plafon Broco bh 13,600 12,364
Broco Standard 1210 bh 13,000 11,818
Fitting TL bh 1,000 909
-

11/135
6 STOP KONTAK In Bouw Broco bh 15,400 14,000
Out Bouw Broco bh 16,400 14,909
-
7 LAMPU Lampu Esesential 5W/CD/WW Philips bh 24,100 21,909
Lampu Esesential 8W/CD/WW Philips bh 26,000 23,636
Lampu Esesential 14W/CD/WW Philips bh 32,200 29,273
Lampu Esesential23W/CD/WW Philips bh 39,200 35,636
Lampu TL 10 W philips bh 12,100 11,000
Lampu TL 18 W philips bh 16,000 14,545
Lampu TL 40 W philips bh 18,100 16,455
Lampu TL 40 W philips komplit set 348,800 317,091
Lampu taman set 150,000 136,364
IP 65 bahan alumunium + lampu induksi 120 set 6,145,000 5,586,364
IP 65 bahan alumunium + lampu induksi 80 set 4,591,500 4,174,091
IP 65 bahan alumunium + lampu LED 50 W k set 1,755,800 1,596,182
Downlight BCS32W Film 1x TLE 32W w/lam set 560,500 509,545
Downlight Fbuah058/1x PLC 18W set 342,100 311,000
Downlight Fbuah058/1x PLC 26W set 399,900 363,545
Lampu led philips 11 W buah 130,100 118,273
Lampu led philips 14 W buah 150,000 136,364
Lampu led philips 18 W buah 170,000 154,545
Lampu led philips 23 W buah 200,000 181,818
Lampu led philips 5 W buah 60,000 54,545
Lampu led philips 8 W buah 100,100 91,000
Lampu Selang 2 kabel roll 2,516,900 2,288,091
-
8 MCB MCB 6 Ampere/Merlin Gerin bh 50,100 45,545
MCB 25 Ampere /Merlin Gerin bh 57,600 52,364
MCB 32 A/ Merlin Gerin bh 80,100 72,818
-
9 Box panel sunlite Dimensi 25 x 50 x 76,5 bh 789,900 718,091
ukuran 25 x 50 x 76,5 cm dari plat besi de bh 935,400 850,364
Sunlite Dimensi 15 x 25 x 25 bh 215,800 196,182
-
10 ALAT LISTRIK T-doos bh 700 636
Grounding Rod komplit bh 89,700 81,545
Isolasi bh 7,300 6,636
Isolasi 5 mils x 3/4" bh 7,100 6,455
Isolasi listrik 3 m (besar) unibel bh 7,800 7,091
Klem Kabel no 7 dus 6,500 5,909
Klem Kabel no 9 dus 6,800 6,182
Klem Kabel no 10 dus 7,700 7,000
Klem Kabel no 12 dus 8,300 7,545
Klem Kabel no 19 dus 15,900 14,455
Klem kabel SR/DM dus 27,200 24,727
-
XII . ALAT - ALAT PENGUNCI & PENGGANTUNG -
1 Door closer SOLID DC 20 SLD buah 276,400 251,273
2 Door stop STP 646 SOLID buah 43,100 39,182
3 Engsel Jendela Dolphin per pasang 26,500 24,091
4 Engsel Pintu Dolphin per pasang 31,000 28,182
5 Engsel angin DEXON 10" buah 91,700 83,364
6 Engsel angin PALOMA buah 31,000 28,182
7 Engsel lemari kuningan Kuningan pasang 6,800 6,182
8 Espagnoled Stenlis bh 10,800 9,818
9 Grendel Jendela exito buah 9,200 8,364
10 Grendel Pintu perza buah 15,800 14,364
11 Hak Angin Putih buah 12,500 11,364
12 Hak Angin Jendela Putih Biasa buah 10,700 9,727
13 Handel Laci kuningan buah 9,400 8,545
14 Hendel Jendela Putih buah 26,900 24,455
15 Hendel Pintu Muler pasang 208,400 189,455
16 Kait Angin putih bh 10,800 9,818
17 Kunci Kunci lemari buah 17,100 15,545
18 Kunci Kunci silinder buah 93,400 84,909
19 Kunci Kunci tanam Biasa buah 58,000 52,727
20 Kunci Kunci tanam KM / WC buah 58,600 53,273
21 Kunci laci Kuningan buah 21,600 19,636

12/135
22 Kunci Tanam Slot pintu antik, kualitas baik bh 183,200 166,545
23 Kunci Tanam Slot pintu biasa, kualitas baik bh 183,200 166,545
24 Kunci Tanam Slot Pintu KM/WC bh 80,800 73,455
25 Slot Pintu muler buah 283,600 257,818
26 Tarikan laci besi (kuning) buah 9,500 8,636
-

13/135
XIII . BAHAN SANITAIR -
1 Bak cuci Bak Cuci stainless steel Kecil (Royal) buah 225,100 204,636
2 Bak cuci Wastafel bak cuci Kecil (Ina) buah 327,600 297,818
3 Bak Cuci Piring Stainless Steel Kecil (Ina) bh 484,600 440,545
4 Bak fiberglass 0.3 m3 (K) buah 323,500 294,091
5 Bak fiberglass 1 m3 (B) buah 388,900 353,545
6 Bath up (Ina) bh 2,368,700 2,153,364
7 Floor drain Stenlis buah 63,300 57,545
8 Jet Shower (WC) soligen bh 365,200 332,000
9 Kloset Duduk warna muda / INA bh 1,615,100 1,468,273
10 Kloset duduk/ monoblok Muda / INA buah 1,489,000 1,353,636
11 Kloset Jongkok Porselin warna muda, INA buah 171,200 155,636
12 Kloset Jongkok Porselin warna tua, INA buah 197,100 179,182
13 Kran air 1/2 " a Soligen buah 16,800 15,273
14 Kran air 3/4" a Soligen buah 24,400 22,182
15 Kran Cuci Piring soligen bh 70,100 63,727
16 Kran shower soligen bh 196,100 178,273
17 Pintu KM/WC Aluminium mutu baik (tebal) bh 1,076,700 978,818
18 Pintu KM/WC Alumunium biasa/standar unit 451,500 410,455
19 Pintu KM/WC PVC mutu baik (tebal) unit 418,800 380,727
20 Shower mandi soligen bh 134,700 122,455
21 Sok Drad Dalam 3/4 buah 3,300 3,000
22 Sok Drad Luar 3/4 buah 3,200 2,909
23 Switch Pelampung KL 121 Radar buah 68,600 62,364
24 Tempat Sabun Keramik (Ina) bh 141,200 128,364
25 Urinoir (Ina) bh 1,184,500 1,076,818
-
26 Cek valve butterfly Ø 2" Buah 627,100 570,091
Cek valve butterfly Ø 3" Buah 912,200 829,273
Cek valve butterfly Ø 4" Buah 1,262,200 1,147,455
Cek valve butterfly Ø 6" Buah 2,055,100 1,868,273
Cek valve butterfly Ø 8" Buah 3,617,400 3,288,545
Cek valve butterfly Ø 10" Buah 5,676,500 5,160,455
Cek valve butterfly Ø 12" Buah 7,978,500 7,253,182
Cek valve Ø 2" Buah 805,100 731,909
Cek valve Ø 3" Buah 1,231,500 1,119,545
Cek valve Ø 4" Buah 1,829,500 1,663,182
Cek valve Ø 6" Buah 3,146,800 2,860,727
Cek valve Ø 8" Buah 5,018,600 4,562,364
Cek valve Ø 10" Buah 8,762,900 7,966,273
Cek valve Ø 12" Buah 12,437,600 11,306,909
-
27 Dop Ø ½" Buah 4,700 4,273
Dop Ø ¾" Buah 5,800 5,273
Dop Ø 1" Buah 7,900 7,182
Dop Ø 1½" Buah 15,300 13,909
Dop Ø 2" Buah 20,900 19,000
Dop Ø 3" Buah 57,800 52,545
Dop Ø 4" Buah 98,300 89,364
Dop Ø 6" Buah 316,900 288,091
-
28 Double nepple Ø ½" Buah 5,300 4,818
Double nepple Ø ¾" Buah 6,800 6,182
Double nepple Ø 1" Buah 9,400 8,545
Double nepple Ø 1 1/4" Buah 15,600 14,182
Double nepple Ø 1 ½" Buah 18,800 17,091
Double nepple Ø 2" Buah 26,100 23,727
Double nepple Ø 3" Buah 72,300 65,727
Double nepple Ø 4" Buah 113,700 103,364
-
29 Elbow Elbow Ø ½" Buah 2,400 2,182
Elbow Elbow Ø ¾" Buah 3,300 3,000
Elbow Elbow Ø 1" Buah 5,000 4,545
Elbow Elbow Ø 1½" Buah 12,000 10,909
Elbow Elbow Ø 2" Buah 18,600 16,909
Elbow Elbow Ø 3" Buah 46,600 42,364
Elbow Elbow Ø 4" Buah 90,200 82,000
Elbow Elbow Ø 6" Buah 215,400 195,818

14/135
-
30 Flange las Ø 1½" Buah 40,200 36,545
Flange las Ø 2" Buah 50,500 45,909
Flange las Ø 3" Buah 67,800 61,636
Flange las Ø 4" Buah 85,200 77,455
Flange las Ø 6" Buah 145,100 131,909
Flange las Ø 8" Buah 190,900 173,545
Flange las Ø 10" Buah 315,100 286,455
Flange las Ø 12" Buah 327,400 297,636
Flange las Ø 16" Buah 759,100 690,091
-
31 Flange buta Ø 4" Buah 128,500 116,818
Flange buta Ø 6" Buah 260,700 237,000
Flange buta Ø 8" Buah 431,900 392,636
Flange buta Ø 10" Buah 650,700 591,545
Flange buta Ø 12" Buah 799,500 726,818
Flange buta Ø 16" Buah 3,119,800 2,836,182
-
32 Flexible conection Ø 2" Buah 671,000 610,000
Flexible conection Ø 3" Buah 994,400 904,000
Flexible conection Ø 4" Buah 1,478,500 1,344,091
Flexible conection Ø 6" Buah 2,208,100 2,007,364
Flexible conection Ø 8" Buah 3,953,700 3,594,273
Flexible conection Ø 10" Buah 5,417,600 4,925,091
Flexible conection Ø 12" Buah 6,204,800 5,640,727
-
33 Fauced sock Ø ½" Buah 2,100 1,909
Fauced sock Ø ¾" Buah 3,100 2,818
Fauced sock Ø 1" Buah 4,700 4,273
Fauced sock Ø 1½" Buah 9,500 8,636
Fauced sock Ø 2" Buah 12,000 10,909
-
34 Fauced elbow Ø ½" Buah 2,500 2,273
Fauced elbow Ø ¾" Buah 3,900 3,545
Fauced elbow Ø 1" Buah 6,000 5,455
-
35 Foot klep Ø 2" Buah 1,265,900 1,150,818
Foot klep Ø 3" Buah 2,820,500 2,564,091
Foot klep Ø 4" Buah 3,418,800 3,108,000
Foot klep Ø 6" Buah 4,422,400 4,020,364
Foot klep Ø 8" Buah 7,186,100 6,532,818
Foot klep Ø 10" Buah 13,823,300 12,566,636
-
36 Gate valve butterfly Ø 2" Buah 748,800 680,727
Gate valve butterfly Ø 3" Buah 961,600 874,182
Gate valve butterfly Ø 4" Buah 1,160,600 1,055,091
Gate valve butterfly Ø 6" Buah 1,795,500 1,632,273
Gate valve butterfly Ø 8" Buah 3,328,200 3,025,636
Gate valve butterfly Ø 10" Buah 7,252,100 6,592,818
Gate valve butterfly Ø 12" Buah 9,196,000 8,360,000
-
37 Keni Ø ½" Buah 6,000 5,455
Keni Ø ¾" Buah 8,500 7,727
Keni Ø 1" Buah 11,800 10,727
Keni Ø 1½" Buah 22,900 20,818
Keni Ø 2" Buah 36,800 33,455
Keni Ø 3" Buah 116,500 105,909
Keni Ø 4" Buah 190,500 173,182
Keni Ø ½" x 45º Buah 6,200 5,636
Keni Ø ¾" x 45º Buah 9,300 8,455
Keni Ø 1½" x 45º Buah 22,900 20,818
Keni Ø 2" x 45º Buah 38,400 34,909
Keni Ø 3" x 45º Buah 120,300 109,364
Keni Ø 4" x 45º Buah 209,200 190,182
-
38 Keni L 3/4 Bahan Plastik buah 4,300 3,909
Keni T 3/4 Bahan Plastik buah 4,600 4,182
-

15/135
39 Lem Pipa Isarplas Tube 10,100 9,182
Lem Pipa Isarplas Kg 49,100 44,636
-
40 Rubber packing Karet Kg 39,200 35,636
-
41 Sealtape Kecil Roll 3,900 3,545
-
42 Sock GIP Ø ½" Buah 5,100 4,636
Sock GIP Ø ¾" Buah 6,700 6,091
Sock GIP Ø 1" Buah 10,300 9,364
Sock GIP Ø 1½" Buah 17,400 15,818
Sock GIP Ø 2" Buah 26,500 24,091
Sock GIP Ø 3" Buah 74,900 68,091
Sock GIP Ø 4" Buah 117,700 107,000
-
43 Stop kran bolt Ø ½" Buah 58,000 52,727
Stop kran bolt Ø ¾" Buah 86,100 78,273
Stop kran bolt Ø 1" Buah 137,800 125,273
Stop kran bolt Ø 1½" Buah 279,000 253,636
Stop kran bolt Ø 2" Buah 374,700 340,636
Stop kran schult Ø ½" Buah 70,700 64,273
Stop kran schult Ø ¾" Buah 98,500 89,545
Stop kran schult Ø 1" Buah 150,200 136,545
Stop kran schult Ø 1½" Buah 341,100 310,091
Stop kran schult Ø 2" Buah 556,300 505,727
-
44 Tee PVC Ø ½" Buah 3,400 3,091
Tee PVC Ø ¾" Buah 4,700 4,273
Tee PVC Ø 1" Buah 7,500 6,818
Tee PVC Ø 1½" Buah 15,900 14,455
Tee PVC Ø 2" Buah 25,300 23,000
Tee PVC Ø 3" Buah 58,400 53,091
-
45 Valve shock Ø ½" Buah 1,800 1,636
Valve shock Ø ¾" Buah 2,300 2,091
Valve shock Ø 1" Buah 3,400 3,091
Valve shock Ø 1½" Buah 8,200 7,455
Valve shock Ø 2" Buah 12,600 11,455
-
46 Water meter Ø ¾" Buah 447,600 406,909
Water meter Ø 1" Buah 712,100 647,364
Water meter Ø 1½" Buah 1,601,900 1,456,273
Water meter Ø 2" Buah 1,778,600 1,616,909
Water meter Ø 3" Buah 2,313,200 2,102,909
Water meter Ø 4" Buah 2,597,900 2,361,727
Water meter Ø 6" Buah 5,674,800 5,158,909
-
47 Reduser sock eksentris 3 x 2" Buah 205,800 187,091
Reduser sock eksentris 4 x 2½" Buah 298,600 271,455
Reduser sock eksentris 6 x 2½" Buah 619,600 563,273
-
48 Reduser sock GIP Ø ¾ x ½" Buah 8,100 7,364
Reduser sock GIP Ø 1 x ¾" Buah 10,600 9,636
Reduser sock GIP Ø 1½ x ¾" Buah 18,600 16,909
Reduser sock GIP Ø 1½ x 1" Buah 18,600 16,909
Reduser sock GIP Ø 2 x 1¼" Buah 27,000 24,545
Reduser sock GIP Ø 2 x 1½" Buah 27,000 24,545
-
49 Reduser sock PVC Ø ¾ x ½" Buah 3,000 2,727
Reduser sock PVC Ø 1 x ¾" Buah 3,700 3,364
Reduser sock PVC Ø 1½ x 1" Buah 8,800 8,000
Reduser sock PVC Ø 2 x 1½" Buah 13,200 12,000
Reduser sock PVC Ø 3 x 2" Buah 47,600 43,273
Reduser sock PVC Ø 4 x 3" Buah 78,800 71,636
-
50 Reduser tee Ø 2 x 1½" Buah 23,400 21,273
Reduser tee Ø 3 x 2" Buah 79,200 72,000
-

16/135
51 Reduser tee PVC Ø ¾ x ½" Buah 4,100 3,727
Reduser tee PVC Ø 1 x ¾" Buah 6,600 6,000
Reduser tee PVC Ø 1½ x 1" Buah 15,700 14,273
-
52 Jet Nozzie Ukuran 2,5" buah 619,900 563,545
-
-
XIV . ALAT PENGIKAT KAYU -
1 Baut Baut Ø 12 mm Kg 33,200 30,182
2 Baut Baut Skrup 6x1/2 buah 4,000 3,636
3 Baut Mur baut 12 Buah 4,800 4,364
4 Benang gulung buah 2,300 2,091
5 Dinabolt dia 12mm (10-15cm) bh 2,800 2,545
6 Ijuk Gulung Kg 48,200 43,818
7 Lem Adhesif aica aibon 70 gram kaleng 17,600 16,000
8 Lem kayu 600 g fox buah 20,100 18,273
9 Lem Vynil Rajawali kg 50,300 45,727
10 Mur baut (kuda-kuda) bh 5,000 4,545
11 Paku Paku Gypsum kg 28,400 25,818
12 Paku Paku Payung Kg 35,300 32,091
13 Paku Paku Sekrup kepala bulat,1 cm buah 800 727
14 Paku Paku Sekrup kepala bulat,3 cm buah 10,200 9,273
15 Paku Paku Untuk Beton Warna putih 5cm Kg 62,900 57,182
16 Paku Paku usuk, Reng Kg 18,800 17,091
17 Paku Ukuran Paku triplek kg 20,100 18,273
18 Paku - ukuran 1" s/d 4" kg 13,100 11,909
19 Paku skrup 1/2" dos 21,600 19,636
20 Skrup 2" Dus 30,400 27,636
21 Skrup Kayu ulir dus 33,900 30,818
-

17/135
XV . POMPA AIR. -
1 Pompa N.A.S. Panasonic bh 653,200 593,818
2 Pompa Tangan Dragon bh 811,700 737,909
3 Pompa air mancur aquila bh 535,500 486,818
-
XVI . PAVING BLOCK -
1 Paving Abu - abu Holland (manual) Uk. 4cm m2 43,700 39,727
2 Paving Abu - abu Holland (manual) Uk. 5cm m2 50,500 45,909
3 Paving Abu - abu Holland (manual) Uk. 6cm m2 58,000 52,727
4 Paving Abu - abu Holland (manual) Uk. 8cm m2 70,100 63,727
5 Paving Abu - abu Holland (press mesin) Uk. 6 cm m2 65,500 59,545
6 Paving Abu - abu Holland (press mesin) Uk. 8 cm m2 78,600 71,455
7 Paving Abu-abu segi enam (manual) Uk. 4 cm m2 43,700 39,727
8 Paving Abu-abu segi enam (manual) Uk. 5 cm m2 50,500 45,909
9 Paving Abu-abu segi enam (manual) Uk. 6 cm m2 53,200 48,364
10 Paving Abu-abu segi enam (manual) Uk. 6 cm m2 64,900 59,000
11 Paving Abu-abu segi enam (manual) Uk. 8 cm m2 70,200 63,818
12 Paving Abu-abu segi enam (mesin) Uk. 8 cm m2 75,400 68,545
13 Paving Warna segi enam (manual) Uk. 4cm m2 54,200 49,273
14 Paving Warna segi enam (manual) Uk. 5cm m2 60,900 55,364
15 Paving Warna segi enam (manual) Uk. 6cm m2 63,500 57,727
16 Paving Warna segi enam (manual) Uk. 8cm m2 80,600 73,273
17 Paving Warna segi enam (mesin) Uk. 6 cm m2 73,200 66,545
18 Paving Warna segi enam (mesin) Uk. 8 cm m2 95,200 86,545
19 Paving Paving Abu - abu Holland (K-300) uk 6 cm m2 71,400 64,909
20 Paving Paving Abu - abu Holland (K-300) uk 8 cm m2 80,200 72,909
21 Paving Paving abu-abu segi enam (K-300) 6 cm m2 66,200 60,182
22 Paving Paving abu-abu segi enam (K-300) 8 cm m2 76,700 69,727
23 Paving Paving Block (8 cm pres mesin K-300) m2 100,800 91,636
24 Paving Paving Warna segi enam (K-300) 6 cm m2 82,100 74,636
25 Paving Paving Warna segi enam (K-300) 8 cm m2 96,900 88,091
26 STANDARD GRASS BLOCK ABU-ABU bh - -
27 BATAKO Uk 38 x 18 x 8 cm bh 4,600 4,182
Uk 40 x 20 x 9 cm bh 5,400 4,909
28 KANSTEEN m' 68,000 61,818
-
XVII . BETON PRACETAK -
1 Gorong -Gorong Beton Ø 100cm 100 x 50 cm m1 155,800 141,636
2 Gorong -Gorong Beton Ø 60cm 60 x 50 cm m1 102,100 92,818
3 Gorong -Gorong Beton Ø 80cm 80 x 50 cm m1 131,800 119,818
4 Gorong2 pipa beton bertulang pracetak diameter 80 bh 273,300 248,455
5 Gorong2 pipa beton bertulang pracetak diameter 100 bh 327,900 298,091
6 Gorong2 pipa beton bertulang pracetak diameter 120 bh 343,000 311,818
7 Gorong2 pipa beton bertulang pracetak diameter 140 bh 710,500 645,909
8 Saluran Beton bertulang Pracetak U50 - 50 bh 453,600 412,364
9 Tiang Pancang Baja Diamete K - 600 Batang 3,950,000 3,590,909
10 Tiang Panjang baja uk. /dia K - 600 Batang 4,481,200 4,073,818
11 Tiang Pancang baja uk. /dia K - 600 Batang 6,011,300 5,464,818
12 Tiang Pancang Beton Pra te K - 600 Batang 3,716,100 3,378,273
13 Tiang Pancang Beton Pra te K - 600 Batang 4,153,300 3,775,727
14 Tiang Pancang Beton Pra te K - 600 Batang 4,481,200 4,073,818
15 Tiang Pancang Beton Pra tekK - 600 Batang 546,500 496,818
16 Unit Pracetak Voided Slab b K - 500 bh 1,391,100 1,264,636
17 Unit Pracetak Voided Slab b K - 500 bh 1,589,800 1,445,273
18 Unit Pracetak Voided Slab b K - 500 bh 1,689,200 1,535,636
19 Unit Pracetak Voided Slab b K - 500 bh 1,788,500 1,625,909
20 Unit Pracetak Voided Slab b K - 500 bh 1,987,200 1,806,545
21 Slurry Seal m2 48,800 44,364
22 Kolom Beton Pracetak 15x15x300 bt 228,600 207,818
23 Waterstop PVC lebar 150 mm m' 59,700 54,273
24 Waterstop PVC lebar 200 mm m' 94,400 85,818
25 Waterstop PVC lebar 230-320 mm m' 144,100 131,000
26 Phenol film 12mm lapisan utk cetak beton pracetak lbr 128,200 116,545
27 PCI Girder L=16 M bh 136,401,500 124,001,364
28 PCI Girder L=20 M bh 153,670,200 139,700,182
29 PCI Girder L=25 M bh 196,186,400 178,351,273
30 PCI Girder L=30 M bh 245,916,000 223,560,000
31 PCI Girder L=35 M bh 264,387,100 240,351,909
32 PCI Girder L=40 M bh 302,094,200 274,631,091

18/135
33 Gorong2 Kotak Bertulang Pa K - 300 bh 1,021,200 928,364
34 Gorong2 Kotak Bertulang Pa K - 300 bh 1,293,600 1,176,000
35 Gorong2 Kotak Bertulang Pa K - 300 bh 1,672,800 1,520,727
36 Gorong2 Kotak Bertulang Pa K - 300 bh 2,992,800 2,720,727
37 Joint Socket Pile 35 x 35 set 874,800 795,273
38 Joint Socket Pile 16x16x16 set 97,300 88,455
-
XVIII. L A I N - L A I N -
1 Reil MCB buah 500 455
2 Rel Laci 50 Cm buah 21,000 19,091
3 Rel Pengaman galvanis m' 663,500 603,182
4 Rel pintu dorong Soligen buah 236,200 214,727
5 Rolling door Almunium m2 632,100 574,636
6 Rolling door Besi m2 494,700 449,727
7 Sarung tangan Kain Set 7,800 7,091
8 sekam sekam kg 2,200 2,000
9 Sekrap bahan seng Buah 8,700 7,909
10 Smoke Bomb / Bom Asap 100 cc buah 427,200 388,364
11 Sosog Bahan Bambu buah 27,000 24,545
12 Spring Knip solid buah 24,200 22,000
13 T Dos 20 mm polos buah 3,000 2,727
14 Tenggok angkut pasir Bahan Bambu buah 13,100 11,909
15 Terpal 5x7 M, A 8 Bahan Plastik lembar 421,700 383,364
16 Venetions Blinds (tirai) m2 134,200 122,000
17 Vertical Blinds (tirai) m2 246,800 224,364
18 Kerb Type A bh - -
19 Kerb jenis 1 bh 81,900 74,455
20 Kerb jenis 2 bh 90,800 82,545
21 Kerb jenis 3 bh 98,000 89,091
22 Strip Bearing bh 383,200 348,364
23 Elastomer Alam Karet kg 49,200 44,727
24 Elastomer Sintesis kg 49,200 44,727
25 Elastomer jenis 1 (300x350x36) bh 279,000 253,636
26 Elastomer jenis 2 (350x400x39) bh 407,900 370,818
27 Elastomer jenis 3 (400x450x45) bh 515,100 468,273
28 Elastomer Logam bh 470,100 427,364
29 Expansion Joint Tipe Torma m' 1,958,600 1,780,545
30 Pelat Rambu (Eng. Grade) bh 287,900 261,727
31 Pelat Rambu (High I. Grade) bh 351,700 319,727
32 Plastik Filter m2 42,800 38,909
33 Reng U Terbalik TS 32 m' 51,900 47,182
34 Paranet Bahan Plastik meter 19,100 17,364
35 Pemantul Cahaya (Reflector) bh 27,400 24,909
36 Penangkal Petir KURN Radius 60 m Ls 19,483,800 17,712,545
37 Alumunium Kusen 2"x4" tebal 1,5 m' 197,100 179,182
38 Folding gate aluminium m2 705,000 640,909
39 Folding gate besi m2 558,500 507,727
40 Kawat las biasa kg 41,700 37,909
41 Kawat las RB 2.6 Dos 184,800 168,000
42 Kawat las RB 3.2 Dos 164,000 149,091
43 LAIN-LAIN : -
Minyak Beton & bekisting ltr 32,200 29,273
Minyak pelumas ltr 38,000 34,545
Solar ltr - - UP
Sealant Dow corning 732 botol 40,200 36,545
Isolasi Kertas nachi Starmas buah 7,700 7,000
Soda api kg 29,100 26,455
Sabun Sabun cuci piring cream/ colek kg 13,300 12,091
Batu asah buah 43,500 39,545
Batu gosok Diamond 6 Ps buah 46,200 42,000
Air m3 3,800 3,455
Adhesif Poliden 60 g Kg 83,900 76,273
Additive anti pengelupasan super bond kg 12,266,000 11,150,909
Bahan Pengeras Beton Besmicel Kg 32,300 29,364
Bahan Pengisi (Filler) Tamb sesuai spesifikasi AHSP bidang BM kg 16,500 15,000
Filler (Abu) sesuai spesifikasi AHSP bidang BM kg 16,500 15,000
Assetiline Ukuran Tabung Oksigen tabung 373,000 339,091
Bahan pengawet: kreosot ltr 8,900 8,091
Additive pengeras beton kg 52,800 48,000
Alkasit Diamont kg 21,500 19,545

19/135
Screening bahan campuran grouting beton kg 129,200 117,455
strorox – 100 bahan campuran beton kedap air kg 1,500 1,364
Expansion Cap m2 86,300 78,455
Curing Compound Concure P ltr 19,900 18,091
Geotextile Woven (3,85 x 150m) m2 66,500 60,455
Geonet Tenax m2 -
Glass Bead 12 cm kg 178,100 161,909
-

Purworejo, Januari 2017


Kepala Dinas Pekerjaan Umum

Ir. F A T H O R I
Pembina Utama Muda
NIP. 19580408 199003 1 006

20/135
169,008.18 175,910 28,590
- - -
178,842.73 186,090 30,310
181,404.55 188,730 30,770
215,537.27 224,270 36,530
- -
230,248.18 239,550 39,050
231,404.55 240,820 39,180
218,430.00 221,910 42,390
235,702.73 235,450 49,750
212,644.55 205,000 52,300
- -
193,636.36 127,450 106,850
165,868.18 147,550 53,150
78,842.73 147,550 (52,150)
87,107.27 147,550 (42,150)
226,694.55 214,000 60,300
214,000 60,300
214,000 48,400
-
- 186,500
- 186,500
19.0476190476 259,048 11,270 2,330
- 9,400
- -
-
1,638 56,180 9,320
1,620 69,640 11,360
- -
- -
15,360 2,640
-
146,360 23,840

910 290

-
-
- 548,400
- 127,300
1,820 380
2,360 640
2,090 410
12,000 2,100
12,000 37,400
12,000 37,400
-
- 14,400
-
-
45,000 7,400
50,550 8,250
1.02 2.25 2.30 53035.29411765 58,360 9,740
0.92 2.25 2.07 48214.31372549 67,450 11,050
84,270 13,830
-
45,820 7,480

21/135
51,180 8,320
59,180 9,720
67,640 11,160
74,820 12,180
1.05 3 3.15 88,550 14,350
72,640 11,860
47,270 7,730
1.05 3 3.15 83,270 13,630
3 95,270 15,530
-

22/135
3,450 650
5,090 910
5,090 910
5,090 910
39,270 6,430
39,270 (11,370)
39,270 (2,170)
16,180 2,020
25,000
12,100
28,600
20,000
-
- 24,000
- 27,700
- 29,000
- 45,100
- -
- 31,000
30,270 (30,270)
30,270 (30,270)
30,450 (850)
30,450 (30,450)
-
- 54,900
73,000 (12,600)
- 65,900
- 76,800

296,100

14,450 2,750
18,270 3,030
18,640 3,060

64,820 (45,620)
102,270 51,430
-
14,450 104,550
14,450 85,950

jml/m3 harga tiap m3 -


41.67 17,141,667 - 411,400
34.72 23,510,417 582,450 94,650
26.04 23,510,417 776,550 126,250
71.43 11,757,143 89,360 75,240
16.67 8,226,667 306,360 187,240
-
41.67 - - -
34.72 11,447,917 283,640 46,060
26.04 11,341,146 374,550 60,950
-
62.50 10,687,500 147,000 24,000
41.67 9,412,500 165,910 59,990
33.33 8,400,000 216,730 35,270
34.72 7,562,500 187,270 30,530
26.04 9,479,167 313,000 51,000
104.17 7,666,667 63,180 10,420
71.43 7,428,571 89,360 14,640
16.67 5,935,000 306,360 49,740
33.33 4,400,000 132,000

62.50 7,393,750 101,730 16,570


34.72 6,378,472 157,910 25,790
26.04 5,994,792 198,000 32,200
104.17 6,489,583 72,270 (9,970)
71.43 6,014,286 72,270 11,930
16.67 5,760,000 53,550 292,050

23/135
- -
41.67 15,033,333 310,360 50,440
33.33 14,380,000 371,000 60,400
34.72 13,826,389 342,450 55,750
26.04 13,770,833 454,820 73,980
71.43 11,992,857 144,450 23,450
16.67 8,245,000 425,450 69,250
- -
83.33 4,575,000 11,270 43,630
62.50 6,875,000 10,360 99,640
34.72 5,288,194 158,910 (6,610)
26.04 4,815,104 158,910 25,990
95.24 2,000,000 23,550 (2,550)
138.89 5,347,222 25,180 13,320
133.33 5,133,333 25,180 13,320
83.33 3,666,667 11,270 32,730
138.89 1,819,444 10,360 2,740
138.89 3,819,444 23,550 3,950
133.33 3,906,667 25,180 4,120
125.00 5,462,500 11,270 32,430
71.43 - 10,360 (10,360)
83.33 4,741,667 10,360 46,540
33.33 2,560,000 10,360 66,440
-
- 27,500
- 24,200
- 35,200
- 800
- 210,700
60,550 125,950
-
11,270 1,930
15,090 2,510
15,450 2,650
15,450 1,150
128,640 20,960
-
-
47,640 7,760
50,180 8,220
50,910 8,290
58,910 9,690
52,730 8,770
53,550 8,750
53,820 8,980
64,550 10,650
7,550 1,350
7,550 75,350
7,550 5,250
7,550 23,250
7,550 7,950
7,550 15,650
7,550 19,950

132,550 21,550

- 230,300
- 219,400

- 163,500

- 866,400

866,400

24/135
- 92,200

92,900

95,800

- 93,300

92,900

99,800

- 435,500
- 344,500

-
-
51,180 8,320
66,910 10,990
80,000 13,100
86,730 14,170
112,360 18,340
134,360 22,040
34,820 (34,820)
-
-
5,360 1,040
5,360 1,040
39,360 6,440
31,270 5,230
6,730 8,370
-
-
10,910 (910)
- 12,000
- 10,200
- 14,100
- 16,000
- -
- -
- 33,600
- 49,500
- 74,800
- 106,100
- 200,200
- 263,300

10,000 32,000

13,640 2,260

- 10,000
- 10,600
- 10,600

- 28,600
- 548,500
- 693,300
23,640 736,160
- 948,900
- 1,314,100
23,640 1,003,560
- 767,300
- 971,500

25/135
23,640 1,124,060

- 1,455,300
- 2,050,100

99,270 12,930
190,820 (20,920)
190,820 22,680
291,820 32,280
291,820 (182,120)

291,820 (253,220)

99,270 143,230
190,820 (101,920)

16,820 1,540,380
16,820 3,180
18,000 9,500
72,270 530,930
72,270 455,330
72,270 (25,870)
-
-
-
18,730 (30)
25,910 (610)
34,640 2,760
- 349,900
52,270 1,530
32,910 2,290
59,550 2,050
37,090 3,510
76,180 620
47,730 2,870
109,730 5,570
64,450 4,250
147,730 2,470
81,640 660
246,820 5,580
128,550 3,150
402,360 8,940
201,450 12,450
573,000 8,400
268,730 5,570
473,550 511,350
472,820 10,980
-
-
18,730 (12,630)
25,910 (17,510)
34,640 (23,340)
- 481,700
52,270 458,930
32,910 390,290
59,550 (40,250)
37,090 641,410
76,180 736,420
47,730 616,670
109,730 (85,130)
64,450 (31,250)
147,730 (120,630)
81,640 (33,540)
246,820 (180,220)
128,550 (73,850)
402,360 (350,060)
201,450 (100,150)
573,000 (492,400)

26/135
268,730 (83,730)
473,550 (265,850)
472,820 (302,320)
573,000 (261,400)
268,730 60,770
473,550 (205,650)
-
-
18,730 167,270
25,910 12,341,590
34,640 160,060
- 319,700
52,270 445,530
32,910 737,590
59,550 1,162,550
37,090 1,940,510
76,180 2,425,220
47,730 3,038,270
109,730 4,768,670
64,450 (2,650)
147,730 7,725,270
81,640 9,938,260

246,820 274,180
128,550 10,930,550
402,360 12,603,240
201,450 14,990,350
573,000 47,400
268,730 441,970
246,820 712,780
128,550 1,269,750
402,360 1,374,140
201,450 2,441,450
573,000 2,651,100
268,730 3,399,470
473,550 4,368,050
472,820 (67,020)
573,000 7,070,200
268,730 8,997,570
-

246,820 (72,320)
128,550 (128,550)
402,360 (402,360)
201,450 (201,450)
573,000 (339,600)
268,730 25,470
246,820 126,180
128,550 464,650
402,360 365,340
201,450 895,250
573,000 (573,000)
268,730 (268,730)
473,550 1,440,650
472,820 (472,820)
573,000 2,517,500
268,730 (268,730)

-
1,940,400 20,400 122400 201,000 18,550 304,850
1,701,600 26,800 160800 122,800 24,360 259,240
1,147,200 41,800 250800 (59,600) 38,000 153,200
739,800 54,600 327600 (204,300) 49,640 73,660
2,334,600 64,200 385200 3,900 58,360 330,740
888,000 114,500 687000 (539,000) 104,090 43,910
329,400 133,800 802800 (747,900) 121,640 (66,740)
395,400 173,400 1040400 (974,500) 157,640 (91,740)

27/135
625,200 285,700 1714200 (1,610,000) 259,730 (155,530)
790,200 335,000 2010000 (1,878,300) 304,550 (172,850)
1,809,600 437,700 2626200 (2,324,600) 397,910 (96,310)
264,000 627,100 3762600 (3,718,600) 570,090 (526,090)
1,250,400 940,600 940,600 (732,200) 855,090 (646,690)
505,200 1,273,300 1,273,300 (1,189,100) 1,157,550 (1,073,350)
526,800 55,700 55,700 32,100 50,640 37,160
987,600 70,700 70,700 93,900 64,270 100,330
-
93,640 15,360
109,730 17,970
137,820 22,480
193,450 31,650
334,450 54,450

93,640 (44,240)

246,820 (228,620)
128,550 (110,350)
402,360 (359,960)
201,450 (158,750)
573,000 (499,600)
268,730 (195,730)
246,820 (69,220)
128,550 49,050
402,360 2,140
201,450 207,850
573,000 206,500
268,730 518,770
473,550 535,250
472,820 535,980
573,000 2,132,300
268,730 2,436,570

246,820 (236,020)
128,550 (113,250)
402,360 (380,360)
201,450 (153,350)
573,000 (499,600)
268,730 (53,330)
246,820 196,080

28/135
-
-
7,910 1,390
17,820 2,980
16,640 2,760
- -
70,360 11,440
- 20,000
- 59,900
- -
19,910 2,990
63,000 8,200
143,180 19,920
19,910 (2,010)
63,000 (4,900)
-
-
-
116,360 18,940
136,180 (136,180)
145,450 21,550
-
47,730 7,770
58,820 9,680
71,180 11,720
79,550 13,150
- -
143,550 22,850
175,910 27,890
187,180 29,720
47,730 76,270
-
-
-
28,360 6,740
30,270 (670)
32,640 3,760
28,640 4,760
28,550 6,450
61,360 10,140
16,640 860
16,640 2,760
16,640 (14,440)
16,640 (14,440)
16,640 860
16,640 (10,140)
16,640 (2,340)
- 4,600
- 9,300
56,180 12,620
56,180 25,020
56,180 (28,180)
46,090 7,510
8,910 390
8,910 490
8,910 (1,310)
8,910 3,190
36,640 (3,540)
218,180 (169,880)
218,180 21,120
80,000 9,800
218,180 (126,980)
80,000 11,200
276,360 (4,860)
276,360 (189,360)
276,360 (189,360)
54,360 6,040
54,360 8,940

29/135
25,640 121,560
25,640 4,360
96,550 15,150
34,360 9,040
18,640 2,260
18,640 40,560
20,910 5,090
-
-
- 8,400
- 9,300
57,360 9,440
-
99,550 23,250
262,180 25,420
262,180 (242,380)

-
- 52,700
- 74,700
176,800
- 79,100
-
-
89,180 14,620
96,640 15,760
137,900

- 53,900
- 75,500
312,300

94,450 15,450
102,000 16,600

1,123,550 437,650
1,123,550 690,950

144,730 23,670

144,730 (127,330)
144,730 (144,730)
-
-
-
202,360 38,040
332,550 69,850
337,090 63,410
-

665,820 122,380
-
344,090 72,210
459,450 96,450
559,360 193,340
622,180 506,720
950,550 (120,650)
336,600
-
15,730 (930)
11,640 2,260
15,550 3,050
12,360 6,440
12,360 12,740
- -

30/135
- -
38,820 8,180
57,820 10,980
71,730 13,570
-
3,450 6,650
10,550 (450)
3,100
10,550 2,050
4,200

10,820 2,780
3,640 9,360
3,640 (2,640)
-

31/135
13,730 1,670
12,910 3,490
-
26,450 (2,350)
29,270 (3,270)
36,820 (4,620)
42,550 (3,350)
9,180 2,920
13,550 2,450
15,180 2,920
15,180 333,620
290,910 (140,910)
29,270 6,115,730
36,820 4,554,680
42,550 1,713,250
9,180 551,320
13,550 328,550
15,180 384,720
29,270 100,830
36,820 113,180
42,550 127,450
9,180 190,820
13,550 46,450
15,180 84,920
290,910 2,225,990
-
111,270 (61,170)
113,910 (56,310)
68,090 12,010
-
181,550 608,350
9,180 926,220
13,550 202,250
-
181,550 (180,850)
13,550 76,150
9,180 (1,880)
13,550 (6,450)
9,180 (1,380)
9,180 (2,680)
13,550 (6,750)
9,180 (1,480)
13,550 (5,250)
9,180 6,720
9,180 18,020
-
-
- 276,400
243,820 (200,720)
80,270 (53,770)
50,360 (19,360)
14,640 77,060
31,000
26,550 (19,750)
22,730 (11,930)
26,550 (17,350)
- 15,800
13,550 (1,050)
7,820 2,880
10,640 (1,240)
13,090 13,810
179,270 29,130
238,550 (227,750)
37,180 (20,080)
203,180 (109,780)
58,000
- 58,600
243,820 (222,220)

32/135
80,270 102,930
50,360 132,840
14,640 66,160
283,600
26,550 (17,050)
-

33/135
-
- 225,100
243,820 83,780
80,270 404,330
50,360 273,140
14,640 374,260
2,368,700
26,550 36,750
22,730 342,470
26,550 1,588,550
13,550 1,475,450
7,820 163,380
10,640 186,460
13,090 3,710
179,270 (154,870)
238,550 (168,450)
37,180 158,920
203,180 873,520
451,500
- 418,800
243,820 (109,120)
80,270 (76,970)
50,360 (47,160)
14,640 53,960
141,200
26,550 1,157,950
-
128,550 498,550
402,360 509,840
201,450 1,060,750
573,000 1,482,100
268,730 3,348,670
473,550 5,202,950
472,820 7,505,680
573,000 232,100
268,730 962,770
128,550 1,700,950
402,360 2,744,440
201,450 4,817,150
573,000 8,189,900
268,730 12,168,870

473,550 (468,850)
472,820 (467,020)
573,000 (565,100)
268,730 (253,430)
246,820 (225,920)
128,550 (70,750)
402,360 (304,060)
201,450 115,450

573,000 (567,700)
268,730 (261,930)
246,820 (237,420)
128,550 (112,950)
402,360 (383,560)
201,450 (175,350)
573,000 (500,700)
268,730 (155,030)

473,550 (471,150)
472,820 (469,520)
573,000 (568,000)
268,730 (256,730)
128,550 (109,950)
402,360 (355,760)
201,450 (111,250)
573,000 (357,600)

34/135
268,730 (228,530)
473,550 (423,050)
472,820 (405,020)
573,000 (487,800)
268,730 (123,630)

268,730 46,370
473,550 (146,150)
472,820 286,280

573,000 (444,500)
268,730 (8,030)

268,730 381,970
473,550 325,950
472,820 2,646,980

573,000 98,000
268,730 725,670

268,730 1,939,370
473,550 3,480,150
472,820 4,944,780
573,000 5,631,800

268,730 (266,630)

268,730 (264,030)
473,550 (464,050)
472,820 (460,820)

573,000 (570,500)
268,730 (264,830)

268,730 997,170
473,550 2,346,950
472,820 2,945,980
573,000 3,849,400
268,730 6,917,370

268,730 480,070
473,550 488,050
472,820 687,780
573,000 1,222,500
268,730 3,059,470

268,730 8,927,270

473,550 (467,550)
472,820 (464,320)
573,000 (561,200)
268,730 (245,830)

268,730 (152,230)
473,550 (283,050)
472,820 (466,620)
573,000 (563,700)
268,730 (245,830)

268,730 (148,430)
473,550 (264,350)

472,820 (468,520)
573,000 (568,400)

35/135
268,730 (258,630)

268,730 (229,530)

473,550 (469,650)

472,820 (467,720)
573,000 (566,300)
268,730 (258,430)

268,730 (242,230)
473,550 (398,650)
472,820 (355,120)

573,000 (515,000)
268,730 (182,630)

268,730 10,270
473,550 (98,850)
472,820 (402,120)
573,000 (474,500)
268,730 (118,530)

268,730 287,570

473,550 (470,150)
472,820 (468,120)
573,000 (565,500)
268,730 (252,830)

268,730 (210,330)

473,550 (471,750)
472,820 (470,520)
573,000 (569,600)
268,730 (260,530)

268,730 178,870
473,550 238,550
472,820 1,129,080
573,000 1,205,600
268,730 2,044,470

472,820 5,201,980

573,000 (367,200)
268,730 29,870

573,000 (564,900)
268,730 (258,130)

573,000 (554,400)
268,730 (241,730)

573,000 (570,000)
268,730 (265,030)

573,000 (559,800)
268,730 (221,130)

573,000 (549,600)
268,730 (189,530)

36/135
573,000 (566,400)
268,730 (253,030)

-
-
16,090 17,110
30,270 (26,270)
640 4,160
29,090 (26,790)
53,910 (51,110)
4,000 44,200
24,450 (6,850)
14,730 5,370
38,090 12,210
16,090 (11,090)
30,270 (1,870)
640 34,660
29,090 (28,290)
53,910 (43,710)
4,000 58,900
16,090 2,710
30,270 (10,170)
640 12,460
29,090 (7,490)
53,910 (23,510)
4,000 29,900
-

37/135
-
698,180 (44,980)
561,820 249,880
561,820 (26,320)
-
-
37,450 6,250
43,270 7,230
49,910 8,090
56,180 13,920
60,180 5,320
67,550 11,050
37,450 6,250
43,270 7,230
45,730 7,470
55,730 9,170
60,270 9,930
64,730 10,670
46,640 7,560
52,270 8,630
37,450 26,050
43,270 37,330
49,910 23,290
56,180 39,020
60,180 11,220
67,550 12,650
37,450 28,750
43,270 33,430
45,730 55,070
55,730 26,370
60,270 36,630
- -
3,820 780
4,550 850
- 68,000
-
-
37,450 118,350
43,270 58,830
49,910 81,890
56,180 217,120
60,180 267,720
67,550 275,450
37,450 673,050
43,270 410,330
45,730 3,904,270
55,730 4,425,470
60,270 5,951,030
64,730 3,651,370
46,640 4,106,660
52,270 4,428,930
37,450 509,050
43,270 1,347,830
49,910 1,539,890
56,180 1,633,020
60,180 1,728,320
67,550 1,919,650
37,450 11,350
43,270 185,330
45,730 13,970
55,730 38,670
60,270 83,830
- 128,200
3,820 136,397,680
4,550 153,665,650
- 196,186,400
49,910 245,866,090
56,180 264,330,920
60,180 302,034,020

38/135
67,550 953,650
37,450 1,256,150
43,270 1,629,530
45,730 2,947,070
55,730 819,070
60,270 37,030

-
14,910 (14,410)
425,450 (404,450)
14,910 648,590
425,450 (189,250)
14,910 617,190
425,450 69,250
14,910 (7,110)
425,450 (423,250)
14,910 (6,210)
425,450 1,750
425,450 (398,450)
14,910 9,290
425,450 (422,450)
14,910 (1,810)
425,450 (3,750)
14,910 119,290
425,450 (178,650)
14,910 (14,910)
425,450 (343,550)
14,910 75,890
425,450 (327,450)
14,910 368,290
425,450 (376,250)
14,910 34,290
425,450 (146,450)
14,910 392,990
425,450 89,650
14,910 455,190
425,450 1,533,150
14,910 272,990
425,450 (73,750)
14,910 27,890
425,450 (373,550)
14,910 4,190
425,450 (398,050)
14,910 19,468,890
425,450 (228,350)
482,090 222,910
482,090 76,410
33,730 7,970
157,910 26,890
144,450 19,550
-
32,730 (530)
32,730 5,270
- -
34,640 5,560
34,640 (26,940)
- 29,100
- 13,300
- 43,500
- 46,200
- 3,800
32,730 51,170
32,730 12,233,270
- 32,300
34,640 (18,140)
- 16,500
- 373,000
- 8,900
- 52,800
32,730 (11,230)

39/135
32,730 96,470
- 1,500
34,640 51,660
- 19,900
- 66,500
- -
- 178,100
- -

40/135
25000

41/135
INDEKS HARGA SATUAN TENAGA KERJA
AHSP BIDANG CIPTA KARYA, KABUPATEN PURWOREJO TA. 2017

HARGA NON PPN HARGA + PPN


NO TENAGA KERJA SATUAN KETERANGAN
(Rp.) (Rp.)

1 2 3 4 5 6
1 Mandor Lapangan Hr - -
2 Kepala Tukang Hr 81,091 89,200
3 Tukang Hr 71,091 78,200
4 Operator Terlatih Hr 71,091 78,200
5 Pembantu Operator Hr 53,273 58,600
6 Buruh Tak Terlatih Hr 42,364 46,600
7 Buruh Terlatih Hr 50,727 55,800
8 Mekanik Hr 75,091 82,600
9 Pembantu Mekanik Hr 48,909 53,800
10 S o p i r Hr 75,091 82,600
11 Pembantu Sopir Hr 42,364 46,600
12 Operator Semi Terampil Hr 48,909 53,800

Purworejo, Januari 2017


Kepala Dinas Pekerjaan Umum

Ir. F A T H O R I
Pembina Utama Muda
NIP. 19580408 199003 1 006

135
JADWAL PELAKSANAAN
KEGIATAN : REHABILITASI RUANG KELAS, PERPUSTAKAAN DAN ATAU RUANG GURU DAN PEMBANGUNAN RUANG KELAS BARU (RKB) SD DAK BIDANG PENDIDIKAN TAHUN 2018
PEKERJAAN : PEMBANGUNAN 1 (SATU) RUANG KELAS BARU SD NEGERI SILO KEC. BRUNO
LOKASI : DESA TEGALSATI KECAMATAN BRUNO
TAHUN ANGGARAN : TAHUN 2018

BOBOT
NO URAIAN PEKERJAAN TOTAL HARGA (Rp) MINGGU 1 MINGGU 2 MINGGU 3 MINGGU 4 MINGGU 5 MINGGU 6 MINGGU 7 MINGGU 8 MINGGU 9 MINGGU 10 MINGGU 11 MINGGU 12 MINGGU 13 MINGGU 14 MINGGU 15 KETERANGAN
%

A PEKERJAAN PERSIAPAN 0.06 150,000.00 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
B PEKERJAAN TANAH & PONDASI 15.48 38,905,079.89 5.160 5.160 5.160
C PEKERJAAN PASANGAN DINDING 14.04 35,281,408.52 2.340 2.340 2.340 2.340 2.340 2.340
D PEKERJAAN PEMBETONAN 18.39 46,226,801.81 2.299 2.299 2.299 2.299 2.299 2.299 2.299 2.299 GARIS RENCANA
E PEKERJAAN PLESTERAN DAN ACIAN 12.99 32,644,903.32 3.247 3.247 3.247 3.247
F PEKERJAAN KUSEN DAN DAUN JENDELA 0.00 - 0.000 0.000 0.000 0.000 0.000 0.000 0.000
G PEKERJAAN STRUKTUR ATAP 31.13 78,237,689.05 4.447 4.447 4.447 4.447 4.447 4.447 4.447
H PEKERJAAN PENUTUP ATAP 7.91 19,889,015.08 2.638 2.638 2.638
I PEKERJAAN PLAFOND 0.00 - 0.000 0.000 0.000 GARIS REALISASI
J PEKERJAAN PENUTUP LANTAI 0.00 - 0.000 0.000
K PEKERJAAN PENGGANTUNG DAN PENGUNCI 0.00 - 0.000 0.000
L PEKERJAAN INSTALASI LISTRTIK 0.00 - 0.000 0.000
M PEKERJAAN INSTALASI AIR DAN SANITASI 0.00 - 0.000 0.000
N PEKERJAAN PENGECATAN 0.00 - 0.000 0.000
O PENGADAAN MEUBELAIR 0.00 - 0.000 0.000 0.000
JUMLAH 100.00 251,334,897.67
RENCANA PER MINGGU 5.164 7.463 9.802 4.643 4.643 12.337 12.337 12.337 9.997 7.089 7.089 7.089 0.004 0.004 0.004
AKUMULASI RENCANA TIAP MINNGU - 5.164 12.627 22.429 27.072 31.714 44.051 56.388 68.725 78.722 85.811 92.899 99.988 99.992 99.996 100.000
REALISASI PER MINGGU
AKUMULASI TIAP MINGGU -
TERLAMBAT/MENDAHULUI

Menyetujui Dibuat
Kepala Sekolah SD N KALIJERING Team Rencana
Kec. PITURUH Kab. Purworejo

PAIJO TEGUH SANTOSO.S.T


NIP. 1234….
PEMERINTAH KABUPATEN PURWOREJO
DINAS PENDIDIKAN KEPEMUDAAN DAN OLAH RAGA
Jl. Mayjend Sutoyo no. No. 69

PURWOREJO

ANGGARAN DAN BIAYA


RENCANA ANGGARAN

DAN BIAYA
(RAB)

KEGIATAN
REHABILITASI RUANG KELAS BERAT SD DANA ALOKASI KHUSUS (DAK )
BIDANG PENDIDIKAN

KEGIATAN
REHABILITASI RUANG KELAS RUSAK BERAT 3 (TIGA) RUANG
SD N KALIJERING
KECAMATAN PITURUH

SD NEGERI KALIJERING
KECAMATAN PITURUH
LOKASI
DESA KALIJERING
KECAMATAN PITURUH
KABUPATEN PURWOREJO

TAHUN ANGGARAN 2018


REKAPITULASI ANGGARAN BIAYA
KEGIATAN : REHABILITASI RUANG KELAS, PERPUSTAKAAN DAN ATAU RUANG GURU DAN PEMBANGUNAN RUANG KELAS BARU (RKB) SD DAK BIDANG PENDIDIKAN TAHUN 2018
PEKERJAAN : PEMBANGUNAN 1 (SATU) RUANG KELAS BARU SD NEGERI SILO KEC. BRUNO
LOKASI : DESA TEGALSATI KECAMATAN BRUNO
TAHUN ANGGARAN : TAHUN 2018

BOBOT JUMLAH HARGA JUMLAH HARGA TOTAL HARGA (Rp)


NO URAIAN PEKERJAAN
% TENAGA (RP) BAHAN (RP)
1 2 3 4 5 6
A PEKERJAAN PERSIAPAN 0.06 - 150,000.00 150,000.00
B PEKERJAAN TANAH & PONDASI 15.48 8,459,359.18 30,445,720.70 38,905,079.89
C PEKERJAAN PASANGAN DINDING 14.04 5,517,802.07 29,763,606.45 35,281,408.52
D PEKERJAAN PEMBETONAN 18.39 6,156,023.61 40,070,778.20 46,226,801.81
E PEKERJAAN PLESTERAN DAN ACIAN 12.99 21,923,350.67 10,721,552.65 32,644,903.32
F PEKERJAAN KUSEN DAN DAUN JENDELA 0.00 - - -
G PEKERJAAN STRUKTUR ATAP 31.13 6,059,164.29 72,178,524.76 78,237,689.05
H PEKERJAAN PENUTUP ATAP 7.91 3,838,745.30 16,050,269.78 19,889,015.08
I PEKERJAAN PLAFOND 0.00 - - -
J PEKERJAAN PENUTUP LANTAI 0.00 - - -
K PEKERJAAN PENGGANTUNG DAN PENGUNCI 0.00 - - -
L PEKERJAAN INSTALASI LISTRTIK 0.00 - - -
M PEKERJAAN INSTALASI AIR DAN SANITASI 0.00 - - -
N PEKERJAAN PENGECATAN 0.00 - - -
O PENGADAAN MEUBELAIR 0.00 - -
JUMLAH 100.00 51,954,445.12 199,380,452.55 251,334,897.67

DI BULATKAN 251,334,000.00
TERBILANG :

Menyetujui Dibuat
Kepala Sekolah SD N KALIJERING Team Rencana
Kec. PITURUH Kab. Purworejo

PAIJO TEGUH SANTOSO.S.T


NIP. 1234….

Mengetahui,
Kepala UPT DPU Wilayah Kemiri
Kabupaten Purworejo

SURATMAN
NIP. 19610216 198503 1 005
RENCANA ANGGARAN DAN BIAYA (RAB)
KEGIATAN : REHABILITASI RUANG KELAS, PERPUSTAKAAN DAN ATAU RUANG GURU DAN PEMBANGUNAN RUANG KELAS BARU (RKB) SD DAK BIDANG PENDIDIKAN TAHUN
2018
PEKERJAAN : PEMBANGUNAN 1 (SATU) RUANG KELAS BARU SD NEGERI SILO KEC. BRUNO
LOKASI : DESA TEGALSATI KECAMATAN BRUNO
TAHUN ANGGARAN : TAHUN 2018 38

NO URAIAN PEKERJAAN ANALISA VOLUME SAT HARGA TENAGA HARGA BAHAN JUMLAH HARGA TENAGA JUMLAH HARGA BAHAN
1 2 3 4 5 6 7 8 9
A PEKERJAAN PERSIAPAN
1 Pasang papan nama pekerjaan 1.00 ls 150,000.00 - 150,000.00
2 Pekerjaan pemasangan bowplank A.2.2.1.4 m' 12,156.41 37,112.11 - -
3 Pekerjaan bongkaran beton bertulang A.2.2.1.13 m3 564,881.58 - -
4 Pekerjaan menurunkan genteng tidak di pakai kembali B.O.W.L.7.a m2 423.64 - -
5 Pekerjaan menurunkan genteng di pakai kembali B.O.W.L.7.a - m2 423.64 - -
6 Menurunkan rangka atap B.O.W.L.9.b - m2 3,108.20 - -
7 Menurunkan rangka kuda-kuda B.O.W.L.12.a - m3 322,328.30 - -
8 Pekerjaan bongkaran 1 m3 dinding tembok bata A.2.2.1.14 - m3 282,440.79 - -
SUB JUMLAH A - 150,000.00
B PEKERJAAN TANAH & PONDASI
1 Pekerjaan galian pondasi A.2.3.1.1 67.08 m3 31,773.00 2,131,332.84 -
2 Pekerjaan urugan kembali galian pondasi A.2.3.1.9 73.50 m3 10,591.00 778,438.50 -
3 Urugan peninggian peil A.2.3.1.14 78.00 m3 10,591.00 114,480.00 826,098.00 8,929,440.00
4 Pekerjaan Aanstamping A.3.2.1.9 12.96 m3 63,931.96 360,897.60 828,558.19 4,677,232.90
5 Pekerjaan pondasi batu kali A.3.2.1.6 31.68 m3 122,946.08 531,535.60 3,894,931.66 16,839,047.81
SUB JUMLAH B 8,459,359.18 30,445,720.70
C PEKERJAAN PASANGAN DINDING
1 Memasang batu merah 1/2 bata 1:4 A.4.4.1.9 27.24 m2 20,629.21 114,424.90 561,939.68 3,116,934.28
2 memasanng batu merah 1/2 bata 1 : 6 A.4.4.1.11 240.24 m2 20,629.21 110,919.10 4,955,862.39 26,646,672.17
SUB JUMLAH C 5,517,802.07 29,763,606.45
NO URAIAN PEKERJAAN ANALISA VOLUME SAT HARGA TENAGA HARGA BAHAN JUMLAH HARGA TENAGA JUMLAH HARGA BAHAN
1 2 3 4 5 6 7 8 9
D PEKERJAAN PEMBETONAN
1 Pekerjaan sloof 15/20
membuat beton mutu K-150 A.4.1.1.5 2.16 m3 91,721.17 895,228.49 198,117.73 1,933,693.54
Pembersian dengan besi polos A.4.1.1.17a 247.82 kg 867.89 12,900.00 215,085.04 3,196,929.60
Pekerjaan begisting sloof (2x pakai) A.4.1.1.21 28.80 m2 42,621.31 124,624.38 1,227,493.61 3,589,182.00
2 Pekerjaan Kolom utama K1 (15/15)
membuat beton mutu K-150 A.4.1.1.5 3.15 m3 91,721.17 895,228.49 288,921.69 2,819,969.75
Pembersian dengan besi polos A.4.1.1.17a 361.41 kg 867.89 12,900.00 313,665.68 4,662,189.00
Pekerjaan begisting kolom (2x pakai) A.4.1.1.22a 42.00 m2 54,096.27 360,690.69 2,272,043.47 15,149,009.17
3 Pekerjaan Ring balk 15/20
membuat beton mutu K-150 A.4.1.1.5 2.16 m3 91,721.17 895,228.49 198,117.73 1,933,693.54
Pembersian dengan besi polos A.4.1.1.17a 247.82 kg 867.89 12,900.00 215,085.04 3,196,929.60
Pekerjaan begisting ring balk (2x pakai) A.4.1.1.21 28.80 m2 42,621.31 124,624.38 1,227,493.61 3,589,182.00
4 Pekerjaan balok teras 15/20
membuat beton mutu K-150 A.4.1.1.5 m3 91,721.17 895,228.49 - -
Pembersian dengan besi polos A.4.1.1.17a kg 867.89 12,900.00 - -
Pekerjaan begisting balok (2x pakai) A.4.1.1.23a m2 54,096.27 376,555.28 - -
5 Pekerjaan balok konsol 15/20
membuat beton mutu K-150 A.4.1.1.5 m3 91,721.17 895,228.49 - -
Pembersian dengan besi polos A.4.1.1.17a kg 867.89 12,900.00 - -
Pekerjaan begisting balok (2x pakai) A.4.1.1.23a m2 54,096.27 376,555.28 - -
6 Pekerjaan balok lateu 11/15 A.4.1.1.36 m' 20,431.03 76,097.28 - -
7 Pekerjaan balok gunungan 11/15 A.4.1.1.36 m' 20,431.03 76,097.28 - -
8 Pekerjaan Plat dak tebal 12
membuat beton mutu K-150 A.4.1.1.5 m3 91,721.17 895,228.49 - -
Pembersian dengan besi polos A.4.1.1.17a kg 867.89 12,900.00 - -
Pekerjaan begisting plat A.4.1.1.24 m2 54,096.27 456,210.69 - -
SUB JUMLAH D 6,156,023.61 40,070,778.20
E PEKERJAAN PLESTERAN DAN ACIAN
1 Pekerjaan plesteran trassram A,4,4,2.4 54.48 m2 24,589.22 16,692.00 1,339,620.43 909,380.16
2 Pekerjaan plesteran 1 ; 6 A,4,4,2.6 480.47 m2 24,589.22 14,560.02 11,814,389.97 6,995,658.63
3 Pekerjaan acian A,4,4,2.27 534.95 m2 16,392.81 5,265.00 8,769,340.27 2,816,513.86
SUB JUMLAH E 21,923,350.67 10,721,552.65
F PEKERJAAN KUSEN DAN DAUN JENDELA
1 Pekerjaan pembuatan kusen pintu damar laut (P1) 3 Buah A.4.6.1.2 m3 1,679,785.80 16,648,666.67 - -
2 Pekerjaan pembuatan kusen partisi kayu damar laut (PR1) 1 unit A.4.6.1.2 m3 1,679,785.80 16,648,666.67 - -
3 Pekerjaan pembuatan kusen bouven kayu damar laut (BV1)….. Bu A.4.6.1.2 m3 1,679,785.80 16,648,666.67 - -
4 Pekerjaan pemasangan daun pintu kayu damarlaut A.4.6.1.5 m2 279,964.30 576,875.00 - -
5 Pekerjaan pemasangan daun jendela dan jalusi kayu damar laut A.4.6.1.6 m2 223,971.44 355,170.00 - -
SUB JUMLAH F - -
NO URAIAN PEKERJAAN ANALISA VOLUME SAT HARGA TENAGA HARGA BAHAN JUMLAH HARGA TENAGA JUMLAH HARGA BAHAN
1 2 3 4 5 6 7 8 9
G PEKERJAAN STRUKTUR ATAP
1 Kuda-kuda kayu kruing bentang 7 m A.4.6.1.13 1.51 m3 1,119,857.20 11,162,363.33 1,695,374.21 16,898,925.10
2 Pemasangan balok teras, murplat dan gording 8/12 kayu kruing A.4.6.1.15 1.84 m3 671,914.32 11,113,483.33 1,238,472.47 20,484,372.48
3 Pemasangan nok kayu kruing uk 8/12 kayu kruing A.4.6.1.15 0.35 m3 671,914.32 11,113,483.33 232,213.59 3,840,819.84
4 Pemasangan rangka kap atap kayu kruing A.4.6.1.16 237.99 m2 12,156.41 130,066.00 2,893,104.02 30,954,407.34
5 Pemasangan konsol teras kayu kruing 6/12 A.4.6.1.15 m3 671,914.32 11,113,483.33 - -
6 Pasang jurai kayu kruing 8/12 A.4.6.1.15 m3 671,914.32 11,113,483.33 - -
7 Pasang Listplank kayu damarlaut 3/25 A.4.6.1.22 m' 20,076.42 159,120.00 - -
8 Pasang lisplank Uk 400 x 20 x 0.8 cm, Kalsirata hrg sat.bahan m' 19,200.00 - -
SUB JUMLAH G 6,059,164.29 72,178,524.76
H PEKERJAAN PENUTUP ATAP
1 Pasang genteng lama m2 12,294.61 -
2 Pasang atap multiroof A.4.5.2.1 237.99 m2 12,294.61 62,500.00 2,925,993.64 14,874,375.00
3 Pasang genteng bubungan A.4.5.2.4 27.84 m2 32,785.62 42,237.60 912,751.66 1,175,894.78
SUB JUMLAH H 3,838,745.30 16,050,269.78
I PEKERJAAN PLAFOND
1 Pemasangan balok induk plafond kayu kruing uk. 6/12 A.4.6.1.15 m3 671,914.32 11,113,483.33 - -
2 Pemasangan rangka plafond 50x100 cm kayu meranti uk 5/7 A.4.6.1.20 m2 12,156.41 88,900.00 - -
3 Pemasangan penutup langit langit kalsirata 100x100x0.5cm A.4.5.1.1 m2 6,814.93 25,378.00 - -
4 Pemasangan list tepi plafond bahan gyipsum A.4.5.1.9 m' 6,078.21 20,558.00 - -
SUB JUMLAH I - -
J PEKERJAAN PENUTUP LANTAI
1 Pengurugan dan peninggian peil (leveling) A.2.3.1.11 m3 12,709.20 281,160.00 - -
2 Pasang rabat beton bawah lantai A.4.1.1.1 m3 91,721.17 782,266.93 - -
3 Pasang keramik dinding 30x30 polos A.4.4.3.54 m2 73,767.65 114,705.04 - -
4 Pasang keramik dinding 25x25 teksture A.4.4.3.53 m2 73,767.65 136,071.40 - -
5 Pasang keramik lantai 30x30 motif A.4.4.3.35 m2 57,374.84 115,325.14 - -
6 Pasang keramik 20x25 keramik dinding A.4.4.3.36 m2 57,374.84 123,541.50 - -
7 Pasang border keramik dinding 10x20 A.4.4.3.41 m2 10,940.77 10,226.50 - -
- -
K PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 pasang kunci tanam A.4.6.2.1 buah 50,061.90 183,200.00 - -
2 pasang engsel pintu A.4.6.2.5 buah 12,515.48 15,500.00 - -
3 pasang engsel jendela A.4.6.2.6 buah 8,343.65 13,250.00 - -
4 pasang kait angin A.4.6.2.9 buah 12,515.48 10,800.00 - -
5 pasang grendel jendela (untuk partisi) A.4.6.2.4 buah 8,343.65 9,200.00 - -
6 pasang kaca bening tebal 5 mm A.4.6.2.17 m2 12,515.48 123,640.00 - -
SUB JUMLAH K - -
NO URAIAN PEKERJAAN ANALISA VOLUME SAT HARGA TENAGA HARGA BAHAN JUMLAH HARGA TENAGA JUMLAH HARGA BAHAN
1 2 3 4 5 6 7 8 9
L PEKERJAAN INSTALASI LISTRTIK
1 Pasang kabel overspaneng antar bangunan titik 150,000.00 - -
2 Pasang stop kontak Broco bh 25,000.00 - -
3 Pasang lampu TL 14 watt Philips titik 36,000.00 - -
4 Pasang saklar tunggal Broco bh 19,000.00 - -
5 Pasang saklar ganda Broco bh 25,000.00 - -
6 Pasang titik lampu - titik 125,000.00 - -
- -
M PEKERJAAN INSTALASI AIR DAN SANITASI
1 Pasang Kloset Jongkok Porselin , INA A.5.1.1.2 bh 161,164.15 209,563.00 - -
2 Pasang Pipa PVC Diam. 4" (Limbah Padat) A.5.1.1.32 m' 6,277.11 97,805.00 - -
3 Pasang Pipa PVC Diam. 3" Saluran Pembuangan Air Kotor A.5.1.1.31 m' 14,123.50 58,202.50 - -
4 Pasang Pipa PVC Diam. 3/4" Saluran Air Bersih A.5.1.1.26 m' 6,277.11 9,803.75 - -
5 Pasang Kran Air Diam. 3/4" A.5.1.1.19 bh 32,103.68 16,809.75 - -
6 Pasang Floodrain (stainless-steel INA) A.5.1.1.14 bh 8,343.65 63,300.00 - -
7 Pasang Wastafel cuci tangan lengkap terpasang bh 450,000.00 0 - -
SUB JUMLAH M - -
N PEKERJAAN PENGECATAN
1 Pengecatan dinding lama (1 lap.Plamir, 2 lap Cat Penutup) A.4.7.1.11 m2 4,512.60 7,368.00 - -
2 Pengecatan dinding baru (1 lap.Plamir, 1 lap Cat Dasar 2 lap. Cat A.4.7.1.10 m2 5,836.89 10,177.60 - -
3 Pengecatan kayu Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Ca A.4.7.1.4 m2 4,091.85 42,688.00 - -
4 Pengecatan Plafond (1 lap.Plamir, 1 lap Cat Dasar 2 lap. Cat Penu A.4.7.1.10 m2 5,836.89 10,177.60 - -
- -
O PENGADAAN MEUBELAIR
1 PENGADAAN/PERBAIKAN MEUBELAIR ls 7,500,000.00 - -
SUB JUMLAH O - -

JUMLAH SUB TOTAL 51,954,445.12 199,380,452.55


JUMLAH TOTAL 251,334,897.67

Menyetujui Dibuat
Kepala Sekolah SD N KALIJERING Team Rencana
Kec. PITURUH Kab. Purworejo

PAIJO TEGUH SANTOSO.S.T


NIP. 1234….
No. Uraian Volume Satuan Harga Satuan Jumlah harga Satuan
Tenaga kerja
1 Pekerja 789.80 OH 42,364.00 33,459,226.29
2 Tukang batu 123.82 OH 71,091.00 8,802,397.33
3 Kepala Tukang 28.16 OH 81,091.00 2,283,332.30
4 Tukang besi 1.73 OH 71,091.00 123,326.39
5 Tukang kayu 102.49 OH 71,091.00 7,286,162.80
6 Tukang Cat - OH 71,091.00 -
51,954,445.12

1 Sirtu 93.60 m3 95,400.00 8,929,440.00


2 Batu Belah 15/20 31.10 m3 216,400.00 6,730,905.60
3 Pasir Urug 5.60 m3 234,300.00 1,311,780.10
4 Batu Bata 18,723.26 bh 1,200.00 22,467,916.80
5 Portland Semen 199.22 zak 81,000.00 16,136,525.40
6 Pasir pasang 15.84 m3 274,300.00 4,345,706.19
7 Kerikil 5.6938 m3 285,200.00 1,623,871.76
8 Besi beton 260.22 kg 12,000.00 3,122,582.40
tul poko dalam batang -
beugel dalam batang -
9 Bendrat 3.72 kg 20,000.00 74,347.20
10 Paku biasa 91.82 kg 18,800.00 1,726,250.82
11 Kayu terentang 5.164506894 m3 5,288,194.44 27,310,916.67
12 Bambu 84 btg 16,600.00 1,394,400.00
13 Plywood 7.35 lbr 166,400.00 1,223,040.00
14 Balok 0 m3 5,288,194.44 -
15 KAYU damar laut 6/12 - m3 13,826,388.89 -
15 KAYU KRUING 6/12 - m3 13,826,388.89 -
15 LEM KAYU - kg 33,500.00 -
16 KAYU DAMAR LAUT - m3 14,380,000.00 -
17 KAYU KRUING 8/12 5.84 m3 9,479,166.67 55,369,106.67
18 KAYU KRUING 5/7 3.33 m3 7,428,571.43 24,750,960.00
19 KAYU KRUING 2/3 0.86 m3 5,935,000.00 5,084,894.34
20 BESI STRIP 55.54 kg 42,000.00 2,332,713.60
21 GENTENG PLENTONG 5,949.75 BUAH 2,500.00 14,874,375.00
22 GENTENG BUBUNG 139.20 BUAH 4,100.00 570,720.00
23 KAYU MRANTI 5/7 - m3 6,014,285.71 -
24 KAYU GLUGU 5/7 3m - m3 2,000,000.00 -
25 PAPAN COR 0.2/0.20 2m - m3 1,819,444.44 -
26 KALSIRATA 100X100X0.4 LBR 22,900.00 -
27 lisplank Kalsirata m' 19,200.00 -
28 LIST GYPSUM M' 19,400.00 -
29 KERAMIK 30X30 polos - DUS 55,400 -
30 SEMEN WARNA - kg 18,000 -
31 keramik 20x20 teksture dus 62,800 -
32 KERAMIK 30X30 motif - dus 59,200 -
33 KERAMIK 10x20 - dus 15,500 -
34 KUNCI TANAM - BUAH 183,200 -
35 ENGSEL PINTU - BUAH 15,500 -
36 ENGSEL JENDELA - BUAH 13,250 -
37 kait angin - BUAH 10,800 -
38 gerendel jendela - BUAH 9,200 -
39 Cat Menie - kg 29,600 -
40 Plamuur - kg 33,400 -
41 Plamir - kg 13,360 -
42 Cat Dasar - kg 68,800 -
43 Cat Penutup (sekualitas decolith) - kg 24,560 -
44 Cat Penutup (sekualitas avian) - kg 68,800 -
45 Kuas - bh 9,400 -
46 Pengencer - kg 26,000 -
47 Amplas - lbr 6,500 -
48 Kloset Jongkok - bh 197,100.00 -
49 Floor Drain (stainless-steel INA) bh 63,300.00 -
50 Pipa PVC Ø ¾" m' 6,325 -
51 Pipa PVC Ø 3" m' 37,550 -
52 Pipa PVC Ø 4" m' 63,100 -
53 Perlengkapan 35% x pipa Ls 106,975 -
54 Kran Air - bh 16,800 -
55 Sealtape - bh 3,900 -
56 Tali Ijuk - kg 0 -
57 Pasang kabel overspaneng antar bangunan - titik 150,000 -
58 Pasang stop kontak Broco - bh 25,000 -
59 Pasang lampu TL 14 watt Philips - titik 36,000 -
60 Pasang saklar tunggal Broco - bh 19,000 -
61 Pasang saklar ganda Broco - bh 25,000 -
62 Pasang titik lampu - titik 150,000 -
63 Keramik Broder - bh 628 -
64 PENGADAAN/PERBAIKAN MEUBELAIR - ls 7,500,000.00 -
BAHAN BANGUNAN 199,380,452.55
PERHITUNGAN VOLUME PEKERJAAN
SD NEGERI CEMPEDAK 01

NO ITEM PEKERJAAN PANJANG LEBAR TINGGI


A PEKERJAAN PERSIAPAN
PEKERJAAN PONDASI
GALIAN PONDASI
pekerjaan galian pondasi menerus 72 0.8 0.8
pekerjaan galian footplate 1 1 1

Urugan peninggian peil 21 7 0.5


Urugan peninggian peil 3 3 0.5

Pekerjaan Aanstamping 72 0.9 0.2


Pekerjaan pondasi batu kali menerus 72 0.55 0.8

3 menurunkan rangka kuda2


balok tarik 7.55 0.12 0.08
mander 2.08 0.12 0.08
skor 1.66 0.12 0.08
kaki kuda2 3.94 0.12 0.08
gapet 3.26 0.12 0.06

jmulah kuda-kuda 7
balok kait angin 4.53 0.12 0.06
total pekerjaan kuda-kuda

1 Pekerjaan pasangan bata 1:4 68.1 0.4 1

2 Pekerjaan pasangan bata 1:6 72 3.2 1


Gunungan 7 2 1
Pekerjaan pasangan bata 1:6 3 1.5 1
Gunungan 7 2 1

pengurang
bv 1.44 0.52 1
jd 1.44 2.08 1
p1 2.08 2.62 1
p2 2.08 0.9 1

JUMLAH TOTAL

3 pekerjaan sloof 72 0.15 0.2


pembesian polos
tulangan pokok 72 4 1
24 ljr
beugel 480 0.66 1
26.4 ljr

begisting 72 0.4 1
4 pekerjaan kolom 0.15 0.2 5
pembesian polos
tulangan pokok 105 4 1
35 ljr
beugel 700 0.66 1
38.5 ljr
begisting 105 0.4 1
6 pelkerjaan kusen pintu P1
tiang 6.06 0.06 0.12
ambang atas dan bawah 3.12 0.06 0.12
jumlah 1 pintu
jumlah yang di ganti 3

7 pelkerjaan kusen pintu j1


tiang 4.12 0.06 0.12
ambang atas dan bawah 1.8 0.06 0.12
jumlah 1 pintu
jumlah yang di ganti 3

8 pelkerjaan daun pintu P1


tiang 0.9 1 2

jumlah 1 pintu
jumlah yang di ganti 3

7 PARTISI
tiang 1.68 0.06 0.12
ambang 5.06 0.06 0.12
jumlah 1 partisi
jumlah yang di ganti 1

8 pelkerjaan daun partisi


tiang 1.5 1 4.7

jumlah 1 pintu
jumlah yang di ganti 1
7 pelkerjaan Daun jendela
jendela j1 1.35 0.08 2
jalusi jendela (3x10) 1.8 0.06 3
jalusi pintu (2x3) 2.08 0.06 2

8 Murpat dll
balok teras 0 0.08 0.12
murplate 48 0.08 0.12
gording 48 0.08 0.12

8 nok
nok 48 0.06 0.12

9 lisplank
depan 0 1 1
belakang 0 1 1
samping depan 7.01 1 1
samping belakang 5.17 1 1

10 genteng baru
depan 0 1 2
samping nok 0 1 0.5
11 plafond
balok induk plafond kayu kruing 6/12 7.5 0.12 0.08

12 rangka plafond
3 ruang kelas 7.35 7.05 1
teras depan 2.2516 0 1
ruang uks 4.85 7.05 0.5
2 teras samping 0.8 12.18 1
belakang 0.8 0 1

13 list tepi plafon


3 ruang kelas 7.35 + 7.05 1 x
teras depan 2.2516 0 1
ruang uks 4.85 7.05 0.5
2 teras samping 0.8 12.18 1
belakang 0.8 0 1

pasang kunci tanam


pasang engsel pintu
pasang engsel jendela 4
pasang kait angin 4
pasang grendel jendela 4

pasang kaca bening tebal 5 mm


daun 0.6 x 0.12 x 1
daun mati 0.6 x 0.85 x 1
angin-angin 0.42 x 0.22 x 1
jumlah jendela 10 10

keramik dinding -4 1 1.25

Pasangan dinding

dinding depan + Belakang 27.5 x 3.55 x 1


dinding sekat 7.5 x 3.55 x 1
gunungan 7.5 x 2.07 x 0.5

luar dan dalam

pengurang
luas kerami dinding 27.5 x 3.55 x 1
Pintu p1 2.27 x 1 x 1
partisi 4.7 x 1.2 x 1
jendela 2.04 x 1.28 x 1
bouven 0.4 x 1.28 x 1

2 sisi luas kusen


luas keramik
total pengurangan
JUMLAH

1 46.08
21 21
67.08

1 73.5
1 4.5
78
1 12.96
1 31.68
31.68
21100
1 0.07248 22100
1 0.019968 1000
2 0.015936
2 0.037824
2 0.023472
a 0.16968 m3
(7xa) 1.18776 m3
10 0.32616
1.51392 m3

1 27.24

1 230.4
1 14
2 9
1 14
267.4

8 5.9904
4 11.9808
1 5.4496
2 3.744
27.1648
240.2352

1 2.16 m3

1 288 m'
7.4 177.6 kg
1 316.8 m'
2.66 70.224 kg
247.824 kg
1 28.8 m'
21 3.15 m3

1 420 m'
7.4 259 kg
1 462 m'
2.66 102.41 kg
361.41 kg
1 42 m'

1 0.043632
1 0.022464
0.066096 m3
0.198288 m3

1 0.029664
1 0.01296
0.042624 m3
0.127872 m3

1 1.8

1.8 m2
5.4 m2

6 0.072576
3 0.109296
0.181872 m3
0.181872 m3

1 7.05

7.05 m2
7.05 m2

10 2.16
10 3.24
3 0.7488
6.1488 m2

0 0
2 0.9216
2 0.9216
1.8432 m3

1 0.3456
0.3456 m3

1 0
1 0
1 7.01
1 5.17
12.18 m'

1 0
2 0
0 m'
4 0.288
0.288 m3

3 155.4525
1 0
1 17.09625
2 19.488
1 0
192.0368 m2

3 43.2
1 2.2516
1 11.9
2 25.96 m2
1 0.8
84.1116

3
18
10 40
10 40
10 40
m2

2 0.144
1 0.51
3 0.2772
2.772

1 -5

2 195.25
5 133.125
1 7.7625
336.1375
672.275

2 -
10 22.7
1 5.64
7 18.2784
10 5.12
51.7384
sisi luas kusen 103.4768
luas keramik -
al pengurangan 103.48

568.80
8122507319
PEMERINTAH KABUPATEN PURWOREJO
DINAS PENDIDIKAN KEPEMUDAAN DAN OLAH RAGA
Jl. Mayjend Sutoyo no. No. 69

PURWOREJO

LAPORAN MINGGUAN
RENCANA ANGGARAN

MINNGU I (SATU)
TANGGAL 01 - 07 MARET 2018

KEGIATAN
REHABILITASI RUANG KELAS BERAT SD DANA ALOKASI KHUSUS (DAK )
BIDANG PENDIDIKAN

KEGIATAN
REHABILITASI RUANG KELAS RUSAK BERAT 3 (TIGA) RUANG
SD N KALIJERING
KECAMATAN PITURUH

SD NEGERI KALIJERING
KEC. PITURUH
LOKASI
DESA KALIJERING
KECAMATAN PITURUH
KABUPATEN PURWOREJO

TAHUN ANGGARAN 2018


REKAPITULASI LAPORAN MINGGUAN
MINGGU KE : I (SATU)
TANGGAL : 01 - 07 Maret - 2018

KEGIATAN : REHABILITASI RUANG KELAS, PERPUSTAKAAN DAN ATAU RUANG GURU DAN PEMBANGUNAN RUANG KELAS BARU (RKB) SD DAK BIDANG PENDIDIKAN TAHUN 2018
PEKERJAAN : PEMBANGUNAN 1 (SATU) RUANG KELAS BARU SD NEGERI SILO KEC. BRUNO
LOKASI : DESA TEGALSATI KECAMATAN BRUNO
TAHUN ANGGARAN : TAHUN 2018

BOBOT BOBOT BOBOT BOBOT SISA


NO URAIAN PEKERJAAN
% S/D MINGGU LALU MINGGU INI S/D MINGGU INI PEKERJAAN
1 2 3 4 5 6 7
A PEKERJAAN PERSIAPAN 0.06 - - - 0.06
B PEKERJAAN TANAH & PONDASI 15.48 - - - 15.48
C PEKERJAAN PASANGAN DINDING 14.04 - - - 14.04
D PEKERJAAN PEMBETONAN 18.39 - - - 18.39
E PEKERJAAN PLESTERAN DAN ACIAN 12.99 - - - 12.99
F PEKERJAAN KUSEN DAN DAUN JENDELA 0.00 - - - -
G PEKERJAAN STRUKTUR ATAP 31.13 - - - 31.13
H PEKERJAAN PENUTUP ATAP 7.91 - - - 7.91
I PEKERJAAN PLAFOND 0.00 - - - -
J PEKERJAAN PENUTUP LANTAI 0.00 - - - -
K PEKERJAAN PENGGANTUNG DAN PENGUNCI 0.00 - - - -
L PEKERJAAN INSTALASI LISTRTIK 0.00 - - - -
M PEKERJAAN INSTALASI AIR DAN SANITASI 0.00 - - - -
N PEKERJAAN PENGECATAN 0.00 - - - -
O PENGADAAN MEUBELAIR 0.00 - - - -
JUMLAH 100.00 - - - 100.00

RENCANA MINGGU INI 5.164


TERLAMBAT/MENDAHULUI -5.164

Purworejo 07 Maret 2018


Menyetujui Dibuat
Kepala Sekolah SD N KALIJERING Team Rencana
Kec. PITURUH Kab. Purworejo

PAIJO TEGUH SANTOSO.S.T


NIP. 1234….
LAPORAN REALISASI PEKERJAAN MINGGUAN
MINGGU KE : I (SATU)
TANGGAL : 01 - 07 Maret - 2018
KEGIATAN : REHABILITASI RUANG KELAS, PERPUSTAKAAN DAN ATAU RUANG GURU DAN PEMBANGUNAN RUANG KELAS BARU (R
PEKERJAAN : PEMBANGUNAN 1 (SATU) RUANG KELAS BARU SD NEGERI SILO KEC. BRUNO
LOKASI : DESA TEGALSATI KECAMATAN BRUNO
TAHUN ANGGARAN : TAHUN 2018

BOBOT REALISASI PEKERJAAN


NO URAIAN PEKERJAAN VOLUME
% S/D MINGGU LALU MINGGU INI S/D MINGGU INI
VOLUME BOBOT VOLUME BOBOT VOLUME
1 2 3 4 5 6 7 8 9
A PEKERJAAN PERSIAPAN
1 Pasang papan nama pekerjaan 1.00 0.060 -
2 Pekerjaan pemasangan bowplank - 0.000 -
3 Pekerjaan bongkaran beton bertulang - 0.000 -
4 Pekerjaan menurunkan genteng tidak di pakai kembali - 0.000 -
5 Pekerjaan menurunkan genteng di pakai kembali - 0.000 -
6 Menurunkan rangka atap - 0.000 -
7 Menurunkan rangka kuda-kuda - 0.000 -
8 Pekerjaan bongkaran 1 m3 dinding tembok bata - 0.000 -
SUB JUMLAH A 0.06 - -
B PEKERJAAN TANAH & PONDASI
1 Pekerjaan galian pondasi 67.08 0.848 -
2 Pekerjaan urugan kembali galian pondasi 73.50 0.310 -
3 Urugan peninggian peil 78.00 3.881 -
4 Pekerjaan Aanstamping 12.96 2.191 -
5 Pekerjaan pondasi batu kali 31.68 8.250 -
SUB JUMLAH B 15.48 - -
BOBOT REALISASI PEKERJAAN
NO URAIAN PEKERJAAN VOLUME
% S/D MINGGU LALU MINGGU INI S/D MINGGU INI
VOLUME BOBOT VOLUME BOBOT VOLUME
1 2 3 4 5 6 7 8 9
C PEKERJAAN PASANGAN DINDING
1 Memasang batu merah 1/2 bata 1:4 27.24 1.464 -
2 memasanng batu merah 1/2 bata 1 : 6 240.24 12.574 -
SUB JUMLAH C 14.04 - -
D PEKERJAAN PEMBETONAN
1 Pekerjaan sloof 15/20
membuat beton mutu K-150 2.16 0.848 -
Pembersian dengan besi polos 247.82 1.358 -
Pekerjaan begisting sloof (2x pakai) 28.80 1.916 -
2 Pekerjaan Kolom utama K1 (15/15)
membuat beton mutu K-150 3.15 1.237 -
Pembersian dengan besi polos 361.41 1.980 -
Pekerjaan begisting kolom (2x pakai) 42.00 6.931 -
3 Pekerjaan Ring balk 15/20
membuat beton mutu K-150 2.16 0.848 -
Pembersian dengan besi polos 247.82 1.358 -
Pekerjaan begisting ring balk (2x pakai) 28.80 1.916 -
4 Pekerjaan balok teras 15/20
membuat beton mutu K-150 - 0.000 -
Pembersian dengan besi polos - 0.000 -
Pekerjaan begisting balok (2x pakai) - 0.000 -
5 Pekerjaan balok konsol 15/20
membuat beton mutu K-150 - 0.000 -
Pembersian dengan besi polos - 0.000 -
Pekerjaan begisting balok (2x pakai) - 0.000 -
6 Pekerjaan balok lateu 11/15 - 0.000 -
7 Pekerjaan balok gunungan 11/15 - 0.000 -
8 Pekerjaan Plat dak tebal 12
membuat beton mutu K-150 - 0.000 -
Pembersian dengan besi polos - 0.000 -
Pekerjaan begisting plat - 0.000 -
SUB JUMLAH D 18.39 - -
BOBOT REALISASI PEKERJAAN
NO URAIAN PEKERJAAN VOLUME
% S/D MINGGU LALU MINGGU INI S/D MINGGU INI
VOLUME BOBOT VOLUME BOBOT VOLUME
1 2 3 4 5 6 7 8 9
E PEKERJAAN PLESTERAN DAN ACIAN
1 Pekerjaan plesteran trassram 54.48 0.895 -
2 Pekerjaan plesteran 1 ; 6 480.47 7.484 -
3 Pekerjaan acian 534.95 4.610 -
SUB JUMLAH E 12.99 - -
F PEKERJAAN KUSEN DAN DAUN JENDELA
1 Pekerjaan pembuatan kusen pintu damar laut (P1) …. Bu - 0.000 -
2 Pekerjaan pembuatan kusen jendela kayu damar laut (J1 - 0.000 -
3 Pekerjaan pembuatan kusen bouven kayu damar laut (BV - 0.000 -
4 Pekerjaan pemasangan daun pintu kayu damarlaut - 0.000 -
5 Pekerjaan pemasangan daun jendela dan jalusi kayu dam - 0.000 -
SUB JUMLAH F - - -
G PEKERJAAN STRUKTUR ATAP
1 Pembuatan dan pemasangan kuda-kuda kayu kruing 8/1 1.51 7.398 -
2 Pemasangan balok teras, murplat dan gording 8/12 kayu 1.84 8.643 -
3 Pemasangan nok kayu kruing uk 8/12 kayu kruing 0.35 1.621 -
4 Pemasangan rangka kap atap kayu kruing 237.99 13.467 -
5 Pemasangan konsol teras kayu kruing 6/12 - 0.000 -
6 Pasang jurai kayu kruing 8/12 - 0.000 -
7 Pasang Listplank kayu damarlaut 3/25 - 0.000 -
8 Pasang lisplank Uk 400 x 20 x 0.8 cm, Kalsirata - 0.000 -
SUB JUMLAH G 31.13 - -
H PEKERJAAN PENUTUP ATAP
1 Pasang genteng lama - 0.000 -
2 Pasang genteng baru 237.99 7.082 -
3 Pasang genteng bubungan 27.84 0.831 -
SUB JUMLAH H 7.91 - -
BOBOT REALISASI PEKERJAAN
NO URAIAN PEKERJAAN VOLUME
% S/D MINGGU LALU MINGGU INI S/D MINGGU INI
VOLUME BOBOT VOLUME BOBOT VOLUME
1 2 3 4 5 6 7 8 9
I PEKERJAAN PLAFOND
1 Pemasangan balok induk plafond kayu kruing uk. 6/12 - 0.000 -
2 Pemasangan rangka plafond 50x100 cm kayu meranti uk - 0.000 -
3 Pemasangan penutup langit langit kalsirata 100x100x0.5 - 0.000 -
4 Pemasangan list tepi plafond bahan gyipsum - 0.000 -
SUB JUMLAH I - - -
J PEKERJAAN PENUTUP LANTAI
1 Pengurugan dan peninggian peil (leveling) - 0.000 -
2 Pasang rabat beton bawah lantai - 0.000 -
3 Pasang keramik dinding 30x30 polos - 0.000 -
4 Pasang keramik dinding 25x25 teksture - 0.000 -
5 Pasang keramik lantai 30x30 motif - 0.000 -
6 Pasang keramik lantai 20x25 keramik dinding - 0.000 -
7 Pasang border keramik dinding 10x20 - 0.000 -
SUB JUMLAH J - - -
K PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 pasang kunci tanam - 0.000 -
2 pasang engsel pintu - 0.000 -
3 pasang engsel jendela - 0.000 -
4 pasang kait angin - 0.000 -
5 pasang grendel jendela - 0.000 -
6 pasang kaca bening tebal 5 mm - 0.000 -
SUB JUMLAH K - - -
L PEKERJAAN INSTALASI LISTRTIK
1 Pasang kabel overspaneng antar bangunan - 0.000 -
2 Pasang stop kontak Broco - 0.000 -
3 Pasang lampu TL 14 watt Philips - 0.000 -
4 Pasang saklar tunggal Broco - 0.000 -
5 Pasang saklar ganda Broco - 0.000 -
6 Pasang titik lampu - 0.000 -
SUB JUMLAH L - - -
BOBOT REALISASI PEKERJAAN
NO URAIAN PEKERJAAN VOLUME
% S/D MINGGU LALU MINGGU INI S/D MINGGU INI
VOLUME BOBOT VOLUME BOBOT VOLUME
1 2 3 4 5 6 7 8 9
M PEKERJAAN INSTALASI AIR DAN SANITASI
1 Pasang Kloset Jongkok Porselin , INA - 0.000 -
2 Pasang Pipa PVC Diam. 4" (Limbah Padat) - 0.000 -
3 Pasang Pipa PVC Diam. 3" Saluran Pembuangan Air Kot - 0.000 -
4 Pasang Pipa PVC Diam. 3/4" Saluran Air Bersih - 0.000 -
5 Pasang Kran Air Diam. 3/4" - 0.000 -
6 Pasang Floodrien (stainless-steel INA) - 0.000 -
7 Pasang Wastafel cuci tangan lengkap terpasang - 0.000 -
SUB JUMLAH M - - -
N PEKERJAAN PENGECATAN
1 Pengecatan dinding lama (1 lap.Plamir, 2 lap Cat Penutu - 0.000 -
2 Pengecatan dinding baru (1 lap.Plamir, 1 lap Cat Dasar - 0.000 -
3 Pengecatan kayu Kayu Baru (1 lp Plamuur, 1 lp Cat dasar - 0.000 -
4 Pengecatan Plafond (1 lap.Plamir, 1 lap Cat Dasar 2 lap - 0.000 -
SUB JUMLAH N - - -
O PENGADAAN MEUBELAIR
1 PENGADAAN/PERBAIKAN MEUBELAIR - 0.000 -
SUB JUMLAH O - - -

JUMLAH TOTAL 100.00 - -

RENCANA 5.16
TERLAMBAT/MENDAHULUI (5.16)

Menyetujui
Kepala Sekolah SD N KALIJERING Team Rencana
Kec. PITURUH Kab. Purworejo
BOBOT REALISASI PEKERJAAN
NO URAIAN PEKERJAAN VOLUME
% S/D MINGGU LALU MINGGU INI S/D MINGGU INI
VOLUME BOBOT VOLUME BOBOT VOLUME
1 2 3 4 5 6 7 8 9
PAIJO TEGUH SANTOSO.S.T
NIP. 1234….
AN

NAN RUANG KELAS BARU (RKB) SD DAK BIDANG PENDIDIKAN TAHUN 2018

SISA PEKERJAAN
S/D MINGGU INI PEKERJAAN
BOBOT VOLUME BOBOT
10 11 12

- 1.000 0.060
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- 0.06

- 67.080 0.848
- 73.500 0.310
- 78.000 3.881
- 12.960 2.191
- 31.680 8.250
- 15.48
SISA PEKERJAAN
S/D MINGGU INI PEKERJAAN
BOBOT VOLUME BOBOT
10 11 12

- 27.240 1.464
- 240.235 12.574
- 14.04

- 2.160 0.848
- 247.824 1.358
- 28.800 1.916

- 3.150 1.237
- 361.410 1.980
- 42.000 6.931

- 2.160 0.848
- 247.824 1.358
- 28.800 1.916

- - -
- - -
- - -

- - -
- - -
- - -
- - -
- - -

- - -
- - -
- - -
- 18.39
SISA PEKERJAAN
S/D MINGGU INI PEKERJAAN
BOBOT VOLUME BOBOT
10 11 12

- 54.480 0.895
- 480.470 7.484
- 534.950 4.610
- 12.99

- - -
- - -
- - -
- - -
- - -
- -

- 1.514 7.398
- 1.843 8.643
- 0.346 1.621
- 237.990 13.467
- - -
- - -
- - -
- - -
- 31.13

- - -
- 237.990 7.082
- 27.840 0.831
- 7.91
SISA PEKERJAAN
S/D MINGGU INI PEKERJAAN
BOBOT VOLUME BOBOT
10 11 12

- - -
- - -
- - -
- - -
- -

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- -

- - -
- - -
- - -
- - -
- - -
- - -
- -

- - -
- - -
- - -
- - -
- - -
- - -
- -
SISA PEKERJAAN
S/D MINGGU INI PEKERJAAN
BOBOT VOLUME BOBOT
10 11 12

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- -

- - -
- - -
- - -
- - -
- -

- - -
- -

- 100.00

Dibuat
Team Rencana
SISA PEKERJAAN
S/D MINGGU INI PEKERJAAN
BOBOT VOLUME BOBOT
10 11 12
TEGUH SANTOSO.S.T
JADWAL PELAKSANAAN
KEGIATAN : REHABILITASI RUANG KELAS, PERPUSTAKAAN DAN ATAU RUANG GURU DAN PEMBANGUNAN RUANG KELAS BARU (RKB) SD DAK BIDANG PENDIDIKAN TAHUN 2018
PEKERJAAN : PEMBANGUNAN 1 (SATU) RUANG KELAS BARU SD NEGERI SILO KEC. BRUNO
LOKASI : DESA TEGALSATI KECAMATAN BRUNO
TAHUN ANGGARAN : TAHUN 2018

BOBOT
NO URAIAN PEKERJAAN TOTAL HARGA (Rp) MINGGU 1 MINGGU 2 MINGGU 3 MINGGU 4 MINGGU 5 MINGGU 6 MINGGU 7 MINGGU 8 MINGGU 9 MINGGU 10 MINGGU 11 MINGGU 12 MINGGU 13 MINGGU 14 MINGGU 15 KETERANGAN
%

A PEKERJAAN PERSIAPAN 0.06 150,000.00 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
B PEKERJAAN TANAH & PONDASI 15.48 38,905,079.89 5.160 5.160 5.160
C PEKERJAAN PASANGAN DINDING 14.04 35,281,408.52 2.340 2.340 2.340 2.340 2.340 2.340
D PEKERJAAN PEMBETONAN 18.39 46,226,801.81 2.299 2.299 2.299 2.299 2.299 2.299 2.299 2.299 GARIS RENCANA
E PEKERJAAN PLESTERAN DAN ACIAN 12.99 32,644,903.32 3.247 3.247 3.247 3.247
F PEKERJAAN KUSEN DAN DAUN JENDELA 0.00 - 0.000 0.000 0.000 0.000 0.000 0.000 0.000
G PEKERJAAN STRUKTUR ATAP 31.13 78,237,689.05 4.447 4.447 4.447 4.447 4.447 4.447 4.447
H PEKERJAAN PENUTUP ATAP 7.91 19,889,015.08 2.638 2.638 2.638
I PEKERJAAN PLAFOND 0.00 - 0.000 0.000 0.000 GARIS REALISASI
J PEKERJAAN PENUTUP LANTAI 0.00 - 0.000 0.000
K PEKERJAAN PENGGANTUNG DAN PENGUNCI 0.00 - 0.000 0.000
L PEKERJAAN INSTALASI LISTRTIK 0.00 - 0.000 0.000
M PEKERJAAN INSTALASI AIR DAN SANITASI 0.00 - 0.000 0.000
N PEKERJAAN PENGECATAN 0.00 - 0.000 0.000
O PENGADAAN MEUBELAIR 0.00 - 0.000 0.000 0.000
JUMLAH 100.00 251,334,897.67
RENCANA PER MINGGU 5.164 7.463 9.802 4.643 4.643 12.337 12.337 12.337 9.997 7.089 7.089 7.089 0.004 0.004 0.004
AKUMULASI RENCANA TIAP MINNGU - 5.164 12.627 22.429 27.072 31.714 44.051 56.388 68.725 78.722 85.811 92.899 99.988 99.992 99.996 100.000
REALISASI PER MINGGU
AKUMULASI TIAP MINGGU -
TERLAMBAT/MENDAHULUI

Menyetujui Dibuat
Kepala Sekolah SD N KALIJERING Team Rencana
Kec. PITURUH Kab. Purworejo

PAIJO TEGUH SANTOSO.S.T


NIP. 1234….
DAFTAR HARGA SATUAN PEKERJAAN
AHSP BIDANG CIPTA KARYA
KABUPATEN PURWOREJO TA. 2017

HARGA SATUAN
NO KODE URAIAN PEKERJAAN SAT PEKERJAAN
(Rp)

I A. 2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


1 A.2.2.1.1 Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter m2 623,544.06
2 A.2.2.1.2 Pembuatan 1 m2 Pagar Sementara dari Seng Gelombang Tinggi 2,00 m m2 702,679.46
3 A.2.2.1.3 Pembuatan 1 m2 Pagar Sementara dari kawat duri tinggi 1,8 meter m2 1,090,452.03
4 A.2.2.1.4 Pengukuran dan Pemasangan 1 m' Bouwplank m' 49,268.52
5 A.2.2.1.5 Pembuatan 1 m2 Kantor Sementara dgn Lantai Plesteran m2 1,048,784.30
6 A.2.2.1.6 Pembuatan 1 m2 rumah jaga (konstruksi kayu ) m2 2,434,674.15
7 A.2.2.1.7 Pembuatan 1 m2 Gudang m2 1,971,378.20
8 A.2.2.1.8 Pembuatan 1 m2 bedeng pekerja m2 1,901,568.20
9 A.2.2.1.9 Pembersihan dan Perataan Lapangan 1 m2 m2 4,236.40
10 A.2.2.1.10 Pembuatan 1 m2 Steger/ Perancah dari Bambu m2 230,479.40
11 A.2.2.1.11 Pembuatan 1 buah Bak Adukan ukuran 40cmx50cmx25cm bh 507,251.53
12 A.2.2.1.12 Pembuatan 1 m2 Jalan Sementara m2 97,322.00
13 A.2.2.1.13 Bongkaran 1 m3 Beton Bertulang m3 564,881.58
14 A.2.2.1.14 Bongkaran 1 m3 Dinding Tembok Bata m3 282,440.79
15 A.2.2.1.15 Pemasangan 1 m2 Pagar Kawat Jaring Galvanis Panjang 240cm m2 2,225.83
16 A.2.2.1.16 Pemasangan 1 m2 Panel Beton Pracetak 5x50x213 cm m2 160,583.37

II A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


1 A.2.3.1.1 Penggalian 1 m3 Tanah Biasa Sedalam 1 m m3 31,773.00
2 A.2.3.1.2 Penggalian 1 m3 Tanah Biasa Sedalam 2 m m3 38,127.60
3 A.2.3.1.3 Penggalian 1 m3 Tanah Biasa Sedalam 3 m m3 44,482.20
4 A.2.3.1.4 Penggalian 1 m3 Tanah Keras Sedalam 1 m m3 42,364.00
5 A.2.3.1.5 Penggalian 1 m3 Tanah Cadas Sedalam 1 m m3 63,546.00
6 A.2.3.1.6 Penggalian 1 m3 Tanah Lumpur Sedalam 1 m m3 50,836.80
7 A.2.3.1.7 Mengerjakan Striping 1 m2 Tanah Tebing Setinggi 1 m m2 2,118.20
8 A.2.3.1.8 Membuang 1 m3 Tanah sejauh 30 m' m3 2,353.56
2 A.2.3.1.9 Pengurugan Kembali 1 m3 Galian Tanah m3 7,060.67
10 A.2.3.1.10 Pemadatan Tanah 1 m3 Tanah (per 20 cm) m3 21,182.00
3 A.2.3.1.11 Pengurukan 1 m3 dengan Pasir Uurg m3 293,869.20
12 A.2.3.1.12 Pemasangan 1 m3 Lapisan Pudel Cmp. 1Kp : 3Ps : 7TL m3 243,254.87
13 A.2.3.1.13 Pemasangan 1 m2 Lapisan Ijuk tebal 10 cm utk Bidang Resapan m2 295,554.60
14 A.2.3.1.14 Pengurukan 1 m3 Sirtu Padat m3 125,071.00

III A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI


1 A.3.2.1.1 Pemasangan 1 m3 Pondasi Batu Belah Campuran 1SP : 4 PP m3 842,901.58
1 A.3.2.1.2 Pemasangan 1 m3 Pondasi Batu Belah Campuran 1SP : 4 PP m3 789,322.08
2 A.3.2.1.3 Pemasangan 1 m3 Pondasi Batu Belah Campuran 1SP : 5 PP m3 752,165.28
4 A.3.2.1.4 Pemasangan 1 m3 Pondasi Batu Belah Campuran 1SP : 6 PP m3 726,048.38
5 A.3.2.1.5 Pemasangan 1 m3 Pondasi Batu Belah Campuran 1SP : 8 PP m3 690,237.28
3 A.3.2.1.6 Pemasangan 1 m3 Pondasi Batu Belah Campuran 1SP : 1KP : 2PP m3 520,201.57
4 A.3.2.1.7 Pemasangan 1 m3 Pondasi Batu Belah Campuran 1 SP : 3 KP : 10 PP m3 654,481.68
8 A.3.2.1.8 Pemasangan 1 m3 Pondasi Batu Belah Campuran ¼ SP : 1KP : 4 PP m3 617,936.91
5 A.3.2.1.9 Pemasang 1 m3 Batu Kosong (Anstamping) m3 424,829.56

77/135
10 A.3.2.1.10 Pemasang 1 m3 Pondasi Siklop, 60% Beton Camp. 1PC : 2PB : 3KR & 40% Batu Belah m3 2,396,564.89

11 A.3.2.1.11 Pemasang 1 m3 Pondasi Sumuran diameter 100 cm m3 795,748.88

IV A.4.1.1 HARGA SATUAN PEKERJAAN BETON


1 A.4.1.1.1 Membuat 1 m3 Beton mutu f'c=7,4 Mpa (K100), slum (12±2)cm, w/c = 0,87 m3 873,988.10
2 A.4.1.1.2 Membuat 1 m3 Beton mutu f'c=9,8 Mpa (K125), slum (12±2)cm, w/c = 0,78 m3 915,681.40
3 A.4.1.1.3 Membuat 1 m3 Beton mutu f'c=12,2 Mpa (K150), slum (12±2)cm, w/c = 0,72 m3 948,315.77

4 A.4.1.1.4 Membuat 1 m3 Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87 m3 831,964.29

5 A.4.1.1.5 Membuat 1 m3 Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66 m3 986,949.67
6 A.4.1.1.6 Membuat 1 m3 Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm, w/c = 0,61 m3 1,023,810.26
7 A.4.1.1.7 Membuat 1 m3 Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 m3 1,051,504.76
8 A.4.1.1.8 Membuat 1 m3 Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 m3 1,069,699.11
Membuat 1 m3 Lantai Kerja Beton mutu f'c=24,0 MPa (K275), slum (12±2)cm, w/c =
9 A.4.1.1.9 m3 1,101,025.32
0,53
10 A.4.1.1.10 Membuat 1 m3 Beton mutu f'c=26,4 MPa (K300), slum (12±2)cm, w/c = 0,52 m3 1,110,721.23
11 A.4.1.1.11 Membuat 1 m3 Beton mutu f'c=28,8 MPa (K325), slum (12±2)cm, w/c = 0,49 m3 1,172,480.39
12 A.4.1.1.12 Membuat 1 m3 Beton mutu f'c=31,2 MPa (K350), slum (12±2)cm, w/c = 0,48 m3 1,185,205.05
13 A.4.1.1.13 Membuat 1 m3 beton kedap air dengan strorox – 100 m3 1,126,308.44
14 A.4.1.1.14 Pemasangan 1 m’ PVC Waterstop lebar 150 mm m' 67,602.84
15 A.4.1.1.15 Pemasangan 1 m’ PVC Waterstop lebar 200 mm m' 104,898.03
16 A.4.1.1.16 Pemasangan 1 m’ PVC Waterstop lebar 230-320 mm m' 157,862.12
17 A.4.1.1.17 Pembesian 10 kg dengan Besi Polos atau Besi Ulir 10 kg 137,509.49
18 A.4.1.1.18 Pemasangan 10 kg Kabel Presstresed Polos/strand 10 kg 134,078.21
19 A.4.1.1.19 Pemasangan 10 kg Jaring Kawat baja/Wire Mesh 10 kg 112,118.56
20 A.4.1.1.20 Pemasangan 1 m2 Bekisting untuk Pondasi m2 259,789.08
21 A.4.1.1.21 Pemasangan 1 m2 Bekisting untuk Sloof m2 286,230.06
21a A.4.1.1.21 Pemasangan 1 m2 Bekisting untuk Sloof m2 286,230.06
22 A.4.1.1.22 Pemasangan 1 m2 Bekisting untuk Kolom m2 443,906.97
23 A.4.1.1.23 Pemasangan 1 m2 Bekisting untuk Balok m2 459,771.55
24 A.4.1.1.24 Pemasangan 1 m2 Bekisting untuk Lantai m2 510,306.97
25 A.4.1.1.25 Pemasangan 1 m2 Bekisting untuk Dinding m2 479,552.11
26 A.4.1.1.26 Pemasangan 1 m2 Bekisting untuk Tangga m2 425,139.61
27 A.4.1.1.27 Pemasangan 1 m2 Jembatan Cor m2 169,502.94
28 A.4.1.1.28 Membuat 1 m3 Pondasi Beton Bertulang (150 kg Besi + Bekisting) m3 4,376,681.81
29 A.4.1.1.29 Membuat 1 m3 Sloof Beton Bertulang (200 kg Besi + Bekisting) m3 5,464,394.88
30 A.4.1.1.30 Membuat 1 m3 Kolom Beton Bertulang (300 kg Besi + Bekisting) m3 9,650,193.93
31 A.4.1.1.31 Membuat 1 m3 Balok Beton Bertulang (200 kg Besi + Bekisting) m3 7,578,498.50
32 A.4.1.1.32 Membuat 1 m3 Balok Beton Bertulang (150 kg Besi + Bekisting) m3 6,948,088.41
33 A.4.1.1.33 Membuat 1 m3 Dinding Beton Bertulang (150 kg Besi + Bekisting) m3 6,694,489.58
34 A.4.1.1.34 Membuat 1 m3 Tangga Beton Bertulang (200 kg Besi + Bekisting) m3 6,819,893.49
35 A.4.1.1.35 Membuat 1 m' Kolom Penguat Beton Bertulang (11 x 11) cm m' 70,734.51
36 A.4.1.1.36 Membuat 1 m' Ring Balok Beton Bertulang (10 x 15) cm m' 96,528.31

V A.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK

1 A.4.1.2.1 Pembuatan 1 m2 lahan produksi tebal 8cm beton f’c 14,5 Mpa (K 175) slump (12 ± 2) cm m2 78,936.51
Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 Mpa (K 175) slump (12 ± 2)
2 A.4.1.2.2 m2 98,746.73
cm
Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 Mpa (K 175) slump (12 ± 2)
3 A.4.1.2.3 m2 107,064.77
cm
Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 Mpa (K 175) slump (12 ± 2)
4 A.4.1.2.4 m2 148,029.64
cm
5 A.4.1.2.5 Pembuatan 1 m2 bekisting untuk plat beton pracetak ( 5 kali pakai) m2 137,613.79

78/135
6 A.4.1.2.6 Pembuatan 1 m2 bekisting untuk balok beton pracetak ( 10-12 kali pakai) m2 54,231.14
7 A.4.1.2.7 Pembuatan 1 m2 bekisting untuk kolom beton pracetak (10-12 kali pakai) m2 48,308.36
8 A.4.1.2.8 Pemasangan dan membuka bekisting 1 buah komponen plat beton pracetak bh 3,524.93
9 A.4.1.2.9 Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak bh 6,493.44
10 A.4.1.2.10 Pemasangan dan membuka bekisting 1 buah komponen Kolom beton pracetak bh 4,714.03
11 A.4.1.2.11 Penuangan/menebar beton untuk 1 buah komponen plat pracetak bh 31,914.24
12 A.4.1.2.12 Penuangan/menebar beton untuk 1 buah komponen balok pracetak bh 32,938.06
13 A.4.1.2.13 Penuangan/menebar beton untuk 1 buah komponen kolom pracetak bh 29,075.69
14 A.4.1.2.14 Mendirikan 1 buah komponen plat pracetak bh 22,560.78
15 A.4.1.2.15 Mendirikan 1 buah komponen balok pracetak bh 20,540.41
16 A.4.1.2.16 Mendirikan 1 buah komponen kolom pracetak bh 38,270.64
17 A.4.1.2.17 Melangsir 1 buah komponen plat pracetak ( ± 20 m) bh 5,869.29
18 A.4.1.2.18 Melangsir 1 buah komponen balok pracetak ( ± 20 m) bh 5,869.29
19 A.4.1.2.19 Melangsir 1 buah komponen kolom pracetak ( ± 20 m) bh 5,869.29
20 A.4.1.2.20 Bahan 1 m3 grouting campuran m3 21,600,000.00
21 A.4.1.2.21 Bahan 1 m3 grouting tidak campuran m3 33,301,520.00
22 A.4.1.2.22 Upah melakukan 1 titik grouting pada join pracetak titik 32,091.13
23 A.4.1.2.23 Pemasangan 1 titik Bekisting join pracetak titik 119,278.08
24 A.4.1.2.24 Upah 1 titik Join dengan Sling titik 41,186.12

VI A.4.2.1 HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM


1 A.4.2.1.1 Pemasangan 1 kg Besi Profil kg 27,354.85
2 A.4.2.1.2 Pemasangan 1 kg Rangka Kuda-kuda Baja IWF kg 25,578.85
3 A.4.2.1.3 Pengerjaan 100 kg Pekerjaan Perakitan (Kuda-kuda Baja) 100 kg 15,226.59
4 A.4.2.1.4 Pembuatan 1 m2 Pintu Besi Plat Baja tebal 2 mm rangkap, rangka baja Siku m2 1,745,827.31
5 A.4.2.1.5 Pengerjaan 10 cm Pengelasan dengan Las Listrik 10 cm 5,098.56
6 A.4.2.1.6 Pembuatan 1 m2 rangka jendela besi scuare tube (25 x 5) cm m2 89,213.79
7 A.4.2.1.7 Pemasangan 1 m2 Pintu Rolling Door Besi m2 640,576.92
8 A.4.2.1.8 Pemasangan 1 m2 Pintu Lipat (Folding Door) m2 611,988.20
9 A.4.2.1.9 Pemasangan 1 m2 Sunscreen Allumunium m2 66,749.20
10 A.4.2.1.10 Pemasangan 1 m2 Rolling Door Allumunium m2 753,664.10
11 A.4.2.1.11 Pemasangan 1 m' Kusen Pintu Allumunium m' 8,071.26
12 A.4.2.1.12 Pemasangan 1 m2 Pintu Allumunium Strip Lebar 8 cm m2 10,332.95
13 A.4.2.1.13 Pemasangan 1 m2 Pintu Kaca Rangka Allumunium m2 21,227.49
14 A.4.2.1.14 Pemasangan 1 m2 Venetions Blinds & Vertical Blinds m2 176,747.44
15 A.4.2.1.15 Pemasangan 1 m2 Terali Besi Strip (2x3) cm m2 216,818.95
16 A.4.2.1.16 Pemasangan 1 m2 Kawat Nyamuk m2 120,142.91
17 A.4.2.1.17 Pemasangan 1 m2 Jendela Nako & Tralis m2 320,472.82
18 A.4.2.1.18 Pemasangan 1 m' Talang Datar/Jurai , Seng BJLS 28 Lebar 90 cm m' 210,779.73

19 A.4.2.1.19 Pemasangan 1 m' Talang 1/2 Lingkaran Ø 15 cm, Seng Plaat BJLS 30 Lebar 45 cm m' 82,382.63

20 A.4.2.1.20 Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi m2 30,391.03

21 A.4.2.1.21 Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon m2 42,547.44

VII A.4.4.1 HARGA SATUAN PEKERJAAN DINDING PASANGAN


Pemasangan 1 m2 Dinding Bata Merah ukuran (5x11x22) cm Tebal 1 bata Camp. 1SP:
1 A.4.4.1.1 m2 274,632.20
2PP
Pemasangan 1 m2 Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP :
2 A.4.4.1.2 m2 287,598.72
3PP
Pemasangan 1 m2 Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP :
3 A.4.4.1.3 m2 277,779.32
4PP
Pemasangan 1 m2 Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP :
4 A.4.4.1.4 m2 273,201.02
5PP

79/135
Pemasangan 1 m2 Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP :
5 A.4.4.1.5 m2 272,693.02
6PP
Pemasangan 1 m2 Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP :
6 A.4.4.1.6 m2 258,084.58
3 KP :10PP
Pemasangan 1 m2 Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp.
7 A.4.4.1.7 m2 145,751.61
1SP : 2PP
Pemasangan 1 m2 Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp.
8 A.4.4.1.8 m2 138,880.61
1SP : 3PP
Pemasangan 1 m2 Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp.
9 A.4.4.1.9 m2 135,054.11
1SP : 4PP
Pemasangan 1 m2 Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp.
10 A.4.4.1.10 m2 132,654.31
1SP : 5PP
Pemasangan 1 m2 Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp.
11 A.4.4.1.11 m2 131,548.31
1SP : 6PP
Pemasangan 1 m2 Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp.
12 A.4.4.1.12 m2 128,874.21
1SP : 8PP
Pemasangan 1 m2 Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp.
13 A.4.4.1.13 m2 129,519.92
1SP : 3KP : 10PP
Pemasangan 1 m2 Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp.
14 A.4.4.1.14 m2 114,229.47
1SP : 1SM : 1PP
Pemasangan 1 m2 Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp.
15 A.4.4.1.15 m2 115,936.28
1KP : 1SM : 2PP
16 A.4.4.1.16 Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 3PP m2 439,971.56
17 A.4.4.1.17 Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 4PP m2 442,223.56
18 A.4.4.1.18 Pemasangan 1m2 dinding conblock HB15 campuran 1SP : 3PP m2 376,363.46
19 A.4.4.1.19 Pemasangan 1m2 dinding conblock HB15 campuran 1SP : 4PP m2 377,786.26
20 A.4.4.1.20 Pemasangan 1 m2 Dinding Conblock HB10 campuran 1SP : 3PP m2 205,333.61
21 A.4.4.1.21 Pemasangan 1 m2 Dinding Conblock HB10 campuran 1SP : 4PP m2 207,008.21

22 A.4.4.1.22 Pemasangan 1 m2 Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1SP : 3PP m2 240,049.71

23 A.4.4.1.23 Pemasangan 1 m2 Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1SP : 4PP m2 240,049.71

24 A.4.4.1.24 Pemasangan 1 m2 Dinding bata berongga ekspose Uk, (12x11x24)cm Camp. 1SP : 3PP m2 1,113,046.82

VIII A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


1 A,4,4,2.1 Pemasangan 1 m2 Plesteran 1 Pc : 1 Pp Tebal 15 mm m2 54,094.50
2 A,4,4,2.2 Pemasangan Plesteran 1 Pc : 2 Pp Tebal 15 mm m2 46,638.10
3 A,4,4,2.3 Pemasangan 1 m2 Plesteran 1 Pc : 3 Pp Tebal 15 mm m2 43,495.24
4 A,4,4,2.4 Pemasangan 1 m2 Plesteran 1 Pc : 4 Pp Tebal 15 mm m2 41,281.22
5 A,4,4,2.5 Pemasangan 1 m2 Plesteran 1 Pc : 5 Pp Tebal 15 mm m2 40,119.10
6 A,4,4,2.6 Pemasangan 1 m2 Plesteran 1 Pc : 6 Pp Tebal 15 mm m2 39,149.24
7 A,4,4,2.7 Pemasangan 1 m2 Plesteran 1 Pc : 7 Pp Tebal 15 mm m2 38,645.94
8 A,4,4,2.8 Pemasangan 1 m2 Plesteran 1 Pc : 8 Pp Tebal 15 mm m2 38,142.64
9 A.4.4.2.9 Pemasangan 1 m2 Plesteran 1 Pc : 1/2 Kp : 3 Pp Tebal 15 mm m2 24,582.24
10 A,4,4,2.10 Pemasangan 1 m2 Plesteran 1 Pc : 2 Kp : 8 Pp Tebal 15 mm m2 20,111.04
11 A,4,4,2.11 Pemasangan 1 m2 Plesteran 1 SM : 1 Kp : 1 Pp Tebal 15 mm m2 29,555.18
12 A,4,4,2.12 Pemasangan 1 m2 Plesteran 1 SM : 1 Kp : 2 Pp Tebal 15 mm m2 30,682.89
13 A,4,4,2.13 Pemasangan 1 m2 Plesteran 1 Pc : 2 Pp Tebal 20 mm m2 62,275.56
14 A,4,4,2.14 Pemasangan 1 m2 Plesteran 1Pc : 3Pp Tebal 20 mm m2 52,154.12
15 A,4,4,2.15 Pemasangan 1 m2 Plesteran 1 Pc : 4 Pp Tebal 20 mm m2 55,041.62
16 A,4,4,2.16 Pemasangan 1 m2 Plesteran 1Pc : 5Pp Tebal 20 mm m2 53,583.56
17 A,4,4,2.17 Pemasangan 1 m2 Plesteran 1Pc : 6Pp Tebal 20 mm m2 52,198.98
18 A,4,4,2.18 Pemasangan 1 m2 Plesteran 1 SM : 2 Kp : 2 Pp Tebal 20 mm m2 43,333.01
19 A,4,4,2.19 Pemasangan 1 m2 Berapen 1 Pc : 5Pp Tebal 15 mm m2 27,865.03
20 A,4,4,2.20 Pemasangan 1 m' Plesteran Skoning 1 Pc : 2Pp, lebar 10 mm m' 39,445.06
21 A,4,4,2.21 Pemasangan 1 m' Plesteran granit 1SP : 2 granit tebal 1cm m' 53,124.37
22 A,4,4,2.22 Pemasangan 1 m' Plesteran traso 1SP : 2 traso tebal 1cm m' 53,124.37
23 A,4,4,2.23 Pemasangan 1 m2 Plesteran Ciprat 1Pc : 2 Pp m2 29,273.41

80/135
24 A,4,4,2.24 Pemasangan 1 m2 Finishing Siar Pasangan Dinding Bata Merah m2 17,370.11
25 A,4,4,2.25 Pemasangan 1 m2 Finishing Siar Pasangan Dinding Conblock ekspose m2 8,370.03
26 A,4,4,2.26 Pemasangan 1 m2 Finishing Siar Pas.Batu Kali Adukan 1Pc : 2Pp m2 38,151.62
27 A,4,4,2.27 Pemasangan 1 m2 Acian m2 21,657.81

IX A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


1 A.4.4.3.1 Pemasangan 1 m2 lantai Ubin PC Abu-abu Uk. 40 x 40 cm m2 163,892.06
2 A.4.4.3.2 Pemasangan 1 m2 lantai Ubin PC Abu-abu Uk. 30 x 30 cm m2 162,811.24
3 A.4.4.3.3 Pemasangan 1 m2 lantai Ubin PC Abu-abu Uk. 20 x 20 cm m2 150,260.34
4 A.4.4.3.4 Pemasangan 1 m2 lantai Ubin PC Warna Uk. 40 x 40 cm m2 195,579.56
5 A.4.4.3.5 Pemasangan 1 m2 lantai Ubin PC Warna Uk. 30 x 30 cm m2 190,590.33
6 A.4.4.3.6 Pemasangan 1 m2 lantai Ubin PC Warna Uk. 20 x 20 cm m2 179,420.34
7 A.4.4.3.7 Pemasangan 1m2 lantai ubin teraso ukuran 40cm x40cm m2 72,151.06
8 A.4.4.3.8 Pemasangan 1m2 lantai ubin teraso ukuran 30cm x30cm m2 76,854.15
9 A.4.4.3.9 Pemasangan 1 m2 lantai Ubin Granit Uk. 40 x 40 cm m2 301,328.06
10 A.4.4.3.10 Pemasangan 1m2 lantai ubin granit ukuran 30cm x30cm m2 253,285.52
11 A.4.4.3.11 Pemasangan 1 m2 lantai teralux ukuran 40 x 40 cm m2 72,151.06
12 A.4.4.3.12 Pemasangan 1m2 lantai ubin teralux ukuran 30cm x30cm m2 76,854.15
13 A.4.4.3.13 Pemasangan 1m2 lantai ubin teralux marmer ukuran 60cm x 60cm m2 74,566.87
14 A.4.4.3.14 Pemasangan 1 m2 lantai teralux marmer Uk. 40 x 40 cm m2 72,151.06
15 A.4.4.3.15 Pemasangan 1m2 lantai ubin teralux marmer ukuran 30cm x30cm m2 72,151.06
16 A.4.4.3.16 Pemasangan 1 m' Ubin Plin Pc.Abu-abu Uk. 10 x 20 cm m' 31,140.97
17 A.4.4.3.17 Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 10cm x 30cm m' 124,261.47
18 A.4.4.3.18 Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 10cm x 40cm m' 140,707.47
19 A.4.4.3.19 Pemasangan 1 m' Ubin Plin Pc.Warna Uk. 10 x 20 cm m' 114,308.47
20 A.4.4.3.20 Pemasangan 1 m’ plint ubin Pc warna ukuran 10cm x 30cm m' 130,606.14
21 A.4.4.3.21 Pemasangan 1 m’ plint ubin Pc warna ukuran 10cm x 40cm m' 147,807.47
22 A.4.4.3.22 Pemasangan 1 m’ plint ubin teraso ukuran 10cm x 30cm m' 15,410.47
23 A.4.4.3.23 Pemasangan 1 m’ plint ubin teraso ukuran 10cm x 40cm m' 15,410.47
24 A.4.4.3.24 Pemasangan 1 m’ plint ubin granit ukuran 10cm x 40cm m' 15,410.47
25 A.4.4.3.25 Pemasangan 1 m’ plint ubin granit ukuran 10cm x 30cm m' 15,410.47
26 A.4.4.3.26 Pemasangan 1 m’ plint ubin teralux kerang ukuran 10cm x 40cm m' 15,410.47
27 A.4.4.3.27 Pemasangan 1 m’ plint ubin teralux kerang ukuran 10cm x 30cm m' 15,410.47
28 A.4.4.3.28 Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 60cm m' 15,410.47
29 A.4.4.3.29 Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 40cm m' 15,410.47
30 A.4.4.3.30 Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 30cm m' 15,410.47
31 A.4.4.3.31 Pemasangan 1m2 lantai teraso cor di tempat, tebal 3cm m2 31,307.06
32 A.4.4.3.32 Pemasangan 1 m2 Lantai Keramik 10x 20 cm m2 132,486.14
33 A.4.4.3.33 Pemasangan 1 m2 lantai Keramik Uk. 10 x 10 cm atau 5 x 20 cm m2 140,586.14
34 A.4.4.3.34 Pemasangan 1 m2 Lantai Keramik 33 x 33 cm m2 112,146.14
35 A.4.4.3.35 Pemasangan 1 m2 Lantai Keramik 30 x 30 cm m2 172,699.97
36 A.4.4.3.36 Pemasangan 1 m2 Lantai Keramik 20 x 20 cm m2 180,916.34
37 A.4.4.3.37 Pemasangan 1 m2 Lantai Keramik uk.10 x 33 cm, untuk variasi / border m2 192,982.30
38 A.4.4.3.38 Pemasangan 1m2 lantai keramik mozaik ukuran 30cm x 30cm m2 126,995.54
39 A.4.4.3.39 Pemasangan 1 m' Plint Keramik Ukuran 10x20 cm m' 20,579.47
40 A.4.4.3.40 Pemasangan 1 m' Plint Keramik Ukuran 10x10 cm m' 21,167.27
41 A.4.4.3.41 Pemasangan 1 m' Plint Keramik Ukuran 5x20 cm m' 21,167.27
42 A.4.4.3.42 Pemasangan 1 m’ plint internal cove artistik 5cm x 5cm x 20cm m' 95,642.78
43 A.4.4.3.43 Pemasangan 1 m2 Lantai Marmer Ukuran 1.00x1.00 cm m2 1,013,070.14
44 A.4.4.3.44 Pemasangan 1 m2 Lantai Karpet m2 38,270.90
45 A.4.4.3.45 Pemasangan 1 m2 underlayer (pelapis bawah karpet) m2 32,192.69
46 A.4.4.3.46 Pemasangan 1 m2 Lantai Parquet m2 87,554.84

81/135
47 A.4.4.3.47 Pemasangan 1 m2 lantai kayu gymfloor m2 87,554.84
48 A.4.4.3.48 Pemasangan 1 m2 Dinding Porselen 11 x 11 cm m2 151,467.45
49 A.4.4.3.49 Pemasangan 1 m2 Dinding porselen 10x20 cm, m2 143,271.05
50 A.4.4.3.50 Pemasangan 1 m2 Dinding Porselen 20x20 cm, m2 128,691.05
51 A.4.4.3.51 Pemasangan 1 m2 dinding keramik artistik 10cm x 20cm m2 143,271.05
52 A.4.4.3.52 Pemasangan 1 m2 dinding keramik artistik 5cm x 20cm m2 1,089,371.05
53 A.4.4.3.53 Pemasangan 1 m2 Dinding Keramik 20x25 cm, m2 209,839.05
54 A.4.4.3.54 Pemasangan 1 m2 Dinding Keramik 30x30 cm, m2 188,472.68
55 A.4.4.3.55 Pemasangan 1 m2 Dinding Marmer Ukuran 1.00x1.00 cm m2 1,064,776.69
56 A.4.4.3.56 Pemasangan 1 m2 dinding bata pelapis 3cm x 7cm x 24cm m2 234,074.35
57 A.4.4.3.57 Pemasangan 1 m2 dinding batu paras m2 200,630.34
58 A.4.4.3.58 Pemasangan 1 m2 Dinding Batu Tempel Hitam m2 255,520.34
59 A.4.4.3.59 Pemasangan 1 m2 Lantai Vynil uk.30 x 30 cm m2 41,221.87
60 A.4.4.3.60 Pemasangan 1 m2 wallpaper lebar 50 cm m2 41,221.87
61 A.4.4.3.61 Pemasangan 1m2 floor harderner m2 14,587.69
62 A.4.4.3.62 Pemasangan 1 m’ plint vynil 15cm x 30cm m' 13,749.13
63 A.4.4.3.63 Pemasangan 1 m' Plint Kayu Klas II tebal 2 cm lebar 10 cm m' 43,905.19

X A.4.5.1 HARGA SATUAN PEKERJAAN PLAFOND


1 A.4.5.1.1 Pemasangan 1 m2 Langit-langit Asbes (1,00x1,00) 5 mm m2 32,192.93
2 A.4.5.1.2 Pemasangan 1 m2 Langit-langit Akustik Ukuran (30x30) cm m2 15,527.69
3 A.4.5.1.3 Pemasangan 1 m2 Langit-langit Akustik Ukuran (30x60) cm m2 129,096.41
4 A.4.5.1.4 Pemasangan 1 m2 Langit-langit Akustik Ukuran (60x120) cm m2 102,946.41

5 A.4.5.1.5 Pemasangan 1 m2 Langit-langit Tripleks Uk (120x240) cm, Tebal 3 mm, 4 mm & 6 mm m2 43,807.91

6 A.4.5.1.6 Pemasangan 1 m2 Langit-langit Lambriziring Kayu Jati, tebal 9 mm m2 354,564.28


7 A.4.5.1.7 Pemasangan 1 m2 Langit-langit Gypsu Board, Uk (120x240) tebal 9 mm m2 41,095.61
8 A.4.5.1.8 Pemasangan 1 m2 Langit-langit Akuatik Uk (60x120) cm & Rangka Allumunium m2 150,632.05
9 A.4.5.1.9 Pemasangan 1 m' List Langit-Langit Kayu Profil m' 26,636.21
10 A.4.5.1.10 Pemasangan 1 m2 Rangka langit-langit besi hollow 40.40 m2 42,547.44

XI A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP


1 A.4.5.2.1 Pemasangan 1 m2 Atap Genteng Palentong Kecil m2 74,794.61
2 A.4.5.2.2 Pemasangan 1 m2 Atap Genteng Kodok Glasur m2 12,335.15
3 A.4.5.2.3 Pemasangan 1 m2 Atap Genteng Plentong Super / Besar m2 12,335.15
4 A.4.5.2.4 Pemasangan 1 m' Genteng Bubung Plentong m' 75,023.22
5 A.4.5.2.5 Pemasangan 1 m' Genteng Bubung Kodok / Glasur m' 54,523.22
6 A.4.5.2.6 Pemasangan 1 m' Genteng Bubung Plentong Besar m' 54,523.22
7 A.4.5.2.7 Pemasangan 1 m2 roof light fibreglass 90x180 m2 12,201.69
8 A.4.5.2.8 Pemasangan 1 m2 Atap Asbes Gelombang 0.92x2.50 m x 5 mm m2 14,323.51
9 A.4.5.2.9 Pemasangan 1 m2 atap asbes gelombang 0,92mx2,25m x 5mm m2 14,323.51
10 A.4.5.2.10 Pemasangan 1 m2 Atap Asbes Gelombang 0.92x2,00 m x 5 mm m2 13,886.97
11 A.4.5.2.11 Pemasangan 1 m2 Atap Asbes Gelombang 0.92x1,80 m x 5 mm m2 13,886.97
12 A.4.5.2.12 Pemasangan 1 m2 atap asbes gelombang 1.05mx3.00m x 4mm m2 52,666.97
13 A.4.5.2.13 Pemasangan 1 m2 atap asbes gelombang 1.05mx2.70m x 4mm m2 54,584.97
14 A.4.5.2.14 Pemasangan 1 m2 atap asbes gelombang 1.05mx2.40m x 4mm m2 51,066.97
15 A.4.5.2.15 Pemasangan 1 m2 Atap Asbes Gelombang 1.05x2.10 m x 4 mm m2 58,256.97
16 A.4.5.2.16 Pemasangan 1 m2 atap asbes gelombang 1.05mx1.50m x 4mm m2 56,526.97
17 A.4.5.2.17 Pemasangan 1 m2 atap asbes gelombang 1.08mx3.00m x 6mm m2 50,183.97
18 A.4.5.2.18 Pemasangan 1 m2 atap asbes gelombang 1.08mx2.70m x 6mm m2 43,716.97
19 A.4.5.2.19 Pemasangan 1 m2 atap asbes gelombang 1.08mx2.40m x 6mm m2 45,212.97
20 A.4.5.2.20 Pemasangan 1 m2 atap asbes gelombang 1.08mx2.10m x 6mm m2 42,698.97

82/135
21 A.4.5.2.21 Pemasangan 1 m2 atap asbes gelombang 1.08mx1.80m x 6mm m2 43,754.97
22 A.4.5.2.22 Pemasangan 1 m’ bubung stel gelombang 0,92m m' 136,390.32
23 A.4.5.2.23 Pemasangan 1 m’ bubung stel gelombang 1,05m m' 143,320.32
24 A.4.5.2.24 Pemasangan 1 m’ bubung stel gelombang 1,08m m' 104,545.32
25 A.4.5.2.25 Pemasangan 1 m’ nok paten 0,92m m' 47,350.32
26 A.4.5.2.26 Pemasangan 1 m’ nok paten 1,05m m' 47,350.32
27 A.4.5.2.27 Pemasangan 1 m’ nok paten 1,08m m' 47,350.32
28 A.4.5.2.28 Pemasangan 1 m’ nok stel rata 0,92m m' 47,350.32
29 A.4.5.2.29 Pemasangan 1 m’ nok stel rata 1,05m m' 47,350.32
30 A.4.5.2.30 Pemasangan 1 m2 Atap Genteng Beton m2 16,956.81
31 A.4.5.2.31 Pemasangan 1 m2 genteng aspal m2 65,241.83
32 A.4.5.2.32 Pemasangan 1 m2 Atap Genteng Metal m2 70,540.81
33 A.4.5.2.33 Pemasangan 1 m2 Atap Sirap Kayu m2 195,112.45
34 A.4.5.2.34 Pemasangan 1 m' Nok Genteng Beton m' 120,349.22
35 A.4.5.2.35 Pemasangan 1 m’ nok genteng aspal m' 74,233.44
36 A.4.5.2.36 Pemasangan 1 m' Nok Genteng Metal m' 54,871.02
37 A.4.5.2.37 Pemasangan 1 m' Nok Sirap m' 38,763.53
38 A.4.5.2.38 Pemasangan 1 m2 Atap Seng Gelombang m2 52,491.69
39 A.4.5.2.39 Pemasangan 1 m' Atap Nok Seng m' 21,530.61
40 A.4.5.2.40 Pemasangan 1 m2 atap alumunium m2 66,160.13
41 A.4.5.2.41 Pemasangan 1 m’ nok alumunium m' 83,436.50
42 A.4.5.2.42 Pemasangan 1 m2 Allumunium Foil / Sisalation m2 22,750.81

XII A.4.6.1 HARGA SATUAN PEKERJAAN KAYU


1 A.4.6.1.1 Pembuatan & Pemasangan 1 m3 Kusen Pintu & Jendela Kayu klas I m3 27,878,208.43
2 A.4.6.1.2 Pembuatan & Pemasangan 1 m3 Kusen Pintu & Jendela Kayu klas II atau III m3 18,328,452.47
3 A.4.6.1.3 Pembuatan & Pemasangan 1 m2 Pintu Klamp Standard Kayu Klas II m2 674,127.51
4 A.4.6.1.4 Pembuatan & Pemasangan 1 m2 Daun Pintu Klamp Sederhana Kayu Klas III m2 475,427.51
5 A.4.6.1.5 Pembuatan & Pemasangan 1 m2 Daun Pintu Panel, Kayu Klas I atau II m2 856,839.30
6 A.4.6.1.6 Pembuatan & Pemasangan 1 m2 Pintu & Jendela Kaca Kayu Klas I atau II m2 579,141.44
7 A.4.6.1.7 Pembuatan & Pemasangan 1 m2 Pintu & Jendela Jalusi Kayu Klas I atau II m2 1,217,034.30
Pembuatan&Pemasangan 1 m2 Pintu kayu lapis (Plywood) Rangkap rangka Kayu Klas II
8 A.4.6.1.8 m2 628,289.01
(lbr s/d 90 cm)
Pembuatan&Pemasangan 1 m2 Pintu Plywood rangkap, rangka expose kayu klas I atau
9 A.4.6.1.9 m2 664,913.44
II
10 A.4.6.1.10 Pembuatan & Pemasangan 1 m2 Jalusi mati Kosen Kayu Klas I atau II m2 1,052,404.08

11 A.4.6.1.11 Pembuatan & Pemasangan 1 m2 Pintu Teakwood Rangkap, Rangka Expose Kayu Klas I m2 957,645.86
Pembuatan & Pemasangan 1 m2 Pintu Teakwood Rangkap Lapis Formika,Rangka
12 A.4.6.1.12 m2 798,013.66
expose Kayu Klas II
Pembuatan&Memasang 1 m3 Konstruksi Kuda-kuda Konvensional Kayu I; II & III
13 A.4.6.1.13 m3 12,282,220.53
Bentang 6 meter
14 A.4.6.1.14 Pembuatan&Pemasangan 1 m3 Konstruksi Kuda-kuda Expose, Kayu Klas I m3 30,823,540.81
15 A.4.6.1.15 Pemasangan 1 m3 konstruksi Gording, Kayu Klas II m3 11,785,397.65
16 A.4.6.1.16 Pemasangan 1 m2 Rangka Atap Genteng Keramik, Kayu Klas II m2 142,222.41
17 A.4.6.1.17 Pemasangan 1 m2 Rangka Atap Genteng Beton, Kayu Klas II m2 163,588.41
18 A.4.6.1.18 Pemasangan 1 m2 Rangka Atap Sirap, Kayu Klas II m2 124,222.69
19 A.4.6.1.19 Pemasangan 1 m2 Rangka Langit-langit (50x100) cm, kayu Klas II atau III m2 150,337.13
20 A.4.6.1.20 Pemasangan 1 m2 Rangka Langit-langit (50x100) cm, kayu Klas II atau III m2 101,056.41
21 A.4.6.1.21 Pemasangan 1 m' Listplank Uk. (3x20)cm Kayu klas I atau II m' 184,316.42
22 A.4.6.1.22 Pemasangan 1 m' Listplank Uk. (3x25)cm Kayu klas I atau klas II m' 179,196.42
23 A.4.6.1.23 Pemasangan 1 m2 Rangka Dinding Pemisah (60x120) cm Kayu klas II atau III m2 256,564.65
24 A.4.6.1.24 Pemasangan 1 m2 Dinding Pemisah Teakwood Rangkap Rangka Kayu Klas II m2 556,493.53
25 A.4.6.1.25 Pemasangan 1 m2 Dinding Pemisah Plywood Rangkap Rangka Kayu Klas II m2 528,380.23

83/135
26 A.4.6.1.26 Pemasangan 1 m2 Dinding Lambriziring dari Papan klas I m2 336,396.50
27 A.4.6.1.27 Pemasangan 1 m2 Dinding Lambriziring dari Plywood ukuran (120x240) cm m2 41,139.65
28 A.4.6.1.28 Pemasangan 1 m2 Dinding Bilik, Rangka Kayu Klas III atau IV m2 117,570.94

XIII A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA


1 A.4.6.2.1 Pemasangan 1 buah Kunci Tanam Antik bh 233,261.90
2 A.4.6.2.2 Pemasangan 1 buah Kunci Tanam Biasa bh 219,980.05
3 A.4.6.2.3 Pemasangan 1 buah Kunci Kamar Mandi bh 116,962.78
4 A.4.6.2.4 Pemasangan 1 buah gerendel jendela bh 17,543.65
5 A.4.6.2.5 Pemasangan 1 buah Engsel Pintu bh 28,015.48
6 A.4.6.2.6 Pemasangan 1 buah Engsel Jendela Kupu-kupu bh 21,593.65
7 A.4.6.2.7 Pemasangan 1 buah Engsel Angin bh 51,076.42
8 A.4.6.2.8 Pemasangan 1 buah spring knip bh 23,215.48
9 A.4.6.2.9 Pemasangan 1 buah Kait Angin bh 23,315.48
10 A.4.6.2.10 Pasang 1 buah Door Closer bh 318,118.25
11 A.4.6.2.11 Pemasangan 1 buah Kunci Selot bh 199,887.30
12 A.4.6.2.12 Pemasangan 1 buah Door holder bh 145,918.25
13 A.4.6.2.13 Pemasangan 1 buah Door Stop bh 51,443.65
14 A.4.6.2.14 Pemasangan 1 buah Rel Pintu Dorong bh 286,261.90
15 A.4.6.2.15 Pemasangan 1 buah Kunci Lemari bh 37,959.13
16 A.4.6.2.16 Pemasangan 1 m2 Kaca tebal 3 mm m2 126,695.48
17 A.4.6.2.17 Pemasangan 1 m2 Kaca tebal 5 mm m2 136,155.48
18 A.4.6.2.18 Pemasangan 1 m2 kaca tebal 8 mm m2 168,688.21
19 A.4.6.2.19 Pemasangan 1 m2 kaca buram tebal 12 mm m2 368,394.03
20 A.4.6.2.20 Pemasangan 1 m2 Kaca Cermin tebal 5 mm m2 197,755.48
21 A.4.6.2.21 Pemasangan 1 m2 Kaca Cermin tebal 8 mm m2 14,184.21
22 A.4.6.2.22 Pemasangan 1 m2 kaca wireglassed tebal 5 mm m2 12,515.48
23 A.4.6.2.23 Pemasangan 1 m2 kaca patri tebal 5 mm m2 1,734,387.32

XIV A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN


1 A.4.7.1.1 1 m2 Pengikisan / pengerokan Permukaan Cat Tembok Lama m2 7,809.60
2 A.4.7.1.2 1 m2 Pencucian Bidang Permukaan Tembok yang Pernah dicat m2 7,019.60
3 A.4.7.1.3 1 m2 Pengerokan Karat Cat Lama permukaan Baja dg cara manual m2 7,019.60

4 A.4.7.1.4 1 m2 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Penutup) m2 46,779.85

5 A.4.7.1.5 Pengecatan 1 m2 Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 3 Lp Cat Penutup) m2 59,634.40

6 A.4.7.1.6 Pelaburan 1 m2 Bidang Kayu dg Teak Oil m2 32,594.03


7 A.4.7.1.7 Pelaburan 1 m2 Bidang Kayu dg Politur m2 51,786.28
8 A.4.7.1.8 Pelaburan 1 m2 Bidang Kayu dg Cat Residu & Ter m2 11,551.40
9 A.4.7.1.9 Pelaburan 1 m2 Bidang Kayu dg Vernis m2 28,430.26
10 A.4.7.1.10 Pengecat 1 m2 Tembok Baru (1 lap.Plamir, 1 lap Cat Dasar 2 lap. Cat Penutup) m2 16,014.49
11 A.4.7.1.11 Pengecatan 1 m2 Tembok Lama (1 lap.Plamir, 2 lap Cat Penutup) m2 11,880.60
12 A.4.7.1.12 Pengecatan 1 m2 Tembok dengan Kalkarium m2 5,352.60
13 A.4.7.1.13 Pelaburan 1 m2 Tembok dengan Kapur Sirih m2 8,478.80
14 A.4.7.1.14 Pelaburan 1 m2 Tembok lama dengan Kapur Sirih (pemeliharaan) m2 6,180.56
15 A.4.7.1.15 Pemasangan 1 m2 Wallpaper m2 26,747.30
16 A.4.7.1.16 Pengecatan 1 m2 Permukaan Baja dg Meni Besi m2 18,281.66
17 A.4.7.1.17 Pengecatan 1 m2 Permukaan Baja dg Meni Besi & Perancah m2 46,582.17
18 A.4.7.1.18 Pengecatan 1 m2 Permukaan Baja Galvanis secara manual 4 lapis m2 42,169.03

19 A.4.7.1.19 Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir m2 42,169.03

20 A.4.7.1.20 Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 3 lapis m2 105,427.68

84/135
21 A.4.7.1.21 Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir m2 93,285.67

XV A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI GEDUNG


1 A.5.1.1.1 Pemasangan 1 buah Closet Duduk / Monoblok bh 1,930,088.39
2 A.5.1.1.2 Pemasangan 1 buah Closet Jongkok Porselen bh 370,727.15
3 A.5.1.1.3 Pemasangan 1 buah closet jongkok teraso bh 182,027.15
4 A.5.1.1.4 Pemasangan 1 buah Urinoir bh 1,673,877.10
5 A.5.1.1.5 Pemasangan 1 buah Wastafel bh 511,651.65
6 A.5.1.1.6 Pemasangan 1 buah Bathcuip porselen bh 2,905,017.38
7 A.5.1.1.7 Pemasangan 1 buah Bak Fibreglass vol.1 m3 bh 813,376.05
8 A.5.1.1.8 Pemasangan 1 buah Bak Mandi Batu Bata Vol. 0,30 m3 bh 1,056,474.30
9 A.5.1.1.9 Pemasangan 1 buah bak mandi teraso vol 0,30 m bh 451,056.05
10 A.5.1.1.10 Pemasangan 1 buah bak air fibreglass vol 1 m3 bh 483,917.25
11 A.5.1.1.11 Pemasangan 1 buah bak beton volume 1 m3 bh 8,045,376.75
12 A.5.1.1.12 Pemasangan 1 buah Bak Cuci Piring Stainless stell bh 250,130.95
13 A.5.1.1.13 Pemasangan 1 buah bak cuci piring teraso bh 87,833.25
14 A.5.1.1.14 Pemasangan 1 buah Floor Drain bh 71,643.65
15 A.5.1.1.15 Pemasangan 1 buah Bak Kontrol Pas.Batu Bata 30x30 tinggi 35 cm bh 342,633.31
16 A.5.1.1.16 Pemasangan 1 buah Bak Kontrol Pas.Batu Bata 45 x 45 tinggi 50 cm bh 512,201.45
17 A.5.1.1.17 Pemasangan 1 buah Bak Kontrol Pas.Batu Bata 60x60 tinggi 60 cm bh 693,386.65
18 A.5.1.1.18 Pemasangan 1 m' Pipa Galvanis Ø ½" m' 41,268.17
19 A.5.1.1.19 Pemasangan 1 buah Kran Ø ½" atau Ø ¾" bh 48,913.43
20 A.5.1.1.20 Pemasangan 1 m' Pipa Galvanis Ø ¾" m' 47,649.00
21 A.5.1.1.21 Pemasangan 1 m' Pipa Galvanis Ø 1" m' 58,809.00
22 A.5.1.1.22 Pemasangan 1 m' Pipa Galvanis Ø 1½ " m' 92,094.66
23 A.5.1.1.23 Pemasangan 1 m' Pipa Galvanis Ø 3" m' 107,124.71
24 A.5.1.1.24 Pemasangan 1 m' Pipa Galvanis Ø 4" m' 23,579.71
25 A.5.1.1.25 Pemasangan 1 m' Pipa PVC tipe AW Ø ½" m' 13,523.36
26 A.5.1.1.26 Pemasangan 1 m' Pipa PVC tipe AW Ø ¾" m' 16,080.86
27 A.5.1.1.27 Pemasangan 1 m' Pipa PVC tipe AW Ø 1" m' 20,769.61
28 A.5.1.1.28 Pemasangan 1 m' Pipa PVC tipe AW Ø 1½" m' 33,285.67
29 A.5.1.1.29 Pemasangan 1 m' Pipa PVC tipe AW Ø 2" m' 39,175.67
30 A.5.1.1.30 Pemasangan 1 m’ pipa PVC tipe AW diameter 21/2” m' 58,802.25
31 A.5.1.1.31 Pemasangan 1 m' Pipa PVC tipe AW Ø 3" m' 72,326.00
32 A.5.1.1.32 Pemasangan 1 m' Pipa PVC tipe AW Ø 4" m' 104,082.11
33 A.5.1.1.33 Pemasangan 1 m' Pipa Air Limbah Jenis Pipa Tanah Ø 20 cm m' 70,377.52
34 A.5.1.1.34 Pemasangan 1 m' Pipa Air Limbah Jenis Pipa Tanah Ø 15 cm m' 22,077.04
35 A.5.1.1.35 Pemasangan 1 m' Pipa Beton Ø 15-20 cm m' 104,291.77
36 A.5.1.1.36 Pemasangan 1 m' Pipa Beton Ø 30-100 cm m' 167,081.34

XVI A.8.4.1 HARGA SATUAN PEKERJAAN PEMASANGAN PIPA


1 A.8.4.1.1 Pemasangan 1 m pipa PVC Ø 63 mm m' 38,688.34
2 A.8.4.1.2 Pemasangan 1 m pipa PVC Ø 90 mm m' 49,360.84
3 A.8.4.1.3 Pemasangan 1 m pipa PVC Ø 110 mm m' 78,447.65
4 A.8.4.1.4 Pemasangan 1 m pipa PVC Ø 150 mm m' 169,997.65
5 A.8.4.1.5 Pemasangan 1 m pipa PVC Ø 200 mm m' 287,083.99
6 A.8.4.1.6 Pemasangan 1 m pipa PVC Ø 250 mm m' 162,519.32
7 A.8.4.1.7 Pemasangan 1 m pipa PVC Ø 300 mm m' 207,905.93
8 A.8.4.1.8 Pemasangan 1 m pipa PVC Ø 400 mm m' 46,621.04
9 A.8.4.1.9 Pemasangan 1 m pipa PVC Ø 450 mm m' 57,372.70
10 A.8.4.1.10 Pemasangan 1 m pipa PVC Ø 500 mm m' 69,370.76

85/135
11 A.8.4.1.11 Pemasangan 1 m pipa PVC Ø 600 mm m' 82,054.43
12 A.8.4.1.12 Pemasangan 1 m pipa PVC Ø 800 mm m' 138,663.33
13 A.8.4.1.13 Pemasangan 1 m pipa PVC Ø 900 mm m' 144,958.56
14 A.8.4.1.14 Pemasangan 1 m pipa PVC Ø 1000 mm m' 162,441.45
15 A.8.4.1.15 Pemasangan 1 m pipa PVC Ø 1100 mm m' 179,924.34
16 A.8.4.1.16 Pemasangan 1 m pipa PVC Ø 1200 mm m' 197,407.24
17 A.8.4.1.17 Pemasangan 1 m pipa HDPE Ø 63 mm m' 70,940.42
18 A.8.4.1.18 Pemasangan 1 m pipa HDPE Ø 100 mm m' 208,028.02
19 A.8.4.1.19 Pemasangan 1 m pipa HDPE Ø 125 mm m' 218,065.62
20 A.8.4.1.20 Pemasangan 1 m pipa HDPE Ø 150 mm m' 356,983.43
21 A.8.4.1.21 Pemasangan 1 m pipa HDPE Ø 200 mm m' 556,321.45
22 A.8.4.1.22 Pemasangan 1 m pipa HDPE Ø 250 mm m' 858,987.26
23 A.8.4.1.23 Pemasangan 1 m pipa HDPE Ø 300 mm m' 1,358,879.08
24 A.8.4.1.24 Pemasangan 1 m pipa HDPE Ø 400 mm m' 2,200,213.13
25 A.8.4.1.25 Pemasangan 1 m pipa HDPE Ø 450 mm m' 2,782,345.56
26 A.8.4.1.26 Pemasangan 1 m pipa HDPE Ø 500 mm m' 3,431,669.19
27 A.8.4.1.27 Pemasangan 1 m pipa HDPE Ø 600 mm m' 5,410,118.63
28 A.8.4.1.28 Pemasangan 1 m pipa HDPE Ø 800 mm m' 8,736,791.40
29 A.8.4.1.29 Pemasangan 1 m pipa HDPE Ø 900 mm m' 11,137,881.81
30 A.8.4.1.30 Pemasangan 1 m pipa HDPE Ø 1000 mm m' 13,746,466.15
31 A.8.4.1.31 Pemasangan 1 m pipa HDPE Ø 1100 mm m' 155,803.42
32 A.8.4.1.32 Pemasangan 1 m pipa HDPE Ø 1200 mm m' 203,110.07
33 A.8.4.1.33 Pemasangan 1 m pipa GIP Ø 63 mm m' 29,527.56
34 A.8.4.1.34 Pemasangan 1 m pipa GIP Ø 100 mm m' 34,280.18
35 A.8.4.1.35 Pemasangan 1 m pipa GIP Ø 125 mm m' 38,393.80
36 A.8.4.1.36 Pemasangan 1 m pipa GIP Ø 150 mm m' 43,364.43
37 A.8.4.1.37 Pemasangan 1 m pipa GIP Ø 200 mm m' 68,217.56
38 A.8.4.1.38 Pemasangan 1 m pipa GIP Ø 250 mm m' 81,368.83
39 A.8.4.1.39 Pemasangan 1 m pipa GIP Ø 300 mm m' 82,101.03
40 A.8.4.1.40 Pemasangan 1 m pipa GIP Ø 400 mm m' 103,868.95
41 A.8.4.1.41 Pemasangan 1 m pipa GIP Ø 450 mm m' 115,913.61
42 A.8.4.1.42 Pemasangan 1 m pipa GIP Ø 500 mm m' 125,933.06
43 A.8.4.1.43 Pemasangan 1 m pipa GIP Ø 600 mm m' 113,763.60
44 A.8.4.1.44 Pemasangan 1 m pipa GIP Ø 800 mm m' 199,385.85
45 A.8.4.1.45 Pemasangan 1 m pipa GIP Ø 900 mm m' 224,831.38
46 A.8.4.1.46 Pemasangan 1 m pipa GIP Ø 1000 mm m' 249,513.11
47 A.8.4.1.47 Pemasangan 1 m pipa GIP Ø 1100 mm m' 274,241.44
48 A.8.4.1.48 Pemasangan 1 m pipa GIP Ø 1200 mm m' 298,923.17
49 A.8.4.1.49 Pemasangan 1 m pipa DCI Ø 100 mm m' 30,451.21
50 A.8.4.1.50 Pemasangan 1 m pipa DCI Ø 125 mm m' 34,014.23
51 A.8.4.1.51 Pemasangan 1 m pipa DCI Ø 150 mm m' 38,184.66
52 A.8.4.1.52 Pemasangan 1 m pipa DCI Ø 200 mm m' 54,613.57
53 A.8.4.1.53 Pemasangan 1 m pipa DCI Ø 250 mm m' 59,175.00
54 A.8.4.1.54 Pemasangan 1 m pipa DCI Ø 300 mm m' 60,591.21
55 A.8.4.1.55 Pemasangan 1 m pipa DCI Ø 400 mm m' 103,434.06
56 A.8.4.1.56 Pemasangan 1 m pipa DCI Ø 450 mm m' 124,055.78
57 A.8.4.1.57 Pemasangan 1 m pipa DCI Ø 500 mm m' 142,467.48
58 A.8.4.1.58 Pemasangan 1 m pipa DCI Ø 600 mm m' 148,062.47
59 A.8.4.1.59 Pemasangan 1 m pipa DCI Ø 800 mm m' 278,754.07
60 A.8.4.1.60 Pemasangan 1 m pipa DCI Ø 900 mm m' 357,263.56
61 A.8.4.1.61 Pemasangan 1 m pipa DCI Ø1000 mm m' 431,144.97
62 A.8.4.1.62 Pemasangan 1 m pipa DCI Ø1100 mm m' 494,537.00

86/135
63 A.8.4.1.63 Pemasangan 1 m pipa DCI Ø1200 mm m' 571,225.87
64 A.8.4.1.64 Pemasangan 1 m pipa baja Ø 63 mm m' 31,073.61
65 A.8.4.1.65 Pemasangan 1 m pipa baja Ø 100 mm m' 36,052.84
66 A.8.4.1.66 Pemasangan 1 m pipa baja Ø 125 mm m' 40,363.07
67 A.8.4.1.67 Pemasangan 1 m pipa baja Ø 150 mm m' 44,097.50
68 A.8.4.1.68 Pemasangan 1 m pipa baja Ø 200 mm m' 69,304.87
69 A.8.4.1.69 Pemasangan 1 m pipa baja Ø 250 mm m' 82,468.56
70 A.8.4.1.70 Pemasangan 1 m pipa baja Ø 300 mm m' 88,070.19
71 A.8.4.1.71 Pemasangan 1 m pipa baja Ø 400 mm m' 147,245.19
72 A.8.4.1.72 Pemasangan 1 m pipa baja Ø 450 mm m' 138,842.74
73 A.8.4.1.73 Pemasangan 1 m pipa baja Ø 500 mm m' 151,337.42
74 A.8.4.1.74 Pemasangan 1 m pipa baja Ø 600 mm m' 137,458.13
75 A.8.4.1.75 Pemasangan 1 m pipa baja Ø 800 mm m' 242,519.64
76 A.8.4.1.76 Pemasangan 1 m pipa baja Ø 900 mm m' 211,515.77
77 A.8.4.1.77 Pemasangan 1 m pipa baja Ø 1000 mm m' 304,666.86
78 A.8.4.1.78 Pemasangan 1 m pipa baja Ø 1100 mm m' 335,257.86
79 A.8.4.1.79 Pemasangan 1 m pipa baja Ø 1200 mm m' 366,765.88

XVII A.8.4.2 HARGA SATUAN PEKERJAAN PEMOTONGAN PIPA


1 A.8.4.2.1 Pemotongan 1 buah pipa PVC Ø 63 mm m' 21,509.40
2 A.8.4.2.2 Pemotongan 1 buah pipa PVC Ø 90 mm m' 42,504.81
3 A.8.4.2.3 Pemotongan 1 buah pipa PVC Ø 110 mm m' 71,295.41
4 A.8.4.2.4 Pemotongan 1 buah pipa PVC Ø 150 mm m' 162,502.61
5 A.8.4.2.5 Pemotongan 1 buah pipa PVC Ø 200 mm m' 277,750.14
6 A.8.4.2.6 Pemotongan 1 buah pipa PVC Ø 250 mm m' 10,969.66
7 A.8.4.2.7 Pemotongan 1 buah pipa PVC Ø 300 mm m' 13,244.47
8 A.8.4.2.8 Pemotongan 1 buah pipa PVC Ø 400 mm m' 28,405.95
9 A.8.4.2.9 Pemotongan 1 buah pipa PVC Ø 450 mm m' 35,994.19
10 A.8.4.2.10 Pemotongan 1 buah pipa PVC Ø 500 mm m' 44,392.83
11 A.8.4.2.11 Pemotongan 1 buah pipa PVC Ø 600 mm m' 53,352.28
12 A.8.4.2.12 Pemotongan 1 buah pipa PVC Ø 800 mm m' 93,366.89
13 A.8.4.2.13 Pemotongan 1 buah pipa PVC Ø 900 mm m' 97,823.31
14 A.8.4.2.14 Pemotongan 1 buah pipa PVC Ø 1000 mm m' 110,164.18
15 A.8.4.2.15 Pemotongan 1 buah pipa PVC Ø 1100 mm m' 122,505.04
16 A.8.4.2.16 Pemotongan 1 buah pipa PVC Ø 1200 mm m' 134,845.91
17 A.8.4.2.17 Pemotongan 1 buah pipa HDPE Ø 63 mm m' 14,160.20
18 A.8.4.2.18 Pemotongan 1 buah pipa HDPE Ø 100 mm m' 101,583.08
19 A.8.4.2.19 Pemotongan 1 buah pipa HDPE Ø 125 mm m' 122,057.61
20 A.8.4.2.20 Pemotongan 1 buah pipa HDPE Ø 150 mm m' 141,128.42
21 A.8.4.2.21 Pemotongan 1 buah pipa HDPE Ø 200 mm m' 193,069.70
22 A.8.4.2.22 Pemotongan 1 buah pipa HDPE Ø 250 mm m' 279,340.05
23 A.8.4.2.23 Pemotongan 1 buah pipa HDPE Ø 300 mm m' 354,596.93
24 A.8.4.2.24 Pemotongan 1 buah pipa HDPE Ø 400 mm m' 528,673.78
25 A.8.4.2.25 Pemotongan 1 buah pipa HDPE Ø 450 mm m' 643,328.94
26 A.8.4.2.26 Pemotongan 1 buah pipa HDPE Ø 500 mm m' 733,113.71
27 A.8.4.2.27 Pemotongan 1 buah pipa HDPE Ø 600 mm m' 960,856.27
28 A.8.4.2.28 Pemotongan 1 buah pipa HDPE Ø 800 mm m' 1,513,090.68
29 A.8.4.2.29 Pemotongan 1 buah pipa HDPE Ø 900 mm m' 1,547,571.03
30 A.8.4.2.30 Pemotongan 1 buah pipa HDPE Ø 1000 mm m' 2,199,807.87
31 A.8.4.2.31 Pemotongan 1 buah pipa HDPE Ø 1100 mm m' 2,574,209.46
32 A.8.4.2.32 Pemotongan 1 buah pipa HDPE Ø 1200 mm m' 3,015,445.58
33 A.8.4.2.33 Pemotongan 1 buah pipa GIP Ø 63 mm m' 1,667.41

87/135
34 A.8.4.2.34 Pemotongan 1 buah pipa GIP Ø 100 mm m' 4,970.63
35 A.8.4.2.35 Pemotongan 1 buah pipa GIP Ø 125 mm m' 7,884.44
36 A.8.4.2.36 Pemotongan 1 buah pipa GIP Ø 150 mm m' 11,265.86
37 A.8.4.2.37 Pemotongan 1 buah pipa GIP Ø 200 mm m' 29,138.15
38 A.8.4.2.38 Pemotongan 1 buah pipa GIP Ø 250 mm m' 40,668.61
39 A.8.4.2.39 Pemotongan 1 buah pipa GIP Ø 300 mm m' 43,193.03
40 A.8.4.2.40 Pemotongan 1 buah pipa GIP Ø 400 mm m' 63,246.93
41 A.8.4.2.41 Pemotongan 1 buah pipa GIP Ø 450 mm m' 72,673.98
42 A.8.4.2.42 Pemotongan 1 buah pipa GIP Ø 500 mm m' 80,683.22
43 A.8.4.2.43 Pemotongan 1 buah pipa GIP Ø 600 mm m' 74,045.19
44 A.8.4.2.44 Pemotongan 1 buah pipa GIP Ø 800 mm m' 134,253.51
45 A.8.4.2.45 Pemotongan 1 buah pipa GIP Ø 900 mm m' 151,689.80
46 A.8.4.2.46 Pemotongan 1 buah pipa GIP Ø 1000 mm m' 169,172.69
47 A.8.4.2.47 Pemotongan 1 buah pipa GIP Ø 1100 mm m' 186,655.58
48 A.8.4.2.48 Pemotongan 1 buah pipa GIP Ø 1200 mm m' 204,138.47
49 A.8.4.2.49 Pemotongan 1 buah pipa DCI Ø 100 mm m' 4,403.43
50 A.8.4.2.50 Pemotongan 1 buah pipa DCI Ø 125 mm m' 6,939.65
51 A.8.4.2.51 Pemotongan 1 buah pipa DCI Ø 150 mm m' 9,911.87
52 A.8.4.2.52 Pemotongan 1 buah pipa DCI Ø 200 mm m' 22,764.35
53 A.8.4.2.53 Pemotongan 1 buah pipa DCI Ø 250 mm m' 29,610.80
54 A.8.4.2.54 Pemotongan 1 buah pipa DCI Ø 300 mm m' 31,835.82
55 A.8.4.2.55 Pemotongan 1 buah pipa DCI Ø 400 mm m' 58,552.60
56 A.8.4.2.56 Pemotongan 1 buah pipa DCI Ø 450 mm m' 70,736.08
57 A.8.4.2.57 Pemotongan 1 buah pipa DCI Ø 500 mm m' 82,047.55
58 A.8.4.2.58 Pemotongan 1 buah pipa DCI Ø 600 mm m' 81,488.35
59 A.8.4.2.59 Pemotongan 1 buah pipa DCI Ø 800 mm m' 161,731.89
60 A.8.4.2.60 Pemotongan 1 buah pipa DCI Ø 900 mm m' 209,750.22
61 A.8.4.2.61 Pemotongan 1 buah pipa DCI Ø 1000 mm m' 250,253.09
62 A.8.4.2.62 Pemotongan 1 buah pipa DCI Ø 1100 mm m' 294,443.79
63 A.8.4.2.63 Pemotongan 1 buah pipa DCI Ø 1200 mm m' 342,415.51
64 A.8.4.2.64 Pemotongan 1 buah pipa baja Ø 63 mm m' 1,774.01
65 A.8.4.2.65 Pemotongan 1 buah pipa baja Ø 100 mm m' 5,290.44
66 A.8.4.2.66 Pemotongan 1 buah pipa baja Ø 125 mm m' 8,309.26
67 A.8.4.2.67 Pemotongan 1 buah pipa baja Ø 150 mm m' 11,467.88
68 A.8.4.2.68 Pemotongan 1 buah pipa baja Ø 200 mm m' 9,647.19
69 A.8.4.2.69 Pemotongan 1 buah pipa baja Ø 250 mm m' 41,296.68
70 A.8.4.2.70 Pemotongan 1 buah pipa baja Ø 300 mm m' 46,369.11
71 A.8.4.2.71 Pemotongan 1 buah pipa baja Ø 400 mm m' 89,626.20
72 A.8.4.2.72 Pemotongan 1 buah pipa baja Ø 450 mm m' 87,089.99
73 A.8.4.2.73 Pemotongan 1 buah pipa baja Ø 500 mm m' 97,001.85
74 A.8.4.2.74 Pemotongan 1 buah pipa baja Ø 600 mm m' 89,408.20
75 A.8.4.2.75 Pemotongan 1 buah pipa baja Ø 800 mm m' 163,334.50
76 A.8.4.2.76 Pemotongan 1 buah pipa baja Ø 900 mm m' 184,900.65
77 A.8.4.2.77 Pemotongan 1 buah pipa baja Ø 1000 mm m' 206,591.59
78 A.8.4.2.78 Pemotongan 1 buah pipa baja Ø 1100 mm m' 228,204.34
79 A.8.4.2.79 Pemotongan 1 buah pipa baja Ø 1200 mm m' 249,895.29

XVIII A.8.4.3 HARGA SATUAN PEKERJAAN PEMASANGAN AKSESORIS PIPA


1 A.8.4.3.1 Pemasangan 1 buah Valve Ø 150 mm m' 122,505.04
2 A.8.4.3.2 Pemasangan 1 buah Valve Ø 200 mm m' 146,890.57
3 A.8.4.3.3 Pemasangan 1 buah Valve Ø 250 mm m' 146,890.57
4 A.8.4.3.4 Pemasangan 1 buah Valve Ø 300 mm m' 171,400.90

88/135
5 A.8.4.3.5 Pemasangan 1 buah Valve Ø 400 mm m' 293,905.94
6 A.8.4.3.6 Pemasangan 1 buah Valve Ø 450 mm m' 293,905.94
7 A.8.4.3.7 Pemasangan 1 buah Valve Ø 500 mm m' 342,801.80
8 A.8.4.3.8 Pemasangan 1 buah Valve Ø 600 mm m' 121,819.44
9 A.8.4.3.9 Pemasangan 1 buah Valve Ø 700 mm m' 122,505.04
10 A.8.4.3.10 Pemasangan 1 buah Valve Ø 800 mm m' 153,061.00
11 A.8.4.3.11 Pemasangan 1 buah Valve Ø 900 mm m' 146,890.57
12 A.8.4.3.12 Pemasangan 1 buah Valve Ø 1000 mm m' 220,374.96
13 A.8.4.3.13 Pemasangan 1 buah Valve Ø 1100 mm m' 257,101.35
14 A.8.4.3.14 Pemasangan 1 buah Valve Ø 1200 mm m' 257,101.35
15 A.8.4.3.15 Pemasangan 1 buah Tee Ø 150 mm m' 9,084.25
16 A.8.4.3.16 Pemasangan 1 buah Tee Ø 200 mm m' 18,511.30
17 A.8.4.3.17 Pemasangan 1 buah Tee Ø 250 mm m' 27,938.35
18 A.8.4.3.18 Pemasangan 1 buah Tee Ø 300 mm m' 30,327.39
19 A.8.4.3.19 Pemasangan 1 buah Tee Ø 400 mm m' 28,706.62
20 A.8.4.3.20 Pemasangan 1 buah Tee Ø 450 mm m' 65,646.54
21 A.8.4.3.21 Pemasangan 1 buah Tee Ø 500 mm m' 75,073.59
22 A.8.4.3.22 Pemasangan 1 buah Tee Ø 600 mm m' 93,927.69
23 A.8.4.3.23 Pemasangan 1 buah Tee Ø 700 mm m' 112,781.79
24 A.8.4.3.24 Pemasangan 1 buah Tee Ø 800 mm m' 131,635.89
25 A.8.4.3.25 Pemasangan 1 buah Tee Ø 900 mm m' 150,489.99
26 A.8.4.3.26 Pemasangan 1 buah Tee Ø 1000 mm m' 169,344.09
27 A.8.4.3.27 Pemasangan 1 buah Tee Ø 1100 mm m' 188,198.19
28 A.8.4.3.28 Pemasangan 1 buah Tee Ø 1200 mm m' 207,052.29

XIX A.8.4.4 HARGA SATUAN PEKERJAAN PENYAMBUNGAN PIPA BARU KE PIPA LAMA

1 A.8.4.4.1 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 80 mm m' 125,636.86
2 A.8.4.4.2 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 100 mm m' 141,062.94
3 A.8.4.4.3 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 150 mm m' 179,628.14
4 A.8.4.4.4 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 200 mm m' 218,193.35
5 A.8.4.4.5 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 250 mm m' 256,758.55
6 A.8.4.4.6 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 300 mm m' 295,323.75
7 A.8.4.4.7 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 400 mm m' 372,454.16
8 A.8.4.4.8 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 450 mm m' 411,019.36
9 A.8.4.4.9 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 500 mm m' 449,740.96
10 A.8.4.4.10 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 600 mm m' 526,714.97
11 A.8.4.4.11 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 700 mm m' 603,845.37
12 A.8.4.4.12 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 800 mm m' 680,975.78

XX A.8.4.5 HARGA SATUAN PEKERJAAN PENGETESAN PIPA


1 A.8.4.5.1 Pengetesan 1 m pipa Ø 50 mm m' 464.76
2 A.8.4.5.2 Pengetesan 1 m pipa Ø 75 mm m' 473.12
3 A.8.4.5.3 Pengetesan 1 m pipa Ø 100 mm m' 489.84
4 A.8.4.5.4 Pengetesan 1 m pipa Ø 150 mm m' 531.64
5 A.8.4.5.5 Pengetesan 1 m pipa Ø 200 mm m' 585.98
6 A.8.4.5.6 Pengetesan 1 m ppipa Ø 250 mm m' 661.22
7 A.8.4.5.7 Pengetesan 1 m pipa Ø 300 mm m' 753.18
8 A.8.4.5.8 Pengetesan 1 m pipa Ø 400 mm m' 983.08
9 A.8.4.5.9 Pengetesan 1 m pipa Ø 500 mm m' 1,116.84
10 A.8.4.5.10 Pengetesan 1 m pipa Ø 600 mm m' 1,639.34

89/135
Purworejo, Januari 2017
Kepala Dinas Pekerjaan Umum

Ir. F A T H O R I
Pembina Utama Muda
NIP. 19580408 199003 1 006

90/135
685,898.47
772,947.41
1,199,497.23
54,195.37
1,153,662.73
2,678,141.57
2,168,516.02
2,091,725.02
4,660.04
253,527.34
557,976.68
107,054.20
621,369.73
310,684.87
2,448.42
176,641.70
-
-
34,950.30
41,940.36
48,930.42
46,600.40
69,900.60
55,920.48
2,330.02
2,588.91
7,766.73
23,300.20
323,256.12
267,580.35
325,110.06
137,578.10
-
-
927,191.73
868,254.28
827,381.80
798,653.21
759,261.00
572,221.73
719,929.84
679,730.60
467,312.51

91/135
2,636,221.37

875,323.77
-
-
961,386.91
1,007,249.54
1,043,147.35

915,160.72

1,085,644.63
1,126,191.28
1,156,655.24
1,176,669.03

1,211,127.85

1,221,793.36
1,289,728.43
1,303,725.56
1,238,939.28
74,363.13
115,387.83
173,648.34
151,260.44
147,486.03
123,330.41
285,767.99
314,853.06
314,853.06
488,297.66
505,748.71
561,337.66
527,507.32
467,653.57
186,453.23
4,814,349.99
6,010,834.37
10,615,213.32
8,336,348.35
7,642,897.25
7,363,938.54
7,501,882.84
77,807.97
106,181.14
-
-

86,830.16

108,621.40

117,771.24

162,832.60

151,375.17

92/135
59,654.25
53,139.20
3,877.42
7,142.78
5,185.43
35,105.67
36,231.87
31,983.26
24,816.85
22,594.45
42,097.70
6,456.22
6,456.22
6,456.22
23,760,000.00
36,631,672.00
35,300.24
131,205.89
45,304.74
-
-
30,090.33
28,136.73
16,749.25
1,920,410.04
5,608.42
98,135.17
704,634.61
673,187.02
73,424.12
829,030.51
8,878.38
11,366.24
23,350.24
194,422.18
238,500.85
132,157.20
352,520.10
231,857.70

90,620.89

33,430.13

46,802.18
-
-

302,095.42

316,358.59

305,557.25

300,521.12

93/135
299,962.32

283,893.04

160,326.77

152,768.67

148,559.52

145,919.74

144,703.14

141,761.63

142,471.92

125,652.41

127,529.90

483,968.71
486,445.91
413,999.81
415,564.89
225,866.97
227,709.03

264,054.68

264,054.68

1,224,351.50

-
-
59,503.94
51,301.90
47,844.76
45,409.34
44,131.00
43,064.16
42,510.53
41,956.90
27,040.46
22,122.14
32,510.70
33,751.17
68,503.12
57,369.53
60,545.78
58,941.92
57,418.88
47,666.31
30,651.54
43,389.57
58,436.80
58,436.80
32,200.75

94/135
19,107.12
9,207.03
41,966.78
23,823.59
-
-
180,281.26
179,092.36
165,286.37
215,137.51
209,649.37
197,362.37
79,366.16
84,539.57
331,460.86
278,614.07
79,366.16
84,539.57
82,023.56
79,366.16
79,366.16
34,255.07
136,687.62
154,778.22
125,739.32
143,666.75
162,588.22
16,951.52
16,951.52
16,951.52
16,951.52
16,951.52
16,951.52
16,951.52
16,951.52
16,951.52
34,437.76
145,734.75
154,644.75
123,360.75
189,969.97
199,007.97
212,280.53
139,695.09
22,637.42
23,284.00
23,284.00
105,207.05
1,114,377.15
42,097.99
35,411.96
96,310.32

95/135
96,310.32
166,614.20
157,598.15
141,560.15
157,598.15
1,198,308.15
230,822.95
207,319.95
1,171,254.36
257,481.79
220,693.37
281,072.37
45,344.06
45,344.06
16,046.46
15,124.04
48,295.71
-
-
35,412.22
17,080.46
142,006.05
113,241.05

48,188.70

390,020.71
45,205.17
165,695.26
29,299.83
46,802.18
-
-
82,274.07
13,568.67
13,568.67
82,525.54
59,975.54
59,975.54
13,421.86
15,755.86
15,755.86
15,275.66
15,275.66
57,933.66
60,043.46
56,173.66
64,082.66
62,179.66
55,202.36
48,088.66
49,734.26
46,968.86

96/135
48,130.46
150,029.35
157,652.35
114,999.85
52,085.35
52,085.35
52,085.35
52,085.35
52,085.35
18,652.49
71,766.01
77,594.89
214,623.69
132,384.14
81,656.79
60,358.12
42,639.88
57,740.85
23,683.67
72,776.14
91,780.15
25,025.89
-
-
30,666,029.28
20,161,297.71
741,540.26
522,970.26
942,523.23
637,055.58
1,338,737.73

691,117.91

731,404.78

1,157,644.49

1,053,410.44

877,815.02

13,510,442.59

33,905,894.89
12,963,937.42
156,444.65
179,947.25
136,644.96
165,370.84
111,162.05
202,748.06
197,116.06
282,221.11
612,142.89
581,218.25

97/135
370,036.15
45,253.62
129,328.03
-
-
256,588.09
241,978.06
128,659.05
19,298.02
30,817.02
23,753.02
56,184.06
25,537.02
25,647.02
349,930.08
219,876.03
160,510.08
56,588.02
314,888.09
41,755.04
139,365.02
149,771.02
185,557.03
405,233.43
217,531.02
15,602.63
13,767.02
1,907,826.05
-
-
8,590.56
7,721.56
7,721.56

51,457.83

65,597.84

35,853.43
56,964.90
12,706.54
31,273.28
17,615.93
13,068.66
5,887.86
9,326.68
6,798.62
29,422.03
20,109.83
51,240.38
46,385.93

46,385.93

115,970.45

98/135
102,614.24

-
-
2,123,097.23
407,799.87
200,229.87
1,841,264.81
562,816.81
3,195,519.11
894,713.66
1,162,121.73
496,161.66
532,308.97
8,849,914.43
275,144.05
96,616.58
78,808.02
376,896.64
563,421.60
762,725.32
45,394.98
53,804.77
52,413.90
64,689.90
101,304.13
117,837.18
25,937.68
14,875.70
17,688.95
22,846.57
36,614.23
43,093.23
64,682.47
79,558.60
114,490.32
77,415.28
24,284.75
114,720.94
183,789.47
-
-
42,557.17 2
54,296.93 3
86,292.41 4
186,997.42 5
315,792.38 8
178,771.25 10
228,696.53
51,283.15
63,109.97
76,307.84

99/135
90,259.87
152,529.66
159,454.42
178,685.60
197,916.78
217,147.96
78,034.46
228,830.82
239,872.18
392,681.77
611,953.59
944,885.99
1,494,766.98
2,420,234.44
3,060,580.12
3,774,836.11
5,951,130.49
9,610,470.54
12,251,669.99
15,121,112.76
171,383.76
223,421.07
32,480.31
37,708.20
42,233.18
47,700.87
75,039.31
89,505.71
90,311.13
114,255.84
127,504.97
138,526.37
125,139.96
219,324.43
247,314.52
274,464.42
301,665.58
328,815.49
33,496.33
37,415.65
42,003.12
60,074.93
65,092.50
66,650.33
113,777.46
136,461.35
156,714.23
162,868.72
306,629.48
392,989.91
474,259.47
543,990.70

100/135
628,348.46
34,180.97
39,658.13
44,399.38
48,507.25
76,235.35
90,715.41
96,877.21
161,969.71
152,727.01
166,471.16
151,203.94
266,771.60
232,667.35
335,133.54
368,783.65
403,442.46
-
-
23,660.34
46,755.29
78,424.95
178,752.88
305,525.15
12,066.62
14,568.92
31,246.54
39,593.61
48,832.12
58,687.51
102,703.58
107,605.64
121,180.60
134,755.55
148,330.50
15,576.22
111,741.38
134,263.38
155,241.26
212,376.67
307,274.06
390,056.63
581,541.16
707,661.84
806,425.08
1,056,941.90
1,664,399.75
1,702,328.13
2,419,788.66
2,831,630.41
3,316,990.14
1,834.15

101/135
5,467.69
8,672.89
12,392.44
32,051.97
44,735.48
47,512.33
69,571.63
79,941.38
88,751.55
81,449.71
147,678.86
166,858.78
186,089.96
205,321.14
224,552.32
4,843.77
7,633.61
10,903.05
25,040.79
32,571.88
35,019.40
64,407.85
77,809.69
90,252.31
89,637.18
177,905.08
230,725.24
275,278.40
323,888.17
376,657.06
1,951.41
5,819.48
9,140.18
12,614.67
10,611.91
45,426.35
51,006.02
98,588.83
95,798.99
106,702.04
98,349.02
179,667.95
203,390.71
227,250.75
251,024.77
274,884.81
-
-
134,755.55
161,579.63
161,579.63
188,540.99

102/135
323,296.54
323,296.54
377,081.98
134,001.38
134,755.55
168,367.10
161,579.63
242,412.45
282,811.49
282,811.49
9,992.67
20,362.43
30,732.18
33,360.13
31,577.28
72,211.20
82,580.95
103,320.46
124,059.97
144,799.48
165,538.99
186,278.50
207,018.01
227,757.52
-

138,200.55
155,169.23
197,590.96
240,012.68
282,434.40
324,856.13
409,699.57
452,121.29
494,715.06
579,386.46
664,229.91
749,073.35
-
-
511.24
520.44
538.83
584.81
644.58
727.35
828.50
1,081.39
1,228.53
1,803.28

103/135
DAFTAR ANALISA BOW
dengan PPN
Analis Uraian Harga Sat. Harga bahan Harga upah Jumlah
1 2 3 4 5 6

L.4 1 m3 Membongkar pasangan tembok tebal I bata


(tidak dengan membersihkan)
2.00000 Pekerja Rp 42,364.00 Rp 84,728.00 Rp 84,728.00
0.10000 Mandor Rp - Rp - Rp -
Rp 84,728.00 Rp 84,728.00

L.5 10 m2 Membongkar lantai tidak dengan membersihkan


2.00000 Pekerja Rp 42,364.00 Rp 84,728.00 Rp 84,728.00
0.10000 Mandor Rp - Rp - Rp -
Rp 84,728.00 Rp 84,728.00

L.5.a 1 m2 = 0.1 x Rp 84,728.00 = Rp 8,472.80

L.6 10 m2 Mengupas plesteran


0.50000 Pekerja Rp 42,364.00 Rp 21,182.00 Rp 21,182.00
0.25000 Mandor Rp - Rp - Rp -
Rp 21,182.00 Rp 21,182.00

L.6.a 1 m2 = 0.1 x Rp 21,182.00 = Rp 2,118.20

L.7 10 m2 Menurunkan atap genteng/sirap


0.10000 Pekerja Rp 42,364.00 Rp 4,236.40 Rp 4,236.40
0.01000 Mandor Rp - Rp - Rp -
Rp 4,236.40 Rp 4,236.40

L.7.a 1 m2 = 0.1 x Rp 4,236.40 = Rp 423.64

L.8 10 m2 Menurunkan atap seng


0.50000 Pekerja Rp 42,364.00 Rp 21,182.00
1.00000 Mandor Rp - Rp -
Rp 21,182.00 Rp 21,182.00

L.8.a 1 m2 = 0.1 x Rp 21,182.00 = Rp 2,118.20

L.9 10 m2 Menurunkan rangka atap ( tidak dipakai lagi dihit. 0.5)


0.25000 Tukang Rp 71,091.00 Rp 17,772.75 Rp 17,772.75
0.02500 Kep. Tukang Rp 81,091.00 Rp 2,027.28 Rp 2,027.28
1.00000 Pekerja Rp 42,364.00 Rp 42,364.00 Rp 42,364.00
0.50000 Mandor Rp - Rp - Rp -
Rp 62,164.03 Rp 62,164.03

L.9.a 1 m2 = 0.1 x Rp 62,164.03 = Rp 6,216.40


L.9.b tdk dipakai lagi Rp 3,108.20
L.12 1 m3 Menurunkan kuda-kuda ( tidak dipakai lagi dihit. 0.5)
6.00000 Tukang Rp 71,091.00 Rp 426,546.00 Rp 426,546.00
0.60000 Kep. Tukang Rp 81,091.00 Rp 48,654.60 Rp 48,654.60
4.00000 Pekerja Rp 42,364.00 Rp 169,456.00 Rp 169,456.00
0.20000 Mandor Rp - Rp - Rp -
Rp 644,656.60 Rp 644,656.60

L.12.a tdk dipakai lagi Rp 322,328.30


upah
DAF TAR ANAL I SA HAR GA SAT UAN P E K E R JAAN
BIDANG CIPTA KARYA SESUAI PERMEN NO. 28/PRT/M/2016
KABUPATEN PURWOREJO TA. 2017

HARGA JUMLAH
No SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp
I A. 2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN

1 A.2.2.1.4 Pengukuran dan Pemasangan 1 m' Bouwplank 49,268.52


A Tenaga 12,156.41
Pekerja L.01 OH 0.100 42,364.00 4,236.40
Tukang Kayu L.02 OH 0.100 71,091.00 7,109.10
Kepala Tukang L.03 OH 0.010 81,091.00 810.91
Mandor L.04 OH 0.005 0.00 -
B Bahan 37,112.11
Kayu 5/7x 3m Kayu Glugu m3 0.012 2,000,000.00 24,000.00
Paku Biasa 2" - 5" Kg 0.020 18,800.00 376.00
Papan cor 2 cm (2m) m3 0.007 1,819,444.44 12,736.11
C PERALATAN
D Jumlah A + B + C 49,268.52
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 49,268.52

2 A.2.2.1.6 Pembuatan 1 m2 rumah jaga (konstruksi kayu ) 2,434,674.15


A Tenaga 161,164.15
Pekerja L.01 OH 1.000 42,364.00 42,364.00
Tukang Kayu L.02 OH 1.500 71,091.00 106,636.50
Kepala Tukang L.03 OH 0.150 81,091.00 12,163.65
Mandor L.04 OH 0.050 0.00 -
B Bahan 2,273,510.00
Kayu Dolken diameter 8 - 10 / 400 cm Btg 3.000 27,500.00 82,500.00
Kayu m3 0.276 7,562,500.00 2,087,250.00
Paku Biasa 2" - 5" Kg 0.700 18,800.00 13,160.00
Seng Gelombang BJLS 32 Lbr 1.500 60,400.00 90,600.00
C PERALATAN
D Jumlah A + B + C 2,434,674.15
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 2,434,674.15

105/135
3 A.2.2.1.9 Pembersihan dan Perataan Lapangan 1 m2 4,236.40
A Tenaga 4,236.40
Pekerja L.01 OH 0.100 42,364.00 4,236.40
Mandor L.04 OH 0.050 0.00 -
B Bahan
C PERALATAN
D Jumlah A + B + C 4,236.40
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 4,236.40

4 A.2.2.1.13 Bongkaran 1 m3 Beton Bertulang 564,881.58


A Tenaga 564,881.58
Pekerja L.02 OH 13.334 42,364.00 564,881.58
Mandor L.04 OH 0.666 0.00 -
B Bahan
C PERALATAN
D Jumlah A + B + C 564,881.58
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 564,881.58

5 A.2.2.1.14 Bongkaran 1 m3 Dinding Tembok Bata 282,440.79


A Tenaga 282,440.79
Pekerja L.02 OH 6.667 42,364.00 282,440.79
Mandor L.04 OH 0.033 0.00 -
B Bahan
C PERALATAN
D Jumlah A + B + C 282,440.79
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 282,440.79

6 A.2.2.1.15 Pemasangan 1 m2 Pagar Kawat Jaring Galvanis Panjang 240cm 2,225.83


A Tenaga 2,225.83
Pekerja L.01 OH 0.042 42,364.00 1,779.29
Tukang Kayu L.02 OH 0.004 71,091.00 284.36
Kepala Tukang L.03 OH 0.002 81,091.00 162.18
Mandor L.04 OH 0.042 0.00 -
B Bahan -
Kawat Jaring Lbr 0.1434 -
C PERALATAN
D Jumlah A + B + C 2,225.83
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 2,225.83

106/135
HARGA JUMLAH
No SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp
II A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
1 A.2.3.1.1 Penggalian 1 m3 Tanah Biasa Sedalam 1 m 31,773.00
A TENAGA 31,773.00
Pekerja L.01 OH 0.75 42,364.00 31,773.00
Mandor L.04 OH 0.025 0.00 -
B BAHAN
C PERALATAN
D Jumlah A + B + C 31,773.00
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 31,773.00

2 A.2.3.1.9 Pengurugan Kembali 1 m3 Galian Tanah


2,353.56
Pengurugan Kembali di hitung dari 1/3 kali koefisien Pekerjaan galian
A TENAGA 21,182.00
Pekerja L.01 OH 0.50 42,364.00 21,182.00
Mandor L.04 OH 0.050 0.00 -
B BAHAN
C PERALATAN
D Jumlah A + B + C 21,182.00
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E)/3 7,060.67

3 A.2.3.1.11 Pengurukan 1 m3 dengan Pasir Uurg 293,869.20


A TENAGA 12,709.20
Pekerja L.01 OH 0.30 42,364.00 12,709.20
Mandor L.04 OH 0.01 0.00 -
B BAHAN 281,160.00
Pasir Urug m3 1.2 234,300.00 281,160.00
C PERALATAN
D Jumlah A + B + C 293,869.20
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 293,869.20

4 A.2.3.1.14 Pengurukan 1 m3 Sirtu Padat 125,071.00


A TENAGA 10,591.00
Pekerja L.01 OH 0.25 42,364.00 10,591.00
Mandor L.04 OH 0.025 0.00 -
B BAHAN 114,480.00
Sirtu m3 1.2 95,400.00 114,480.00
C PERALATAN
D Jumlah A + B + C 125,071.00
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 125,071.00

107/135
HARGA JUMLAH
No SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp
III A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI
Overhead & Profit
1 A.3.2.1.2 Pemasangan 1 m3 Pondasi Batu Belah Campuran 1SP : 4 PP 789,322.08
A TENAGA 122,946.08
Pekerja L.01 OH 1.5 42,364.00 63,546.00
Tukang Batu L.02 OH 0.750 71,091.00 53,318.25
Kepala Tukang L.03 OH 0.075 81,091.00 6,081.83
Mandor L.04 OH 0.075 0.00 -
B BAHAN 666,376.00
Batu Belah 15/20 m3 1.2 216,400.00 259,680.00
Portland Sement Kg 163 1,620.00 264,060.00
Pasir Pasang m3 0.52 274,300.00 142,636.00
C PERALATAN
D Jumlah A + B + C 789,322.08
E Overhead & Profit (contoh 10%) 0% -
F Harga Satuan Pekerjaan (D+E) 789,322.08

2 A.3.2.1.3 Pemasangan 1 m3 Pondasi Batu Belah Campuran 1SP : 5 PP 752,165.28


A TENAGA 122,946.08
Pekerja L.01 OH 1.5 42,364.00 63,546.00
Tukang Batu L.02 OH 0.750 71,091.00 53,318.25
Kepala Tukang L.03 OH 0.075 81,091.00 6,081.83
Mandor L.04 OH 0.075 0.00 -
B BAHAN 629,219.20
Batu Belah 15/20 m3 1.2 216,400.00 259,680.00
Portland Sement Kg 136 1,620.00 220,320.00
Pasir Pasang m3 0.544 274,300.00 149,219.20
C PERALATAN
D Jumlah A + B + C 752,165.28
E Overhead & Profit (contoh 10%) 0% -
F Harga Satuan Pekerjaan (D+E) 752,165.28

108/135
3 A.3.2.1.6 Pemasangan 1 m3 Pondasi Batu Belah Campuran 1SP : 1KP : 2PP 520,201.57
A Tenaga 122,946.08
Pekerja L.01 OH 1.5 42,364.00 63,546.00
Tukang Batu L.02 OH 0.750 71,091.00 53,318.25
Kepala Tukang L.03 OH 0.075 81,091.00 6,081.83
Mandor L.04 OH 0.075 0.00 -
B Bahan 397,255.50
Batu Belah 15/20 m3 1.2 216,400.00 259,680.00
Kapur Pasang (KP) m3 0.17 259,047.62 44,038.10
Portland Sement Kg 0.17 1,620.00 275.40
Pasir Pasang m3 0.340 274,300.00 93,262.00
C PERALATAN
D Jumlah A + B + C 520,201.57
E Overhead & Profit (contoh 10%) 0% -
F Harga Satuan Pekerjaan (D+E) 520,201.57

4 A.3.2.1.7 Pemasangan 1 m3 Pondasi Batu Belah Campuran 1 SP : 3 KP : 10 PP 654,481.68


A Tenaga 122,946.08
Pekerja L.01 OH 1.5 42,364.00 63,546.00
Tukang Batu L.02 OH 0.750 71,091.00 53,318.25
Kepala Tukang L.03 OH 0.075 81,091.00 6,081.83
Mandor L.04 OH 0.075 0.00 -
B Bahan 531,535.60
Batu Belah 15/20 m3 1.2 216,400.00 259,680.00
Portland Sement kg 61 1,620.00 98,820.00
Kapur Pasang m3 0.147 259,047.62 38,080.00
Pasir Pasang m3 0.492 274,300.00 134,955.60
C PERALATAN
D Jumlah A + B + C 654,481.68
E Overhead & Profit (contoh 10%) 0% -
F Harga Satuan Pekerjaan (D+E) 654,481.68

5 A.3.2.1.9 Pemasang 1 m3 Batu Kosong (Anstamping) 424,829.56


A Tenaga 63,931.96
Pekerja L.01 OH 0.78 42,364.00 33,043.92
Tukang Batu L.02 OH 0.39 71,091.00 27,725.49
Kepala Tukang L.03 OH 0.039 81,091.00 3,162.55
Mandor L.04 OH 0.039 0.00 -
B Bahan 360,897.60
Batu Belah 15/20 m3 1.2 216,400.00 259,680.00
Pasir Urug m3 0.432 234,300.00 101,217.60
C PERALATAN
D Jumlah A + B + C 424,829.56
E Overhead & Profit (contoh 10%) 0% -
F Harga Satuan Pekerjaan (D+E) 424,829.56

109/135
HARGA JUMLAH
No SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp
IV A.4.1.1 HARGA SATUAN PEKERJAAN BETON

1 A.4.1.1.1 Membuat 1 m3 Beton mutu f'c=7,4 Mpa (K100), slum (12±2)cm, w/c = 0,87 873,988.10
A Tenaga 91,721.17
Pekerja L.01 OH 1.65 42,364.00 69,900.60
Tukang Batu L.02 OH 0.275 71,091.00 19,550.03
Kepala Tukang L.03 OH 0.028 81,091.00 2,270.55
Mandor L.04 OH 0.083 0.00 -
B Bahan 782,266.93
Portland Semen Kg 247 1,620.00 400,140.00
Pasir Beton Kg 869 195.93 170,261.93
Kerikil (maksimum 30 mm) Kg 999 211.26 211,048.00
Air ltr 215 3.80 817.00
C PERALATAN
D Jumlah A + B + C 873,988.10
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 873,988.10
Overhead & Profit (contoh 10%)
2 A.4.1.1.2 Membuat 1 m3 Beton mutu f'c=9,8 Mpa (K125), slum (12±2)cm, w/c = 0,78 915,681.40
A Tenaga 91,721.17
Pekerja L.01 OH 1.65 42,364.00 69,900.60
Tukang Batu L.02 OH 0.28 71,091.00 19,550.03
Kepala Tukang L.03 OH 0.03 81,091.00 2,270.55
Mandor L.04 OH 0.08 0.00 -
B Bahan 823,960.23
Portland Semen Kg 276 1,620.00 447,120.00
Pasir Beton kg 828 195.93 162,228.86
Kerikil (maksimum 30 mm) kg 1,012 211.26 213,794.37
Air ltr 215 3.80 817.00
C PERALATAN
D Jumlah A + B + C 915,681.40
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 915,681.40

3 A.4.1.1.3 Membuat 1 m3 Beton mutu f'c=12,2 Mpa (K150), slum (12±2)cm, w/c = 0,72 948,315.77
A Tenaga 91,721.17
Pekerja L.01 OH 1.65 42,364.00 69,900.60
Tukang Batu L.02 OH 0.28 71,091.00 19,550.03
Kepala Tukang L.03 OH 0.03 81,091.00 2,270.55
Mandor L.04 OH 0.08 0.00 -
B Bahan 856,594.60
Portland Semen Kg 299 1,620.00 484,380.00
Pasir Beton kg 799 195.93 156,546.93
Kerikil (maksimum 30 mm) kg 1,017 211.26 214,850.67
Air ltr 215 3.80 817.00
C PERALATAN
D Jumlah A + B + C 948,315.77
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 948,315.77

4 A.4.1.1.4 Membuat 1 m3 Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87 831,964.29
A Tenaga 66,676.82
Pekerja L.01 OH 1.200 42,364.00 50,836.80
Tukang Batu L.02 OH 0.200 71,091.00 14,218.20
Kepala Tukang L.03 OH 0.020 81,091.00 1,621.82
Mandor L.04 OH 0.006 0.00 -
B Bahan 765,287.47
Portland Semen Kg 230 1,620.00 372,600.00
Pasir Beton kg 893 195.93 174,964.21
Kerikil (maksimum 30 mm) kg 1,027 211.26 216,963.26
Air ltr 200 3.80 760.00

110/135
C PERALATAN
D Jumlah A + B + C 831,964.29
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 831,964.29

2 A.4.1.1.5 Membuat 1 m3 Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66 986,949.67
A Tenaga 91,721.17
Pekerja L.01 OH 1.65 42,364.00 69,900.60
Tukang Batu L.02 OH 0.275 71,091.00 19,550.03
Kepala Tukang L.03 OH 0.028 81,091.00 2,270.55
Mandor L.04 OH 0.083 0.00 -
B Bahan 895,228.49
Portland Semen Kg 326 1,620.00 528,120.00
Pasir Beton Kg 760 195.93 148,905.71
Kerikil (maksimum 30 mm) Kg 1,029 211.26 217,385.78
Air ltr 215 3.80 817.00
C PERALATAN
D Jumlah A + B + C 986,949.67
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 986,949.67

111/135
3 A.4.1.1.17a Pembesian 1 kg dengan Besi Polos atau Besi Ulir 13,767.89
A Tenaga 867.89
Pekerja L.01 OH 0.01 42,364.00 296.55
Tukang Besi L.02 OH 0.01 71,091.00 497.64
Kepala Tukang L.03 OH 0.001 81,091.00 56.76
Mandor L.04 OH 0.000 42,364.00 16.95
B Bahan 12,900.00
Besi Beton (polos/ulir) Kg 1.05 12,000.00 12,600.00
Kawat Beton Kg 0.015 20,000.00 300.00
C PERALATAN
D Jumlah A + B + C 13,767.89
E Jumlah A + B + C -
F Harga Satuan Pekerjaan (D+E) 13,767.89

4 A.4.1.1.21 Pemasangan 1 m2 Bekisting untuk Sloof 286,230.06


A Tenaga 42,621.31
Pekerja L.01 OH 0.52 42,364.00 22,029.28
Tukang Kayu L.02 OH 0.26 71,091.00 18,483.66
Kepala Tukang L.03 OH 0.026 81,091.00 2,108.37
Mandor L.04 OH 0.026 0.00 -
B Bahan 243,608.75
Kayu Klas III (Terentang) m3 0.045 5,288,194.44 237,968.75
Paku Biasa 2" - 5" Kg 0.3 18,800.00 5,640.00
Minyak Bekisting Ltr 0.1 0.00 -
C PERALATAN
D Jumlah A + B + C 286,230.06
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 286,230.06

5 A.4.1.1.21a Pemasangan 1 m2 Bekisting untuk Sloof (2 x pakai) 167,245.68


A Tenaga 42,621.31
Pekerja L.01 OH 0.52 42,364.00 22,029.28
Tukang Kayu L.02 OH 0.26 71,091.00 18,483.66
Kepala Tukang L.03 OH 0.026 81,091.00 2,108.37
Mandor L.04 OH 0.026 0.00 -
B Bahan 124,624.38
Kayu Klas III (Terentang) m3 0.023 5,288,194.44 118,984.38
Paku Biasa 2" - 5" Kg 0.3 18,800.00 5,640.00
Minyak Bekisting Ltr 0.1 0.00 -
C PERALATAN
D Jumlah A + B + C 167,245.68
E Jumlah A + B + C -
F Harga Satuan Pekerjaan (D+E) 167,245.68

112/135
6 A.4.1.1.22a Pemasangan 1 m2 Bekisting untuk Kolom (2x pakai) 414,786.97
A Tenaga 54,096.27
Pekerja L.01 OH 0.66 42,364.00 27,960.24
Tukang Kayu L.02 OH 0.33 71,091.00 23,460.03
Kepala Tukang L.03 OH 0.033 81,091.00 2,676.00
Mandor L.04 OH 0.033 0.00 -
B Bahan 360,690.69
Kayu Klas III (Terentang) m3 0.04 5,288,194.44 211,527.78
Paku Biasa 2" - 5" Kg 0.4 18,800.00 7,520.00
Minyak Bekisting Ltr 0.2 0.00 -
Balok Kayu Klas II m3 0.015 5,288,194.44 79,322.92
Plywood tebal 9mm Lbr 0.18 166,400.00 29,120.00
Bambu Btg 2 16,600.00 33,200.00
C PERALATAN
D Jumlah A + B + C 414,786.97
E0 -
F Harga Satuan Pekerjaan (D+E) 414,786.97

7 A.4.1.1.23a Pemasangan 1 m2 Bekisting untuk Balok (2x pakai) 430,651.55


A Tenaga 54,096.27
Pekerja L.01 OH 0.66 42,364.00 27,960.24
Tukang Kayu L.02 OH 0.33 71,091.00 23,460.03
Kepala Tukang L.03 OH 0.033 81,091.00 2,676.00
Mandor L.04 OH 0.033 0.00 -
B Bahan 376,555.28
Kayu Klas III (Terentang) m3 0.04 5,288,194.44 211,527.78
Paku Biasa 2" - 5" Kg 0.4 18,800.00 7,520.00
Minyak Bekisting Ltr 0.2 0.00 -
Balok Kayu Klas II m3 0.018 5,288,194.44 95,187.50
Plywood tebal 9mm Lbr 0.18 166,400.00 29,120.00
Bambu Btg 2 16,600.00 33,200.00
C PERALATAN
D Jumlah A + B + C 430,651.55
E0 -
F Harga Satuan Pekerjaan (D+E) 430,651.55

8 A.4.1.1.35 Membuat 1 m' Kolom Penguat Beton Bertulang (11 x 11) cm 70,734.51
A Tenaga 12,377.53
Pekerja L.01 OH 0.18 42,364.00 7,625.52
Tukang batu L.02 OH 0.02 71,091.00 1,421.82
Tukang Kayu L.02 OH 0.02 71,091.00 1,421.82
Tukang Besi L.02 OH 0.02 71,091.00 1,421.82
Kepala Tukang L.03 OH 0.006 81,091.00 486.55
Mandor L.04 OH 0.009 0.00 -
B Bahan 58,356.99
Kayu Klas III (Terentang) m3 0.002 5,288,194.44 10,576.39
Paku Biasa 2" - 5" Kg 0.01 18,800.00 188.00
Besi Beton Polos Kg 3 12,000.00 36,000.00
Kawat Beton Kg 0.045 20,000.00 900.00
Portland Semen Kg 4 1,620.00 6,480.00
Pasir Beton m3 0.006 274,300.00 1,645.80
Kerikil Beton m3 0.009 285,200.00 2,566.80
C PERALATAN
D Jumlah A + B + C 70,734.51
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 70,734.51

113/135
9 A.4.1.1.36 Membuat 1 m' Ring Balok Beton Bertulang (10 x 15) cm 96,528.31
A Tenaga 20,431.03
Pekerja L.01 OH 0.297 42,364.00 12,582.11
Tukang batu L.02 OH 0.033 71,091.00 2,346.00
Tukang Kayu L.02 OH 0.033 71,091.00 2,346.00
Tukang Besi L.02 OH 0.033 71,091.00 2,346.00
Kepala Tukang L.03 OH 0.01 81,091.00 810.91
Mandor L.04 OH 0.015 0.00 -
B Bahan B 76,097.28
Kayu Klas III (Terentang) m3 0.003 5,288,194.44 15,864.58
Paku Biasa 2" - 5" Kg 0.02 18,800.00 376.00
Besi Beton Polos Kg 3.6 12,000.00 43,200.00
Kawat Beton Kg 0.05 20,000.00 1,000.00
Portland Semen Kg 5.5 1,620.00 8,910.00
Pasir Beton m3 0.009 274,300.00 2,468.70
Kerikil Beton m3 0.015 285,200.00 4,278.00
C PERALATAN
D Jumlah A + B + C 96,528.31
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 96,528.31

114/135
HARGA JUMLAH
No SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp
VII A.4.4.1 HARGA SATUAN PEKERJAAN DINDING PASANGAN

9 A.4.4.1.9 Pemasangan 1 m2 Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 4PP 135,054.11
A Tenaga 20,629.21
Pekerja L.01 OH 0.30 42,364.00 12,709.20
Tukang Batu L.02 OH 0.1 71,091.00 7,109.10
Kepala Tukang L.03 OH 0.01 81,091.00 810.91
Mandor L.04 OH 0.015 0.00 -
B Bahan 114,424.90
Bata Merah 5 x 11 x 22 Buah 70 1,200.00 84,000.00
Portland Semen Kg 11.50 1,620.00 18,630.00
Pasir Pasang m3 0.043 274,300.00 11,794.90
C PERALATAN
D Jumlah A + B + C 135,054.11
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 135,054.11

11 A.4.4.1.11 Pemasangan 1 m2 Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP 131,548.31
A Tenaga 20,629.21
Pekerja L.01 OH 0.30 42,364.00 12,709.20
Tukang Batu L.02 OH 0.1 71,091.00 7,109.10
Kepala Tukang L.03 OH 0.01 81,091.00 810.91
Mandor L.04 OH 0.015 0.00 -
B Bahan 110,919.10
Bata Merah 5 x 11 x 22 Buah 70 1,200.00 84,000.00
Portland Semen Kg 8.32 1,620.00 13,478.40
Pasir Pasang m3 0.049 274,300.00 13,440.70
C PERALATAN
D Jumlah A + B + C 131,548.31
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 131,548.31

115/135
13 A.4.4.1.13 Pemasangan 1 m2 Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3KP : 10PP 129,519.92

A Tenaga 20,629.21
Pekerja L.01 OH 0.30 42,364.00 12,709.20
Tukang Batu L.02 OH 0.1 71,091.00 7,109.10
Kepala Tukang L.03 OH 0.01 81,091.00 810.91
Mandor L.04 OH 0.015 0.00 -
B Bahan 108,890.71
Bata Merah 5 x 11 x 22 Buah 70 1,200.00 84,000.00
Portland Semen Kg 4.5 1,620.00 7,290.00
Pasir Pasang m3 0.05 274,300.00 13,715.00
Kapur Padam m3 0.015 259,047.62 3,885.71
C PERALATAN
D Jumlah A + B + C 129,519.92
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 129,519.92

17 A.4.4.1.17 Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 4PP 442,223.56
A Tenaga 13,362.76
Pekerja L.01 OH 0.035 42,364.00 1,482.74
Tukang Batu L.02 OH 0.150 71,091.00 10,663.65
Kepala Tukang L.03 OH 0.015 81,091.00 1,216.37
Mandor L.04 OH 0.018 - -
B Bahan 428,860.80
HB-20 Buah 12.500 14,000.00 175,000.00
Semen Portland kg 24.260 1,620.00 39,301.20
Pasir Pasang m3 0.772 274,300.00 211,759.60
Besi Angek diameter 8 kg 0.280 10,000.00 2,800.00
C PERALATAN
D Jumlah A + B + C 442,223.56
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 442,223.56

20 A.4.4.1.20 Pemasangan 1 m2 Dinding Conblock HB10 campuran 1SP : 3PP 205,333.61


A Tenaga 20,629.21
Pekerja L.01 OH 0.300 42,364.00 12,709.20
Tukang Batu L.02 OH 0.100 71,091.00 7,109.10
Kepala Tukang L.03 OH 0.010 81,091.00 810.91
Mandor L.04 OH 0.015 - -
B Bahan 184,704.40
Batako buah 12.500 4,600.00 57,500.00
PC kg 15.160 1,620.00 24,559.20
Pasir Pasang m3 0.364 274,300.00 99,845.20
Besi Angkur Ø 8 mm kg 0.280 10,000.00 2,800.00
C PERALATAN
D Jumlah A + B + C 205,333.61
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 205,333.61

116/135
HARGA JUMLAH
No SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp
VIII A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN

4 A,4,4,2.4 Pemasangan 1 m2 Plesteran 1 Pc : 4 Pp Tebal 15 mm 41,281.22


A Tenaga 24,589.22
Pekerja L.01 OH 0.3 42,364.00 12,709.20
Tukang batu L.02 OH 0.15 71,091.00 10,663.65
Kepala Tukang L.03 OH 0.015 81,091.00 1,216.37
Mandor L.04 OH 0.015 - -
B Bahan 16,692.00
Portland Semen Kg 6.240 1,620.00 10,108.80
Pasir Pasang m3 0.024 274,300.00 6,583.20
C PERALATAN
D Jumlah A + B + C 41,281.22
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 41,281.22

6 A,4,4,2.6 Pemasangan 1 m2 Plesteran 1 Pc : 6 Pp Tebal 15 mm 39,149.24


A Tenaga 24,589.22
Pekerja L.01 OH 0.3 42,364.00 12,709.20
Tukang batu L.02 OH 0.15 71,091.00 10,663.65
Kepala Tukang L.03 OH 0.015 81,091.00 1,216.37
Mandor L.04 OH 0.015 - -
B Bahan 14,560.02
Portland Semen Kg 4.416 1,620.00 7,153.92
Pasir Pasang m3 0.027 274,300.00 7,406.10
C PERALATAN
D Jumlah A + B + C 39,149.24
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 39,149.24

10 A,4,4,2.10 Pemasangan 1 m2 Plesteran 1 Pc : 2 Kp : 8 Pp Tebal 15 mm 20,111.04


A Tenaga 24,755.05
Pekerja L.01 OH 0.36 42,364.00 15,251.04
Tukang batu L.02 OH 0.12 71,091.00 8,530.92
Kepala Tukang L.03 OH 0.012 81,091.00 973.09
Mandor L.04 OH 0.018 - -
B Bahan 11,641.24
Portland Semen kg 3 1,620.00 4,860.00
Kapur Padam m3 0.005 259,047.62 1,295.24
Pasir Pasang m3 0.020 274,300.00 5,486.00
C PERALATAN
D Jumlah A + B + C 20,111.04
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 20,111.04

117/135
20 A,4,4,2.20 Pemasangan 1 m' Plesteran Skoning 1 Pc : 2Pp, lebar 10 mm 39,445.06
A Tenaga 35,069.16
Pekerja L.01 OH 0.080 42,364.00 3,389.12
Tukang batu L.02 OH 0.40 71,091.00 28,436.40
Kepala Tukang L.03 OH 0.040 81,091.00 3,243.64
Mandor L.04 OH 0.004 - -
B Bahan 4,375.90
Portland Semen Kg 0.5 1,620.00 810.00
Pasir Pasang m3 0.013 274,300.00 3,565.90
C PERALATAN
D Jumlah A + B + C 39,445.06
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 39,445.06

27 A,4,4,2.27 Pemasangan 1 m2 Acian 21,657.81


A Tenaga 16,392.81
Pekerja L.01 OH 0.20 42,364.00 8,472.80
Tukang batu L.02 OH 0.10 71,091.00 7,109.10
Kepala Tukang L.03 OH 0.010 81,091.00 810.91
Mandor L.04 OH 0.010 - -
B Bahan 5,265.00
Portland Semen Kg 3.25 1,620.00 5,265.00
C PERALATAN
D Jumlah A + B + C 21,657.81
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 21,657.81

118/135
HARGA
JUMLAH
No SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp
IX A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

16 A.4.4.3.16 Pemasangan 1 m' Ubin Plin Pc.Abu-abu Uk. 10 x 20 cm 31,140.97


A Tenaga 10,940.77
Pekerja L.01 OH 0.090 42,364.00 3,812.76
Tukang Batu L.02 OH 0.090 71,091.00 6,398.19
Kepala Tukang L.03 OH 0.009 81,091.00 729.82
Mandor L.04 OH 0.005 0.00 -
B Bahan 20,200.20
Ubin Plin Pc Abu-abu 10x20 cm Buah 5.300 3,100.00 16,430.00
Portland Semen Kg 1.650 1,620.00 2,673.00
Pasir Pasang m3 0.004 274,300.00 1,097.20
C PERALATAN
D Jumlah A + B + C 31,140.97
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 31,140.97

19 A.4.4.3.19 Pemasangan 1 m' Ubin Plin Pc.Warna Uk. 10 x 20 cm 114,308.47


A Tenaga 10,940.77
Pekerja L.01 OH 0.090 42,364.00 3,812.76
Tukang Batu L.02 OH 0.090 71,091.00 6,398.19
Kepala Tukang L.03 OH 0.009 81,091.00 729.82
Mandor L.04 OH 0.005 0.00 -
B Bahan 103,367.70
Ubin Plin Pc SWarna 10x20 cm Buah 5.300 18,660.00 98,898.00
Portland Semen Kg 1.14 1,620.00 1,846.80
Semen Warna Kg 0.100 18,000.00 1,800.00
Pasir Pasang m3 0.003 274,300.00 822.90
C PERALATAN
D Jumlah A + B + C 114,308.47
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 114,308.47

32 A.4.4.3.32 Pemasangan 1 m2 Lantai Keramik 10x 20 cm 132,486.14


A Tenaga 57,374.84
Pekerja L.01 OH 0.700 42,364.00 29,654.80
Tukang Batu L.02 OH 0.350 71,091.00 24,881.85
Kepala Tukang L.03 OH 0.035 81,091.00 2,838.19
Mandor L.04 OH 0.035 0.00 -
B Bahan 75,111.30
Keramik 10 x 20 cm Buah 53.000 - -
Portland Semen Kg 8.190 1,620.00 13,267.80
Semen Warna Kg 2.750 18,000.00 49,500.00
Pasir Pasang m3 0.045 274,300.00 12,343.50
C PERALATAN
D Jumlah A + B + C 132,486.14
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 132,486.14

119/135
35 A.4.4.3.35 Pemasangan 1 m2 Lantai Keramik 30 x 30 cm 172,699.97
A Tenaga 57,374.84
Pekerja L.01 OH 0.700 42,364.00 29,654.80
Tukang Batu L.02 OH 0.350 71,091.00 24,881.85
Kepala Tukang L.03 OH 0.035 81,091.00 2,838.19
Mandor L.04 OH 0.035 0.00 -
B Bahan 115,325.14
Ubin Keramik 30 x 30 cm Buah 11.870 5,036.36 59,781.64
Portland Semen Kg 10.000 1,620.00 16,200.00
Pasir Pasang m3 0.045 274,300.00 12,343.50
Semen Warna Kg 1.500 18,000.00 27,000.00
C PERALATAN
D Jumlah A + B + C 172,699.97
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 172,699.97

36 A.4.4.3.36 Pemasangan 1 m2 Lantai Keramik 20 x 20 cm 180,916.34


A Tenaga 57,374.84
Pekerja L.01 OH 0.700 42,364.00 29,654.80
Tukang Batu L.02 OH 0.350 71,091.00 24,881.85
Kepala Tukang L.03 OH 0.035 81,091.00 2,838.19
Mandor L.04 OH 0.035 0.00 -
B Bahan 123,541.50
Ubin Keramik 20 x 20 cm Buah 26.500 2,460.00 65,190.00
Portland Semen Kg 10.400 1,620.00 16,848.00
Semen Warna Kg 1.620 18,000.00 29,160.00
Pasir Pasang m3 0.045 274,300.00 12,343.50
C PERALATAN
D Jumlah A + B + C 180,916.34
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 180,916.34

120/135
41 A.4.4.3.41 Pemasangan 1 m' Plint Keramik Ukuran 5x20 cm 21,167.27
A Tenaga 10,940.77
Pekerja L.01 OH 0.090 42,364.00 3,812.76
Tukang Batu L.02 OH 0.090 71,091.00 6,398.19
Kepala Tukang L.03 OH 0.009 81,091.00 729.82
Mandor L.04 OH 0.005 0.00 -
B Bahan 10,226.50
Ubin Keramik Buah 10.600 628.00 6,656.80
Portland Semen Kg 1.140 1,620.00 1,846.80
Pasir Pasang m3 0.003 274,300.00 822.90
Semen Warna Kg 0.050 18,000.00 900.00
C PERALATAN
D Jumlah A + B + C 21,167.27
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 21,167.27

53 A.4.4.3.53 Pemasangan 1 m2 Dinding Keramik 20x25 cm, 209,839.05


A Tenaga 73,767.65
Pekerja L.01 OH 0.9 42,364.00 38,127.60
Tukang Batu L.02 OH 0.45 71,091.00 31,990.95
Kepala Tukang L.03 OH 0.045 81,091.00 3,649.10
Mandor L.04 OH 0.045 0.00 -
B Bahan 136,071.40
Keramik Buah 26.5 2,512.00 66,568.00
Portland Semen Kg 9.3 1,620.00 15,066.00
Pasir Pasang m3 0.018 274,300.00 4,937.40
Semen Warna Kg 2.75 18,000.00 49,500.00
C PERALATAN
D Jumlah A + B + C 209,839.05
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 209,839.05

58 A.4.4.3.58 Pemasangan 1 m2 Dinding Batu Tempel Hitam 255,520.34


A Tenaga 57,374.84
Pekerja L.01 OH 0.700 42,364.00 29,654.80
Tukang Batu L.02 OH 0.350 71,091.00 24,881.85
Kepala Tukang L.03 OH 0.035 81,091.00 2,838.19
Mandor L.04 OH 0.035 0.00 -
B Bahan 198,145.50
Batu tempel hitam m2 1.100 154,100.00 169,510.00
Portland Semen Kg 11.750 1,620.00 19,035.00
Pasir Pasang m3 0.035 274,300.00 9,600.50
C PERALATAN
D Jumlah A + B + C 255,520.34
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 255,520.34

121/135
HARGA
JUMLAH
No SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp
X A.4.5.1 HARGA SATUAN PEKERJAAN PLAFOND

1 A.4.5.1.1 Pemasangan 1 m2 Langit-langit Asbes (1,00x1,00) 5 mm 32,192.93


Tenaga 6,814.93
Pekerja L.01 OH 0.03 42,364.00 1,270.92
Tukang Kayu L.02 OH 0.07 71,091.00 4,976.37
Kepala Tukang L.03 OH 0.007 81,091.00 567.64
Mandor L.04 OH 0.004 0.00 -
Bahan 25,378.00
Plat Asbes (1x1m kalsirata) Lbr 1.1 22,900.00 25,190.00
Paku Kg 0.01 18,800.00 188.00
C PERALATAN
D Jumlah A + B + C 32,192.93
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 32,192.93
Overhead & Profit (contoh 10%)

9 A.4.5.1.9 Pemasangan 1 m' List Langit-Langit Kayu Profil 26,636.21


Tenaga 6,078.21
Pekerja L.01 OH 0.05 42,364.00 2,118.20
Tukang Kayu L.02 OH 0.05 71,091.00 3,554.55
Kepala Tukang L.03 OH 0.005 81,091.00 405.46
Mandor L.04 OH 0.003 0.00 -
Bahan 20,558.00
List GYPSUM m1 1.05 19,400.00 20,370.00
Paku Kg 0.01 18,800.00 188.00
C PERALATAN
D Jumlah A + B + C 26,636.21
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 26,636.21

122/135
HARGA
JUMLAH
No SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp
XI A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP

1 A.4.5.2.1 Pemasangan 1 m2 Atap Genteng Palentong Kecil 74,794.61


A Tenaga 12,294.61
Pekerja L.01 OH 0.15 42,364.00 6,354.60
Tukang Kayu L.02 OH 0.075 71,091.00 5,331.83
Kepala Tukang L.03 OH 0.0075 81,091.00 608.18
Mandor L.04 OH 0.008 0.00 -
B Bahan 62,500.00
Genteng Palentong Buah 25 2,500.00 62,500.00
C PERALATAN
D Jumlah A + B + C 74,794.61
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 74,794.61
#REF!

2 A.4.5.2.4 Pemasangan 1 m' Genteng Bubung Plentong 75,023.22


A Tenaga 32,785.62
Pekerja L.01 OH 0.4 42,364.00 16,945.60
Tukang Kayu L.02 OH 0.2 71,091.00 14,218.20
Kepala Tukang L.03 OH 0.02 81,091.00 1,621.82
Mandor L.04 OH 0.002 0.00 -
B Bahan B 42,237.60
Genteng Bubung Plentong Buah 5 4,100.00 20,500.00
Portland Semen Kg 8 1,620.00 12,960.00
Pasir Pasang m3 0.032 274,300.00 8,777.60
C PERALATAN
D Jumlah A + B + C 75,023.22
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 75,023.22

123/135
HARGA
JUMLAH
No SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp
XII A.4.6.1 HARGA SATUAN PEKERJAAN KAYU

2 A.4.6.1.2 Pembuatan & Pemasangan 1 m3 Kusen Pintu & Jendela Kayu klas II atau III 18,328,452.47
A Tenaga 1,679,785.80
Pekerja L.01 OH 6.00 42,364.00 254,184.00
Tukang Kayu L.02 OH 18.00 71,091.00 1,279,638.00
Kepala Tukang L.03 OH 1.80 81,091.00 145,963.80
Mandor L.04 OH 0.30 0.00 -
B Bahan 16,648,666.67
Kayu Klas II (damar laut) , Balok m3 1.2 13,826,388.89 16,591,666.67
Paku Biasa 2" - 5 " kg 1.25 18,800.00 23,500.00
Lem Kayu kg 1 33,500.00 33,500.00
C PERALATAN
D Jumlah A + B + C 18,328,452.47
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 18,328,452.47

5 A.4.6.1.5 Pembuatan & Pemasangan 1 m2 Daun Pintu Panel, Kayu Klas I atau II 856,839.30
A Tenaga 279,964.30
Pekerja L.01 OH 1.00 42,364.00 42,364.00
Tukang Kayu L.02 OH 3.00 71,091.00 213,273.00
Kepala Tukang L.03 OH 0.30 81,091.00 24,327.30
Mandor L.04 OH 0.05 0.00 -
B Bahan 576,875.00
Kayu Klas II (Damar Laut), papan m3 0.04 14,380,000.00 575,200.00
Lem Kayu kg 0.050 33,500.00 1,675.00
C PERALATAN
D Jumlah A + B + C 856,839.30
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 856,839.30

6 A.4.6.1.6 Pembuatan & Pemasangan 1 m2 Pintu & Jendela Kaca Kayu Klas I atau II 579,141.44
A Tenaga 223,971.44
Pekerja L.01 OH 0.800 42,364.00 33,891.20
Tukang Kayu L.02 OH 2.400 71,091.00 170,618.40
Kepala Tukang L.03 OH 0.240 81,091.00 19,461.84
Mandor L.04 OH 0.040 0.00 -
B Bahan 355,170.00
Kayu Klas II (Damar Laut), papan m3 0.024 14,380,000.00 345,120.00
Lem Kayu kg 0.300 33,500.00 10,050.00
C PERALATAN
D Jumlah A + B + C 579,141.44
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 579,141.44

124/135
13 A.4.6.1.13 Pembuatan&Memasang 1 m3 Konstruksi Kuda-kuda Konvensional Kayu I; II & III Bentang 6 m 12,282,220.53
A Tenaga 1,119,857.20
Pekerja L.01 OH 4 42,364.00 169,456.00
Tukang Kayu L.02 OH 12 71,091.00 853,092.00
Kepala Tukang L.03 OH 1.2 81,091.00 97,309.20
Mandor L.04 OH 0.2 0.00 -
B Bahan 11,162,363.33
Kayu KRUING 8/12 m3 1.1 9,479,166.67 10,427,083.33
Besi Strip Kg 15 42,000.00 630,000.00
Paku Biasa 2" - 5" Kg 5.6 18,800.00 105,280.00
C PERALATAN
D Jumlah A + B + C 12,282,220.53
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 12,282,220.53

125/135
15 A.4.6.1.15 Pemasangan 1 m3 konstruksi Gording, Kayu Klas II 11,785,397.65
A Tenaga 671,914.32
Pekerja L.01 OH 2.4 42,364.00 101,673.60
Tukang Kayu L.02 OH 7.2 71,091.00 511,855.20
Kepala Tukang L.03 OH 0.72 81,091.00 58,385.52
Mandor L.04 OH 0.12 0.00 -
B Bahan 11,113,483.33
Kayu KRUING 8/12 m3 1.1 9,479,166.67 10,427,083.33
Besi Strip Kg 15 42,000.00 630,000.00
Paku Biasa 2" - 5" Kg 3 18,800.00 56,400.00
C PERALATAN
D Jumlah A + B + C 11,785,397.65
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 11,785,397.65

16 A.4.6.1.16 Pemasangan 1 m2 Rangka Atap Genteng Keramik, Kayu Klas II 142,222.41


A Tenaga 12,156.41
Pekerja L.01 OH 0.1 42,364.00 4,236.40
Tukang Kayu L.02 OH 0.1 71,091.00 7,109.10
Kepala Tukang L.03 OH 0.01 81,091.00 810.91
Mandor L.04 OH 0.005 0.00 -
B Bahan 130,066.00
Kayu Klas II (Kruing), Kaso-kaso (5x7) cm m3 0.014 7,428,571.43 104,000.00
Reng (2x3) cm m3 0.0036 5,935,000.00 21,366.00
Paku Biasa 2" - 5" Kg 0.25 18,800.00 4,700.00
C PERALATAN
D Jumlah A + B + C 142,222.41
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 142,222.41

18 A.4.6.1.18 Pemasangan 1 m2 Rangka Atap Sirap, Kayu Klas II 124,222.69


A Tenaga 14,587.69
Pekerja L.01 OH 0.12 42,364.00 5,083.68
Tukang Kayu L.02 OH 0.12 71,091.00 8,530.92
Kepala Tukang L.03 OH 0.012 81,091.00 973.09
Mandor L.04 OH 0.006 0.00 -
B Bahan 109,635.00
Kayu KRUING 6/12 m3 0.014 7,562,500.00 105,875.00
Paku Biasa 2" - 5" Kg 0.2 18,800.00 3,760.00
C PERALATAN
D Jumlah A + B + C 124,222.69
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 124,222.69

19 A.4.6.1.19 Pemasangan 1 m2 Rangka Langit-langit (50x100) cm, kayu Klas II atau III 150,337.13
A Tenaga 30,114.63
Pekerja L.01 OH 0.15 42,364.00 6,354.60
Tukang Kayu L.02 OH 0.30 71,091.00 21,327.30
Kepala Tukang L.03 OH 0.030 81,091.00 2,432.73
Mandor L.04 OH 0.075 0.00 -
B Bahan 120,222.50
Kayu Kruing balok m3 0.0154 7,562,500.00 116,462.50
Paku Biasa 2" - 5" Kg 0.2 18,800.00 3,760.00
C PERALATAN
D Jumlah A + B + C 150,337.13
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 150,337.13

126/135
20 A.4.6.1.20 Pemasangan 1 m2 Rangka Langit-langit (50x100) cm, kayu Klas II atau III 101,056.41
A Tenaga 12,156.41
Pekerja L.01 OH 0.1 42,364.00 4,236.40
Tukang Kayu L.02 OH 0.1 71,091.00 7,109.10
Kepala Tukang L.03 OH 0.01 81,091.00 810.91
Mandor L.04 OH 0.01 0.00 -
B Bahan 88,900.00
Kayu MRANTI uk 5/7 m3 0.0140 6,014,285.71 84,200.00
Paku Biasa 2" - 5" Kg 0.25 18,800.00 4,700.00
C PERALATAN
D Jumlah A + B + C 101,056.41
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 101,056.41

22 A.4.6.1.22 Pemasangan 1 m' Listplank Uk. (3x25)cm Kayu klas I atau klas II 179,196.42
A Tenaga 20,076.42
Pekerja L.01 OH 0.1 42,364.00 4,236.40
Tukang Kayu L.02 OH 0.2 71,091.00 14,218.20
Kepala Tukang L.03 OH 0.02 81,091.00 1,621.82
Mandor L.04 OH 0.005 0.00 -
B Bahan 159,120.00
Kayu Damar Laut, papan 3/25 m3 0.011 14,380,000.00 158,180.00
Paku Biasa 2" - 5" Kg 0.05 18,800.00 940.00
C PERALATAN
D Jumlah A + B + C 179,196.42
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 179,196.42

127/135
HARGA
JUMLAH
No SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp
XIII A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA

1 A.4.6.2.1 Pemasangan 1 buah Kunci Tanam Antik 233,261.90


A Tenaga 50,061.90
Pekerja L.01 OH 0.060 42,364.00 2,541.84
Tukang Kayu L.02 OH 0.600 71,091.00 42,654.60
Kepala Tukang L.03 OH 0.060 81,091.00 4,865.46
Mandor L.04 OH 0.003 0.00 -
B Bahan 183,200.00
Kunci Tanam Antik Buah 1.000 183,200.00 183,200.00
C PERALATAN
D Jumlah A + B + C 233,261.90
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 233,261.90
Overhead & Profit (contoh 10%)
Overhead & Profit (contoh 10%)

4 A.4.6.2.4 Pemasangan 1 buah gerendel jendela 17,543.65


A Tenaga 8,343.65
Pekerja L.01 OH 0.010 42,364.00 423.64
Tukang Kayu L.02 OH 0.100 71,091.00 7,109.10
Kepala Tukang L.03 OH 0.010 81,091.00 810.91
Mandor L.04 OH 0.005 0.00 -
B Bahan 9,200.00
Kunci gerendel jendela Buah 1.000 9,200.00 9,200.00
C PERALATAN
D Jumlah A + B + C 17,543.65
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 17,543.65

5 A.4.6.2.5 Pemasangan 1 buah Engsel Pintu 28,015.48


A Tenaga 12,515.48
Pekerja L.01 OH 0.015 42,364.00 635.46
Tukang Kayu L.02 OH 0.150 71,091.00 10,663.65
Kepala Tukang L.03 OH 0.015 81,091.00 1,216.37
Mandor L.04 OH 0.0008 0.00 -
B Bahan 15,500.00
Engsel pintu Buah 1.000 15,500.00 15,500.00
C PERALATAN
D Jumlah A + B + C 28,015.48
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 28,015.48

6 A.4.6.2.6 Pemasangan 1 buah Engsel Jendela Kupu-kupu 21,593.65


A Tenaga 8,343.65
Pekerja L.01 OH 0.010 42,364.00 423.64
Tukang Kayu L.02 OH 0.100 71,091.00 7,109.10
Kepala Tukang L.03 OH 0.010 81,091.00 810.91
Mandor L.04 OH 0.005 0.00 -
B Bahan 13,250.00
Engsel Jendela Buah 1.000 13,250.00 13,250.00
C PERALATAN
D Jumlah A + B + C 21,593.65
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 21,593.65

9 A.4.6.2.9 Pemasangan 1 buah Kait Angin 23,315.48


A Tenaga 12,515.48
Pekerja L.01 OH 0.015 42,364.00 635.46
Tukang Kayu L.02 OH 0.150 71,091.00 10,663.65
Kepala Tukang L.03 OH 0.015 81,091.00 1,216.37
Mandor L.04 OH 0.008 0.00 -
B Bahan 10,800.00

128/135
Kait Angin Buah 1.000 10,800.00 10,800.00
C PERALATAN
D Jumlah A + B + C 23,315.48
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 23,315.48

129/135
HARGA
JUMLAH
No SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp
XIV A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN

4 A.4.7.1.4 1 m2 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Penutup) 46,779.85
A Tenaga 4,091.85
Pekerja L.01 OH 0.070 42,364.00 2,965.48
Tukang Cat L.02 OH 0.009 71,091.00 639.82
Kepala Tukang L.03 OH 0.006 81,091.00 486.55
Mandor L.04 OH 0.003 0.00 -
B Bahan 42,688.00
Cat Menie kg 0.2000 29,600.00 5,920.00
Plamuur kg 0.1500 33,400.00 5,010.00
Cat Dasar kg 0.1700 68,800.00 11,696.00
Cat Penutup (sekualitas avian) kg 0.2600 68,800.00 17,888.00
Kuas bh 0.0100 9,400.00 94.00
Pengencer kg 0.0300 26,000.00 780.00
Amplas lbr 0.2000 6,500.00 1,300.00
C PERALATAN
D Jumlah A + B + C 46,779.85
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 46,779.85

130/135
10 A.4.7.1.10 Pengecat 1 m2 Tembok Baru (1 lap.Plamir, 1 lap Cat Dasar 2 lap. Cat Penutup) 16,014.49
A Tenaga 5,836.89
Pekerja L.01 OH 0.02 42,364.00 847.28
Tukang Cat L.02 OH 0.063 71,091.00 4,478.73
Kepala Tukang L.03 OH 0.0063 81,091.00 510.87
Mandor L.04 OH 0.0030 0.00 -
B Bahan 10,177.60
Plamir Kg 0.1 13,360.00 1,336.00
Cat Dasar Kg 0.1 24,560.00 2,456.00
Cat Penutup 2 kali (sekualitas decolith) Kg 0.26 24,560.00 6,385.60
C PERALATAN
D Jumlah A + B + C 16,014.49
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 16,014.49

11 A.4.7.1.11 Pengecatan 1 m2 Tembok Lama (1 lap.Plamir, 2 lap Cat Penutup) 11,880.60


A Tenaga 4,512.60
Pekerja L.01 OH 0.028 42,364.00 1,186.19
Tukang Cat L.02 OH 0.042 71,091.00 2,985.82
Kepala Tukang L.03 OH 0.0042 81,091.00 340.58
Mandor L.04 OH 0.0030 0.00 -
B Bahan B 7,368.00
Cat Dasar Kg 0.12 24,560.00 2,947.20
Cat Penutup 2 kali (sekualitas decolith) Kg 0.18 24,560.00 4,420.80
C PERALATAN
D Jumlah A + B + C 11,880.60
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 11,880.60

131/135
HARGA
JUMLAH
No SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp
XV A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI GEDUNG

2 A.5.1.1.2 Pemasangan 1 buah Closet Jongkok Porselen 370,727.15


A Tenaga 161,164.15
Pekerja L.01 OH 1.000 42,364.00 42,364.00
Tukang Batu L.02 OH 1.500 71,091.00 106,636.50
Kepala Tukang L.03 OH 0.150 81,091.00 12,163.65
Mandor L.04 OH 0.160 0.00 -
B Bahan 209,563.00
Kloset Jongkok Unit 1.000 197,100.00 197,100.00
Portland Semen Kg 6.000 1,620.00 9,720.00
Pasir Pasang m3 0.010 274,300.00 2,743.00
C PERALATAN
D Jumlah A + B + C 370,727.15
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 370,727.15

14 A.5.1.1.14 Pemasangan 1 buah Floor Drain 71,643.65


A Tenaga 8,343.65
Pekerja L.01 OH 0.010 42,364.00 423.64
Tukang Batu L.02 OH 0.100 71,091.00 7,109.10
Kepala Tukang L.03 OH 0.010 81,091.00 810.91
Mandor L.04 OH 0.005 0.00 -
B Bahan 63,300.00
Floor Drain (stainless-steel INA) bh 1.000 63,300.00 63,300.00

C PERALATAN
D Jumlah A + B + C 71,643.65
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 71,643.65

132/135
19 A.5.1.1.19 Pemasangan 1 buah Kran Ø ½" atau Ø ¾" 48,913.43
A Tenaga 32,103.68
Pekerja L.01 OH 0.010 42,364.00 423.64
Tukang Batu L.02 OH 0.400 71,091.00 28,436.40
Kepala Tukang L.03 OH 0.040 81,091.00 3,243.64
Mandor L.04 OH 0.005 0.00 -
B Bahan 16,809.75
Kran Air bh 1.000 16,800.00 16,800.00
Sealtape bh 0.0025 3,900.00 9.75
C PERALATAN
D Jumlah A + B + C 48,913.43
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 48,913.43

20 A.5.1.1.20 Pemasangan 1 m' Pipa Galvanis Ø ¾" 47,649.00


A Tenaga 9,415.67
Pekerja L.01 OH 0.054 42,364.00 2,287.66
Tukang Batu L.02 OH 0.090 71,091.00 6,398.19
Kepala Tukang L.03 OH 0.009 81,091.00 729.82
Mandor L.04 OH 0.027 0.00 -
B Bahan 38,233.33
Pipa Galvanis Ø ¾" m' 1.200 24,666.67 29,600.00
Perlengkapan 35% x pipa Ls 0.350 24,666.67 8,633.33
C PERALATAN
D Jumlah A + B + C 47,649.00
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 47,649.00

133/135
26 A.5.1.1.26 Pemasangan 1 m' Pipa PVC tipe AW Ø ¾" 16,080.86
A Tenaga 6,277.11
Pekerja L.01 OH 0.036 42,364.00 1,525.10
Tukang Batu L.02 OH 0.060 71,091.00 4,265.46
Kepala Tukang L.03 OH 0.006 81,091.00 486.55
Mandor L.04 OH 0.002 0.00 -
B Bahan 9,803.75
Pipa PVC Ø ¾" m' 1.200 6,325.00 7,590.00
Perlengkapan 35% x pipa Ls 0.350 6,325.00 2,213.75
C PERALATAN
D Jumlah A + B + C 16,080.86
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 16,080.86

134/135
31 A.5.1.1.31 Pemasangan 1 m' Pipa PVC tipe AW Ø 3" 72,326.00
A Tenaga 14,123.50
Pekerja L.01 OH 0.081 42,364.00 3,431.48
Tukang Batu L.02 OH 0.135 71,091.00 9,597.29
Kepala Tukang L.03 OH 0.0135 81,091.00 1,094.73
Mandor L.04 OH 0.004 0.00 -
B Bahan 58,202.50
Pipa PVC Ø 3" m' 1.200 37,550.00 45,060.00
Perlengkapan 35% x pipa Ls 0.350 37,550.00 13,142.50
C PERALATAN
D Jumlah A + B + C 72,326.00
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 72,326.00

32 A.5.1.1.32 Pemasangan 1 m' Pipa PVC tipe AW Ø 4" 104,082.11


A Tenaga 6,277.11
Pekerja L.01 OH 0.036 42,364.00 1,525.10
Tukang Batu L.02 OH 0.060 71,091.00 4,265.46
Kepala Tukang L.03 OH 0.006 81,091.00 486.55
Mandor L.04 OH 0.002 0.00 -
B Bahan 97,805.00
Pipa PVC Ø 4" m' 1.200 63,100.00 75,720.00
Perlengkapan 35% x pipa Ls 0.350 63,100.00 22,085.00
C PERALATAN
D Jumlah A + B + C 104,082.11
E Overhead & Profit (contoh 10%) -
F Harga Satuan Pekerjaan (D+E) 104,082.11

135/135