Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

0 1 2 3 4 5 6 7 8 9

Beware!
Before switching the controller ON ensure that the proper power voltage is set.
Changing the operation voltage move two wires as follows.

230 VAC Operation


Grey color wire to position 21
Orange color wire to position 22
115 VAC Operation
Gray color wire to position 33
Orange color wire to position 10

90 100

Itaca s.r.l JOB#: SM171006 Controller Power set-up 115/230 VAC DWG: SM171006.ES
=
+
Via Genova 23 SM171006 Hitchiner FG-50 torsion bar
17/10/18 G RAHO 10098 Rivoli - Italy Page 91
Date Name www.itaca-sw.it Of 19

You might also like