D 1m2 Begisting balok beton biasa dengan multiplex 12mm (tanpa perancah)
No Uraian Satuan Koefisien Harga Satuan (Rp)
A TENAGA
1 Pekerja OH 0.660 71,000.00
2 Tukang Kayu OH 0.330 88,000.00
3 Kepala tukang kayu OH 0.033 99,000.00
4 Mandor OH 0.033 94,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Multiplex 12 lbr 0.200 144,000.00
2 Kaso 5/7 m3 0.015 4,500,000.00
3 Paku 5cm dan 7cm kg 0.250 15,000.00
4 Minyak Begisting L 0.200 30,500.00
JUMLAH BAHAN
C PERALATAN
JUMLAH PERALATAN
D Jumlah harga tenaga, bahan dan peralatann (A+B+C)
E Faktor tak terduga 15% x D
F Harga satuan pekerjaan (D+E)
F 1m2 Begisting plat lantai biasa dengan multiplex 12mm (tanpa perancah)
No Uraian Satuan Koefisien Harga Satuan (Rp)
A TENAGA
1 Pekerja OH 0.660 71,000.00
2 Tukang Kayu OH 0.330 88,000.00
3 Kepala tukang kayu OH 0.033 99,000.00
4 Mandor OH 0.033 94,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Multiplex 12 lbr 0.200 144,000.00
2 Kaso 5/7 m3 0.015 4,500,000.00
3 Paku 5cm dan 7cm kg 0.250 15,000.00
4 Minyak Begisting L 0.200 30,500.00
JUMLAH BAHAN
C PERALATAN
JUMLAH PERALATAN
D Jumlah harga tenaga, bahan dan peralatann (A+B+C)
E Faktor tak terduga 15% x D
F Harga satuan pekerjaan (D+E)
G 1m2 Perancah Begisting plat lantai dengan kayu dolken diameter 6-10cm
No Uraian Satuan Koefisien Harga Satuan (Rp)
A TENAGA
1 Pekerja OH 0.660 71,000.00
2 Tukang Kayu OH 0.330 88,000.00
3 Kepala tukang kayu OH 0.033 99,000.00
4 Mandor OH 0.033 94,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 kayu dolken diameter 6 btg 4.000 22,000.00
2 Paku 5cm dan 7cm kg 0.350 15,000.00
JUMLAH BAHAN
C PERALATAN
JUMLAH PERALATAN
D Jumlah harga tenaga, bahan dan peralatann (A+B+C)
E Faktor tak terduga 15% x D
F Harga satuan pekerjaan (D+E)
A TENAGA
1 Pekerja OH 0.070 71,000.00
2 Tukang besi OH 0.070 88,000.00
3 Kepala tukang besi OH 0.007 99,000.00
4 Mandor OH 0.003 94,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 pipa besi 3" kg 1.100 13,470.94
2 jasa bending pipa 3" m1 1.100 4,000.00
JUMLAH BAHAN
C PERALATAN
JUMLAH PERALATAN
D Jumlah harga tenaga, bahan dan peralatann (A+B+C)
E Faktor tak terduga 15% x D
F Harga satuan pekerjaan (D+E)
K 1m3 Pekerjaan beton kolom 50/60
A BAHAN
1 Spesi beton m3 1.000 1,251,600
2 Besi polos kg 124.800 10,500
3 Besi ulir kg 3.970 13,200
4 Bekisting m2 8.000 59,900
5 Alat Bantu Is 1.000 100,000
Harga satuan pekerjaan
35,500
2,350
37,850
871,500
871,500
92,000
87,000
179,000
1,088,350
163,253
1,251,600
50
62
69
28
209
8,663
279
8,941
-
9,150
1,372
10,500
50
62
69
28
209
11,025
279
11,304
-
11,512
1,727
13,200
h)
Jumlah Harga (Rp)
46,860
29,040
3,267
3,102
82,269
28,800
67,500
3,750
6,100
106,150
-
188,419
28,263
216,600
46,860
29,040
3,267
3,102
82,269
88,000
5,250
93,250
-
175,519
26,328
201,800
46,860
29,040
3,267
3,102
82,269
28,800
67,500
3,750
6,100
106,150
-
188,419
28,263
216,600
46,860
29,040
3,267
3,102
82,269
88,000
5,250
93,250
-
175,519
26,328
201,800
116,929
49,500
6,000
6,100
178,529
-
260,798
39,120
299,900
59,900
28,400
1,880
30,280
-
30,280
4,542
34,800
42,000
557
42,557
-
42,557
6,384
48,900
4,970
6,160
693
282
12,105
10,858
4,400
15,258
-
27,363
4,104
31,400
4,970
6,160
693
282
12,105
14,775
4,400
19,175
-
31,280
4,692
35,900
4,970
6,160
693
282
12,105
14,818
4,400
19,218
-
31,323
4,698
36,000
Jumlah Harga (Rp)
1,251,600.000
1,310,400.000
52,404.000
479,200.000
100,000.000
3,193,604.000
1,251,600.000
1,228,500.000
62,304.000
599,000.000
100,000.000
3,241,404.000
1,251,600.000
117,600.000
695,244.000
698,434.000
100,000.000
2,862,878.000
RINCIAN ANGGARAN BIAYA
Pekerjaan : PEMBANGUNAN GEDUNG FAKULTAS KEDOKTERAN UNIVERSITAS JEMBER
Bag. Pekerjaan : BANGUNAN GEDUNG
A Lantai 1
I. PEKERJAAN KOLOM
1 Beton kolom struktur 50/60 (K1) m3
a Pekerjaan Beton m3
b Pembesian Polos m3
c Pembesian Ulir m3
d Bekisting m3
C Lantai 3
I. PEKERJAAN KOLOM
1 Beton kolom struktur 50/60 (K1) m3
a Pekerjaan Beton m3
b Pembesian Polos m3
c Pembesian Ulir m3
d Bekisting m3
D Lantai 4
I. PEKERJAAN KOLOM
1 Beton kolom struktur 40/40 (K2) m3
a Pekerjaan Beton m3
b Pembesian Polos m3
c Pembesian Ulir m3
d Bekisting m3
E Lantai 5
I. PEKERJAAN KOLOM
1 Beton kolom struktur 40/40 (K2) m3
a Pekerjaan Beton m3
b Pembesian Polos m3
c Pembesian Ulir m3
d Bekisting m3
2 Beton kolom struktur 30/30 (K3) m3
a Pekerjaan Beton m3
b Pembesian Polos m3
c Pembesian Ulir m3
d Bekisting m3
F Lantai Atap
I. PEKERJAAN KOLOM
1 Beton kolom struktur 25/25 (K5) m3
a Pekerjaan Beton m3
b Pembesian Polos m3
c Pembesian Ulir m3
d Bekisting m3
G PEKERJAAN ATAP
1 Kuda-kuda pipa baja pipa STK. 41 dia. 6", tbl. 4,5 kg
2 Gording pipa baja pipa baja pipa STK 41 dia. 2 1/2", tbl. 3,2 kg
3 Bracing pipa baja pipa baja pipa STK 41 dia. 3", tbl. 3,2 kg
Harga Satuan Jumlah Harga
( Rp ) ( Rp )
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
59,900
1,322,000
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
59,900
1,322,000
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
59,900
1,322,000
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
59,900
1,322,000
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
13,200
59,900
1,335,200
1,251,600
10,500
59,900
1,322,000
1,251,600
10,500
59,900
1,322,000
31,400 31,400
35,900 35,900
36,000 36,000
RINCIAN ANGGARAN BIAYA
Pekerjaan : PEMBANGUNAN GEDUNG FAKULTAS KEDOKTERAN UNIVERSITAS JEMBER
Bag. Pekerjaan : BANGUNAN GEDUNG
A Lantai 1
I. PEKERJAAN KOLOM
1 Beton kolom struktur 50/60 (K1) m3 52.50
2 Beton kolom struktur 40/40 (K2) m3 3.90
3 Beton kolom struktur 25/55 (KL) m3 7.92
4 Beton kolom struktur 25/40 (K6) m3 1.44
II. PEKERJAAN BALOK
Beton balok sparator lift 20/30 m3 0.91
B Lantai 2
I. PEKERJAAN KOLOM
1 Beton kolom struktur 50/60 (K1) m3 42.84
2 Beton kolom struktur 40/40 (K2) m3 3.26
3 Beton kolom struktur 25/55 (KL) m3 5.61
4 Beton kolom struktur 25/40 (K6) m3 1.02
II. PEKERJAAN BALOK
1 Beton balok struktur 35/70 m3 55.00
2 Beton balok struktur 30/60 m3 15.48
3 Beton balok struktur 30/50 m3 24.57
4 Beton balok struktur 30/40 m3 3.53
5 Beton balok struktur 25/40 m3 13.71
6 Beton balok sparator lift 20/30 m3 0.91
7 Beton balok struktur 20/25 m3 5.16
III. PEKERJAAN PLAT LANTAI
1 Beton plat lantai t=12cm m3 113.56
C Lantai 3
I. PEKERJAAN KOLOM
1 Beton kolom struktur 50/60 (K1) m3 42.84
2 Beton kolom struktur 40/40 (K2) m3 3.26
3 Beton kolom struktur 25/55 (KL) m3 5.61
4 Beton kolom struktur 25/40 (K6) m3 1.02
II. PEKERJAAN BALOK
1 Beton balok struktur 35/70 m3 55.00
2 Beton balok struktur 30/60 m3 15.48
3 Beton balok struktur 30/50 m3 23.31
4 Beton balok struktur 30/40 m3 2.74
5 Beton balok struktur 25/40 m3 13.71
6 Beton balok sparator lift 20/30 m3 0.91
7 Beton balok struktur 20/25 m3 5.16
III. PEKERJAAN PLAT LANTAI
1 Beton plat lantai t=12cm m3 109.06
D Lantai 4
I. PEKERJAAN KOLOM
1 Beton kolom struktur 40/40 (K2) m3 2.61
2 Beton kolom struktur 50/50 (K3) m3 28.56
3 Beton kolom struktur 25/55 (KL) m3 4.49
4 Beton kolom struktur 25/40 (K6) m3 0.82
II. PEKERJAAN BALOK
1 Beton balok struktur 35/70 m3 55.00
2 Beton balok struktur 30/60 m3 15.48
3 Beton balok struktur 30/50 m3 23.31
4 Beton balok struktur 30/40 m3 2.74
5 Beton balok struktur 25/40 m3 13.71
6 Beton balok sparator lift 20/30 m3 0.91
7 Beton balok struktur 20/25 m3 5.16
III. PEKERJAAN PLAT LANTAI
1 Beton plat lantai t=12cm m3 109.06
E Lantai 5
I. PEKERJAAN KOLOM
1 Beton kolom struktur 40/40 (K2) m3 18.28
2 Beton kolom struktur 30/30 (K3) m3 2.20
3 Beton kolom struktur 25/55 (KL) m3 4.49
4 Beton kolom struktur 25/40 (K6) m3 0.82
II. PEKERJAAN BALOK
1 Beton balok struktur 35/70 m3 55.00
2 Beton balok struktur 30/60 m3 15.48
3 Beton balok struktur 30/50 m3 23.31
4 Beton balok struktur 30/40 m3 2.74
5 Beton balok struktur 25/40 m3 13.71
6 Beton balok sparator lift 20/30 m3 0.91
7 Beton balok struktur 20/25 m3 5.16
III. PEKERJAAN PLAT LANTAI
1 Beton plat lantai t=12cm m3 109.06
F Lantai Atap
I. PEKERJAAN KOLOM
1 Beton kolom struktur 25/25 (K5) m3 3.19
2 Beton kolom struktur 25/40 (K6) m3 0.15
3 Beton kolom struktur 25/55 (KL) m3 1.65
II. PEKERJAAN BALOK
1 Beton balok struktur 35/70 m3 37.36
2 Beton balok struktur 30/60 m3 7.02
3 Beton balok struktur 30/50 m3 15.36
4 Beton balok struktur 30/40 m3 5.16
5 Beton balok struktur 25/40 m3 14.86
6 Beton balok struktur 20/25 m3 5.05
7 Beton balok struktur 20/30 elevasi +24,46 m3 1.27
8 Beton balok struktur 20/30 elevasi +25,96 m3 0.57
9 Beton balok struktur 30/40 elevasi +25,96 m3 1.87
III. PEKERJAAN PLAT LANTAI
1 Beton plat lantai t=12cm elevasi +23,46 m3 73.61
2 Beton plat lantai t=10cm elevasi +24,26 , +24,96 , +25,96 m3 4.99
G PEKERJAAN ATAP
1 Kuda-kuda pipa baja pipa STK. 41 dia. 6", tbl. 4,5 kg 1912.61
2 Gording pipa baja pipa baja pipa STK 41 dia. 2 1/2", tbl. 3,2 kg 2908.08
3 Bracing pipa baja pipa baja pipa STK 41 dia. 3", tbl. 3,2 kg 488.16
4 Plat landasan, simpul, tupai dll kg 240.08
5 Batang tarik diameter 19 kg 217.56
6 Batang tarik diameter 16 + mur kg 186.84
7 Ikatan gording diameter 12 + mur kg 218.56
8 Jarum keras bh 23.00
9 Baut angkur diameter 19 bh 56.00
10 Listplank kayu 3/25 (empat sisi) m1 96.90
11 Penutup atap CMS lengkung m2 499.30
12 Papan kompres (dua sisi samping) m1 29.70
13 Pengecatan rangka kuda-kuda, gording dan listplank m2 1146.78
Harga Satuan Jumlah Harga
( Rp ) ( Rp )
1,335,200 70,098,000.00
1,335,200 5,207,280.00
1,335,200 10,574,784.00
1,335,200 1,922,688.00
1,335,200 1,215,032.00
1,335,200 57,199,968.00
1,335,200 4,352,752.00
1,335,200 7,490,472.00
1,335,200 1,361,904.00
1,335,200 73,436,000.00
1,335,200 20,668,896.00
1,335,200 32,805,864.00
1,335,200 4,713,256.00
1,335,200 18,305,592.00
1,335,200 1,215,032.00
1,335,200 6,889,632.00
1,322,000 150,126,320.00
1,335,200 57,199,968.00
1,335,200 4,352,752.00
1,335,200 7,490,472.00
1,335,200 1,361,904.00
1,335,200 73,436,000.00
1,335,200 20,668,896.00
1,335,200 31,123,512.00
1,335,200 3,658,448.00
1,335,200 18,305,592.00
1,335,200 1,215,032.00
1,335,200 6,889,632.00
1,322,000 144,177,320.00
1,335,200 3,484,872.00
1,335,200 38,133,312.00
1,335,200 5,995,048.00
1,335,200 1,094,864.00
-
1,335,200 73,436,000.00
1,335,200 20,668,896.00
1,335,200 31,123,512.00
1,335,200 3,658,448.00
1,335,200 18,305,592.00
1,335,200 1,215,032.00
1,335,200 6,889,632.00
1,322,000 144,177,320.00
1,335,200 24,407,456.00
1,335,200 2,937,440.00
1,335,200 5,995,048.00
1,335,200 1,094,864.00
1,335,200 73,436,000.00
1,335,200 20,668,896.00
1,335,200 31,123,512.00
1,335,200 3,658,448.00
1,335,200 18,305,592.00
1,335,200 1,215,032.00
1,335,200 6,889,632.00
1,322,000 144,177,320.00
1,335,200 4,259,288.00
1,335,200 200,280.00
1,335,200 2,203,080.00
1,335,200 49,883,072.00
1,335,200 9,373,104.00
1,335,200 20,508,672.00
1,335,200 6,889,632.00
1,335,200 19,841,072.00
1,335,200 6,742,760.00
1,335,200 1,695,704.00
1,335,200 761,064.00
1,335,200 2,496,824.00
1,322,000 97,312,420.00
1,322,000 6,596,780.00
31,400 60,055,954.00
35,900 104,400,072.00
36,000 17,573,760.00