Professional Documents
Culture Documents
04 - 53 - PM - Typ - Layout-03 - Radha Swami (20june2017)
04 - 53 - PM - Typ - Layout-03 - Radha Swami (20june2017)
Proposed STP
Cap. 6 MLD
57.4M Area - 0.65 Ha.
46
LT
N BE
GREE
.1
M
15
10
11
16
O AD
IDE R
5MW
U/F
14
93.4M
O/F
40.2
12
U/F
5MW
07
O/F
IDE R
U/F
OAD
DEC
05
SBR
ASIN B 06
ANTE
-1 13
M
09
R 08
SAS
RAS
U/F
SAS 03
RAS
O/F
U/F
04 01
17
02
O/F
SBR
BASIN
-2
09
DEC
U/F
ANTE
R
87.3M
INDORE MUNICIPAL CORPORATION Legend IMPROVEMENT AND REJUVENATION THE EXISTING WATER SUPPLY &
WATER SUPPLY AND DRAINAGE CELL SEWERAGE SYSTEM AND PREPARATION OF DETAILED PROJECT REPORT FOR
Priority (Phase -1) 5 MLD
WATER SUPPLY AND SEWERAGE SYSTEM OF 29 VILLAGES RECENTLY JOINED IN
Phase -2 5 MLD INDORE MUNICIPAL CORPORATION AREA
DRA CONSULTANTS Pvt. Ltd. DRA/IMC/SEW/DPR/009
Typical Layout Plan of
Proposed STP at Radha Swami Ground