Indore Municipal Corporation: 8.8 Sewerage Network in Newly Proposed Area
Indore Municipal Corporation: 8.8 Sewerage Network in Newly Proposed Area
Indore Municipal Corporation: 8.8 Sewerage Network in Newly Proposed Area
A data base will be formed of the sewer segments, their 2050 populations, ground level at
various nodes and details of existing sewers (dia., slope, and ‘n’ value) etc. With this data
base, a 2050 design will be evolved.
(i) Proposing new sewers in the areas which doesn’t exist now, and
(ii) Proposing trunk sewers, main sewers and sub main sewers to connect up the
existing and proposed street sewers and convey the flows to the final
collection points.
(iii) Indicating the reaches where existing sewers are inadequate to meet 2050
requirement and giving the larger dia’s required for them.
(iv) The inadequate stretches as determined above for 2050 flows will require
initial replacement. The inadequacy checks shall be made by the SEWER
gems software.
The cost for retaining of the existing sewer layout in the project area may be required and
be providing while considering the following;
1. Provision of sewers in unsewered streets and laying new trunk sewer and main sewers.
Table 15: Village covered under proposed STP’s & Existing STP
P a g e | 81
DRA Consultants Ltd., Nagpur