Quotation: 1 Wooden Doors
Quotation: 1 Wooden Doors
1 Wooden Doors
Ironmongery : Excluded
As Per Dwg: A-501
Ironmongery : Excluded
As Per Dwg: A-501
Door Type D-800 Single Leaf (NFR) @ Maid Rm, Bath Rm & Laundry
O/A Size :
800mm W x 2200mm Ht. Jamb Size: 160mm
Material/Finish: Solid Oak Wood Frame & Architraves in Paint Finish to
E Nos 209
Match Shutters, 45mm Thk Solid Shutters Both Sides Oak Veneer PU Lacquer
Finish.
Ironmongery : Excluded
As Per Dwg: A-501
Page 1 of 63
QUOTATION
Date: 31-Dec-14 Quotation Ref. N
Door Type D-903 Single Leaf (NFR) @ Gym, Watch Man & Security
O/A Size : 900mm W
x 2200mm Ht. Jamb Size: 160mm
Material/Finish: Solid Oak Wood Frame & Architraves in Paint Finish to
G Nos 14
Match Shutters, 45mm Thk Solid Shutters Both Sides Oak Veneer PU Lacquer
Finish.
Ironmongery : Excluded
As Per Dwg: A-501
Door Type D-801 Single Leaf (NFR) @ Gym Toilet & Shower
O/A Size : 900mm W x 2200mm
Ht. Jamb Size: 160mm Material/Finish:
Solid Oak Wood Frame & Architraves in Paint Finish to Match Shutters,
D Nos 14
45mm Thk Solid Shutters Both Sides High Pressure Laminate (HPL) Finish.
Ironmongery : Excluded
As Per Dwg: A-501
Page 2 of 63
QUOTATION
Date: 31-Dec-14 Quotation Ref. N
Door Type D-102 Single Leaf (60 MFR) @ Tel. Elect, Garbage & FFC
O/A Size : 1000mm W x 2200mm
Ht. Jamb Size: 200mm Material/Finish:
Solid Oak Wood Frame & Architraves in Paint Finish to Match Shutters, 60 Nos 36
Minutes Fire Rated Shutters Both Sides Oak Veneer PU Lacquer Finish With
Louver Door.
Ironmongery : Excluded
As Per Dwg: A-501
Ironmongery : Excluded
As Per Dwg: A-501
One Million Four Hundred Ten Thousand Four Hundred Twenty Five Dirh
Page 3 of 63
QUOTATION
Quotation Ref. No : ASI/QTN/BS/2014/LR/353
3,550.00 312,400.00
.
.
2,625.00 328,125.00
2,350.00 4,700.00
2,100.00 438,900.00
Page 4 of 63
QUOTATION
Quotation Ref. No : ASI/QTN/BS/2014/LR/353
4,900.00 9,800.00
2,350.00 32,900.00
4,600.00 82,800.00
2,450.00 34,300.00
Page 5 of 63
QUOTATION
Quotation Ref. No : ASI/QTN/BS/2014/LR/353
3,875.00 139,500.00
4,500.00 27,000.00
1,410,425.00
Page 6 of 63
Supply & Installation of Timber Door With Frames
60 MFR
Unit Rate
No. Description / TYPE Unit Type D-120
(AED)
Quantity Amount
Finish to door panel Varnish
Door frame Timber
Architrave
Door Width (m) 1.200
Door Height (m) 2.200
4 Labour for install. sub-frame & w/ grouting (D/L) 12.00 hr 1.00 12.00
Door jamb White Oak Wood 0.200 0.050 240.00 cft 2.86 686.62
Architrave (White Oak Wood ) 0.04 0.020 240.00 cft 0.47 113.52
1 Labour for architrave indoor 12.00 hr. 3.00 36.00
2 Paint Finish 25.00 m2 1.24 31.00
3 Glue 1.75 dr 1.00 1.75
4 Labour for finishing 12.00 hr. 3.00 36.00
5 Labour for install. of Architrave 12.00 hr. 3.00 36.00
6 Packing 12.00 hr. 0.25 3.00
Door Panel
1 60 M Fire Rated Core
2 1 HFR Core 1075mm x 2200mm x 54mm Thk 380.00 Sht 1.00 380.00
3 White Oak wood Lipping 240.00 cft 0.18 42.02
4 White Oak Veneer 25.00 Sqm 6.60 165.00
5 Labour Charges for Veneer 12.00 hr 3.00 36.00
6 Paint Finishing 25.00 Sqm 5.28 132.00
7 Labour Charges for Paint Finishing 12.00 hr 3.00 36.00
8 Intumescent strip 2.00 set 15.00 30.00
9 Labour for installation (Single Door) 12.00 hr 4.00 48.00
10 Labour for indoor factory 12.00 hr 4.00 48.00
11 Packing 12.00 hr 0.50 6.00
12 Fixing ironmongery-SL 12.00 hr 4.00 48.00
13 Transportation 15.00 Ls 1.00 15.00
Contingency 5% 109.22
FOH 25% 546.09
Cost + OH 2,839.69
4 Labour for install. sub-frame & w/ grouting (D/L) 12.00 hr 1.00 12.00
Door jamb White Oak Wood 0.160 0.050 240.00 cft 2.21 530.99
Architrave ( White Oak Wood ) 0.04 0.020 240.00 cft 0.46 109.86
1 Labour for architrave indoor 12.00 hr. 3.00 36.00
2 Paint Finish 25.00 m2 1.20 30.00
3 Glue 1.75 dr 1.00 1.75
4 Labour for finishing 12.00 hr. 3.00 36.00
5 Labour for install. of Architrave 12.00 hr. 3.00 36.00
6 Packing 12.00 hr. 0.25 3.00
Door Panel
1 Non Fire Rated Core
2 44mm thk Solid Core 9150 x 2135mm x 44mm Thk 115.00 Sht 1.00 115.00
3 White Oak wood Lipping 240.00 cft 0.14 32.96
4 White Oak Veneer 25.00 Sqm 5.50 137.50
5 Labour Charges for Veneer 12.00 hr 2.00 24.00
6 Paint Finishing 25.00 Sqm 4.40 110.00
7 Labour Charges for Paint Finishing 12.00 hr 3.50 42.00
8 Labour for installation (Single Door) 12.00 hr 4.00 48.00
9 Labour for indoor factory 12.00 hr 4.00 48.00
10 Packing 12.00 hr 0.65 7.80
11 Fixing ironmongery-SL 12.00 hr 3.50 42.00
12 Transportation 10.00 Ls 1.00 10.00
Contingency 5% 80.76
FOH 25% 403.82
Cost + OH 2,099.88
Unit Rate
No. Description / TYPE Unit
(AED)
5 Packing 12.00 hr
3 Glue 1.75 dr
Contingency
FOH
Cost + OH
Profit
60 MFR
Type D-160
Quantity Amount
Varnish
Timber
1.600
2.200
1.20 40.40
2.00 44.00
1.00 12.00
1.00 12.00
0.25 3.00
3.15 755.28
4.00 48.00
1.20 30.00
1.00 1.75
4.00 48.00
4.00 48.00
1.00 15.00
0.50 6.00
0.64 153.80
3.00 36.00
1.32 33.00
1.00 1.75
3.00 36.00
3.00 36.00
0.25 3.00
2.00 760.00
0.39 93.93
8.80 220.00
4.00 48.00
7.04 176.00
6.50 78.00
15.00 30.00
6.00 72.00
7.00 84.00
0.85 10.20
5.00 60.00
2.00 20.00
3,015.12
5% 150.76
25% 753.78
3,919.66
25% 4,900.00
Supply & Installation of Timber Door With Frames
90 MFR
Unit Rate
No. Description / TYPE Unit Type D-120
(AED)
Quantity Amount
Finish to door panel Varnish
Door frame Timber
Architrave
Door Width (m) 0.900
Door Height (m) 2.200
4 Labour for install. sub-frame & w/ grouting (D/L) 12.00 hr 1.00 12.00
Door jamb White Oak Wood 0.200 0.050 240.00 cft 2.72 652.29
Architrave (White Oak Wood ) 0.04 0.020 240.00 cft 0.45 108.03
1 Labour for architrave indoor 12.00 hr. 3.00 36.00
2 Paint Finish 25.00 m2 1.18 29.50
3 Glue 1.75 dr 1.00 1.75
4 Labour for finishing 12.00 hr. 3.00 36.00
5 Labour for install. of Architrave 12.00 hr. 3.00 36.00
6 Packing 12.00 hr. 0.25 3.00
Door Panel
1 90 Minutes Fire Rated Core
2 1.5 HFR Core 915mm x 2200mm x 64mm Thk 900.00 Sht 1.00 900.00
3 White Oak wood Lipping 240.00 cft 0.19 45.41
4 White Oak Veneer 25.00 Sqm 4.95 123.75
5 Labour Charges for Veneer 12.00 hr 3.00 36.00
6 Paint Finishing 25.00 Sqm 3.96 99.00
7 Labour Charges for Paint Finishing 12.00 hr 3.00 36.00
8 Intumescent strip 2.00 set 15.00 30.00
9 Labour for installation (Single Door) 12.00 hr 4.00 48.00
10 Labour for indoor factory 12.00 hr 4.00 48.00
11 Packing 12.00 hr 0.55 6.60
12 Fixing ironmongery-SL 12.00 hr 4.00 48.00
13 Transportation 15.00 Ls 0.90 13.50 Glass Beading (White Oak Wood)
14 Wired Glass Vision Panel (8mm thk) 500.00 sqm 0.25 125.00 L W
15 Glass Beading 240.00 Cft 0.04 10.17 0.500 0.030
16 U-Shaped PVC Profile 54.00 Lm 2.00 108.00 0.500 0.030
Total Cost: Cost 2,830.94
Contingency 5% 141.55
FOH 25% 707.73
Cost + OH 3,680.22
4 Labour for install. sub-frame & w/ grouting (D/L) 12.00 hr 1.00 12.00
Door jamb White Oak Wood 0.160 0.050 240.00 cft 2.17 521.83
Architrave ( White Oak Wood ) 0.04 0.020 240.00 cft 0.45 108.03
1 Labour for architrave indoor 12.00 hr. 3.00 36.00
2 Paint Finish 25.00 m2 1.18 29.50
3 Glue 1.75 dr 1.00 1.75
4 Labour for finishing 12.00 hr. 3.00 36.00
5 Labour for install. of Architrave 12.00 hr. 3.00 36.00
6 Packing 12.00 hr. 0.25 3.00
Door Panel
1 Non Fire Rated Core
2 44mm thk Solid Core 9150 x 2135mm x 44mm Thk 115.00 Sht 1.25 143.75
3 White Oak wood Lipping 240.00 cft 0.13 31.93
4 Laminate (HPL Plain Color) 75.00 Sht 2.00 150.00
5 Labour Charges for Lamination 12.00 hr 3.00 36.00
6 Labour for installation (Single Door) 12.00 hr 4.00 48.00
7 Labour for indoor factory 12.00 hr 4.00 48.00
8 Packing 12.00 hr 0.55 6.60
9 Fixing ironmongery-SL 12.00 hr 4.00 48.00
10 Transportation 10.00 Ls 1.00 10.00
Contingency 5% 75.39
FOH 25% 376.97
Cost + OH 1,960.26
4 Labour for install. sub-frame & w/ grouting (D/L) 12.00 hr 1.00 12.00
Door jamb White Oak Wood 0.200 0.050 240.00 cft 2.77 663.73
Architrave (White Oak Wood ) 0.04 0.020 240.00 cft 0.46 109.86
1 Labour for architrave indoor 12.00 hr. 3.00 36.00
2 Paint Finish 25.00 m2 1.20 30.00
3 Glue 1.75 dr 1.00 1.75
4 Labour for finishing 12.00 hr. 3.00 36.00
5 Labour for install. of Architrave 12.00 hr. 3.00 36.00
6 Packing 12.00 hr. 0.25 3.00
Door Panel
1 60 M Fire Rated Core
2 1 HFR Core 1075mm x 2200mm x 54mm Thk 380.00 Sht 1.00 380.00
3 White Oak wood Lipping 240.00 cft 0.16 39.55
4 White Oak Veneer 25.00 Sqm 5.50 137.50
5 Labour Charges for Veneer 12.00 hr 3.00 36.00
6 Paint Finishing 25.00 Sqm 4.40 110.00
7 Labour Charges for Paint Finishing 12.00 hr 3.00 36.00
8 Intumescent strip 2.00 set 15.00 30.00
9 Labour for installation (Single Door) 12.00 hr 4.00 48.00
10 Labour for indoor factory 12.00 hr 4.00 48.00
11 Packing 12.00 hr 0.95 11.40
12 Fixing ironmongery-SL 12.00 hr 4.00 48.00
13 Transportation 15.00 Ls 1.00 15.00
Contingency 5% 105.40
FOH 25% 526.98
Cost + OH 2,740.28
Unit Rate
No. Description / TYPE Unit
(AED)
5 Packing 12.00 hr
Contengency
FOH
Cost + OH
Profit
90 MFR
G, L, & P
Quantity Amount
Varnish
Timber
1.100
2.400
0.89 30.73
1.50 22.50
1.00 12.00 12.00
1.00 12.00 12.00
1.95 351.65
4.00 48.00 48.00
0.89 26.55
1.00 1.75
3.00 36.00 36.00
3.00 36.00 36.00
1.00 15.00
0.25 3.00 3.00
1.07 193.27
3.00 36.00 36.00
1.20 36.00
1.00 1.75
3.00 36.00 36.00
3.00 36.00 36.00
0.25 3.00 3.00
1.00 875.00
0.17 30.79
6.34 126.72
2.00 24.00 24.00
14.00 70.00
2.00 24.00 24.00
5.28 158.40
3.00 36.00 36.00
1.00 15.00
4.00 48.00 48.00
5.00 60.00 60.00
0.25 3.00 3.00
4.00 48.00 48.00
1.00 20.00
Labour Cost 504.00
2,479.12 Material Cost 1,975.12
5% 123.96
25% 619.78
3,222.86
25% 4,032.00
Project : Me'aisem City Center
Unit Rate
No. Description / TYPE Unit
(AED)
5 Packing 12.00 hr
Contengency
FOH
Cost + OH
Profit
90 MFR
H, Z17
Quantity Amount
Varnish
Timber
1.000
2.400
0.87 30.21
1.50 22.50
1.00 12.00 12.00
1.00 12.00 12.00
1.92 345.69
4.00 48.00 48.00
0.87 26.10
1.00 1.75
3.00 36.00 36.00
3.00 36.00 36.00
1.00 15.00
0.25 3.00 3.00
1.07 193.27
3.00 36.00 36.00
1.20 36.00
1.00 1.75
3.00 36.00 36.00
3.00 36.00 36.00
0.25 3.00 3.00
1.00 875.00
0.17 29.87
5.76 115.20
2.00 24.00 24.00
13.60 68.00
2.00 24.00 24.00
4.80 144.00
3.00 36.00 36.00
1.00 15.00
4.00 48.00 48.00
5.00 60.00 60.00
0.25 3.00 3.00
4.00 48.00 48.00
1.00 20.00
Labour Cost 504.00
2,443.34 Material Cost 1,939.34
5% 122.17
25% 610.84
3,176.34
25% 3,973.00
Project : Me'aisem City Center
Unit Rate
No. Description / TYPE Unit
(AED)
5 Packing 12.00 hr
Contengency
FOH
Cost + OH
Profit
60 MFR
S, & Z3 (150)
Quantity Amount
Varnish
Timber
2.000
2.400
1.02 35.42
2.00 30.00
1.00 12.00 12.00
2.00 24.00 24.00
2.25 405.30
5.00 60.00 60.00
1.02 30.60
2.00 3.50
4.00 48.00 48.00
4.00 48.00 48.00
2.00 30.00
0.25 3.00 3.00
1.27 228.87
3.00 36.00 36.00
1.38 41.40
1.00 1.75
3.00 36.00 36.00
3.50 42.00 42.00
0.50 6.00 6.00
2.00 930.00
0.46 82.56
11.52 230.40
3.00 36.00 36.00
9.60 288.00
5.00 60.00 60.00
2.00 30.00
5.00 60.00 60.00
8.00 96.00 96.00
1.00 12.00 12.00
5.00 60.00 60.00
2.00 40.00
3,049.80 Labour Cost 642.00
Material Cost 2,407.80
5% 152.49
25% 762.45
3,964.74
50% 5,947.00
Project : Me'aisem City Center
Door jamb White Oak Wood 0.150 0.050 180.00 cft 1.99
1 Labour for door frame (indoor) 12.00 hr. 4.00
2 Paint Finishing 25.00 Sqm 0.90
3 Glue 1.75 dr 2.00
4 Labour for painting 12.00 hr. 3.00
5 Labour for installation of Dr Jamb-DL 12.00 hr. 3.00
6 Acoustic Seal 15.00 Set 1.00
7 Packing 12.00 hr. 0.25
Contengency 10%
FOH 25%
Cost + OH
Profit 25%
60 MFR
T
Amount
Varnish
Timber
1.200
2.400
31.25
22.50
12.00 12.00
12.00 12.00
3.00 3.00
357.62
48.00 48.00
22.50
3.50
36.00 36.00
36.00 36.00
15.00
3.00 3.00
175.16
36.00 36.00
23.20
1.75
24.00 24.00
24.00 24.00
3.00 3.00
465.00
34.61
132.48
24.00 24.00
144.00
48.00 48.00
With Core
48.00 48.00
48.00 48.00
6.00 6.00
48.00 48.00
20.00
Labour Cost 459.00
1,907.57 Material Cost 1,448.57
190.76
476.89
2,575.21
3,219.00
Project : Me'aisem City Center
Unit Rate
No. Description / TYPE Unit
(AED)
5 Packing 12.00 hr
Contengency
FOH
Cost + OH
Profit
90 MFR
Z & Z1
Quantity Amount
Varnish
Timber
2.000
3.050
1.62 56.25
2.00 30.00
1.00 12.00 12.00
2.00 24.00 24.00
3.58 643.71
5.00 60.00 60.00
1.62 48.60
2.00 3.50
4.00 48.00 48.00
4.00 48.00 48.00
2.00 30.00
0.25 3.00 3.00
1.27 228.87
3.00 36.00 36.00
1.38 41.40
1.00 1.75
3.00 36.00 36.00
3.50 42.00 42.00
0.50 6.00 6.00
2.00 1,750.00
0.53 94.88
14.64 292.80
3.00 36.00 36.00
12.20 366.00
5.00 60.00 60.00
2.00 30.00
5.00 60.00 60.00
8.00 96.00 96.00
1.00 12.00 12.00
5.00 60.00 60.00
2.00 40.00
4,299.76 Labour Cost 642.00
Material Cost 3,657.76
5% 214.99
25% 1,074.94
5,589.69
50% 8,385.00
Project : Me'aisem City Center
Unit Rate
No. Description / TYPE Unit
(AED)
5 Packing 12.00 hr
Contengency
FOH
Cost + OH
Profit
60 MFR
Z2 (200)
Quantity Amount
Varnish
Timber
1.600
2.400
1.28 44.44
2.00 30.00
1.00 12.00 12.00
2.00 24.00 24.00
2.83 508.61
5.00 60.00 60.00
1.28 38.40
2.00 3.50
4.00 48.00 48.00
4.00 48.00 48.00
2.00 30.00
0.25 3.00 3.00
1.27 228.87
3.00 36.00 36.00
1.38 41.40
1.00 1.75
3.00 36.00 36.00
3.50 42.00 42.00
0.50 6.00 6.00
2.00 930.00
0.42 75.14
9.22 184.32
3.00 36.00 36.00
7.68 230.40
5.00 60.00 60.00
2.00 30.00
5.00 60.00 60.00
8.00 96.00 96.00
1.00 12.00 12.00
5.00 60.00 60.00
2.00 40.00
3,058.84 Labour Cost 642.00
Material Cost 2,416.84
5% 152.94
25% 764.71
3,976.49
50% 5,965.00
Project : Me'aisem City Center
Unit Rate
No. Description / TYPE Unit
(AED)
5 Packing 12.00 hr
Contengency
FOH
Cost + OH
Profit
90 MFR
Z4 & Z5
Quantity Amount
Varnish
Timber
1.700
2.400
0.65 22.57
2.00 30.00
1.00 12.00 12.00
2.00 24.00 24.00
1.43 258.28
5.00 60.00 60.00
0.65 19.50
2.00 3.50
4.00 48.00 48.00
4.00 48.00 48.00
2.00 30.00
0.25 3.00 3.00
3.18 572.18
3.00 36.00 36.00
1.38 41.40
1.00 1.75
3.00 36.00 36.00
3.50 42.00 42.00
0.50 6.00 6.00
2.00 1,750.00
0.43 77.00
9.79 195.84
3.00 36.00 36.00
8.16 244.80
5.00 60.00 60.00
2.00 30.00
5.00 60.00 60.00
8.00 96.00 96.00
1.00 12.00 12.00
5.00 60.00 60.00
2.00 40.00
3,958.82 Labour Cost 642.00
Material Cost 3,316.82
5% 197.94
25% 989.70
5,146.46
50% 7,720.00
Project : Me'aisem City Center
Unit Rate
No. Description / TYPE Unit
(AED)
5 Packing 12.00 hr
Contengency
FOH
Cost + OH
Profit
90 MFR
Z6 & Z7
Quantity Amount
Varnish
Timber
1.600
2.400
0.64 22.22
2.00 30.00
1.00 12.00 12.00
2.00 24.00 24.00
1.41 254.30
5.00 60.00 60.00
0.64 19.20
2.00 3.50
4.00 48.00 48.00
4.00 48.00 48.00
2.00 30.00
0.25 3.00 3.00
1.27 228.87
3.00 36.00 36.00
1.38 41.40
1.00 1.75
3.00 36.00 36.00
3.50 42.00 42.00
0.50 6.00 6.00
2.00 1,750.00
0.42 75.14
9.22 184.32
3.00 36.00 36.00
7.68 230.40
5.00 60.00 60.00
2.00 30.00
5.00 60.00 60.00
8.00 96.00 96.00
1.00 12.00 12.00
5.00 60.00 60.00
2.00 40.00
3,583.11 Labour Cost 642.00
Material Cost 2,941.11
5% 179.16
25% 895.78
4,658.05
50% 6,987.00
Project : Me'aisem City Center
Unit Rate
No. Description / TYPE Unit
(AED)
5 Packing 12.00 hr
Contengency
FOH
Cost + OH
Profit
60 MFR
Z8
Quantity Amount
Varnish
Timber
2.000
2.400
0.68 23.61
2.00 30.00
1.00 12.00 12.00
2.00 24.00 24.00
1.50 270.20
5.00 60.00 60.00
0.68 20.40
2.00 3.50
4.00 48.00 48.00
4.00 48.00 48.00
2.00 30.00
0.25 3.00 3.00
1.27 228.87
3.00 36.00 36.00
1.38 41.40
1.00 1.75
3.00 36.00 36.00
3.50 42.00 42.00
0.50 6.00 6.00
2.00 930.00
0.46 82.56
11.52 230.40
3.00 36.00 36.00
9.60 288.00
5.00 60.00 60.00
2.00 30.00
5.00 60.00 60.00
8.00 96.00 96.00
1.00 12.00 12.00
5.00 60.00 60.00
2.00 40.00
2,892.69 Labour Cost 642.00
Material Cost 2,250.69
5% 144.63
25% 723.17
3,760.50
50% 5,641.00
Project : Me'aisem City Center
Unit Rate
No. Description / TYPE Unit
(AED)
5 Packing 12.00 hr
Contengency
FOH
Cost + OH
Profit
90 MFR
Z9 (200)
Quantity Amount
Varnish
Timber
1.000
2.300
1.12 38.89
1.50 22.50
1.00 12.00 12.00
1.00 12.00 12.00
2.47 192.85
4.00 48.00 48.00
1.12 33.60
1.00 1.75
3.00 36.00 36.00
3.00 36.00 36.00
1.00 15.00
0.25 3.00 3.00
1.07 83.75
3.00 36.00 36.00
1.20 36.00
1.00 1.75
3.00 36.00 36.00
3.00 36.00 36.00
0.25 3.00 3.00
1.00 875.00
0.16 12.57
5.52 110.40
2.00 24.00 24.00
13.20 66.00
2.00 24.00 24.00
4.60 138.00
3.00 36.00 36.00
1.00 15.00
4.00 48.00 48.00
5.00 60.00 60.00
0.25 3.00 3.00
4.00 48.00 48.00
1.00 20.00
Labour Cost 504.00
2,167.06 Material Cost 1,663.06
5% 108.35
25% 541.76
2,817.18
25% 3,524.00
Project : Me'aisem City Center
Unit Rate
No. Description / TYPE Unit
(AED)
5 Packing 12.00 hr
Contengency
FOH
Cost + OH
Profit
60 MFR
Z14
Quantity Amount
Varnish
Timber
1.600
3.150
0.79 27.43
2.00 30.00
1.00 12.00 12.00
2.00 24.00 24.00
1.74 313.91
5.00 60.00 60.00
0.79 23.70
2.00 3.50
4.00 48.00 48.00
4.00 48.00 48.00
2.00 30.00
0.25 3.00 3.00
1.27 228.87
3.00 36.00 36.00
1.38 41.40
1.00 1.75
3.00 36.00 36.00
3.50 42.00 42.00
0.50 6.00 6.00
2.00 930.00
0.50 89.36
12.10 241.92
3.00 36.00 36.00
10.08 302.40
5.00 60.00 60.00
2.00 30.00
5.00 60.00 60.00
8.00 96.00 96.00
1.00 12.00 12.00
5.00 60.00 60.00
2.00 40.00
2,976.24 Labour Cost 642.00
Material Cost 2,334.24
5% 148.81
25% 744.06
3,869.11
50% 5,804.00
Project : Me'aisem City Center
Unit Rate
No. Description / TYPE Unit
(AED)
5 Packing 12.00 hr
Contengency
FOH
Cost + OH
Profit
90 MFR
Z19
Quantity Amount
Varnish
Timber
1.000
2.400
0.58 20.14
2.00 30.00
1.00 12.00 12.00
2.00 24.00 24.00
1.28 230.46
5.00 60.00 60.00
0.58 17.40
2.00 3.50
4.00 48.00 48.00
4.00 48.00 48.00
2.00 30.00
0.25 3.00 3.00
1.27 228.87
3.00 36.00 36.00
1.38 41.40
1.00 1.75
3.00 36.00 36.00
3.50 42.00 42.00
0.50 6.00 6.00
2.00 1,750.00
0.36 64.02
5.76 115.20
3.00 36.00 36.00
4.80 144.00
5.00 60.00 60.00
2.00 30.00
5.00 60.00 60.00
8.00 96.00 96.00
1.00 12.00 12.00
5.00 60.00 60.00
2.00 40.00
3,388.75 Labour Cost 642.00
Material Cost 2,746.75
5% 169.44
25% 847.19
4,405.37
50% 6,608.00