Insp. Notes at SS On 18.12.18
Insp. Notes at SS On 18.12.18
CEElTrD/HQ at KIITSS on
18.12.2018
6 In the switch yard old ballast has been removed and new
ballast is yet to be filled.
;'-"'fi-Yk, rl
- -"tri 4;
*6a
e ,
,.4
25kV side
It
\.
;r
I 1.
r !i:
L32
7 CB ald associated equipment connected with patch tripling
work is lyinq in the TSS.
8 Aciditv test kit is not available in the TSS.
9 reeaer cs trippings for the last 4 months are tabulated, below.
CB-229 (BKL side CB-230 (BZA side
2t
2t
16
08
10 For switch yard lighting, 9 Nos. tubular poles are still fitted with ST.DEE/M/SC
4' x 24W, T5 fittinqs, require replacement with LED fittings.
11 Similarly, T5 fittings in Control room are to be replaced with
LED tube liqht fittings.
t2 Counselled the staff available on safety awareness and ST.DEE/TrDlSC
precautions to be taken while working. &
13 But for the yearly maintenance of Power Transformers TR-46, ADEE/TTDIDKJ
all other equipment maintenance schedules have been
completed.
r<\r
'sad)
il re
N.
lrrDlHQ
Headquarters Office,
Electrical Branch,
Rail Nilayam,
Secunderabad - 500025.