Professional Documents
Culture Documents
Defects Inspected On Site (18th October 2018)
Defects Inspected On Site (18th October 2018)
Section 1: Right Hand Side 2. Gagali retaining wall – poles not cut to
design level
1. Scouring on Ap40 due to lack of
stormwater management behind Gagali
Ret. Wall
13. No proper maintenance done to the 2. Poor existing road condition in Section
LDS ret. Wall 2 due to lack of maintenance
3. Poor maintenance of pedestrian
walkway and fence in Section 1
4. Contaminated sub-base covered with
silt from CH: 510-570, CH: 502-488 and
CH: 481-430
2.