PROJECT WIND FARM SUBSTATION

LOCATION T2 SUBSTATION - CONTROL BUILDING FOUNDATION

Inspection Photos Report :Repair concrete surface


Date: 25-Oct-17
Location: Control Building Foundation
Layout Foundation Repair
PROJECT WIND FARM SUBSTATION

LOCATION T2 SUBSTATION - CONTROL BUILDING FOUNDATION

Concrete Repair Documentation


Date: 25-Oct-17

Location: Control Building Foundation

Mark. A3 Mark. A3

Before After North Side

Honeycomb Area: H (mm) W (mm) Depth (mm)


North 0.00 0.00 0.00

East 0.00 0.00 0.00

South 0.00 0.00 0.00

West 150.00 200.00 30.00

Material Usage:

Bonding Agent : LANKO 751 Lanko Latex Bounding Agent

Primary : LANKO 731 Non-Shrinking Mortar

Compound : LANKO 361 Lancure Curing Compound Note : Cosmetic

Mark. A3 Mark. A3

Proccess After East Side

Note : Cosmetic

Mark. A3 Mark. A3

After West Side After South Side

Note : Honeycomb Note : Cosmetic

CLIMATE : Bright Cloudy TIME :

Drizzle Rain