Chainage

Sl.No Type Description


From To

1 0+000 1+250 1+250 TCS-4 4-Lane Urban Section (Concentric Widening)

2-Lane Rural Section (Concentric Widening)


2 1+250 3+550 2+300 TCS-2 (Open country-plain/rolling terrain)

3 3+550 4+040 0+490 TCS-2A 2-Lane Village Section (Concentric Widening)

2-Lane Rural Section (Eccentric Widening- RHS)


4 4+040 4+310 0+270 TCS-3A (Open country-plain/rolling terrain)

2-Lane Rural Section (Eccentric Widening- LHS)


5 4+310 4+680 0+370 TCS-3 (Open country-plain/rolling terrain)

2-Lane Rural Section (Eccentric Widening- RHS)


6 4+680 5+240 0+560 TCS-3A (Open country-plain/rolling terrain)

2-Lane Rural Section (Eccentric Widening- LHS)


7 5+240 5+790 0+550 TCS-3 (Open country-plain/rolling terrain)

2-Lane Rural Section (Eccentric Widening- RHS)


8 5+790 6+220 0+430 TCS-3A (Open country-plain/rolling terrain)

9 6+220 7+360 1+140 TCS-2A 2-Lane Village Section (Concentric Widening)

2-Lane Rural Section (Eccentric Widening- LHS)


10 7+360 8+220 0+860 TCS-3 (Open country-plain/rolling terrain)

2-Lane Rural Section (Concentric Widening)


11 8+220 8+620 0+400 TCS-2 (Open country-plain/rolling terrain)

2-Lane Rural Section (Eccentric Widening- LHS)


12 8+620 8+780 0+160 TCS-3 (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- RHS)
13 8+780 9+030 0+250 TCS-3A (Open country-plain/rolling terrain)

14 9+030 9+380 0+350 TCS-2A 2-Lane Village Section (Concentric Widening)

2-Lane Rural Section (Eccentric Widening- LHS)


15 9+380 10+030 0+650 TCS-3 (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- RHS)
16 10+030 10+330 0+300 TCS-3A (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- LHS)
17 10+330 11+300 0+970 TCS-3 (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- RHS)
18 11+300 11+440 0+140 TCS-3A (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- LHS)
19 11+440 12+290 0+850 TCS-3 (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- RHS)
20 12+290 12+390 0+100 TCS-3A (Open country-plain/rolling terrain)
21 12+390 12+780 0+390 TCS-2A 2-Lane Village Section (Concentric Widening)

2-Lane Rural Section (Concentric Widening)


22 12+780 12+860 0+080 TCS-2 (Open country-plain/rolling terrain)

2-Lane Rural Section (Eccentric Widening- RHS)


23 12+860 13+480 0+620 TCS-3A (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- LHS)
24 13+480 14+470 0+990 TCS-3 (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- RHS)
25 14+470 14+840 0+370 TCS-3A (Open country-plain/rolling terrain)

26 14+840 16+770 1+930 TCS-3 2-Lane Rural Section (Eccentric Widening- LHS)
(Open country-plain/rolling terrain)
27 16+770 17+630 0+860 TCS-2A 2-Lane Village Section (Concentric Widening)
2-Lane Rural Section (Eccentric Widening- RHS)
28 17+630 18+060 0+430 TCS-3A (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- LHS)
29 18+060 18+850 0+790 TCS-3 (Open country-plain/rolling terrain)

2-Lane Rural Section (Concentric Widening)


30 18+850 19+060 0+210 TCS-2 (Open country-plain/rolling terrain)

2-Lane Rural Section (Eccentric Widening- LHS)


31 19+060 19+130 0+070 TCS-3 (Open country-plain/rolling terrain)
4-lane bypass
32 19+130 21+820 2+690 TCS-5 (Open country-Plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- LHS)
33 21+820 22+500 0+680 TCS-3 (Open country-plain/rolling terrain)

2-Lane Rural Section (Concentric Widening)


34 22+500 22+700 0+200 TCS-2 (Open country-plain/rolling terrain)

2-Lane Rural Section (Eccentric Widening- RHS)


35 22+700 22+850 0+150 TCS-3A (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- LHS)
36 22+850 23+300 0+450 TCS-3 (Open country-plain/rolling terrain)

2-Lane Rural Section (Concentric Widening)


37 23+300 23+500 0+200 TCS-2 (Open country-plain/rolling terrain)

2-Lane Rural Section (Eccentric Widening- LHS)


38 23+500 23+640 0+140 TCS-3 (Open country-plain/rolling terrain)

2-Lane Rural Section (Concentric Widening)


39 23+640 23+980 0+340 TCS-2 (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- LHS)
40 23+980 24+045 0+065 TCS-3 (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- RHS)
41 24+045 24+090 0+045 TCS-3A (Open country-plain/rolling terrain)

2-Lane Rural Section (Concentric Widening)


42 24+090 24+280 0+190 TCS-2 (Open country-plain/rolling terrain)

2-Lane Rural Section (Eccentric Widening- RHS)


43 24+280 24+310 0+030 TCS-3A (Open country-plain/rolling terrain)

2-Lane Rural Section (Concentric Widening)


44 24+310 24+335 0+025 TCS-2 (Open country-plain/rolling terrain)

2-Lane Rural Section (Eccentric Widening- RHS)


45 24+335 24+390 0+055 TCS-3A (Open country-plain/rolling terrain)

2-Lane Rural Section (Concentric Widening)


46 24+390 24+550 0+160 TCS-2 (Open country-plain/rolling terrain)

2-Lane Rural Section (Eccentric Widening- LHS)


47 24+550 24+590 0+040 TCS-3 (Open country-plain/rolling terrain)

2-Lane Rural Section (Concentric Widening)


48 24+590 24+740 0+150 TCS-2 (Open country-plain/rolling terrain)

2-Lane Rural Section (Eccentric Widening- RHS)


49 24+740 24+800 0+060 TCS-3A (Open country-plain/rolling terrain)

2-Lane Rural Section (Concentric Widening)


50 24+800 25+550 0+750 TCS-2 (Open country-plain/rolling terrain)

2-Lane Rural Section (Eccentric Widening- RHS)


51 25+550 25+590 0+040 TCS-3A (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- LHS)
52 25+590 25+635 0+045 TCS-3
(Open country-plain/rolling terrain)

2-Lane Rural Section (Concentric Widening)


53 25+635 25+675 0+040 TCS-2 (Open country-plain/rolling terrain)

2-Lane Rural Section (Eccentric Widening- RHS)


54 25+675 25+720 0+045 TCS-3A (Open country-plain/rolling terrain)

2-Lane Rural Section (Concentric Widening)


55 25+720 25+750 0+030 TCS-2 (Open country-plain/rolling terrain)

2-Lane Rural Section (Eccentric Widening- LHS)


56 25+750 25+780 0+030 TCS-3 (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- RHS)
57 25+780 25+840 0+060 TCS-3A (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- LHS)
58 25+840 25+890 0+050 TCS-3 (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- RHS)
59 25+890 25+950 0+060 TCS-3A (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- LHS)
60 25+950 26+000 0+050 TCS-3 (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- RHS)
61 26+000 26+030 0+030 TCS-3A (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- LHS)
62 26+030 26+065 0+035 TCS-3 (Open country-plain/rolling terrain)

2-Lane Rural Section (Concentric Widening)


63 26+065 26+100 0+035 TCS-2 (Open country-plain/rolling terrain)

64 26+100 26+160 0+060 TCS-3 2-Lane Rural Section (Eccentric Widening- LHS)
(Open country-plain/rolling terrain)

2-Lane Rural Section (Concentric Widening)


65 26+160 26+630 0+470 TCS-2 (Open country-plain/rolling terrain)

2-Lane Rural Section (Eccentric Widening- LHS)


66 26+630 26+670 0+040 TCS-3 (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- RHS)
67 26+670 26+700 0+030 TCS-3A (Open country-plain/rolling terrain)

2-Lane Rural Section (Concentric Widening)


68 26+700 27+190 0+490 TCS-2 (Open country-plain/rolling terrain)

2-Lane Rural Section (Eccentric Widening- LHS)


69 27+190 27+260 0+070 TCS-3 (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- RHS)
70 27+260 27+300 0+040 TCS-3A (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- LHS)
71 27+300 27+370 0+070 TCS-3 (Open country-plain/rolling terrain)

2-Lane Rural Section (Concentric Widening)


72 27+370 27+480 0+110 TCS-2 (Open country-plain/rolling terrain)

2-Lane Rural Section (Eccentric Widening- RHS)


73 27+480 27+590 0+110 TCS-3A (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- LHS)
74 27+590 27+660 0+070 TCS-3 (Open country-plain/rolling terrain)

2-Lane Rural Section (Concentric Widening)


75 27+660 28+090 0+430 TCS-2 (Open country-plain/rolling terrain)

76 28+090 28+400 0+310 TCS-2A 2-Lane Village Section (Concentric Widening)

2-Lane Rural Section (Concentric Widening)


77 28+400 28+720 0+320 TCS-2 (Open country-plain/rolling terrain)

2-Lane Rural Section (Eccentric Widening- RHS)


78 28+720 29+090 0+370 TCS-3A (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- LHS)
79 29+090 30+085 0+995 TCS-3 (Open country-plain/rolling terrain)
2-Lane Rural Section (New Construction)
80 30+085 30+180 0+095 TCS-1 (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- LHS)
81 30+180 30+650 0+470 TCS-3 (Open country-plain/rolling terrain)

2-Lane Rural Section (Concentric Widening)


82 30+650 30+950 0+300 TCS-2 (Open country-plain/rolling terrain)

83 30+950 32+160 1+210 TCS-2A 2-Lane Village Section (Concentric Widening)


2-Lane Rural Section (Eccentric Widening- RHS)
84 32+160 32+570 0+410 TCS-3A (Open country-plain/rolling terrain)

2-Lane Rural Section (Concentric Widening)


85 32+570 32+800 0+230 TCS-2 (Open country-plain/rolling terrain)

2-Lane Rural Section (Eccentric Widening- LHS)


86 32+800 33+450 0+650 TCS-3 (Open country-plain/rolling terrain)
87 33+450 34+000 0+550 TCS-2A 2-Lane Village Section (Concentric Widening)
2-Lane Rural Section (Eccentric Widening- LHS)
88 34+000 34+420 0+420 TCS-3 (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- RHS)
89 34+420 35+200 0+780 TCS-3A (Open country-plain/rolling terrain)
90 35+200 37+040 1+840 TCS-2A 2-Lane Village Section (Concentric Widening)

2-Lane Rural Section (Concentric Widening)


91 37+040 37+600 0+560 TCS-2 (Open country-plain/rolling terrain)

2-Lane Rural Section (New Construction)


92 37+600 39+100 1+500 TCS-1 (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- LHS)
93 39+100 39+650 0+550 TCS-3 (Open country-plain/rolling terrain)

2-Lane Rural Section (Concentric Widening)


94 39+650 40+060 0+410 TCS-2 (Open country-plain/rolling terrain)

2-Lane Rural Section (Eccentric Widening- RHS)


95 40+060 41+080 1+020 TCS-3A (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- LHS)
96 41+080 41+360 0+280 TCS-3 (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- RHS)
97 41+360 41+980 0+620 TCS-3A (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- LHS)
98 41+980 42+230 0+250 TCS-3 (Open country-plain/rolling terrain)
99 42+230 43+000 0+770 TCS-2A 2-Lane Village Section (Concentric Widening)
2-Lane Rural Section (Eccentric Widening- LHS)
100 43+000 43+680 0+680 TCS-3 (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- RHS)
101 43+680 43+920 0+240 TCS-3A (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- LHS)
102 43+920 44+010 0+090 TCS-3 (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- RHS)
103 44+010 44+310 0+300 TCS-3A (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- LHS)
104 44+310 45+200 0+890 TCS-3 (Open country-plain/rolling terrain)
105 45+200 45+740 0+540 TCS-2A 2-Lane Village Section (Concentric Widening)
2-Lane Rural Section (Eccentric Widening- RHS)
106 45+740 46+070 0+330 TCS-3A (Open country-plain/rolling terrain)

107 46+070 46+400 0+330 TCS-3 2-Lane Rural Section (Eccentric Widening- LHS)
(Open country-plain/rolling terrain)
2-Lane Rural Section (New Construction)
108 46+400 47+100 0+700 TCS-1 (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- RHS)
109 47+100 47+660 0+560 TCS-3A (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- LHS)
110 47+660 47+820 0+160 TCS-3 (Open country-plain/rolling terrain)
2-Lane Rural Section (New Construction)
111 47+820 48+040 0+220 TCS-1 (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- LHS)
112 48+040 48+140 0+100 TCS-3 (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- RHS)
113 48+140 49+210 1+070 TCS-3A (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- LHS)
114 49+210 49+430 0+220 TCS-3 (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- RHS)
115 49+430 49+940 0+510 TCS-3A (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- LHS)
116 49+940 50+220 0+280 TCS-3
(Open country-plain/rolling terrain)
117 50+220 50+700 0+480 TCS-2A 2-Lane Village Section (Concentric Widening)
2-Lane Rural Section (Eccentric Widening- LHS)
118 50+700 51+820 1+120 TCS-3 (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- RHS)
119 51+820 52+280 0+460 TCS-3A (Open country-plain/rolling terrain)
120 52+280 52+680 0+400 TCS-2A 2-Lane Village Section (Concentric Widening)
2-Lane Rural Section (Eccentric Widening- RHS)
121 52+680 52+980 0+300 TCS-3A (Open country-plain/rolling terrain)
122 52+980 53+380 0+400 TCS-2A 2-Lane Village Section (Concentric Widening)
2-Lane Rural Section (Eccentric Widening- RHS)
123 53+380 54+170 0+790 TCS-3A (Open country-plain/rolling terrain)

2-Lane Rural Section (Concentric Widening)


124 54+170 54+850 0+680 TCS-2 (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- LHS)
125 54+850 55+500 0+650 TCS-3 (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- RHS)
126 55+500 56+240 0+740 TCS-3A (Open country-plain/rolling terrain)
2-Lane Rural Section (New Construction)
127 56+240 56+490 0+250 TCS-1 (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- RHS)
128 56+490 56+640 0+150 TCS-3A (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- LHS)
129 56+640 56+830 0+190 TCS-3 (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- RHS)
130 56+830 56+990 0+160 TCS-3A (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- LHS)
131 56+990 57+320 0+330 TCS-3 (Open country-plain/rolling terrain)

132 57+320 58+100 0+780 TCS-3A 2-Lane Rural Section (Eccentric Widening- RHS)
(Open country-plain/rolling terrain)

2-Lane Rural Section (Concentric Widening)


133 58+100 57+920 -0+180 TCS-2 (Open country-plain/rolling terrain)

2-Lane Rural Section (Eccentric Widening- RHS)


134 57+920 59+240 1+320 TCS-3A (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- LHS)
135 59+240 58+570 -0+670 TCS-3 (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- LHS)
136 58+570 60+000 1+430 TCS-3 (Open country-plain/rolling terrain)
137 60+000 60+700 0+700 TCS-2A 2-Lane Village Section (Concentric Widening)
2-Lane Rural Section (Eccentric Widening- RHS)
138 60+700 61+060 0+360 TCS-3A (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- LHS)
139 61+060 61+770 0+710 TCS-3 (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- RHS)
140 61+770 63+090 1+320 TCS-3A (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- LHS)
141 63+090 63+320 0+230 TCS-3 (Open country-plain/rolling terrain)

2-Lane Rural Section (Concentric Widening)


142 63+320 63+530 0+210 TCS-2 (Open country-plain/rolling terrain)

2-Lane Rural Section (Eccentric Widening- LHS)


143 63+530 63+870 0+340 TCS-3 (Open country-plain/rolling terrain)
144 63+870 64+430 0+560 TCS-2A 2-Lane Village Section (Concentric Widening)
2-Lane Rural Section (Eccentric Widening- RHS)
145 64+430 65+170 0+740 TCS-3A (Open country-plain/rolling terrain)

2-Lane Rural Section (Concentric Widening)


146 65+170 65+340 0+170 TCS-2 (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- LHS)
147 65+340 68+310 2+970 TCS-3 (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- RHS)
148 68+310 68+420 0+110 TCS-3A (Open country-plain/rolling terrain)
2-Lane Rural Section (New Construction)
149 68+420 68+600 0+180 TCS-1 (Open country-plain/rolling terrain)

2-Lane Rural Section (Concentric Widening)


150 68+600 69+020 0+420 TCS-2 (Open country-plain/rolling terrain)

2-Lane Rural Section (Eccentric Widening- RHS)


151 69+020 69+600 0+580 TCS-3A (Open country-plain/rolling terrain)

2-Lane Rural Section (Concentric Widening)


152 69+600 69+800 0+200 TCS-2 (Open country-plain/rolling terrain)

153 69+800 70+190 0+390 TCS-3A 2-Lane Rural Section (Eccentric Widening- RHS)
(Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- LHS)
154 70+190 70+430 0+240 TCS-3 (Open country-plain/rolling terrain)

2-Lane Rural Section (Concentric Widening)


155 70+430 70+600 0+170 TCS-2 (Open country-plain/rolling terrain)

2-Lane Rural Section (Eccentric Widening- LHS)


156 70+600 71+570 0+970 TCS-3 (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- RHS)
157 71+570 71+870 0+300 TCS-3A (Open country-plain/rolling terrain)
158 71+870 72+330 0+460 TCS-2A 2-Lane Village Section (Concentric Widening)
2-Lane Rural Section (Eccentric Widening- LHS)
159 72+330 72+550 0+220 TCS-3 (Open country-plain/rolling terrain)
2-Lane Rural Section (Eccentric Widening- RHS)
160 72+550 72+710 0+160 TCS-3A (Open country-plain/rolling terrain)
4-lane bypass
161 72+710 75+500 2+790 TCS-5 (Open country-Plain/rolling terrain)
Type Description
2-Lane Rural Section (New Construction)
TCS-1 (Open country-plain/rolling terrain)

2-Lane Rural Section (Concentric Widening)


TCS-2 (Open country-plain/rolling terrain)

Mahajenahalli TCS-2A 2-Lane Village Section (Concentric Widening)

2-Lane Rural Section (Eccentric Widening- LHS) (Open country-


TCS-3 plain/rolling terrain)

2-Lane Rural Section (Eccentric Widening- RHS)


TCS-3A (Open country-plain/rolling terrain)

TCS-4 4-Lane Urban Section (Concentric Widening)

4-lane bypass
TCS-5 (Open country-Plain/rolling terrain)

TCS-6 (Strengthening & Widening to 4 Lane of Existing 14m Carriageway)

Amaravathi

Byaladahalli
Nandi tavare

Kumbaluru

Malebennur
Arakere

Masadi

Gollerahalli

Honnali realignment

Govinakovi
Basavanahalli

Curve Improvement

Chiluru Kadadakatte

Kengatte

Dodderi
Holaluru

Suthu kote
Gondichattanahalli
Chainage
Sl.No length Type Description
From To
1 0 1250 1250 TCS-2.5
2 1250 3420 2170 TCS-2.5A
3 3420 3580 160 VUP junction
4 3580 3850 270 TCS - 2.11
5 3850 4000 150
6 4000 4250 250
7 4250 4560 310
8 4560 4760 200
9 4760 5170 410
10 5170 5260 90
11 5260 5770 510
12 5770 5820 50
13 5820 7020 1200
14 7020 7090 70
15 7090 7670 580
16 7670 7850 180
17 7850 8210 360
18 8210 8440 230
19 8440 8820 380
20 8820 9130 310
21 9130 9310 180
22 9310 10010 700
23 10010 10380 370
24 10380 11260 880
25 11260 11440 180
26 11440 12290 850
27 12290 12340 50
28 12340 12800 460
29 12800 -12800
30 0 0
31 0 0
32 0 0
33 0 0
34 0 0
35 0 0
36 0 0
37 0 0
38 0 0
39 0 0
40 0 0
41 0 0
42 0 0
43 0 0
44 0 0
45 0 0
46 0 0
47 0 0
48 0 0
49 0 0
50 0 0
51 0 0
52 0 0
53 0 0
54 0 0
55 0 0
56 0 0
57 0 0
58 0 0
59 0 0
60 0 0
61 0 0
essentric wideing (LHS)
LHS

LHS

RHS

LHS

RHS

LHS

LHS
RHS

LHS

LHS

LHS

LHS
RHS
TCS-2.5 4 lane divided carriageway in Build-up section (concentric widening)
TCS-2.5A 4 lane divided carriageway in Build-up section (Essentric widening)
TCS-2.2 2-lane highway in open country (new construction)
TCS-2.2A 2-lane highway in open country (concentric widenong)
TCS-2.2B 2-lane highway in open country (Essentric widenong)
TCS - 2.11 2-lane highway in Build-up section
TCS- 2.6 4-lane Bypass in open country