Const. Manager ToR
Const. Manager ToR
Const. Manager ToR
Project Coordination:
The construction manager is responsible for the management of existing and new projects
for the achievement of the project objectives within overall quality budget limits and
timeframe.
Design Management:
Review the construction design documentation to ensure it meet’s project scope of work
and RFP; Manage all construction activates required delivering the project, including:
- The preparation of a terms of reference, scope of works, tender documentation and
assist in assessment of offers from subcontractors
- Recommendation of preferred subcontractors for appointment by the Company based
on sub-contractor completive pricing, experience and past performances.
Page 1 of 4
- Management of the project management team and contractors to ensure a coordinated
approach and timely delivery of services are met
- Management of the technical team to ensure the Company’s objectives are met.
- Act as the point of contact between the company and the contractors, project personnel
and clients as deemed necessary.
- Manage design queries between design officer, Design firm and clients.
- Manage all consultancies required to prepare any necessary reports and all statutory
planning and development requirements.
- Consult and negotiate with client and other referral departments regarding project
documents approval requirements.
- Review documentation for consistency and quality, validate works progress claims and
provide advice on claims for additional fees.
- Manage the variation request and approval processes.
- Arrange through the design team a monthly design report, which includes all issues
regarding planning, approvals and design.
- Coordinate the preparation of tender and contract documentation.
- Approve packaging of contract works.
Contract Management:
Manage the contractors required to deliver the project, including:
Page 2 of 4
- Ensure the approved budget and construction milestones are achieved
- Manage the variation request and approval processes.
- Arrange for the preparation a monthly construction report.
- Carry out regular inspections and issue the certificate of practical completion.
- Close coordination with QC manager on all design and construction approvals and
obtain the certificate of classification.
- Coordinate and deliver all manuals, guarantees, maintenance schedules and "as built"
drawings to the Department.
- Coordinate the rectification of all defects during the defect liability period.
- Carry out a final inspection and issue the Final Certificate.
Project Meetings
- Organize and chair regular design meetings, construction meetings and project control
group meetings, including the preparation and distribution of minutes within 24 hours
of conducting the meeting.
- Convene, chair and minute regular meetings as required with clients and management
team.
Time Management
Risk Management
- Manage all risks associated with the project and put forward strategies for risk
mitigation and minimization for approval by Management team.
- Confirm the indicative Project Cost and develop the project cash flows in a format
acceptable to the management team.
- Manage the cost management to prepare budget estimates, pre-tender estimates, post
tender estimates, variation estimates and progress claim certification.
- Prepare the monthly progress claim to the client including all construction and
contractor claims
Page 3 of 4
- Arrange for preparation a cost management report outlining budget, milestones,
committed funds, uncommitted funds, variations and forecast cost to complete the
project.
- Manage the design and construction activities to ensure the project is delivered within
budget.
REPORTING REQUIREMENTS
The Construction Manager will formally report on a monthly basis to the COO and CEO in timely
bases on the status of the redevelopment to cover the following areas as a minimum:
- Cost report, indicating all committed funds, variations and forecast cost to complete,
- Collecting Design report indicating current design status and design issues,
- Program/Schedule updates highlighting any delays or time savings and detailing any
extension of time requests and approvals.
- Construction report detailing current progress and highlighting any issues.