WRITE UP ON BOILER LOGIC SYSTEM

IMPORTANT NOTE:

This write up is meant for general guidelines and better understanding of the system. However it may be noted that All the logic
conditions spelt in English Language may not be exact equivalent of pictorial representations of logics.It is mandatory that the
operating personal should refer to the respective contract logics.
It must be recognized that no amount of written instruction can replace intelligent thinking and reasoning on the part of boiler
operators, especially when coping with unforeseen operating conditions. It is operator’s responsibility to become thoroughly familiar,
not only with immediate steam generating equipment but also with all pertinent control equipment. Satisfactory performance and
safety depend to a great extent on proper functioning of controls and auxiliary equipment.
The Boiler Logic System has been designed for ENERGISED to Open and De-energise to Close philosophy.

1 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html

1.0

ID FAN START / STOP LOGIC

STARTING LOGIC

ID FAN will start after ID Fan start command is given from DCS only when the following conditions are satisfied:

1. Drive remote selected (05-MF-202G)


2. Module Ready (05-MF-202R)
3. Feild Stop PB not operated(05-MF-202K)
4. ID Fan-A Disc damper closed (05ZSC-279)
5. ID Fan not running

AND

6. (ID Fan vane minimum (05ZSC285)


7. Fluid Coupling Bypass selected

OR

8. Scoop minimum (05ZSC-278)

AND

9. ID Fan-A motor bearing (DE) temp not high


10. ID Fan –A motor bearing (NDE) temp not high
11. ID Fan-A bearing (DE) temp not high
12. ID Fan-A bearing (NDE) temp not high

AND

13. { (Coal Feeder – 1 discharge gateS closed ( 05ZSC-310/311)


14. Coal Feeder – 2 discharge gate closed (05ZSC-333/334)
15. SWGR.Read (05-MF-202E)
16. Trip Circuit Healthy (05-MF-202C)
17. SWGR. Ready to start(05-MF-202A)

STOP / TRIPPING LOGIC

2 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html

If any one of the following signals is present ID Fan will stop / trip

1. ID Fan stop command from DCS


2. Feild Stop PB(Local) operated(05-MF-202K)
3. O/L acted(05-MF-202C)
3. ID Fan – A bearing (DE) temp high
4. ID Fan- A bearing (NDE) temp high
5. ID Fan – A motor bearing (DE) temp high
6. ID Fan – A motor bearing (NDE) temp high
7. Furnace Pressure very low
8. Module not ready(05-MF-202R)
9. ID Fan-A Bearing (DE) VIB. Very high
10. Scop outlet temperature very high
11. ID Fan running for 30 sec

AND

Oil Pressure low

13 SWGR. Not ready (05-MF-202E)


14 ID Fan Bearin (NDE) VIB Very High

2.0

ID FAN DISCHARGE DAMPER LOGIC


IDFan discharge damper will open after a Start command is given from CRT only when the following conditions are satisfied :

1. Damper not fully opened (05ZS0-279)


2. Valve closing logic not present
3. Module Ready(05-MV-129R)
4. O/L not operated(05-MV-129L)
5. Stop command not operated from CRT
6. Valve opening torque not high(05TS0-279)
7. {(Remote selected AND Open command from CRT AND ID Fan running and 60sec time count over)
8. Field stop not operated (05-MV-129K)

ID Fan discharge damper will close if the following signals are present:

1. Damper not fully closed (05ZSc-279)


2. Valve opening logic not present
3. Module Ready(05-MV-129R)
4. O/L not operated(05-MV-129L)
5. Stop command not operated from CRT
6. Valve opening torque not high(05TSc-279)
7. {(Remote selected AND Open command from CRT AND ID Fan not running )
8. Field stop not operated (05-MV-129K)

3 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html

3.0

SA FAN – A/B START / STOP LOGIC

SA Fan-A will start after SA Fan-A start command is received from the CRT only when the following conditions are satisfied
:
1 Drive remote selected (05-MF-203G)
2 Module Ready (05-MF-203R)
3. Feild Stop PB not operated(05-MF-203K)

4. SA Fan not running (05-MF-203M)

AND

5. (SA Fan vane minimum (05ZSC-280)


6. Fluid Coupling Bypass selected

OR

7. Scoop minimum (05ZSC-268)

AND

8. SA Fan motor bearing (DE) temp not high


9. SA Fan –A motor bearing (NDE) temp not high
10. SA Fan-A bearing (DE) temp not high
11. SA Fan-A bearing (NDE) temp not high

AND

12. Furnace Pressure > min 13. Furnace Pressure <


max
14. SWGR.Ready (05-MF-203R)
15. Trip Circuit Healthy (05-MF-203C)
16. ID Fan Running (05-MF-202M)
17. SWGR.Ready to start (05-MF-202A)

SA Fan –A will stop /trip if any one of the following signals is present:

1. SA Fan stop command from DCS


2. Feild Stop PB(Local) operated(05-MF-203K)
3. O/L acted(05-MF-203C))
4. SA Fan bearing (DE) temp high
5. SA Fan bearing (NDE) temp high
6. SA Fan motor bearing (DE) temp high

4 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html

7. SA Fan motor bearing (NDE) temp high


8. ID FAN not running (05-MF-202M)
9. Module not ready(05-MF-203R)
10. SA Fan Bearing (DE) VIB. Very high
11. Scop outlet temperature very high
12. SA Fan running for 30 sec

AND

Oil Pressure Low


13. Trip Ckt. Not healthy (05-MF-203L)
14. Boiler tripped
15. SA Fan Bearing (NDE) VIB Very High
16. SWGR. Not ready (05-MF-203E)

4.0

PA FAN START / STOP LOGIC

PA Fan will start after receiving PA Fan –A start command from CRT only if the following conditions are satisfied:

1 Drive remote selected (05-MF-201G)


2 Module Ready (05-MF-201R)
3. Feild Stop PB not operated(05-MF-201K)
4. PA Fan not running (05-MF-201M)

AND

5. (PA Fan vane minimum (05ZSC283)


6. Fluid Coupling Bypass selected

OR

7. Scoop minimum (05ZSC-273)

AND

8. PA Fan motor bearing (DE) temp not high


9. PA Fan –A motor bearing (NDE) temp not high
10. PA Fan-A bearing (DE) temp not high
11. PA Fan-A bearing (NDE) temp not high

AND

12. Furnace Pressure > min

5 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html

13. Furnace Pressure < max


14. SWGR.Ready (05-MF-201E)
15. Trip Circuit Healthy (05-MF-201C)
16. ID Fan Running (05-MF-202M)
17. Drum Level > min
18. Drum Level max
19. TA Flow > min
20. SA Flow > min
21. SA Fan running (05-MF-203M)
22. SWGR. Ready to start (05-MF-201A)

PA Fan will stop / trip if any one of the following signals is present:
1. PA Fan stop command from DCS
2. Feild Stop PB(Local) operated(05-MF-201K)
3. PA Discharge Pressure >max
4. PA Fan bearing (DE) temp high
5. PA Fan bearing (NDE) temp high
6. PA Fan motor bearing (DE) temp high
7. PA Fan motor bearing (NDE) temp high
8. ID FAN not running (05-MF-202M)
9. Module not ready(05-MF-201R)
10. PA Fan Bearing (DE) VIB. Very high
11. Scop outlet temperature very high
12. PA Fan running for 30 sec

AND

Oil Pressure Low


13. Trip Ckt. Not healthy (05-MF-201C
14. )
15. Boiler tripped
16. PA Fan Bearing (NDE) VIB. Very High
17. SA Fan not running (05-MF-203M)
18. SWGR.not ready (05-MF-201E)

5.0

FEED TRANSFER PUMP 1/2 START/STOP LOGIC

Feed Transfer pump1/2 will start if the following conditions are satisfied :
1. Pump 1/2 not running(05-MP-106M/107M)

6 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html

2. Feild Stop PB not operated(05-MP-106K/107K)


3. Level not very low.
4. O/L not acted (05-MP-106L/107L)
5. Stop command not operated from CRT
6. Module Ready (05-MP-106R/107R)
7. [{(Remote selected AND Open command from CRT)

Cooling water pump will stop if any one of the following signal is present
1. Feild Stop PB operated(05-MP-106K/107K)
2. Level very low.
3. O/L acted (05-MP-106L/107L)
4. Stop command operated from CRT
5. Module not Ready (05-MP-106R/107R)

6.0

COAL FEEDER-1/2 START / STOP SEQUENCE

Coal feeder will start after start command is given from CRT if the following conditions are satisfied :

1. Remote selected (05-MK-301G/302G)


2. Module Ready (05-MK-301R/302R)
3. Fuel Conveyor –1 running(05-MC-301M/302M)
4. Bed temp > min 1A (2 out of 4 logic)
5. Air protect ok
6. Boiler not tripped
7. C oal Feeder not running(05-MK-301M/302M)
8. PA fan running( 05-MF-201M)
9. DOL not selected (05-MK-301O/302O)
10. Coal feeder Field stop PB not operated 905-MK-3013/3023)
11. Ready for start (05-MK-3014/3024)

Coal feeder will stop / trip if any one of the following signal is present :

1. PA fan not running


2. Boiler tripped
3. Bed temp > 920deg C
4. Fuel Conveyor not running (05-MC-301M/302M)
5. Coal feeder stop PB (DCS) operated
6. Feild stop PB operated.(05-MK-3013/3023)
7. Module not ready (05-MK-301R/302R)
8. O/L acted(05-MK-3015/3025)
9. Bed Temperature < min3
10. Syphon-1 outlet temperature > max(450 Deg C)
11. Syphon-2 outlet temperature > max(450 Deg C)
12. Ready for start signal not present (05-MK-3014/3024)

7 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html

7.0

COAL CONVEYOR 1/2 START/STOP SEQUENCE

Coal Conveyor 1/2 will start after a Start command is given from CRT only when the following conditions are satisfied :
1. Remote selected (05-MC-301G/302G)
2. Module Ready (05-MC-301R/302R)
3. Fuel Feeder not running(05-MK-301M/302M)
4. Lime Screw Feeder not running(05-MK-303M/304M)
5. O/L not acted(05-MC-3015/3025)
6. Coal Conveyor not running(05-MC-301M/302M)
7. Coal Conveyor outlet gates not closed
8. DOL not selected (05-MC-3010/3020)
9. Coal Conveyor Field stop PB not operated (05-MC-3013/3023)
10. Ready for start (05-MC-3014/3024)

COAL CONVEYOR-1/2 will stop/trip if the following signals are present:

1. Boiler tripped
2. Both Outlet gates closed.
3. Coal feeder stop PB (DCS) operated
4. Feild stop PB operated.(05-MC-3013/3023)
5. Module not ready (05-MC-301R/302R)
6. O/L acted(05-MC-3015/3025)
7. Ready for start signal not present (05-MC-3014/3024)

8.0

BOILER TRIP CONDITIONS

Master fuel trip is initiated by one of the following conditions:

1. Bed temp > max 2 (940 Deg C)


2. Furnace pressure very high (100 mmwcl)
3. Furnace pressure very low (-150 mmwcl)
4. Drum level very high
5. Drum level very low
6. Total PA flow < min (50T/HR)
7. PA discharge pressure < min(900 mmwcl)
8. Bed height very low(600 mm)
9. Bed height very high(1400mm)
10. Both ID tripped
11. Emergency PB (DESK) operated
12. MFT operated from CRT

8 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html

9.0

BOILER AIR PROTECT OK

Boiler air protect ok signal will be on if the following signals are present :

1. Furnace draft > min


2. Furnace draft < max
3. Bed temp < max 3
4. Syphon 1 temp < max
5. Syphon 2 temp <max
6. Drum level > min
7. Drum level < max
8. PA flow > min.
9. Bed Temp >min 1A

10.0

AIR / FLUE TRIPPING SEQUENCE

When the boiler trips the air and flue tripping sequence will be as follows:

Step 1.

Both the coal feeders will trip and associated outlet gates will also close if Bed Temp >max3 (920Deg C)

Step 2.
Both PA fans will trip after coal feeders trip if Bed Temp> max 2 (940 Deg C)

Step 3.
Both SA fans will trip 5mins after PA fans trip if Bed Temp > max2

11.0

HOT GAS GENERATOR - 1/2

FURNACE PURGE

9 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html

Before any fuel firing can take place a satisfactory Purge cycle must be completed. To start a furnace Purge cycle the following conditions must be
satisfied:

1. Primary air pressure not low


2. Atomising air pressure not low (05PSL-631/645)
3. Fuel oil pressure not low (05PSL-622/637)
4. Fuel oil pressure not high
5. No flame
6. Oil S30V in closed position ()
7. HAG outlet gas temp not high high
8. HAG bypass isolation damper fully closed (P26SD5/6ZS1)
9. No scavenging on
10. Instrument Air Pressure not low(05PSL-619/634)
11. PA flow > min
12. Diff pressure across HGG not low.(05DPS-657/670)

With all the above conditions satisfied Purge Ready lamp will be on.After Purge Start PB operated furnace purging will start Purge Ready lamp will be off,
Purge Progress indication will be available in CRT and after a time delay of 5 mins BURNER READY and Purge Complete indication will be available on
CRT.

BURNER START COMMAND

With BURNER READY signal on


AND
(Local mode selected

AND

Burner start PB operated)

OR

(Remote mode selected

AND

Burner start command from CRT)


Following cycle will be initiated :

Step 1

Ignitor will be inserted and when Ignitor Retract limit switch is released Ignitor Transformer will be energised
For 15 sec

Step 2

10 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html

When Ignitor is inserted oil valve and atomizing air valve will open simultaneously.

Step 3

CONDITION 1

Ignition time over and oil flame established


Oil valve and Atomising valve will remain in open position.
CONDITION 2

Ignition time over, oil valve opened but oil flame not established
Oil valve will be closed. Ignitor will be inserted and energized .Scavenge on / start indication will be available on CRT and
Atomising valve will remain in open condition.Scavenge valve will open.
After 20secs HEA will be de-energised and after 25secs both scavenge and atomising valve will be closed

Step 4

Oil burner firing and burner stop PB operated


Oil valve will close
Atomising valve remain open
Scavenge on/start indication will be available on CRT
Ignitor will be inserted and energized.
Scavenge valve will open.
After 20secs Ignitor will be de-energised and retracted after 20 sec and after 25 secs both scavenge and
atomising air valve will close.

CONDITIO 3

Oil burner firing and HAG trips due to any one of the following conditions :

Prmary air pressure low


Atomising air pressure low
HAG outlet temp high high
Emergency stop PB operated
Oil pressure low
Oil pressure high.
DP across HGG low
PA flow low

Then the following occurs:


Oil valve will close
Atomising air valve will close
No scavenging will take place.

11 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html

12.0

CYCLONE ASH SCREW FEEDER 1/2

Cyclone ash screw feeder will start after Cyclone ash screew feeder – 1 start command is given from DCS if the following conditions are satisfied :

1. Remote selected (05-MK-505G/506G)


2. Module Ready (05-MK-505R/506R)
3. Screw Feeder not running(05-MK-505M/506M)
4. Ash Static Cooler Level not high (05LSH-516/509)
5. O/L not acted(05-MK-5055/5065)
6. Cooling Water Flow ok(05FSL-725/732)
7. Inlet gates closed(05ZSC-512/505)
8. DOL not selected (05-MK-5050/5060)
9. Coal Conveyor Field stop PB not operated (05-MK-5053/5063)
10. Ready for start (05-MK-5054/5064)

Cyclone ash screw feeder will stop if any one of the following signals is present :

1. Boiler tripped
2. Ash Static Cooler Level high (05LSH-516/509)
3. Screw feeder stop PB (DCS) operated
4. Feild stop PB operated.(05-MK-5053/5063)
5. Module not ready (05-MK-505R/506R)
6. O/L acted(05-MK-5055/5065)
7. Ready for start signal not present (05-MK-5054/5064)

13.0

CYCLONE-1/2 DISCHARGE GATE VALVE

Cyclone discharge gate will open if the following conditions are satisfied:

1. Cyclone no discharge gate valve not fully opened ( 05ZSO-512/505)


2. Cyclone ash screw feeder -1/2 running(05SAL-514/508)
3. Solenoid valve power supply available
4. (Bed temp < 830deg C.AND Auto selected)OR(Manual selected AND Open command from CRT)

Cyclone discharge gate will close if any one of the following signal is present

1. Cyclone ash screw feeder – 1/2 not running(05SAL-514/508/)


2. Solenoid valve power supply not available
3. (Close command given from CRT AND Manual selected)OR(Auto selected AND Bed Temp>860 Deg C)

12 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html

4. Boiler tripped
. AND
. Cyclone-1/2 disc gate is not full closed (05ZSC-512/505)

14.0

BED ASH SCREW FEEDER - 1/3

Bed ash screw feeder – 1/3 will start after receiving start command from CRT if the following conditions are satisfied :
1. Remote selected (05-MK-501G/502G)
2. Module Ready (05-MK-501R/502 R)
3. Screw Feeder not running(05-MK-501M/502M)
4. Cooling water flow ok (05FSL-723/727)
5. O/L not acted(05-MK-5015/5025)
6. Bed Ash Screw Feeder 2/4 not running(05SAL-522/528)
7. Inlet gate closed(05ZSC-518/525)
8. DOL not selected (05-MK-5010/5020)
9. Bed Ash Screw Feeder Field stop PB not operated (05-MK-5013/5023)
10. Ready for start (05-MK-5014/5024)

Bed ash screw feeder – 1/2 will stop if any one of the following signals is present:

1. Boiler tripped
2. Bed Ash Screw Feeder 2/4 not running (05SAL-522/528)
3. Screw feeder stop PB (DCS) operated
4. Feild stop PB operated.(05-MK-5013/5023)
5. Module not ready (05-MK-501R/502R)
6. O/L acted(05-MK-5015/5025)
7. Ready for start signal not present (05-MK-5014/5024)

15.0

BED ASH DISCHARGE GATE VALVE 1/2

Bed ash discharge gate valve will open if the following conditions are satisfied :

1. Bed ash gate valve not fully opened (05ZS0-518/525)


2. Bed ash screw feeder speed 1/3 running (05SAL-521/527)
3. ( Auto selected

AND

4. Bed level high)

13 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html

OR

5. ( Auto not selected

AND

6. Open command given from DCS).


7. Solenoid valve power supply available(P64SG10-SK/P64SG14-SK)

Bed ash discharge gate valve will close if any one of the following signals is present :

1. Bed ash screw feeder 1/3 not running(05SAL-521/527)


2. (Auto selected

AND

3. Bed level low)


4. (Auto not selected

AND

5. Close command given from CRT)


6. Boiler tripped.
7. Solenoid valve power supply not available
8. Bed ash gate valve not fully closed (05ZSC-518/525)

16.0

EMERGENCY BLOWDOWN VALVE

EBD valve will open after a Start command is given from CRT only when the following conditions are satisfied :

1. EBD valve not fully opened (05ZS0-145)


2. Valve closing logic not present
3. Module Ready(05-MV-116R)
4. O/L not operated(05-MV-116L)
5. Stop command not operated from CRT
6. Valve opening torque not high(05TS0-145)
7. {(Remote selected AND Open command from CRT)
8. Field stop not operated (05-MV-116K)

EBD Valve will close if the following signals are present:

1. EBD valve not fully closed (05ZSC-145)


2. Valve opening logic not present
3. Module Ready(05-MV-116R)
4. O/L not operated(05-MV-116L)
5. Stop command not operated from CRT
6. Valve closing torque not high(05TSC-145)
7. {(Remote selected AND Close command from CRT)
8. Field stop not operated (05-MV-116K)

14 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html

17.0

FEED WATER MOTORISED 0 - 100% ISOLATION VALVE

Feed Water Motorised valve will open after a Start command is given from CRT only when the following conditions are satisfied
:

1. Isolation valve not fully opened (05ZS0-125)


2. Valve closing logic not present
3. Module Ready(05-MV-118R)
4. O/L not operated(05-MV-118L)
5. Stop command not operated from CRT
6. Valve opening torque not high(05TS0-125)
7. {(Remote selected AND Open command from CRT)
8. Field stop not operated (05-MV-118K)

Feed Water Motorised Valve will close if the following signals are present:
1. Isolation valve not fully closed (05ZSC-125)
2. Valve opening logic not present
3. Module Ready(05-MV-118R)
4. O/L not operated(05-MV-118L)
5. Stop command not operated from CRT
6. Valve closing torque not high(05TSC-125)
7. {(Remote selected AND Close command from CRT)
8. Field stop not operated (05-MV-118K)

18.0

MAIN STEAM BYPASS VALVE

Main Steam Bypass valve will open after a Start command is given from CRT only when the following conditions are satisfied :

1. Bypass valve not fully opened (05ZS0-169)


2. Valve closing logic not present
3. Module Ready(05-MV-104R)
4. O/L not operated(05-MV-104L)
5. Stop command not operated from CRT
6. Valve opening torque not high(05TS0-169)
7. {(Remote selected AND Open command from CRT)
8. Field stop not operated (05-MV-118K)

Main Steam Bypass Valve will close if the following signals are present:
1. Bypass valve not fully closed (05ZSC-125)
2. Valve opening logic not present
3. Module Ready(05-MV-104R)
4. O/L not operated(05-MV-104L)
5. Stop command not operated from CRT

15 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html

6. Valve closing torque not high(05TSC-169)


7. {(Remote selected AND Close command from CRT AND Auto not selected) OR (Auto selected AND Main steam stop valve full
open) )
8. Field stop not operated (05-MV-104K)

19.0

FEED WATER MOTORISED 0 - 40% ISOLATION VALVE

Feed Water Motorised Isolation valve will open after a Start command is given from CRT only when the following conditions are satisfied :

1. Isolation valve not fully opened (05ZS0-124)


2. Valve closing logic not present
3. Module Ready(05-MV-117R)
4. O/L not operated(05-MV-117L)
5. Stop command not operated from CRT
6. Valve opening torque not high(05TS0-124)
7. {(Remote selected AND Open command from CRT)
8. Field stop not operated (05-MV-117K)

Feed Water Motorised Isolation Valve will close if the following signals are present:

1. Isolation valve not fully closed (05ZSC-124)


2. Valve opening logic not present
3. Module Ready(05-MV-117R)
4. O/L not operated(05-MV-117L)
5. Stop command not operated from CRT
6. Valve closing torque not high(05TSC-124)
7. {(Remote selected AND Close command from CRT)
8. Field stop not operated (05-MV-117K)

20.0

FEED WATER MOTORISED (0% - 100%) BYPASS ISOLATION VALUE

Feed Water Motorised Isolation valve will open after a Start command is given from CRT only when the following conditions are
satisfied :
1. Isolation valve not fully opened (05ZS0-127)
2. Valve closing logic not present
3. Module Ready(05-MV-119R)
4. O/L not operated(05-MV-119L)
5. Stop command not operated from CRT
6. Valve opening torque not high(05TS0-127)
7. {(Remote selected AND Open command from CRT)
8. Field stop not operated (05-MV-119K)

16 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html

Feed Water Motorised Isolation Valve will close if the following signals are present:
1. Isolation valve not fully closed (05ZSC-127)
2. Valve opening logic not present
3. Module Ready(05-MV-119R)
4. O/L not operated(05-MV-119L)
5. Stop command not operated from CRT
6. Valve closing torque not high(05TSC-127)
7. {(Remote selected AND Close command from CRT)
8. Field stop not operated (05-MV-119K)

21.0

MOTORISED ISOLATION VALVE BEFORE START-UP VENT VALVE

Start –up Vent Motorised Isolation valve will open after a Start command is given from CRT only when the following conditions are
satisfied :
1. Isolation valve not fully opened (05ZS0-168)
2. Valve closing logic not present
3. Module Ready(05-MV-102R)
4. O/L not operated(05-MV-102L)
5. Stop command not operated from CRT
6. Valve opening torque not high(05TS0-168)
7. {(Remote selected AND Open command from CRT)
8. Field stop not operated (05-MV-102K)

Start-up Vent Motorised Isolation Valve will close if the following signals are present:
1. Isolation valve not fully closed (05ZSC-168)
2. Valve opening logic not present
3. Module Ready(05-MV-102R)
4. O/L not operated(05-MV-102L)
5. Stop command not operated from CRT
6. Valve closing torque not high(05TSC-168)
7. {(Remote selected AND Close command from CRT)
8. Field stop not operated (05-MV-102K)

22.0

START-UP VENT VALVE (INCHING TYPE)

Start-up vent valve will open after a Start command is given from CRT only when the following conditions are satisfied :

1. Start-up vent valve not fully opened (05ZS0-167)


2. Valve closing logic not present
3. Module Ready(05-MV-101R)
4. O/L not operated(05-MV-101L)

17 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html

5. Stop command not operated from CRT


6. Valve opening torque not high(05TS0-167)
7. {(Remote selected AND Open command from CRT)
8. Field stop not operated (05-MV-101K)
9. Up stream valve full opened (05ZSO-168)

Start-up vent valve will close if the following signals are present:

1. Start-up vent valve not fully closed (05ZSC-167)


2. Valve opening logic not present
3. Module Ready(05-MV-101R)
4. O/L not operated(05-MV-101L)
5. Stop command not operated from CRT
6. Valve closing torque not high(05TSC-167)
7. {(Remote selected AND Close command from CRT)
8. Field stop not operated (05-MV-101K)

23.0

DRUM VENT VALVE

Drum vent valve will open after a Start command is given from CRT only when the following conditions are satisfied :
1. Drum vent valve not fully opened (05ZS0-146)
2. Valve closing logic not present
3. Module Ready(05-MV-128R)
4. O/L not operated(05-MV-128L)
5. Stop command not operated from CRT
6. Valve opening torque not high(05TS0-146)
7. {(Remote selected AND Open command from CRT)
8. Field stop not operated (05-MV-128K)

Drum vent valve will close if the following signals are present:
1. Drum vent valve not fully closed (05ZSC-146)
2. Valve opening logic not present
3. Module Ready(05-MV-128R)
4. O/L not operated(05-MV-128L)
5. Stop command not operated from CRT
6. Valve closing torque not high(05TSC-146)
7. {(Remote selected AND Close command from CRT)
8. Field stop not operated (05-MV-128K)

24.0

MAIN STEAM LINE TO EXISTING HEADER VALVE ½

18 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html

Main Steam Line to Existing Header Isolation valve will open after a Open command is given from CRT only when the following
conditions are satisfied :

1. Main Steam Line to Existing Header valve 1/2 not fully opened (05ZS0-199B/199A)
2. Valve closing logic not present
3. Module Ready(05-MV-126/127R)
4. O/L not operated(05-MV-126/127L)
5. Stop command not operated from CRT
6. Valve opening torque not high(05TS0-199B/199A)
7. {(Remote selected AND Open command from CRTAND Integral Bypass Valve full opened)
8. Field stop not operated (05-MV-126/127K)

Main Steam Line to Existing Header Isolation valve will close after a Close command is given from CRT only when the following
conditions are satisfied :

1. Main Steam Line to Existing Header valve 1/2 not fully closed (05ZSC-199B/199A)
2. Valve opening logic not present
3. Module Ready(05-MV-126/127R)
4. O/L not operated(05-MV-126/127L)
5. Stop command not operated from CRT
6. Valve closing torque not high(05TSC-199B/199A)
7. {(Remote selected AND Close command from CRT)
8. Field stop not operated (05-MV-126/127K)

25.0

BFP DISCHARGE VALVE 1/2

BFP Discharge Valve will open after a Start command is given from CRT only when the following conditions are satisfied :
1. Isolation valve not fully opened (05ZS0-117A/118A)
2. Valve closing logic not present
3. Module Ready(05-MV-122/123R)
4. O/L not operated(05-MV-122/123L)
5. Stop command not operated from CRT
6. Valve opening torque not high(05TS0-117A/118A)
7. {(Remote selected AND Open command from CRT AND BFP 1/2 running and 30 sec time count over)
8. Field stop not operated (05-MV-122/123K)

BFP Discharge Valve will close if the following signals are present:

1. Isolation valve not fully closed (05ZSC-117A/118A)


2. Valve opening logic not present

19 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html

3. Module Ready(05-MV-122/123R)
4. O/L not operated(05-MV-122/123L)
5. Stop command not operated from CRT
6. Valve opening torque not high(05TSC-117A/118A)
7. {(Remote selected AND Close command from CRT AND BFP 1/2 not running )
8. Field stop not operated (05-MV-122/123K)

26.0

ATTEMPERATOR SPRAY BLOCK VALVE (P29GL46 )

Spray Water Block valve will open after a Start command is given from CRT only when the following conditions are satisfied :
1. Spray Block valve not fully opened (05ZS0-197)
2. Valve closing logic not present
3. Module Ready(05-MV-105R)
4. O/L not operated(05-MV-105L)
5. Stop command not operated from CRT
6. Valve opening torque not high(05TS0-197)
7. {(Remote selected AND Open command from CRT)
8. Field stop not operated (05-MV-105K)
9. Steam Flow >10%
10. Boiler not tripped

Spray Water Block Valve will close if the following signals are present:
1. Spray water Block valve not fully closed (05ZSC-197)
2. Valve opening logic not present
3. Module Ready(05-MV-105R)
4. O/L not operated(05-MV-105L)
5. Stop command not operated from CRT
6. Valve closing torque not high(05TSC-197)
7. {(Remote selected AND Close command from CRT)
8. Field stop not operated (05-MV-105K)
9. Steam flow< 10%
10. Boiler Tripped

27.0

ATTEMPERATOR MOTORISED ISOLATION VALVE BEFORE SPRAY CONTROL VALVE 1 & 2

Attemperator-1/2 Motorised Isolation valve before Spray Control Valve ½ will open after a Start command is given from CRT only when the following
conditions are satisfied :

1. Spray Block valve fully opened (05ZS0-197)


2. Valve closing logic not present
3. Module Ready(05-MV-109/111R)
4. O/L not operated(05-MV-109/111L)
5. Stop command not operated from CRT
6. Valve opening torque not high(05TS0-191/188)
7. {(Remote selected AND Open command from CRT)

20 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html

8. Field stop not operated (05-MV-109/111K)


9. Isolation valve not full opened (05ZSO-191/188)

Attemperator-1/2 Motorised Isolation Valve will close if the following signals are present:

1. Isolation valve not fully closed (05ZSC-191/188)


2. Valve opening logic not present
3. Module Ready(05-MV-109/111R)
4. O/L not operated(05-MV-109/111L)
5. Stop command not operated from CRT
6. Valve closing torque not high(05TSC-191/188)
7. {(Remote selected AND Close command from CRT)
8. Field stop not operated (05-MV-109/111K)
9. Boiler Tripped

28.0

ATTEMPERATOR – ½ MOTORISED ISOLATION VALVE BEFORE


MOTORISED BYPASS VALVE
Attemperator-1/2 Motorised Isolation valve before Bypass Valve 1/2 will open after a Start command is given from CRT only when
the following conditions are satisfied :

1. Spray Block valve fully opened (05ZS0-197)


2. Valve closing logic not present
3. Module Ready(05-MV-110/112R)
4. O/L not operated(05-MV-110/112L)
5. Stop command not operated from CRT
6. Valve opening torque not high(05TS0-190/189)
7. {(Remote selected AND Open command from CRT)
8. Field stop not operated (05-MV-110/112K)
9. Isolation valve not full opened (05ZSO-190/189)

Attemperator-1/2 Motorised Isolation Valve before Bypass Valve will close if the following signals are present:
1. Isolation valve not fully closed (05ZSC-190/189)
2. Valve opening logic not present
3. Module Ready(05-MV-110/112R)
4. O/L not operated(05-MV-110/112L)
5. Stop command not operated from CRT
6. Valve closing torque not high(05TSC-190/189)
7. {(Remote selected AND Close command from CRT)
8. Field stop not operated (05-MV-110/112K)
9. Boiler Tripped
.

21 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html

DEAERATOR LEVEL CONTROL BYPASS VALVE

Deaerator Level Control Bypass valve will open after a Start command is given from CRT only when the following conditions are
satisfied :
1. Deaerator level control bypass valve not fully opened (05ZS0-194B)
2. Valve closing logic not present
3. Module Ready(05-MV-125R)
4. O/L not operated(05-MV-125L)
5. Stop command not operated from CRT
6. Valve opening torque not high(05TS0-194B)
7. {(Remote selected AND Open command from CRT)
8. Field stop not operated (05-MV-125K)

Deaerator Level Control Bypass Valve will close if the following signals are present:

1. Deaerator level control bypass valve not fully closed (05ZSC-194B)


2. Valve opening logic not present
3. Module Ready(05-MV-125R)
4. O/L not operated(05-MV-125L)
5. Stop command not operated from CRT
6. Valve closing torque not high(05TSC-194B)
7. (Remote selected AND Close command from CRT)
8. Field stop not operated (05-MV-125K)

30.0

DEAERATOR PRESSURE CONTROL BYPASS VALVE

Deaerator Pressure Control Bypass valve will open after a Start command is given from CRT only when the following conditions are satisfied :
1. Deaerator pressure control bypass valve not fully opened (05ZS0-194A)
2. Valve closing logic not present
3. Module Ready(05-MV-124R)
4. O/L not operated(05-MV-124L)
5. Stop command not operated from CRT
6. Valve opening torque not high(05TS0-194A)
7. {(Remote selected AND Open command from CRT AND Integral Bypass Valve full open)
8. Field stop not operated (05-MV-124K)

Deaerator Pressure Control Bypass valve will close after Close command is given from CRT only when the following conditions are satisfied :

1. Deaerator pressure control bypass valve not fully closed (05ZSC-194a)


2. Valve opening logic not present
3. Module Ready(05-MV-124R)
4. O/L not operated(05-MV-124L)
5. Stop command not operated from CRT
6. Valve closing torque not high(05TSC-194A)
7. (Remote selected AND Close command from CRT)
8. Field stop not operated (05-MV-124K)

22 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html

31.0

MAIN STEAM STOP VALVE

Main Steam Stop valve will open after a Start command is given from CRT only when the following conditions are
satisfied :

1. Main Steam Stop valve not fully opened (05ZS0-170)


2. Valve closing logic not present
3. Module Ready(05-MV-103R)
4. O/L not operated(05-MV-103L)
5. Stop command not operated from CRT
6. Valve opening torque not high(05TS0-170)
7. {(Remote selected AND Open command from CRT)
8. Field stop not operated (05-MV-103K)
9. Main Steam Bypass valve full opened (05ZSO-169)

Main Steam Stop Valve will close if the following signals are present:

1. Main Steam Stop valve not fully closed (05ZSC-170)


2. Valve opening logic not present
3. Module Ready(05-MV-103R)
4. O/L not operated(05-MV-103L)
5. Stop command not operated from CRT
6. Valve closing torque not high(05TSC-170)
7. {(Remote selected AND Open command from CRT)
8. Field stop not operated (05-MV-103K)

32.0

ATTEMPERATOR - 1 NOZZLE ISOLATION VALVE

Attemperator –1 nozzle valve will open after open command is received from CRT only if the following conditions are satisfied :
1. Isolation valve not fully opened (05ZSO-158)
2. Valve closing logic not present
3. Module Ready(05-MV-106R)
4. O/L not operated(05-MV-106L)
5. Stop command not operated from CRT
6. Valve opening torque not high(05TSO-158)
7. {(Remote selected AND Open command from CRT)
8. Field stop not operated (05-MV-106K)
9. Boiler not Tripped
10. Spray water Flow >1T/HR

23 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html

Attemperator-1 nozzel Valve will close if the following signals are present:
1. Isolation valve not fully closed (05ZSC-158)
2. Valve opening logic not present
3. Module Ready(05-MV-106R)
4. O/L not operated(05-MV-106L)
5. Stop command not operated from CRT
6. Valve closing torque not high(05TSC-158)
7. {(Remote selected AND Close command from CRT)
8. Field stop not operated (05-MV-106K)
9. Boiler Tripped
10. Spray water Flow <.5T/HR

33.0

ATTEMPERATOR - 2 NOZZLE ISOLATION VALVE 1/2

Attemperator –2 nozzle valve 1/2 will open after open command is received from CRT only if the following conditions are satisfied :

1. Isolation valve not fully opened (05ZSO-161/160)


2. Valve closing logic not present
3. Module Ready(05-MV-107/108R)
4. O/L not operated(05-MV-107/108L)
5. Stop command not operated from CRT
6. Valve opening torque not high(05TSO-161/160)
7. {(Remote selected AND Open command from CRT)
8. Field stop not operated (05-MV-107/108K)
9. Boiler not Tripped
10. Spray water Flow >1T/HR

Attemperator-2 nozzel Valve 1/2 will close if the following signals are present:
1. Isolation valve not fully closed (05ZSC-161/160)
2. Valve opening logic not present
3. Module Ready(05-MV-107/108R)
4. O/L not operated(05-MV-107/108L)
5. Stop command not operated from CRT
6. Valve closing torque not high(05TSC-161/160)
7. {(Remote selected AND Close command from CRT)
8. Field stop not operated (05-MV-107/108K)
9. Boiler Tripped
10. Spray water Flow <.5T/HR

34.0

CO VENT VALVE ( P26LD9 )

CO Vent valve will open only if the following conditions are satisfied :
1. PA Fan not running
2. Solenoid Valve Power Supply available

24 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html

CO Vent valve will close only if the following conditions are satisfied :

1. PA Fan running

2. Solenoid Valve Power Supply available

35.0

BLOWDOWN TRANSFER PUMP 1/2 START/STOP LOGIC

Blow Down Transfer pump will start if the following conditions are satisfied :
1. Pump 1/2 not running(05-MP-108M/109M
2. Feild Stop PB not operated(05-MP-108K/109K)
3. Level not very low.
4. O/L not acted (05-MP-108L/109L)
5. Stop command not operated from CRT
6. Module Ready (05-MP-108R/109R)
7. [{(Remote selected AND Open command from CRT)

Blow Down Transfer pump will stop if any one of the following signal is present
1. Feild Stop PB operated(05-MP-108K/109K)
2. Level very low.
3. O/L acted (05-MP-108L/109L)
4. Stop command operated from CRT
5. Module not Ready (05-MP-108R/109R)

36.0

CLOSED LOOP COOLING WATER PUMP 1/2 START/STOP LOGIC

Cooling water pump will start if the following conditions are satisfied :
1. Pump 1/2 not running(05-MP-701M/702M
2. Feild Stop PB not operated(05-MP-701K/702K)
3. Level not very low.
4. O/L not acted (05-MP-701L/702L)
5. Stop command not operated from CRT
6. Module Ready (05-MP-701R/702R)
7. [{(Remote selected AND Open command from CRT)

Cooling water pump will stop if any one of the following signal is present
1. Feild Stop PB operated(05-MP-701K/702K)
2. Level very low.
3. O/L acted (05-MP-701L/702L)
4. Stop command operated from CRT
5. Module not Ready (05-MP-701R/702R)

25 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html

37.0

HSD PUMP 1/2START/STOP LOGIC:

HSD pump will start if the following conditions are satisfied :


1. Pump 1/2 not running(05-MP-601M/602M
2. Feild Stop PB not operated(05-MP-601K/602K)
3. Level not very low.
4. O/L not acted (05-MP-601L/602L)
5. Stop command not operated from CRT
6. Module Ready (05-MP-601R/602R)
7. [{(Remote selected AND Open command from CRT)

HSD pump will stop if any one of the following signal is present
1. Feild Stop PB operated(05-MP-601K/602K)
2. Level very low.
3. O/L acted (05-MP-601L/602L)
4. Stop command operated from CRT
5. Module not Ready (05-MP-601R/602R)

38.0

BFP-1 START / STOP LOGIC

STARTING LOGIC

BFP1/2/3will start after start command is given from DCS only when the following conditions are satisfied:
1. Drive remote selected(05-MP-101G)
2. SWGR ready to start (05-MP-101A)
3. Feild Stop PB not operated(05-mp-101K)
4. BFP-1 disc valve closed (05ZSC-117A)
5. BFP not running (05-MP-101D)
6. BFP1 motor bearing(DE) temp not high
7. BFP1motor bearing (NDE)temp not high
8. BFP1 bearing (DE) temp not high
9. BFP1 bearing (NDE) temp not high
10 BFP suction pressure not low
11. Module Ready (05-MP-101R)
12. SWGR. Ready (05-MP-101E)
13. Trip Ckt Healthy (0-MP-101C)

STOP / TRIPPING LOGIC

If any one of the following signals is present BFP will stop / trip

26 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html

1. BFP1/2/3 stop command from DCS


2. Feild Stop PB operated(05-MP-101K)
3. Trip Ckt not Healthy (0-MP-101C)
4. BFP1 bearing (DE) temp high
5. BFP1 bearing (NDE) temp high
6. BFP1 motor bearing (DE) temp high
7. BFP1 motor bearing (NDE) temp high
8. DEAERATOR Level very low(P2BLS2)
9. BFP Suction pressure very low.
10. BFP1 Bearing (DE) VIB. Very high
11. BFP1 Bearing (NDE) VIB. Very high
12. Module not Ready (05-MP-101R)
13. SWGR.not Ready (05-MP-101E)
14. DP across Strainer very high

39.0

LP DOSING PUMP 1/2/3/4 START/STOP LOGIC


LP Dosing pump1/2/3/4 will start if the following conditions are satisfied :
1. Pump 1/2 not running(05-MP-102M/103M/104M/105M
2. Feild Stop PB not operated(05-MP-102K/103K/104M/105M)
3. Level not very low.
4. O/L not acted (05-MP-102L/103L/104L/105L)
5. Stop command not operated from CRT
6. Module Ready (05-MP-102R/103R/104R/105R)
7. [{(Remote selected AND Open command from CRT)

LP Dosing pump1/2/3/4 will stop if any one of the following signal is present
1. Feild Stop PB operated(05-MP-102K/103K/104K/105K)
2. Level very low.
3. O/L acted (05-MP-102L/103L/104L/105L)
4. Stop command operated from CRT
5. Module not Ready (05-MP-102R/103R/104R/105R)

40.0

STIRRER 1/2 START/STOP LOGIC

Stirrer1/2/ will start if the following conditions are satisfied :


1. Stirrer 1/2 not running(05-MK-101M/102M
2. Feild Stop PB not operated(05-MK-101K/102K)
3. O/L not acted (05-MK-101L/102L)
4. Stop command not operated from CRT
5. Module Ready (05-MK-101R/102R)

27 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html

6. [{(Remote selected AND Open command from CRT)

Stirrer1/2/3/4 will stop if any one of the following signal is present


1. Feild Stop PB operated(05-Mk-101K/102K)
2. O/L acted (05-MP-102L/103L)
3. Stop command operated from CRT
4. Module not Ready (05-Mk-101R/102R)

41.0

ATTEMPERATOR 1/2 MOTORISED BYPASS SPRAY CONTROL VALVE

Attemperator Spray Control Bypass valve will open after a Start command is given from CRT only when the following conditions are
satisfied :
1. Attemperator Spray control bypass valve not fully opened (05ZS0-184/187)
2. Valve closing logic not present
3. Module Ready(05-MV-113/114R)
4. O/L not operated(05-MV-113/114L)
5. Stop command not operated from CRT
6. Valve opening torque not high(05TS0-184/187)
7. {(Remote selected AND Open command from CRT)
8. Field stop not operated (05-MV-113/114K)

Attemperator Spray Control Bypass Valve will close if the following signals are present:

1. Attemperator Spray control bypass valve not fully closed (05ZSC-184/187)


2. Valve opening logic not present
3. Module Ready(05-MV-113/114R)
4. O/L not operated(05-MV-113/114L)
5. Stop command not operated from CRT
6. Valve closing torque not high(05TSC-184/187)
7. {(Remote selected AND Open command from CRT)
8. Field stop not operated (05-MV-113/114K)

42.0

SAND/LIME STONE FEEDING SCREW FEEDER 1/2


Sand/LIME STONE Screw Feeder will start after receiving start command from CRT if the following conditions are satisfied :

1. Remote selected (05-MK-303G/304G)


2. Module Ready (05-MK-303R/304 R)
3. Screw Feeder not running(05-MK-303M/304M)
4. Inlet gate closed(05ZSC-307/326)
5. O/L not acted(05-MK-3035/3045)

28 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html

6. Fuel Conveyor 1/2 running(05SAL-355/354)


7. Inlet gate closed(05ZSC-308/331)
8. DOL not selected (05-MK-303O/304O)
9. Screw Feeder Field stop PB not operated (05-MK-3033/3043)
10. Ready for start (05-MK-3034/3044)

Sand/LIME STONE Screw Feeder will stop if any one of the following signals is present:

1. Boiler tripped
2. Fuel Conveyor 1/2 not running (05SAL-355/354)
3. Screw feeder stop PB (DCS) operated
4. Feild stop PB operated.(05-MK-3033/3043)
5. Module not ready (05-MK-303R/304R)
6. O/L acted(05-MK-3035/3045)
7. Ready for start signal not present (05-MK-3034/3044)

43.0

LIME STONE FEEDING SCREW FEEDER (P1ESC1))


Lime Stone screw feeder will start after receiving start command from CRT if the following conditions are satisfied :
1. Module Ready(P1FESC1-D_RDY)
2. Drive in remote mode
3. O/L not acted(P1ESC1-D_TRP)
4. Screw feeder – 1 not running(P1ESC1-D_RUN)

Sand/ESP screw feeder will stop if any one of the following signals is present:
1. Stop command given from DCS
2. Module not ready(P1ESC1-D_RDY)
3. O/L acted(P1ESC1-D_TRP)

44.0

MOTORISED FEED CONTROL BYPASS VALVE

Motorised Feed Control Bypass valve will open after a Start command is given from CRT only when the following conditions are satisfied :
1. Feed control bypass valve not fully opened (05ZS0-127)
2. Valve closing logic not present
3. Module Ready(05-MV-120R)

29 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html

4. O/L not operated(05-MV-120L)


5. Stop command not operated from CRT
6. Valve opening torque not high(05TS0-127)
7. {(Remote selected AND Open command from CRT)
8. Field stop not operated (05-MV-120K)

Motorised Feed Control Bypass Valve will close if the following signals are present:
1. Feed control bypass valve not fully closed (05ZSC-127)
2. Valve opening logic not present
3. Module Ready(05-MV-120R)
4. O/L not operated(05-MV-120L)
5. Stop command not operated from CRT
6. Valve closing torque not high(05TS0-127)
7. {(Remote selected AND Close command from CRT)
8. Field stop not operated (05-MV-120K)

45.0
SLIDE GATE 1/2 AT LIME BUNKER OUTLET

Slide Gate 1/2 will open if the following signals are present:
1. Gate1/2 not fully opened (05ZSO-308/326)
2. Gate opening logic not present
3. Module Ready(05-MV-301R/302R)
4. O/L not operated(05-MV-301L/302L)
5. Stop command not operated from CRT
6. Gate opening torque not high(05TS0-308/326)
7. {(Remote selected AND Open command from CRT)
8. Field stop not operated (05-MV-301K/302K)
9. Lime Screw Feeder 1/2 running(05-MV-303M/304M)

Slide Gate 1/2 will close if the following signals are present:
1. Gate1/2 not fully closed (05ZSC-308/326)
2. Gate closing logic not present
3. Module Ready(05-MV-301R/302R)
4. O/L not operated(05-MV-301L/302L)
5. Stop command not operated from CRT
6. Gate closing torque not high(05TSC-308/326)
7. {(Remote selected AND Close command from CRT) OR (Lime Screw Feeder1/2 not running)}
8. Field stop not operated (05-MV-301K/302K)

46.0
SLIDE GATE 1/2 AT SAND BUNKER OUTLET

Slide Gate 1/2 will open if the following signals are present:
1. Gate1/2 not fully opened (05ZSO-307/331)
2. Gate opening logic not present

30 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html

3. Module Ready(05-MV-303R/304R)
4. O/L not operated(05-MV-303L/304L)
5. Stop command not operated from CRT
6. Gate opening torque not high(05TS0-307/331)
7. {(Remote selected AND Open command from CRT)
8. Field stop not operated (05-MV-303K/304K)
9. Lime Screw Feeder 1/2 running(05-MV-303M/304M)

Slide Gate 1/2 will close if the following signals are present:
1. Gate1/2 not fully closed (05ZSC-307/331)
2. Gate closing logic not present
3. Module Ready(05-MV-303R/304R)
4. O/L not operated(05-MV-303L/304L)
5. Stop command not operated from CRT
6. Gate closing torque not high(05TSC-307/331)
7. {(Remote selected AND Close command from CRT) OR (Lime Screw Feeder1/2 not running)}
8. Field stop not operated (05-MV-303K/304K)

47.0
SLIDE GATE 1/2/3/4 AT COAL CONVEYOR OUTLET

Slide Gate 1/2/3/4 will open if the following signals are present:
1. Gate1/2/3/4 not fully opened (05ZSO-310/311/333/334)
2. Gate opening logic not present
3. Module Ready(05-MV-501R/502R/503R/504R)
4. O/L not operated(05-MV-501L/502L/503L/504L)
5. Stop command not operated from CRT
6. Gate opening torque not high(05TS0-310/311/333/334)
7. {(Remote selected AND Open command from CRT)
8. Field stop not operated (05-MV-501K/502K/503K/504K)

Slide Gate 1/2/3/4 will close if the following signals are present:

1. Gate1/2/3/4 not fully closed (05ZSC-310/311/333/334)


2. Gate opening logic not present
3. Module Ready(05-MV-501R/502R/503R/504R)
4. O/L not operated(05-MV-501L/502L/503L/504L)
5. Stop command not operated from CRT
6. Gate closing torque not high(05TSC-310/311/333/334)
7. {(Remote selected AND Open command from CRT)
8. Field stop not operated (05-MV-501K/502K/503K/504K)

48.0

MAIN STEAM LINE TO EXISTING HEADER INTEGRAL BYPASS VALVE 1/2

31 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html

Main Steam Line to Existing Header Isolation Integral Bypass valve will open after a Open command is given from CRT only when the
following conditions are satisfied :

1. Main Steam Line to Existing Header Integral Bypass valve 1/2 not fully opened (05ZS0-199C/199D)
2. Valve closing logic not present
3. Module Ready(05-MV-130/131R)
4. O/L not operated(05-MV-130/131L)
5. Stop command not operated from CRT
6. Valve opening torque not high(05TS0-199C/199D)
7. {(Remote selected AND Open command from CRT)
8. Field stop not operated (05-MV-130/131K)

Main Steam Line to Existing Header Isolation Integral Bypass valve will close after a Close command is given from CRT only when
the following conditions are satisfied :

1. Main Steam Line to Existing Header valve 1/2 not fully closed (05ZSC-199C/199D)
2. Valve opening logic not present
3. Module Ready(05-MV-130/131R)
4. O/L not operated(05-MV-130/131L)
5. Stop command not operated from CRT
6. Valve closing torque not high(05TSC-199C/199D)
7. {(Remote selected AND Close command from CRT)
8. Field stop not operated (05-MV-130/131K)

49.0

DEAERATOR PRESSURE CONTROL INTEGRAL BYPASS VALVE

Deaerator Pressure Control Integral Bypass valve will open after a Start command is given from CRT only when the following conditions are satisfied :
1. Deaerator pressure control Integral bypass valve not fully opened (05ZS0-194C)
2. Valve closing logic not present
3. Module Ready(05-MV-121R)
4. O/L not operated(05-MV-121L)
5. Stop command not operated from CRT
6. Valve opening torque not high(05TS0-194C)
7. {(Remote selected AND Open command from CRT)
8. Field stop not operated (05-MV-121K)

Deaerator Pressure Control Integral Bypass valve will close after Close command is given from CRT only when the following conditions are satisfied :

1. Deaerator pressure control bypass valve not fully closed (05ZSC-194a)


2. Valve opening logic not present

32 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html

3. Module Ready(05-MV-121R)
4. O/L not operated(05-MV-121L)
5. Stop command not operated from CRT
6. Valve closing torque not high(05TSC-194C)
7. (Remote selected AND Close command from CRT)
8. Field stop not operated (05-MV-121K)