This write up is meant for general guidelines and better understanding of the system. However it may be noted that All the logic
conditions spelt in English Language may not be exact equivalent of pictorial representations of logics.It is mandatory that the
operating personal should refer to the respective contract logics.
It must be recognized that no amount of written instruction can replace intelligent thinking and reasoning on the part of boiler
operators, especially when coping with unforeseen operating conditions. It is operator’s responsibility to become thoroughly familiar,
not only with immediate steam generating equipment but also with all pertinent control equipment. Satisfactory performance and
safety depend to a great extent on proper functioning of controls and auxiliary equipment.
The Boiler Logic System has been designed for ENERGISED to Open and De-energise to Close philosophy.
1 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html
1.0
STARTING LOGIC
ID FAN will start after ID Fan start command is given from DCS only when the following conditions are satisfied:
AND
OR
AND
AND
2 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html
If any one of the following signals is present ID Fan will stop / trip
AND
2.0
ID Fan discharge damper will close if the following signals are present:
3 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html
3.0
SA Fan-A will start after SA Fan-A start command is received from the CRT only when the following conditions are satisfied
:
1 Drive remote selected (05-MF-203G)
2 Module Ready (05-MF-203R)
3. Feild Stop PB not operated(05-MF-203K)
AND
OR
AND
AND
SA Fan –A will stop /trip if any one of the following signals is present:
4 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html
AND
4.0
PA Fan will start after receiving PA Fan –A start command from CRT only if the following conditions are satisfied:
AND
OR
AND
AND
5 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html
PA Fan will stop / trip if any one of the following signals is present:
1. PA Fan stop command from DCS
2. Feild Stop PB(Local) operated(05-MF-201K)
3. PA Discharge Pressure >max
4. PA Fan bearing (DE) temp high
5. PA Fan bearing (NDE) temp high
6. PA Fan motor bearing (DE) temp high
7. PA Fan motor bearing (NDE) temp high
8. ID FAN not running (05-MF-202M)
9. Module not ready(05-MF-201R)
10. PA Fan Bearing (DE) VIB. Very high
11. Scop outlet temperature very high
12. PA Fan running for 30 sec
AND
5.0
Feed Transfer pump1/2 will start if the following conditions are satisfied :
1. Pump 1/2 not running(05-MP-106M/107M)
6 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html
Cooling water pump will stop if any one of the following signal is present
1. Feild Stop PB operated(05-MP-106K/107K)
2. Level very low.
3. O/L acted (05-MP-106L/107L)
4. Stop command operated from CRT
5. Module not Ready (05-MP-106R/107R)
6.0
Coal feeder will start after start command is given from CRT if the following conditions are satisfied :
Coal feeder will stop / trip if any one of the following signal is present :
7 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html
7.0
Coal Conveyor 1/2 will start after a Start command is given from CRT only when the following conditions are satisfied :
1. Remote selected (05-MC-301G/302G)
2. Module Ready (05-MC-301R/302R)
3. Fuel Feeder not running(05-MK-301M/302M)
4. Lime Screw Feeder not running(05-MK-303M/304M)
5. O/L not acted(05-MC-3015/3025)
6. Coal Conveyor not running(05-MC-301M/302M)
7. Coal Conveyor outlet gates not closed
8. DOL not selected (05-MC-3010/3020)
9. Coal Conveyor Field stop PB not operated (05-MC-3013/3023)
10. Ready for start (05-MC-3014/3024)
1. Boiler tripped
2. Both Outlet gates closed.
3. Coal feeder stop PB (DCS) operated
4. Feild stop PB operated.(05-MC-3013/3023)
5. Module not ready (05-MC-301R/302R)
6. O/L acted(05-MC-3015/3025)
7. Ready for start signal not present (05-MC-3014/3024)
8.0
8 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html
9.0
Boiler air protect ok signal will be on if the following signals are present :
10.0
When the boiler trips the air and flue tripping sequence will be as follows:
Step 1.
Both the coal feeders will trip and associated outlet gates will also close if Bed Temp >max3 (920Deg C)
Step 2.
Both PA fans will trip after coal feeders trip if Bed Temp> max 2 (940 Deg C)
Step 3.
Both SA fans will trip 5mins after PA fans trip if Bed Temp > max2
11.0
FURNACE PURGE
9 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html
Before any fuel firing can take place a satisfactory Purge cycle must be completed. To start a furnace Purge cycle the following conditions must be
satisfied:
With all the above conditions satisfied Purge Ready lamp will be on.After Purge Start PB operated furnace purging will start Purge Ready lamp will be off,
Purge Progress indication will be available in CRT and after a time delay of 5 mins BURNER READY and Purge Complete indication will be available on
CRT.
AND
OR
AND
Step 1
Ignitor will be inserted and when Ignitor Retract limit switch is released Ignitor Transformer will be energised
For 15 sec
Step 2
10 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html
When Ignitor is inserted oil valve and atomizing air valve will open simultaneously.
Step 3
CONDITION 1
Ignition time over, oil valve opened but oil flame not established
Oil valve will be closed. Ignitor will be inserted and energized .Scavenge on / start indication will be available on CRT and
Atomising valve will remain in open condition.Scavenge valve will open.
After 20secs HEA will be de-energised and after 25secs both scavenge and atomising valve will be closed
Step 4
CONDITIO 3
Oil burner firing and HAG trips due to any one of the following conditions :
11 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html
12.0
Cyclone ash screw feeder will start after Cyclone ash screew feeder – 1 start command is given from DCS if the following conditions are satisfied :
Cyclone ash screw feeder will stop if any one of the following signals is present :
1. Boiler tripped
2. Ash Static Cooler Level high (05LSH-516/509)
3. Screw feeder stop PB (DCS) operated
4. Feild stop PB operated.(05-MK-5053/5063)
5. Module not ready (05-MK-505R/506R)
6. O/L acted(05-MK-5055/5065)
7. Ready for start signal not present (05-MK-5054/5064)
13.0
Cyclone discharge gate will open if the following conditions are satisfied:
Cyclone discharge gate will close if any one of the following signal is present
12 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html
4. Boiler tripped
. AND
. Cyclone-1/2 disc gate is not full closed (05ZSC-512/505)
14.0
Bed ash screw feeder – 1/3 will start after receiving start command from CRT if the following conditions are satisfied :
1. Remote selected (05-MK-501G/502G)
2. Module Ready (05-MK-501R/502 R)
3. Screw Feeder not running(05-MK-501M/502M)
4. Cooling water flow ok (05FSL-723/727)
5. O/L not acted(05-MK-5015/5025)
6. Bed Ash Screw Feeder 2/4 not running(05SAL-522/528)
7. Inlet gate closed(05ZSC-518/525)
8. DOL not selected (05-MK-5010/5020)
9. Bed Ash Screw Feeder Field stop PB not operated (05-MK-5013/5023)
10. Ready for start (05-MK-5014/5024)
Bed ash screw feeder – 1/2 will stop if any one of the following signals is present:
1. Boiler tripped
2. Bed Ash Screw Feeder 2/4 not running (05SAL-522/528)
3. Screw feeder stop PB (DCS) operated
4. Feild stop PB operated.(05-MK-5013/5023)
5. Module not ready (05-MK-501R/502R)
6. O/L acted(05-MK-5015/5025)
7. Ready for start signal not present (05-MK-5014/5024)
15.0
Bed ash discharge gate valve will open if the following conditions are satisfied :
AND
13 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html
OR
AND
Bed ash discharge gate valve will close if any one of the following signals is present :
AND
AND
16.0
EBD valve will open after a Start command is given from CRT only when the following conditions are satisfied :
14 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html
17.0
Feed Water Motorised valve will open after a Start command is given from CRT only when the following conditions are satisfied
:
Feed Water Motorised Valve will close if the following signals are present:
1. Isolation valve not fully closed (05ZSC-125)
2. Valve opening logic not present
3. Module Ready(05-MV-118R)
4. O/L not operated(05-MV-118L)
5. Stop command not operated from CRT
6. Valve closing torque not high(05TSC-125)
7. {(Remote selected AND Close command from CRT)
8. Field stop not operated (05-MV-118K)
18.0
Main Steam Bypass valve will open after a Start command is given from CRT only when the following conditions are satisfied :
Main Steam Bypass Valve will close if the following signals are present:
1. Bypass valve not fully closed (05ZSC-125)
2. Valve opening logic not present
3. Module Ready(05-MV-104R)
4. O/L not operated(05-MV-104L)
5. Stop command not operated from CRT
15 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html
19.0
Feed Water Motorised Isolation valve will open after a Start command is given from CRT only when the following conditions are satisfied :
Feed Water Motorised Isolation Valve will close if the following signals are present:
20.0
Feed Water Motorised Isolation valve will open after a Start command is given from CRT only when the following conditions are
satisfied :
1. Isolation valve not fully opened (05ZS0-127)
2. Valve closing logic not present
3. Module Ready(05-MV-119R)
4. O/L not operated(05-MV-119L)
5. Stop command not operated from CRT
6. Valve opening torque not high(05TS0-127)
7. {(Remote selected AND Open command from CRT)
8. Field stop not operated (05-MV-119K)
16 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html
Feed Water Motorised Isolation Valve will close if the following signals are present:
1. Isolation valve not fully closed (05ZSC-127)
2. Valve opening logic not present
3. Module Ready(05-MV-119R)
4. O/L not operated(05-MV-119L)
5. Stop command not operated from CRT
6. Valve closing torque not high(05TSC-127)
7. {(Remote selected AND Close command from CRT)
8. Field stop not operated (05-MV-119K)
21.0
Start –up Vent Motorised Isolation valve will open after a Start command is given from CRT only when the following conditions are
satisfied :
1. Isolation valve not fully opened (05ZS0-168)
2. Valve closing logic not present
3. Module Ready(05-MV-102R)
4. O/L not operated(05-MV-102L)
5. Stop command not operated from CRT
6. Valve opening torque not high(05TS0-168)
7. {(Remote selected AND Open command from CRT)
8. Field stop not operated (05-MV-102K)
Start-up Vent Motorised Isolation Valve will close if the following signals are present:
1. Isolation valve not fully closed (05ZSC-168)
2. Valve opening logic not present
3. Module Ready(05-MV-102R)
4. O/L not operated(05-MV-102L)
5. Stop command not operated from CRT
6. Valve closing torque not high(05TSC-168)
7. {(Remote selected AND Close command from CRT)
8. Field stop not operated (05-MV-102K)
22.0
Start-up vent valve will open after a Start command is given from CRT only when the following conditions are satisfied :
17 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html
Start-up vent valve will close if the following signals are present:
23.0
Drum vent valve will open after a Start command is given from CRT only when the following conditions are satisfied :
1. Drum vent valve not fully opened (05ZS0-146)
2. Valve closing logic not present
3. Module Ready(05-MV-128R)
4. O/L not operated(05-MV-128L)
5. Stop command not operated from CRT
6. Valve opening torque not high(05TS0-146)
7. {(Remote selected AND Open command from CRT)
8. Field stop not operated (05-MV-128K)
Drum vent valve will close if the following signals are present:
1. Drum vent valve not fully closed (05ZSC-146)
2. Valve opening logic not present
3. Module Ready(05-MV-128R)
4. O/L not operated(05-MV-128L)
5. Stop command not operated from CRT
6. Valve closing torque not high(05TSC-146)
7. {(Remote selected AND Close command from CRT)
8. Field stop not operated (05-MV-128K)
24.0
18 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html
Main Steam Line to Existing Header Isolation valve will open after a Open command is given from CRT only when the following
conditions are satisfied :
1. Main Steam Line to Existing Header valve 1/2 not fully opened (05ZS0-199B/199A)
2. Valve closing logic not present
3. Module Ready(05-MV-126/127R)
4. O/L not operated(05-MV-126/127L)
5. Stop command not operated from CRT
6. Valve opening torque not high(05TS0-199B/199A)
7. {(Remote selected AND Open command from CRTAND Integral Bypass Valve full opened)
8. Field stop not operated (05-MV-126/127K)
Main Steam Line to Existing Header Isolation valve will close after a Close command is given from CRT only when the following
conditions are satisfied :
1. Main Steam Line to Existing Header valve 1/2 not fully closed (05ZSC-199B/199A)
2. Valve opening logic not present
3. Module Ready(05-MV-126/127R)
4. O/L not operated(05-MV-126/127L)
5. Stop command not operated from CRT
6. Valve closing torque not high(05TSC-199B/199A)
7. {(Remote selected AND Close command from CRT)
8. Field stop not operated (05-MV-126/127K)
25.0
BFP Discharge Valve will open after a Start command is given from CRT only when the following conditions are satisfied :
1. Isolation valve not fully opened (05ZS0-117A/118A)
2. Valve closing logic not present
3. Module Ready(05-MV-122/123R)
4. O/L not operated(05-MV-122/123L)
5. Stop command not operated from CRT
6. Valve opening torque not high(05TS0-117A/118A)
7. {(Remote selected AND Open command from CRT AND BFP 1/2 running and 30 sec time count over)
8. Field stop not operated (05-MV-122/123K)
BFP Discharge Valve will close if the following signals are present:
19 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html
3. Module Ready(05-MV-122/123R)
4. O/L not operated(05-MV-122/123L)
5. Stop command not operated from CRT
6. Valve opening torque not high(05TSC-117A/118A)
7. {(Remote selected AND Close command from CRT AND BFP 1/2 not running )
8. Field stop not operated (05-MV-122/123K)
26.0
Spray Water Block valve will open after a Start command is given from CRT only when the following conditions are satisfied :
1. Spray Block valve not fully opened (05ZS0-197)
2. Valve closing logic not present
3. Module Ready(05-MV-105R)
4. O/L not operated(05-MV-105L)
5. Stop command not operated from CRT
6. Valve opening torque not high(05TS0-197)
7. {(Remote selected AND Open command from CRT)
8. Field stop not operated (05-MV-105K)
9. Steam Flow >10%
10. Boiler not tripped
Spray Water Block Valve will close if the following signals are present:
1. Spray water Block valve not fully closed (05ZSC-197)
2. Valve opening logic not present
3. Module Ready(05-MV-105R)
4. O/L not operated(05-MV-105L)
5. Stop command not operated from CRT
6. Valve closing torque not high(05TSC-197)
7. {(Remote selected AND Close command from CRT)
8. Field stop not operated (05-MV-105K)
9. Steam flow< 10%
10. Boiler Tripped
27.0
Attemperator-1/2 Motorised Isolation valve before Spray Control Valve ½ will open after a Start command is given from CRT only when the following
conditions are satisfied :
20 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html
Attemperator-1/2 Motorised Isolation Valve will close if the following signals are present:
28.0
Attemperator-1/2 Motorised Isolation Valve before Bypass Valve will close if the following signals are present:
1. Isolation valve not fully closed (05ZSC-190/189)
2. Valve opening logic not present
3. Module Ready(05-MV-110/112R)
4. O/L not operated(05-MV-110/112L)
5. Stop command not operated from CRT
6. Valve closing torque not high(05TSC-190/189)
7. {(Remote selected AND Close command from CRT)
8. Field stop not operated (05-MV-110/112K)
9. Boiler Tripped
.
21 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html
Deaerator Level Control Bypass valve will open after a Start command is given from CRT only when the following conditions are
satisfied :
1. Deaerator level control bypass valve not fully opened (05ZS0-194B)
2. Valve closing logic not present
3. Module Ready(05-MV-125R)
4. O/L not operated(05-MV-125L)
5. Stop command not operated from CRT
6. Valve opening torque not high(05TS0-194B)
7. {(Remote selected AND Open command from CRT)
8. Field stop not operated (05-MV-125K)
Deaerator Level Control Bypass Valve will close if the following signals are present:
30.0
Deaerator Pressure Control Bypass valve will open after a Start command is given from CRT only when the following conditions are satisfied :
1. Deaerator pressure control bypass valve not fully opened (05ZS0-194A)
2. Valve closing logic not present
3. Module Ready(05-MV-124R)
4. O/L not operated(05-MV-124L)
5. Stop command not operated from CRT
6. Valve opening torque not high(05TS0-194A)
7. {(Remote selected AND Open command from CRT AND Integral Bypass Valve full open)
8. Field stop not operated (05-MV-124K)
Deaerator Pressure Control Bypass valve will close after Close command is given from CRT only when the following conditions are satisfied :
22 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html
31.0
Main Steam Stop valve will open after a Start command is given from CRT only when the following conditions are
satisfied :
Main Steam Stop Valve will close if the following signals are present:
32.0
Attemperator –1 nozzle valve will open after open command is received from CRT only if the following conditions are satisfied :
1. Isolation valve not fully opened (05ZSO-158)
2. Valve closing logic not present
3. Module Ready(05-MV-106R)
4. O/L not operated(05-MV-106L)
5. Stop command not operated from CRT
6. Valve opening torque not high(05TSO-158)
7. {(Remote selected AND Open command from CRT)
8. Field stop not operated (05-MV-106K)
9. Boiler not Tripped
10. Spray water Flow >1T/HR
23 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html
Attemperator-1 nozzel Valve will close if the following signals are present:
1. Isolation valve not fully closed (05ZSC-158)
2. Valve opening logic not present
3. Module Ready(05-MV-106R)
4. O/L not operated(05-MV-106L)
5. Stop command not operated from CRT
6. Valve closing torque not high(05TSC-158)
7. {(Remote selected AND Close command from CRT)
8. Field stop not operated (05-MV-106K)
9. Boiler Tripped
10. Spray water Flow <.5T/HR
33.0
Attemperator –2 nozzle valve 1/2 will open after open command is received from CRT only if the following conditions are satisfied :
Attemperator-2 nozzel Valve 1/2 will close if the following signals are present:
1. Isolation valve not fully closed (05ZSC-161/160)
2. Valve opening logic not present
3. Module Ready(05-MV-107/108R)
4. O/L not operated(05-MV-107/108L)
5. Stop command not operated from CRT
6. Valve closing torque not high(05TSC-161/160)
7. {(Remote selected AND Close command from CRT)
8. Field stop not operated (05-MV-107/108K)
9. Boiler Tripped
10. Spray water Flow <.5T/HR
34.0
CO Vent valve will open only if the following conditions are satisfied :
1. PA Fan not running
2. Solenoid Valve Power Supply available
24 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html
CO Vent valve will close only if the following conditions are satisfied :
1. PA Fan running
35.0
Blow Down Transfer pump will start if the following conditions are satisfied :
1. Pump 1/2 not running(05-MP-108M/109M
2. Feild Stop PB not operated(05-MP-108K/109K)
3. Level not very low.
4. O/L not acted (05-MP-108L/109L)
5. Stop command not operated from CRT
6. Module Ready (05-MP-108R/109R)
7. [{(Remote selected AND Open command from CRT)
Blow Down Transfer pump will stop if any one of the following signal is present
1. Feild Stop PB operated(05-MP-108K/109K)
2. Level very low.
3. O/L acted (05-MP-108L/109L)
4. Stop command operated from CRT
5. Module not Ready (05-MP-108R/109R)
36.0
Cooling water pump will start if the following conditions are satisfied :
1. Pump 1/2 not running(05-MP-701M/702M
2. Feild Stop PB not operated(05-MP-701K/702K)
3. Level not very low.
4. O/L not acted (05-MP-701L/702L)
5. Stop command not operated from CRT
6. Module Ready (05-MP-701R/702R)
7. [{(Remote selected AND Open command from CRT)
Cooling water pump will stop if any one of the following signal is present
1. Feild Stop PB operated(05-MP-701K/702K)
2. Level very low.
3. O/L acted (05-MP-701L/702L)
4. Stop command operated from CRT
5. Module not Ready (05-MP-701R/702R)
25 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html
37.0
HSD pump will stop if any one of the following signal is present
1. Feild Stop PB operated(05-MP-601K/602K)
2. Level very low.
3. O/L acted (05-MP-601L/602L)
4. Stop command operated from CRT
5. Module not Ready (05-MP-601R/602R)
38.0
STARTING LOGIC
BFP1/2/3will start after start command is given from DCS only when the following conditions are satisfied:
1. Drive remote selected(05-MP-101G)
2. SWGR ready to start (05-MP-101A)
3. Feild Stop PB not operated(05-mp-101K)
4. BFP-1 disc valve closed (05ZSC-117A)
5. BFP not running (05-MP-101D)
6. BFP1 motor bearing(DE) temp not high
7. BFP1motor bearing (NDE)temp not high
8. BFP1 bearing (DE) temp not high
9. BFP1 bearing (NDE) temp not high
10 BFP suction pressure not low
11. Module Ready (05-MP-101R)
12. SWGR. Ready (05-MP-101E)
13. Trip Ckt Healthy (0-MP-101C)
If any one of the following signals is present BFP will stop / trip
26 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html
39.0
LP Dosing pump1/2/3/4 will stop if any one of the following signal is present
1. Feild Stop PB operated(05-MP-102K/103K/104K/105K)
2. Level very low.
3. O/L acted (05-MP-102L/103L/104L/105L)
4. Stop command operated from CRT
5. Module not Ready (05-MP-102R/103R/104R/105R)
40.0
27 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html
41.0
Attemperator Spray Control Bypass valve will open after a Start command is given from CRT only when the following conditions are
satisfied :
1. Attemperator Spray control bypass valve not fully opened (05ZS0-184/187)
2. Valve closing logic not present
3. Module Ready(05-MV-113/114R)
4. O/L not operated(05-MV-113/114L)
5. Stop command not operated from CRT
6. Valve opening torque not high(05TS0-184/187)
7. {(Remote selected AND Open command from CRT)
8. Field stop not operated (05-MV-113/114K)
Attemperator Spray Control Bypass Valve will close if the following signals are present:
42.0
28 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html
Sand/LIME STONE Screw Feeder will stop if any one of the following signals is present:
1. Boiler tripped
2. Fuel Conveyor 1/2 not running (05SAL-355/354)
3. Screw feeder stop PB (DCS) operated
4. Feild stop PB operated.(05-MK-3033/3043)
5. Module not ready (05-MK-303R/304R)
6. O/L acted(05-MK-3035/3045)
7. Ready for start signal not present (05-MK-3034/3044)
43.0
Sand/ESP screw feeder will stop if any one of the following signals is present:
1. Stop command given from DCS
2. Module not ready(P1ESC1-D_RDY)
3. O/L acted(P1ESC1-D_TRP)
44.0
Motorised Feed Control Bypass valve will open after a Start command is given from CRT only when the following conditions are satisfied :
1. Feed control bypass valve not fully opened (05ZS0-127)
2. Valve closing logic not present
3. Module Ready(05-MV-120R)
29 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html
Motorised Feed Control Bypass Valve will close if the following signals are present:
1. Feed control bypass valve not fully closed (05ZSC-127)
2. Valve opening logic not present
3. Module Ready(05-MV-120R)
4. O/L not operated(05-MV-120L)
5. Stop command not operated from CRT
6. Valve closing torque not high(05TS0-127)
7. {(Remote selected AND Close command from CRT)
8. Field stop not operated (05-MV-120K)
45.0
SLIDE GATE 1/2 AT LIME BUNKER OUTLET
Slide Gate 1/2 will open if the following signals are present:
1. Gate1/2 not fully opened (05ZSO-308/326)
2. Gate opening logic not present
3. Module Ready(05-MV-301R/302R)
4. O/L not operated(05-MV-301L/302L)
5. Stop command not operated from CRT
6. Gate opening torque not high(05TS0-308/326)
7. {(Remote selected AND Open command from CRT)
8. Field stop not operated (05-MV-301K/302K)
9. Lime Screw Feeder 1/2 running(05-MV-303M/304M)
Slide Gate 1/2 will close if the following signals are present:
1. Gate1/2 not fully closed (05ZSC-308/326)
2. Gate closing logic not present
3. Module Ready(05-MV-301R/302R)
4. O/L not operated(05-MV-301L/302L)
5. Stop command not operated from CRT
6. Gate closing torque not high(05TSC-308/326)
7. {(Remote selected AND Close command from CRT) OR (Lime Screw Feeder1/2 not running)}
8. Field stop not operated (05-MV-301K/302K)
46.0
SLIDE GATE 1/2 AT SAND BUNKER OUTLET
Slide Gate 1/2 will open if the following signals are present:
1. Gate1/2 not fully opened (05ZSO-307/331)
2. Gate opening logic not present
30 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html
3. Module Ready(05-MV-303R/304R)
4. O/L not operated(05-MV-303L/304L)
5. Stop command not operated from CRT
6. Gate opening torque not high(05TS0-307/331)
7. {(Remote selected AND Open command from CRT)
8. Field stop not operated (05-MV-303K/304K)
9. Lime Screw Feeder 1/2 running(05-MV-303M/304M)
Slide Gate 1/2 will close if the following signals are present:
1. Gate1/2 not fully closed (05ZSC-307/331)
2. Gate closing logic not present
3. Module Ready(05-MV-303R/304R)
4. O/L not operated(05-MV-303L/304L)
5. Stop command not operated from CRT
6. Gate closing torque not high(05TSC-307/331)
7. {(Remote selected AND Close command from CRT) OR (Lime Screw Feeder1/2 not running)}
8. Field stop not operated (05-MV-303K/304K)
47.0
SLIDE GATE 1/2/3/4 AT COAL CONVEYOR OUTLET
Slide Gate 1/2/3/4 will open if the following signals are present:
1. Gate1/2/3/4 not fully opened (05ZSO-310/311/333/334)
2. Gate opening logic not present
3. Module Ready(05-MV-501R/502R/503R/504R)
4. O/L not operated(05-MV-501L/502L/503L/504L)
5. Stop command not operated from CRT
6. Gate opening torque not high(05TS0-310/311/333/334)
7. {(Remote selected AND Open command from CRT)
8. Field stop not operated (05-MV-501K/502K/503K/504K)
Slide Gate 1/2/3/4 will close if the following signals are present:
48.0
31 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html
Main Steam Line to Existing Header Isolation Integral Bypass valve will open after a Open command is given from CRT only when the
following conditions are satisfied :
1. Main Steam Line to Existing Header Integral Bypass valve 1/2 not fully opened (05ZS0-199C/199D)
2. Valve closing logic not present
3. Module Ready(05-MV-130/131R)
4. O/L not operated(05-MV-130/131L)
5. Stop command not operated from CRT
6. Valve opening torque not high(05TS0-199C/199D)
7. {(Remote selected AND Open command from CRT)
8. Field stop not operated (05-MV-130/131K)
Main Steam Line to Existing Header Isolation Integral Bypass valve will close after a Close command is given from CRT only when
the following conditions are satisfied :
1. Main Steam Line to Existing Header valve 1/2 not fully closed (05ZSC-199C/199D)
2. Valve opening logic not present
3. Module Ready(05-MV-130/131R)
4. O/L not operated(05-MV-130/131L)
5. Stop command not operated from CRT
6. Valve closing torque not high(05TSC-199C/199D)
7. {(Remote selected AND Close command from CRT)
8. Field stop not operated (05-MV-130/131K)
49.0
Deaerator Pressure Control Integral Bypass valve will open after a Start command is given from CRT only when the following conditions are satisfied :
1. Deaerator pressure control Integral bypass valve not fully opened (05ZS0-194C)
2. Valve closing logic not present
3. Module Ready(05-MV-121R)
4. O/L not operated(05-MV-121L)
5. Stop command not operated from CRT
6. Valve opening torque not high(05TS0-194C)
7. {(Remote selected AND Open command from CRT)
8. Field stop not operated (05-MV-121K)
Deaerator Pressure Control Integral Bypass valve will close after Close command is given from CRT only when the following conditions are satisfied :
32 of 33 11/6/2018, 9:29 AM
200 mw boiler inter lock | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/200-mw-boiler-inter-lock.html
3. Module Ready(05-MV-121R)
4. O/L not operated(05-MV-121L)
5. Stop command not operated from CRT
6. Valve closing torque not high(05TSC-194C)
7. (Remote selected AND Close command from CRT)
8. Field stop not operated (05-MV-121K)