Document Spliting New Document
Document Spliting New Document
Senario
Output
FG Valuation
MM
PP
Controlling
In input tax code GL is worngly assigned automatically 1215199 which is not part of GL master
can we check the gl change date of GL and whoes id used for change the GL
need to check the toay or last day entry on CGST
GL-1215199 is not crated but when creating the Tax Code error - GL not created
However the same GL is assign in tax code 01 to 09 and other
Transaction JIC/JRS/JIS same GL is assigned 1215199 but different automatic posting is being post in different GL
Output GL is updated and available in master data but input GL is not
post in different GL
Step 2
Step 3
Note
Note
Step 4
Note
Note
Step 5
Note
Product Costing Step
Cost center Planning
Prerequisit
Company codes and plants in organizational structure are planned.
Quantity Staructure
In this we estimate the components of manufactured goods and cost of sold goods
based on the BOM and Routing
Pre-requisites:
The master Data should be crated
1. Material Master (Inculding MRP, accounting and Cost View)
2. BOM should be created
3.work center (Cost center and activity type)
4. Routing (Product planning )
5.Master Receipt (Production Planning- Precess industries)
6.Production Version
7.Product cost collector(Production planning repetive manufacturing)
Costing Run
Costing run is used to cost mass volumes of materials in a particular company code. This
allows user to select materials, detonate quantity structure, cost, analyse, mark and
release.
Pre-requisites:
1.Material Masters (MRP, Accounting and costing views)
2.Quantity Structure (BOM, Master Recipe or Routing and Production versions)
3.Condition types and production Information records
4.Configuration
5.CO Master Data
Materials are costed for the duration of the annual or monthly costing process. To
execute costing runs, analyse results, mark and release costs transaction CK40N is used.
This can be formed using controlling area, costing version, costing variant, company
code and transfer control. Therefore, costing run can only be made for one company at
a time. It has also created for a specific range of date.
4.CO Master Data (Activity types, Actual and Primary and secondary cost elements)
5.Assessment/Distribution Cycles, Actual Statistical Key Figures
cost
inve