DAFTAR HARGA UPAH DAN BAHAN

Tahun Anggaran : 2011


No. HARGA
U R A I A N KET.
STN
I II III IV
A. UPAH
1 Kepala Tukang 98,000 Hari
2 Tukang 78,000 Hari
3 Pekerja 47,500 Hari
4 Mandor 72,000 Hari
B. BAHAN
1 Batu Kali/Batu Belah (Sungai/Gunung) 135,000 M3
2 Batu Bata 685 Bh
3 Batu Kacang 10,000 Kg
4 Besi Beton Polos 12,875 Kg
5 Besi Beton Ulir 17,000 Kg
6 Bak Mandi Fible Glass (Terpasang) 250,000 Bh
7 Box Zekering MCB 2 Group 200,000 Bh
8 Batu Apung 3,000 Kg
9 Baut 1 cm 5,700 Bh
10 Cat Tembok 28,250 Kg
11 Cat Dasar 28,200 Kg
12 Cat Menie 24,150 Kg
13 Cat Kayu/Minyak Synthetic Enamel 41,700 Kg
14 Cat Acylic Emultion Paint 41,700 Kg
15 Cat Polyuretkme 325,000 Kg
17 Cat Efek Perunggu 400,000 Kg
18 Calsiboard 6 mm 73,500 Lbr
19 Daun Pintu Panel 80 x 200 cm 550,000 Bh
20 Daun Pintu Panel 70 x 200 cm 500,000 Bh
21 Daun Jendela Kaca Uk. 50 x 120 cm 250,000 Bh
22 Daun Jendela Kaca Uk. 42 x 60 cm 125,000 Bh
23 Decrabon 250,000 Kg
24 Engsel Pintu 29,400 Bh
25 Engsel Jendela 22,800 Bh
26 Efhek Perunggu Cair 325,000 Kg
27 Efhek Perunggu Serbuk 450,000 Kg
28 Fibre Glass (serabut gelas) 21,500 Kg
29 Floor Drain + Pipa Pembuang (Terpasang) 22,000 Bh
30 Hak Angin 9,500 Bh
31 Handel Jendela 10,000 Bh
32 Kloset Jongkok (Terpasang) 200,000 Bh
33 Kaca Bening 5 mm 104,600 M2
34 Kayu/Papan Bekisting 3,385,000 M3
35 Kayu Sembarang Keras 3,647,000 M3
36 Kayu Klas II 4,300,000 M3
37 Kawat Ikat 20,000 Kg
38 Kayu Dolken 35,000 Btg
39 Kerikil Beton 110,000 M3
40 Keramik 20 x 20 cm 39,250 M2
41 Keramik 25 x 25 cm 40,000 M2
42 Keramik 40 x 40 cm 43,700 M2
43 Keramik 60 x 60 cm polished 58,000 M2
44 Kunci Pintu 100,000 Bh
45 Kran Air + Instalasi (Terpasang) 20,000 Bh
46 Kerikil Beton (Maxsimum 30 mm) 115,000 M3
47 Kayu Reiling (Seumanthok) 50,000 M'
48 Lampu Hemat Energi 18 Watt 35,000 Bh
49 Lampu Hemat Energi 10 Watt 30,000 Bh
50 Las Argon 5,000 Ttk
51 Minyak Cat 20,150 Ltr
52 Minyak Bekesting 20,000 Ltr
53 Multiplek 4 mm 76,000 Lbr
54 Multiplek 9 mm 157,500 Lbr
55 Pintu Kamar Mandi PVC 200,000 Bh
56 Plamur Tembok 20,000 Kg
57 Pacok Jendela 10,000 Bh
58 Pasir urug 102,000 M3
59 Pasir Pasang 110,000 M3
60 Paku Kayu 16,200 Kg
61 Paku Seng 16,200 Kg
62 Pekerjaan titik api/cahaya + Instalasi 70,000 Bh
63 Plamur Kayu 13,500 Kg
64 Papan Ukiran 250,000 M2
65 Plamir 13,500 Kg
66 Plywood 9 mm
67 Plat sirip 3,550 M'
68 Residu 4,000 Kg
69 Bubung Seng BJLS 0.20 38,000 Lbr
70 Septicktank & Peresapan + Instalasi (Terpasang 4,000,000 Bh
71 Stop Kontak + Instalasi 128,000 Bh
72 Saklar Ganda 30,000 Bh
73 Saklar Tunggal 25,000 Bh
74 Sekrup 425 Bh
75 Seng Genteng 58,000 Lbr
76 Onduline 35,500 Lbr
77 Semen PC Andalas @ 40 Kg 40,200 Zak
78 Semen PC Andalas @ 40 Kg 1,005 Kg
79 Semen warna 2,316 Kg
80 Seng Genteng 58,000 M2
81 Wiremess (Kawat Jaring) 12,500 M2
82 Tanah Timbun 50,000 M3
83 Triplek 57,900 lbr
KODE SNI : RSNI.T-12-2002 (B.8)
NAMA PEKERJAAN : 1 M2 Pembersihan Lapangan
a satuan b axb
A. BAHAN
1 Rp -
jumlah A Rp -
B. TENAGA
1. Pekerja 0.0100 Org Rp 47,500.00 Rp 475.00
2 . Mandor 0.0500 Org Rp 72,000.00 Rp 3,600.00
3 Rp -
jumlah B Rp 4,075.00
C. ALAT
1 Rp -
2 Rp -
jumlah C Rp -
TOTAL A+B+C Rp 4,075.00

KODE SNI : RSNI.T-12-2002 (B.4)


NAMA PEKERJAAN : 1 M' Pengukuran dan Pemasangan Bouwplank
a satuan b axb
A. BAHAN
1. Kayu/Papan Bekisting 0.0040 m3 Rp 3,385,000.00 Rp 13,540.00
2. Paku 0.0200 Kg Rp 16,200.00 Rp 324.00
Rp -
jumlah A Rp 13,864.00
B. TENAGA
1. Pekerja 0.0400 Org Rp 47,500.00 Rp 1,900.00
2. Tukang 0.0500 Org Rp 78,000.00 Rp 3,900.00
3. Kepala Tukang 0.0500 Org Rp 98,000.00 Rp 4,900.00
4. Mandor 0.0500 Org Rp 72,000.00 Rp 3,600.00
jumlah B Rp 14,300.00
C. ALAT
1 Rp -
2 Rp -
jumlah C Rp -
TOTAL A+B+C Rp 28,164.00
KODE SNI : SNI.DT-91-006-2007 (6.1)
NAMA PEKERJAAN : 1 M3 Galian Tanah
a satuan b axb
A. BAHAN
1 Rp -
2 Rp -
3 Rp -
jumlah A Rp -
B. TENAGA
1. Pekerja 0.4000 Org Rp 47,500.00 Rp 19,000.00
2. Mandor 0.0400 Org Rp 72,000.00 Rp 2,880.00
3 Rp -
jumlah B Rp 21,880.00
C. ALAT
1 Rp -
jumlah C Rp -
TOTAL A+B+C Rp 21,880.00

KODE SNI : SNI.DT-91-0006-2007 (6.9)


NAMA PEKERJAAN : 1 M3 Urugan Kembali
a satuan b axb
A. BAHAN
1 Rp -
2 Rp -
3 Rp -
jumlah A Rp -
B. TENAGA
1. Pekerja 0.1920 Org Rp 47,500.00 Rp 9,120.00
2. Mandor 0.0190 Org Rp 72,000.00 Rp 1,368.00
3 Rp -
jumlah B Rp 10,488.00
C. ALAT
1 Rp -
jumlah C Rp -
TOTAL A+B+C Rp 10,488.00
KODE SNI : SNI.DT-91-0006-2007 (6.11-b)
NAMA PEKERJAAN : 1 M3 Timbunan Tanah
a satuan b axb
A. BAHAN
1. Tanah Timbun 1.2000 m3 Rp 50,000.00 Rp 60,000.00
2 Rp -
3 Rp -
jumlah A Rp 60,000.00
B. TENAGA
1. Pekerja 0.3000 Org Rp 47,500.00 Rp 14,250.00
2. Mandor 0.0100 Org Rp 72,000.00 Rp 720.00
3 Rp -
jumlah B Rp 14,970.00
C. ALAT
1 Rp -
jumlah C Rp -
TOTAL A+B+C Rp 74,970.00

KODE SNI : SNI.DT-91-0006-2007 (6.11)


NAMA PEKERJAAN : 1 M3 Timbunan Pasir
a satuan b axb
A. BAHAN
1. Pasir Urug 1.2000 m3 Rp 102,000.00 Rp 122,400.00
2 Rp -
3 Rp -
jumlah A Rp 122,400.00
B. TENAGA
1. Pekerja 0.3000 Org Rp 73,500.00 Rp 22,050.00
2. Mandor 0.0100 Org Rp 550,000.00 Rp 5,500.00
3 Rp -
jumlah B Rp 27,550.00
C. ALAT
1 Rp -
jumlah C Rp -
TOTAL A+B+C Rp 149,950.00
KODE SNI : SNI.DT-91-0007-2007 (6.2)
NAMA PEKERJAAN : M3 Pasangan Pondasi 1 PC : 4 PS
a satuan b axb
A. BAHAN
1. Batu Kali/Batu Gunung 1.1000 m3 Rp 135,000.00 Rp 148,500.00
2. Semen PC 163.0000 Kg Rp 1,005.00 Rp 163,815.00
3. Pasir Pasang 0.5200 m3 Rp 110,000.00 Rp 57,200.00
jumlah A Rp 369,515.00
B. TENAGA
1. Pekerja 1.5000 Org Rp 47,500.00 Rp 71,250.00
2. Tukang 0.6000 Org Rp 78,000.00 Rp 46,800.00
3. Kepala Tukang 0.6000 Org Rp 98,000.00 Rp 58,800.00
4. Mandor 0.0750 Org Rp 72,000.00 Rp 5,400.00
jumlah B Rp 182,250.00
C. ALAT
1 Rp -
jumlah C Rp -
TOTAL A+B+C Rp 551,765.00

KODE SNI : SNI.DT-91-0007-2007 (6.9)


NAMA PEKERJAAN : 1 M3 Pasangan Batu Kosong/Aanstamping
a satuan b axb
A. BAHAN
1. Batu kali/Batu Gunung 1.2000 m3 Rp 135,000.00 Rp 162,000.00
2. Pasir Urug 0.3000 m3 Rp 102,000.00 Rp 30,600.00
3 Rp -
jumlah A Rp 192,600.00
B. TENAGA
1. Pekerja 0.7800 Org Rp 47,500.00 Rp 37,050.00
2. Tukang 0.3900 Org Rp 78,000.00 Rp 30,420.00
3. Kepala Tukang 0.0390 Org Rp 98,000.00 Rp 3,822.00
4. Mandor 0.0390 Org Rp 72,000.00 Rp 2,808.00
jumlah B Rp 74,100.00
C. ALAT
1 Rp -
jumlah C Rp -
TOTAL A+B+C Rp 266,700.00
KODE SNI : SNI.DT-91-0009-2007 (6.7)
NAMA PEKERJAAN : 1 M2 Pasangan Batu merah tebal 1/2 batu, 1 PC : 2 PS
a satuan b axb
A. BAHAN
1. Batu merah 80.0000 bh Rp 685.00 Rp 54,800.00
2. Semen PC 18.9500 Kg Rp 1,005.00 Rp 19,044.75
3. Pasir Pasang 0.0380 m3 Rp 110,000.00 Rp 4,180.00
jumlah A Rp 78,024.75
B. TENAGA
1. Pekerja 0.3200 Org Rp 47,500.00 Rp 15,200.00
2. Tukang 0.1000 Org Rp 78,000.00 Rp 7,800.00
3. Kepala Tukang 0.0100 Org Rp 98,000.00 Rp 980.00
4. Mandor 0.0150 Org Rp 72,000.00 Rp 1,080.00
jumlah B Rp 8,780.00
C. ALAT
1 Rp -
jumlah C Rp -
TOTAL A+B+C Rp 86,804.75

KODE SNI : SNI.DT-91-0010-2007 (6.2)


NAMA PEKERJAAN : 1 M2 Plesteran 1 PC : 2 PS
a satuan b axb
A. BAHAN
1. Semen PC 8.5200 Kg Rp 1,005.00 Rp 8,562.60
2. Pasir Pasang 0.0170 m3 Rp 110,000.00 Rp 1,870.00
3 Rp -
jumlah A Rp 10,432.60
B. TENAGA
1. Pekerja 0.2000 Org Rp 47,500.00 Rp 9,500.00
2. Tukang 0.1500 Org Rp 78,000.00 Rp 11,700.00
3. Kepala Tukang 0.0150 Org Rp 98,000.00 Rp 1,470.00
4. Mandor 0.0100 Org Rp 72,000.00 Rp 720.00
jumlah B Rp 23,390.00
C. ALAT
1 Rp -
jumlah C Rp -
TOTAL A+B+C Rp 33,822.60
KODE SNI : SNI.DT-91-0011-2007 (6.13)
NAMA PEKERJAAN : 1 M3 Pasang kayu kuda-kuda
a satuan b axb
A. BAHAN
1. kayu kuda-kuda 1.1000 m3 Rp 4,300,000.00 Rp 4,730,000.00
2. Besi plat besi 15.0000 Kg Rp 17,000.00 Rp 255,000.00
3. Paku 0.8000 Kg Rp 16,200.00 Rp 12,960.00
jumlah A Rp 4,997,960.00
B. TENAGA
1. Pekerja 4.0000 Org Rp 47,500.00 Rp 190,000.00
2. Tukang 12.0000 Org Rp 78,000.00 Rp 936,000.00
3. Kepala Tukang 1.2000 Org Rp 98,000.00 Rp 117,600.00
4. Mandor 0.2000 Org Rp 72,000.00 Rp 14,400.00
jumlah B Rp 1,258,000.00
C. ALAT
1 Rp -
jumlah C Rp -
TOTAL A+B+C Rp 6,255,960.00

KODE SNI : SNI.DT-91-0011-2007 (6.1)


NAMA PEKERJAAN : 1 M3 Pasang Kosen Pintu/Jendela
a satuan b axb
A. BAHAN
1. Kayu Seumantok/setara 1.1000 m3 Rp 4,300,000.00 Rp 4,730,000.00
2 Rp -
3 Rp -
jumlah A Rp 4,730,000.00
B. TENAGA
1. Pekerja 6.0000 Org Rp 47,500.00 Rp 285,000.00
2. Tukang 20.0000 Org Rp 78,000.00 Rp 1,560,000.00
3. Kepala Tukang 2.0000 Org Rp 98,000.00 Rp 196,000.00
4. Mandor 0.3000 Org Rp 72,000.00 Rp 21,600.00
jumlah B Rp 2,062,600.00
C. ALAT
1 Rp -
jumlah C Rp -
TOTAL A+B+C Rp 6,792,600.00
KODE SNI : SNI _ 2008
NAMA PEKERJAAN : 1 M2 Pasang Pintu Panel Kayu
a satuan b axb
A. BAHAN
1. Kayu Bahan Pintu 0.0400 m3 Rp 3,385,000.00 Rp 135,400.00
2 Rp -
3 Rp -
jumlah A Rp 135,400.00
B. TENAGA
1. Pekerja 1.0000 Org Rp 47,500.00 Rp 47,500.00
2. Tukang 2.5000 Org Rp 78,000.00 Rp 195,000.00
3. Kepala Tukang 0.2500 Org Rp 98,000.00 Rp 24,500.00
4. Mandor 0.0500 Org Rp 72,000.00 Rp 3,600.00
jumlah B Rp 270,600.00
C. ALAT
1 Rp -
jumlah C Rp -
TOTAL A+B+C Rp 406,000.00

KODE SNI : SNI _ 2008


NAMA PEKERJAAN : 1 M2 Pasang Pintu dan Jendela Panel Kaca
a satuan b axb
A. BAHAN
1. Kayu Bahan Pintu 0.0350 m3 Rp 3,385,000.00 Rp 118,475.00
2. Kaca Bening 5 mm 1.1000 m2 Rp 104,600.00 Rp 115,060.00
3 Rp -
jumlah A Rp 233,535.00
B. TENAGA
1. Pekerja 0.8000 Org Rp 47,500.00 Rp 38,000.00
2. Tukang 2.0000 Org Rp 78,000.00 Rp 156,000.00
3. Kepala Tukang 0.2000 Org Rp 98,000.00 Rp 19,600.00
4. Mandor 0.0400 Org Rp 72,000.00 Rp 2,880.00
jumlah B Rp 216,480.00
C. ALAT
1 Rp -
jumlah C Rp -
TOTAL A+B+C Rp 450,015.00
KODE SNI : Anl F.38
NAMA PEKERJAAN : Mengerjakan 1m2 Papan Listplank
a satuan b axb
A. BAHAN
1. Kayu Klas II 0.0110 m3 Rp 4,300,000.00 Rp 47,300.00
2. Paku Kayu 0.0500 Kg Rp 16,200.00 Rp 810.00
Rp -
jumlah A Rp 48,110.00
B. TENAGA
1. Pekerja 0.1100 Org Rp 78,000.00 Rp 8,580.00
2. Tukang 0.2200 Org Rp 78,000.00 Rp 17,160.00
3. Kepala Tukang 0.0220 Org Rp 98,000.00 Rp 2,156.00
4. Mandor 0.0050 Org Rp 72,000.00 Rp 360.00
jumlah B Rp 28,256.00
C. ALAT
1 Rp -
jumlah C Rp -
TOTAL A+B+C Rp 76,366.00

KODE SNI : Supl. Ixa


NAMA PEKERJAAN : 1 m2 cat tembok/dinding/plafond (3 x)
a satuan b axb
A. BAHAN
1. Cat Tembok 2 x 0.2600 Kg Rp 28,250.00 Rp 7,345.00
2. Plamur 0.1000 Kg Rp 20,000.00 Rp 2,000.00
3. Cat Dasar 0.1000 Kg Rp 28,200.00 Rp 2,820.00
jumlah A Rp 12,165.00
B. TENAGA
1. Pekerja 0.0200 Org Rp 47,500.00 Rp 950.00
2. Tukang 0.0630 Org Rp 78,000.00 Rp 4,914.00
3. Kepala Tukang 0.0063 Org Rp 98,000.00 Rp 617.40
4. Mandor 0.0025 Org Rp 72,000.00 Rp 180.00
jumlah B Rp 6,661.40
C. ALAT
1 Rp -
jumlah C Rp -
TOTAL A+B+C Rp 18,826.40
KODE SNI : SNI 03-2838-2002-5a
NAMA PEKERJAAN : Lantai keramik 60 x 60 cm
a satuan b axb
A. BAHAN
1. Keramik 60 x 60 cm 1.0000 m2 Rp 58,000.00 Rp 58,000.00
2. Semen portland 11.3800 Kg Rp 1,005.00 Rp 11,436.90
3. Pasir pasang 0.0420 m3 Rp 110,000.00 Rp 4,620.00
4. Semen warna 1.5000 Kg Rp 2,316.00 Rp 3,474.00
jumlah A Rp 77,530.90
B. TENAGA
1. Pekerja 0.0300 Org Rp 47,500.00 Rp 1,425.00
2. Tukang 0.3500 Org Rp 78,000.00 Rp 27,300.00
3. Kepala Tukang 0.0350 Org Rp 98,000.00 Rp 3,430.00
4. Mandor 0.0300 Org Rp 72,000.00 Rp 2,160.00
jumlah B Rp 34,315.00
C. ALAT
1 Rp -
jumlah C Rp -
TOTAL A+B+C Rp 111,845.90

KODE SNI : SNI 03-2838-2002-5b


NAMA PEKERJAAN : Lantai keramik 40 x 40 cm
a satuan b axb
A. BAHAN
1. Keramik 40 x 40 cm 1.0000 m2 Rp 43,700.00 Rp 43,700.00
2. Semen portland 11.3800 Kg Rp 1,005.00 Rp 11,436.90
3. Pasir pasang 0.0420 m3 Rp 110,000.00 Rp 4,620.00
4. Semen warna 1.5000 Kg Rp 2,316.00 Rp 3,474.00
jumlah A Rp 63,230.90
B. TENAGA
1. Pekerja 0.0300 Org Rp 47,500.00 Rp 1,425.00
2. Tukang 0.3500 Org Rp 78,000.00 Rp 27,300.00
3. Kepala Tukang 0.0350 Org Rp 98,000.00 Rp 3,430.00
4. Mandor 0.0300 Org Rp 72,000.00 Rp 2,160.00
jumlah B Rp 34,315.00
C. ALAT
1 Rp -
jumlah C Rp -
TOTAL A+B+C Rp 97,545.90
KODE SNI : SNI 03-2838-2002-5d
NAMA PEKERJAAN : Dinding keramik 20 x 20 cm
a satuan b axb
A. BAHAN
1. keramik 20 x 20 cm 1.0000 m2 Rp 39,250.00 Rp 39,250.00
2. Semen portland 11.3800 Kg Rp 1,005.00 Rp 11,436.90
3. Pasir pasang 0.0420 m3 Rp 110,000.00 Rp 4,620.00
4. Semen warna 1.5000 Kg Rp 2,316.00 Rp 3,474.00
jumlah A Rp 58,780.90
B. TENAGA
1. Pekerja 0.0300 Org Rp 47,500.00 Rp 1,425.00
2. Tukang 0.3500 Org Rp 78,000.00 Rp 27,300.00
3. Kepala Tukang 0.0350 Org Rp 98,000.00 Rp 3,430.00
4. Mandor 0.0300 Org Rp 72,000.00 Rp 2,160.00
jumlah B Rp 34,315.00
C. ALAT
1 Rp -
jumlah C Rp -
TOTAL A+B+C Rp 93,095.90

KODE SNI : Anl K10+K23+K28


NAMA PEKERJAAN : 1 m2 mengecat kosen/pintu/jendela/listplank/kanopi
a satuan b axb
A. BAHAN
1. Cat Meni 0.2000 Kg Rp 24,150.00 Rp 4,830.00
2. Plamur 0.1500 Kg Rp 20,000.00 Rp 3,000.00
3. Cat Dasar 0.1700 Kg Rp 28,200.00 Rp 4,794.00
4. Cat warna 2 x 0.2600 Kg Rp 41,700.00 Rp 10,842.00
jumlah A Rp 23,466.00
B. TENAGA
1. Pekerja 0.0700 Org Rp 47,500.00 Rp 3,325.00
2. Tukang 0.0090 Org Rp 78,000.00 Rp 702.00
3. Kepala Tukang 0.0060 Org Rp 98,000.00 Rp 588.00
4. Mandor 0.0025 Org Rp 72,000.00 Rp 180.00
jumlah B Rp 4,795.00
C. ALAT
1 Rp -
jumlah C Rp -
TOTAL A+B+C Rp 28,261.00
KODE SNI : SNI 7394 : 2008
NAMA PEKERJAAN : Membuat 1 m3 Sloof Beton Bertulang (200 Kg Besi + Bekisting)
a satuan b axb
A. BAHAN
1. Kayu Kelas II 0.2700 m3 Rp 4,300,000.00 Rp 1,161,000.00
2. Paku 5 cm - 12 cm 2.000 Kg Rp 16,200.00 Rp 32,400.00
3. Minyak Bekisting 0.600 Liter Rp 20,000.00 Rp 12,000.00
4. Besi Beton Polos 210.000 Kg Rp 12,875.00 Rp 2,703,750.00
5. Kawat Beton 3.000 Kg Rp 20,000.00 Rp 60,000.00
6. Semen PC 336.000 Kg Rp 1,005.00 Rp 337,680.00
7. Pasir Beton 0.540 m3 Rp 110,000.00 Rp 59,400.00
8. Kerikil 0.810 m3 Rp 110,000.00 Rp 89,100.00
jumlah A Rp 4,455,330.00
B. TENAGA
1. Pekerja 5.5600 Org Rp 47,500.00 Rp 264,100.00
2. Tukang 3.2350 Org Rp 78,000.00 Rp 252,330.00
3. Kepala Tukang 0.3230 Org Rp 98,000.00 Rp 31,654.00
4. Mandor 0.2830 Org Rp 72,000.00 Rp 20,376.00
jumlah B Rp 568,460.00
C. ALAT
1 Rp -
jumlah C Rp -
TOTAL A+B+C Rp 5,023,790.00

KODE SNI : SNI 7394 : 2008 (6.31)


NAMA PEKERJAAN : Membuat 1 m3 kolom beton bertulang (200 kg besi + bekisting)
a satuan b axb
A. BAHAN
1. Kayu Kelas II 0.320 m3 Rp 4,300,000.00 Rp 1,376,000.00
2. Paku 5 cm - 12 cm 3.200 Kg Rp 16,200.00 Rp 51,840.00
3. Minyak Bekisting 1.600 Liter Rp 20,000.00 Rp 32,000.00
4. Besi Beton polos 210.000 Kg Rp 12,875.00 Rp 2,703,750.00
5. Kawat Beton 3.000 Kg Rp 20,000.00 Rp 60,000.00
6. Semen PC 336.000 Kg Rp 1,005.00 Rp 337,680.00
7. Pasir Beton 0.540 m3 Rp 110,000.00 Rp 59,400.00
8. Kerikil 0.810 m3 Rp 110,000.00 Rp 89,100.00
9. Kayu Kelas II Balok 0.140 m3 Rp 4,300,000.00 Rp 602,000.00
jumlah A Rp 5,311,770.00
B. TENAGA
1. Pekerja 6.3500 Org Rp 47,500.00 Rp 301,625.00
2. Tukang 3.3250 Org Rp 78,000.00 Rp 259,350.00
3. Kepala Tukang 0.3333 Org Rp 98,000.00 Rp 32,663.40
4. Mandor 0.3180 Org Rp 72,000.00 Rp 22,896.00
jumlah B Rp 616,534.40
C. ALAT
1 Rp -
jumlah C Rp -
TOTAL A+B+C Rp 5,928,304.40
KODE SNI : SNI 2839 : 2008 (6.5)
NAMA PEKERJAAN : Plafon
a satuan b axb
A. BAHAN
1. Tripleks 0.3750 Rp 57,900.00 Rp 21,712.50
2. Paku Tripleks 0.0300 Rp 16,200.00 Rp 486.00
Rp -
jumlah A Rp 22,198.50
B. TENAGA
1. Pekerja 0.1000 Org Rp 47,500.00 Rp 4,750.00
2. Tukang 0.1000 Org Rp 78,000.00 Rp 7,800.00
3. Kepala Tukang 0.0100 Org Rp 98,000.00 Rp 980.00
4. Mandor 0.0050 Org Rp 72,000.00 Rp 360.00
jumlah B Rp 13,890.00
C. ALAT
1 Rp -
jumlah C Rp -
TOTAL A+B+C Rp 36,088.50

KODE SNI :
NAMA PEKERJAAN
a satuan b axb
A. BAHAN
Rp -
Rp -
Rp -
jumlah A Rp -
B. TENAGA
1. Pekerja Org Rp -
2. Tukang Org Rp -
3. Kepala Tukang Org Rp -
4. Mandor Org Rp -
jumlah B Rp -
C. ALAT
1 Rp -
jumlah C Rp -
TOTAL A+B+C Rp -
KODE SNI RSNI T-30-200-B.4
1 Buah Kunci
A. Bahan
1. Kunci Pintu 1.0000 Buah Rp 120,000.00 Rp 120,000.00
Jumlah Rp 120,000.00
B. Tenaga
1. Pekerja 0.0050 Org Rp 47,500.00 Rp 237.50
2. Tukang 0.5000 Org Rp 78,000.00 Rp 39,000.00
3. Kepala Tukang 0.0050 Org Rp 98,000.00 Rp 490.00
4. Mandor 0.0003 Org Rp 72,000.00 Rp 18.00
Jumlah Rp 39,745.50
C. Alat
Jumlah
Total A + B + C Rp 159,745.50
Dibulatkan Rp 158,300.00

KODE SNI RSNI T-30-200-B.5


1 Buah Engsel Pintu
A. Bahan
Engsel Pintu 1.000 Buah Rp 26,800.00 Rp 26,800.00
Jumlah Rp 26,800.00
B. Tenaga
1. Pekerja 0.0500 Org Rp 47,500.00 Rp 2,375.00
2. Tukang 0.5000 Org Rp 78,000.00 Rp 39,000.00
3. Kepala Tukang 0.0500 Org Rp 98,000.00 Rp 4,900.00
4. Mandor 0.0025 Org Rp 72,000.00 Rp 180.00
Jumlah Rp 46,455.00
C. Alat
Jumlah
Total A + B + C Rp 73,255.00
Dibulatkan Rp 71,500.00

KODE SNI RSNI T-30-200-B.6


Buah Engsel Jendela
A. Bahan
Engsel Jendela 1.000 Buah Rp 20,200.00 Rp 20,200.00
Jumlah Rp 20,200.00
B. Tenaga
1. Pekerja 0.0100 Org Rp 47,500.00 Rp 475.00
2. Tukang 0.1000 Org Rp 78,000.00 Rp 7,800.00
3. Kepala Tukang 0.0100 Org Rp 98,000.00 Rp 980.00
4. Mandor 0.0005 Org Rp 72,000.00 Rp 36.00
Jumlah Rp 9,291.00
C. Alat
Jumlah
Total A + B + C Rp 29,491.00
Dibulatkan Rp 29,200.00
KODE SNI RSNI T-30-200-B.25
1 Buah Pacok Jendela
A. Bahan
1. Pacok Jendela 1.000 Buah Rp 12,100.00 Rp 12,100.00
Jumlah Rp 12,100.00
B. Tenaga
1. Pekerja 0.0200 Org Rp 47,500.00 Rp 950.00
2. Tukang 0.2000 Org Rp 78,000.00 Rp 15,600.00
3. Kepala Tukang 0.0200 Org Rp 98,000.00 Rp 1,960.00
4. Mandor 0.0008 Org Rp 72,000.00 Rp 54.00
Jumlah Rp 18,564.00
C. Alat
Jumlah
Total A + B + C Rp 30,664.00
Dibulatkan Rp 30,000.00

KODE SNI RSNI T-30-200-B.26


1 Buah Hak Tarikan Jendela
A. Bahan
1. Tarikan Jendela 1.000 Buah Rp 14,500.00 Rp 14,500.00
Jumlah Rp 14,500.00
B. Tenaga
1. Pekerja 0.0150 Org Rp 47,500.00 Rp 712.50
2. Tukang 0.1500 Org Rp 78,000.00 Rp 11,700.00
3. Kepala Tukang 0.0150 Org Rp 78,000.00 Rp 1,170.00
4. Mandor 0.0008 Org Rp 72,000.00 Rp 54.00
Jumlah Rp 13,636.50
C. Alat
Jumlah
Total A + B + C Rp 28,136.50
Dibulatkan Rp 28,000.00
KODE SNI : SNI.03-3436-2002 (6.36)
NAMA PEKERJAAN : Bubungan Seng Genteng 0,20
a satuan b axb
A. BAHAN
1.Bubungan Seng Genteng Rp 38,000.00 Rp 41,800.00
0,20 1.1000 lbr
2. Paku seng 0.0500 Kg Rp 16,200.00 Rp 810.00
jumlah A Rp 42,610.00
B. TENAGA
1. Pekerja 0.2500 Org Rp 47,500.00 Rp 11,875.00
2. Tukang 0.1500 Org Rp 78,000.00 Rp 11,700.00
3. Kepala Tukang 0.0150 Org Rp 98,000.00
4. Mandor 0.0130 Org Rp 72,000.00
jumlah B Rp 193,575.00
C. ALAT
1 Rp -
jumlah C Rp -
TOTAL A+B+C Rp 236,185.00

KODE SNI SNI.03-3436-2002 (6.38)


NAMA PEKERJAAN : Atap Seng BJLS 0.20
a satuan b axb
A. BAHAN
1. Seng BJLS 0,20 0.7000 Rp 58,000.00 Rp 40,600.00
2. Paku seng 0.0200 Rp 16,200.00
Rp -
jumlah A Rp 40,600.00
B. TENAGA
1. Pekerja 0.1200 Org Rp 47,500.00 Rp 5,700.00
2. Tukang 0.0600 Org Rp 78,000.00 Rp 4,680.00
3. Kepala Tukang 0.0060 Org Rp 98,000.00 Rp 588.00
4. Mandor 0.0060 Org Rp 72,000.00 Rp 432.00
jumlah B Rp 11,400.00
C. ALAT
1 Rp -
jumlah C Rp -
TOTAL A+B+C Rp 52,000.00
REKAPITULASI PERHITUNGAN VOLUME

I. PEKERJAAN PERSIAPAN

DIMENSI
Unit JENIS PEKERJAAN SATUAN Kuantitas
P L T
Pembersihan Lapangan Kerja m² 15.50 20.50 317.75
Pengukuran Bouwplank m¹ 12.50 15.50 56.00

II. PEKERJAAN PONDASI

DIMENSI
Unit JENIS PEKERJAAN SATUAN Kuantitas
P L T

Galian Tanah Pondasi m³ 57.01 0.80 0.75 34.21

Urugan Kembali 1/4 Dari Tanah Galian m³ 8.55


Urugan Pasir Dibawah Pondasi m³ 57.01 0.80 0.05 2.28
Aanstamping Batu Gunung m³
▪ Aanstamping (sb tegak + sb datar) m³ 57.01 0.80 0.10 4.56
Pasangan Pondasi Batu Gunung m³
▪ Pasangan batu gunung m³ 57.01 0.42 0.60 14.20
Urugan Tanah Dibawah : m³
3 a. Lantai kamar tidur m³
▪ Kamar 1 m³ 3.00 3.50 0.33 3.47
▪ Kamar 2 m³ 3.00 3.00 0.33 2.97
▪ Kamar 3 m³ 3.00 3.00 0.33 2.97
b. Lantai ruang tamu m³ 3.00 3.50 0.33 3.47
c. Lantai R.makan dan R.keluarga m³
▪ Pias 1 m³ 1.50 1.00 0.30 0.45
▪ Pias 2 m³ 4.50 4.00 0.30 5.40
d. Lantai ruang dapur m³ 2.00 2.75 0.31 1.71
e. Slasar m³ 3.00 1.00 0.28 0.84
DIMENSI
Unit JENIS PEKERJAAN SATUAN Kuantitas
P L T
f. Lantai teras m³ 3.00 2.00 2.80 16.80
g. Lantai kamar mandi m³ 1.50 2.00 0.23 0.69
jumlah m³ 38.76
Urugan Pasir Dibawah Lantai m³
3 a. Kamar tidur m³
▪ Kamar 1 m³ 3.00 3.50 0.10 1.05
▪ Kamar 2 m³ 3.00 3.00 0.10 0.90
▪ Kamar 3 m³ 3.00 3.00 0.10 0.90
b. Lantai Ruang tamu m³ 3.00 3.50 0.10 1.05
c. Lantai R.makan dan R.keluarga m³
▪ Pias 1 m³ 1.50 1.00 0.10 0.15
▪ Pias 2 m³ 4.50 4.00 0.10 1.80
d. Ruang dapur m³ 2.00 2.75 0.10 0.55
e. Teras m³ 3.00 2.00 0.10 0.60
f. Kamar mandi m³ 1.50 2.00 0.10 0.30
e. Slasar m³ 3.00 1.00 0.10 0.30
JUMLAH 67.39

III. PEKERJAAN BETON

Unit JENIS PEKERJAAN SATUAN DIMENSI


Kuantitas
P L T
Beton Sloof m³ 57.01 0.18 0.25 2.57
23 Kolom Praktis (tiang) m³ 0.13 0.13 3.65 1.42
Reng Balok m³ 57.01 0.15 0.20 1.71
Lantai m³
3 a. Kamar tidur m³
▪ Kamar 1 m³ 3.00 3.50 0.07 0.74
▪ Kamar 2 m³ 3.00 3.00 0.07 0.63
▪ Kamar 3 m³ 3.00 3.00 0.07 0.63
b. Lantai Ruang tamu m³ 3.00 3.50 0.07 0.74
c. Lantai R.makan dan R.keluarga m³
▪ Pias 1 m³ 1.50 1.00 0.07 0.11
▪ Pias 2 m³ 4.50 4.00 0.07 1.26
d. Ruang dapur m³ 2.00 2.75 0.07 0.39
e. Teras m³ 3.00 2.00 0.07 0.42
f. Kamar mandi m³ 1.50 2.00 0.07 0.21
e. Slasar m³ 3.00 1.01 0.07 0.21
JUMLAH 11.02
IV. PEKERJAAN PASANGAN
DIMENSI
Unit JENIS PEKERJAAN SATUAN Kuantitas
P L T
Luas Dinding m² 57.01 3.20 182.43
Luas Kusen m²
5 ▪ Pintu 1 m² 0.92 2.16 9.94
1 ▪ Pintu 2 m² 0.82 2.16 1.77
3 ▪ Jendela 1 m² 1.38 1.12 4.64
2 ▪ Jendela 2 m² 1.38 1.82 5.02
1 ▪ Jendela 3 m² 0.72 1.82 1.31
1 ▪ Jendela 4 m² 0.72 1.12 0.81
22 ▪ Ventilasi 1 m² 0.26 0.46 2.63
2 ▪ Ventilasi 2 m² 1.28 0.52 1.33
Jumlah 27.45
4 Luas Dinding Tumbak m² 4.50 2.76 24.84
Luas Total Pasangan Bata m² 179.83
2 Luas Plesteran m² 359.65

V. PEKERJAAN KUSEN PINTU DAN JENDELA


DIMENSI
Unit JENIS PEKERJAAN SATUAN Kuantitas
P L T
5 Kayu kusen Pintu P1 m³ 5.36 0.06 0.13 0.21
1 kayu kusen pintu P2 m³ 5.26 0.06 0.13 0.04
3 Kayu kusen jendela J1 m³ 6.36 0.06 0.13 0.15
2 Kayu kusen jendela J2 m³ 8.46 0.06 0.13 0.13
1 Kayu kusen jendela J3 m³ 5.32 0.06 0.13 0.04
1 Kayu kusen jendela J4 m³ 3.92 0.06 0.13 0.03
22 Kayu kusen ventilasi V1 m³ 1.56 0.06 0.13 0.27
2 Kayu kusen ventilasi V2 m³ 4.36 0.06 0.13 0.07
JUMLAH m³ 0.94

DIMENSI
Unit JENIS PEKERJAAN SATUAN Kuantitas
P L T
5 Daun pintu P1 m² 0.80 2.00 8.00
1 Daun pintu P2 m² 0.70 2.00 1.40
Jumlah m² 9.40
Pemasangan kaca jendela dan ventilasi
3 ▪ Jendela J1 m² 1.20 1.00 3.60
2 ▪ Jendela J2 m² 1.20 1.70 4.08
1 ▪ Jendela J3 m² 0.60 1.70 1.02
1 ▪ Jendela J4 m² 0.60 1.00 0.60
22 ▪ Ventilasi V1 m² 0.40 0.40 3.52
2 ▪ Ventilasi V2 m² 1.10 0.40 0.88
JUMLAH m² 13.70

VI. PEKERJAAN ATAP


DIMENSI
Unit JENIS PEKERJAAN SATUAN Kuantitas
P L T
kuda-kuda type K1
2 Kaki kuda-kuda 6/12 m³ 6.33 0.06 0.12 0.09
2 balok gapit 4/14 m³ 9.14 0.40 0.14 1.02
1 hanger 6/12 m³ 5.11 0.06 0.12 0.04
2 balok blint 2x 5/15 m³ 16.48 0.50 0.15 2.47
2 balok sokong tegak 6/12 m³ 2.01 0.60 0.12 0.29
2 balok sokong miring 6/12 m³ 3.03 0.60 0.12 0.44

2 jumlah m³ 8.70

kuda-kuda tpye 1/2 k1


2 Kaki kuda-kuda 6/12 m³ 6.33 0.06 0.12 0.09
2 balok gapit 4/14 m³ 9.14 0.40 0.14 1.02
1 hanger 6/12 m³ 5.11 0.06 0.12 0.04
2 balok blint 2x 5/15 m³ 16.48 0.50 0.15 2.47
2 balok sokong tegak 6/12 m³ 2.01 0.60 0.12 0.29
2 balok sokong miring 6/12 m³ 3.03 0.60 0.12 0.44

2 JUMLAH 8.70

kuda-kuda type K2
2 Kaki kuda-kuda 6/12 m³ 6.33 0.06 0.12 0.09
2 balok gapit 4/14 m³ 9.14 0.40 0.14 1.02
1 hanger 6/12 m³ 5.11 0.06 0.12 0.04
2 balok blint 2x 5/15 m³ 16.48 0.50 0.15 2.47
2 balok sokong tegak 6/12 m³ 2.01 0.60 0.12 0.29
2 balok sokong miring 6/12 m³ 3.03 0.60 0.12 0.44

5 jumlah m³ 21.75

kuda-kuda type 1/2 K2


2 Kaki kuda-kuda 6/12 m³ 6.33 0.06 0.12 0.09
2 balok gapit 4/14 m³ 9.14 0.40 0.14 1.02
1 hanger 6/12 m³ 5.11 0.06 0.12 0.04
2 balok blint 2x 5/15 m³ 16.48 0.50 0.15 2.47
2 balok sokong tegak 6/12 m³ 2.01 0.60 0.12 0.29
2 balok sokong miring 6/12 m³ 3.03 0.60 0.12 0.44

1 JUMLAH m³ 4.35

kuda-kuda type K3
2 Kaki kuda-kuda 6/12 m³ 6.33 0.06 0.12 0.09
2 balok gapit 4/14 m³ 9.14 0.40 0.14 1.02
1 hanger 6/12 m³ 5.11 0.06 0.12 0.04
2 balok blint 2x 5/15 m³ 16.48 0.50 0.15 2.47
2 balok sokong tegak 6/12 m³ 2.01 0.60 0.12 0.29
2 balok sokong miring 6/12 m³ 3.03 0.60 0.12 0.44

1 jumlah m³ 4.35
kuda-kuda type 1/2 K3
2 Kaki kuda-kuda 6/12 m³ 6.33 0.06 0.12 0.09
2 balok gapit 4/14 m³ 9.14 0.40 0.14 1.02
1 hanger 6/12 m³ 5.11 0.06 0.12 0.04
2 balok blint 2x 5/15 m³ 16.48 0.50 0.15 2.47
2 balok sokong tegak 6/12 m³ 2.01 0.60 0.12 0.29
2 balok sokong miring 6/12 m³ 3.03 0.60 0.12 0.44

1 JUMLAH 4.35

jumlah total 52.19

kuda-kuda type K1
13 gording 5/10 m³ 0.14 0.05 0.10 0.01
2 jumlah 0.02

kuda-kuda type K2
9 gording 5/10 m³ 0.14 0.05 0.10 0.01
5 jumlah 0.03

kuda-kuda type K3
9 gording 5/10 m³ 0.14 0.05 0.10 0.01
1 JUMLAH 0.01

total volume gording m³ 0.06

total volume gording dan kuda-kuda m³ 52.25


Papan Listplank m² 46.25 0.03 0.20 1.39
Bubungan Seng BJLS 0,20 lbr 31.32 0.20 6.26
Atap Seng genteng BJLS 0.20 lbr 52.41 6.06 317.60

VII. PEKERJAAN PLAFON


JENIS PEKERJAAN DIMENSI
Unit SATUAN Kuantitas
P L T
3 a. Plafond kamar tidur m²
▪ Kamar 1 3.00 3.50 10.50
▪ Kamar 2 3.00 3.00 9.00
▪ Kamar 3 3.00 3.00 9.00
b. Lantai Ruang tamu 3.00 3.50 10.50
c. Lantai R.makan dan R.keluarga
▪ Pias 1 1.50 1.00 1.50
▪ Pias 2 4.50 4.00 18.00
d. Ruang dapur 2.00 2.75 5.50
e. Teras 3.00 2.00 6.00
f. Kamar mandi 1.50 2.00 3.00
e. Slasar 3.00 1.01 3.03
JUMLAH 76.03

VIII. PEKERJAAN LANTAI


DIMENSI
Unit JENIS PEKERJAAN SATUAN Kuantitas
P L T
Lantai Keramik 60 x 60 cm m²
3 a. Kamar tidur
▪ Kamar 1 3.00 3.50 10.50
▪ Kamar 2 3.00 3.00 9.00
▪ Kamar 3 3.00 3.00 9.00
b. Lantai Ruang tamu 3.00 3.50 10.50
c. Lantai R.makan dan R.keluarga
▪ Pias 1 1.50 1.00 1.50
▪ Pias 2 4.50 4.00 18.00
d. Ruang dapur 2.00 2.75 5.50
e. Teras 3.00 2.00 6.00
e. Slasar 3.00 1.01 3.03
Jumlah 73.03
Lantai Keramik 40 x 40 cm m²
f. Kamar mandi 1.50 2.00 3.00
JUMLAH 3.00
IX. PEKERJAAN INSTALASI LISTRIK
Unit JENIS PEKERJAAN DIMENSION
SATUAN Kuantitas
P L T
Pasangan Instalasi Dalam titik 7
3 ▪ Lampu pijar buah 3
6 ▪ Lampu TL buah 6
3 Lampu pijar 40 watt buah 3
6 Lampu TL WST 1 x 20 watt buah 6
1 Box Zekering 2 Group buah 1
6 Stop Kontak titik 6
5 Sakelar Tunggal titik 5
2 Sakelar Ganda titik 2

SANITASI
Unit JENIS PEKERJAAN SATUAN DIMENSION
Kuantitas
P L T
1 Closet Jongkok buah 1.00
1 Bak Air buah 1.00
1 Pipa Air Bersih Ls 1.00
1 Pipa Air Kotor Ls 1.00
3 Kran Air buah 3.00
1 Floor Drain buah 2.00
1 Bak Kontrol unit 1.00
1 Septictank unit 1.00
KETERANGAN
9.50
1.50 1.50 1.50 3.00 2.00
P=(P+6), L=(L+8)
A
Keliling + 1.5

2.00
R. TIDUR

3.00
± 0.00

1.01
SELASAR - 0.05

KETERANGAN
R. MAKAN

1.75
2.00
± 0.00
DAPUR

2.75
KM/WC
- 0.10 - 0.02
P=3+3+3+3+2+2.75+2+5.75+3+1+3+3.5+1.5

1.00
+3+1.5+2+1.5+1.5+2.5+1+1+2+2+1.5+1.01 B R. KELUARGA B

r
± 0.00

a
12.50

1.25
R. TIDUR
3.00

b
± 0.00

ga m R. TAMU

3.50
± 0.00
3.50

R. TIDUR
± 0.00

1.00
TERAS
- 0.05
1.00

1.00
A
1.50 3.00 3.00 2.00
9.50

DENAH
SKALA 1 : 100
1.50 3.00 3.00 2.00
9.50

DENAH
SKALA 1 : 100
KETERANGAN

13

Pas. bata 1 : 4
Pas. bata 1 : 2
Lantai beton cor diplester
Pasir urug bawah lantai
Tanah urug bawah lantai
± 0.00 ± 0.00
7 7
10 10

50 50
33 18/25 33

Besi angker Ø 12 - 100


60 Pondasi batu gunung 60
75 Aanstamping 75
Pasir alas

10 10
5 5

23
10 60 10
80

DETAIL POT. II
SKALA 1 : 25

KETERANGAN
32 14 32

KETERANGAN 33 20 33 33 20 33

3
Kayu 6/13

6
46
40
Kaca bening 5 mm
Kayu 3/12

3
Panel jadi
13

Kayu 6/13

6
Kayu 3/12

Panel jadi

2 16
2 10
2 16
2 10
13
13 Kayu 6/13
Kayu 6/13 Pintu panel lapis seng
Pintu panel jadi

13

13
13

13
6 80 6 6 70 6

DETAIL P1 - 5 BH
SKALA 1 : 20 DETAIL P2 - 1 BH
1/2 x L x T x Unit SKALA 1 : 20

L. dinding - L. kusen + L. tumbak


Luas dinding x 2 bidang
32 32 34 32
33 20 33 33 20 33 33 20 33

3
46
40
Kaca bening 5 mm

46
40
Kaca bening 5 mm

3
13
18

13

18
Kayu 6/13 Kayu 6/13
6

6
Kayu 3/8 Kayu 3/8

KETERANGAN Kaca bening 5 mm Kaca bening 5 mm

P=(2xP+2xL)
18 2
17 0

17 0
18 2
P=(2xP+2xL)
P=(2xP+2xL)
P=(2xP+2xL)

6
6

Kayu 3/8 13 Kayu 3/8 13


Kaca bening 5 mm Kaca bening 5 mm

13
13

6 6 60 6 60 6 6
6 6 60 6 6
150
84

DETAIL J3 - 1 BH DETAIL J2 - 2 BH
6
6
Kayu 3/8 13 Kayu 3/8 13
Kaca bening 5 mm Kaca bening 5 mm

P=(2xP+2xL)

13
13
6 6 60 6 60 6 6
6 6 60 6 6
150

P=(2xP+2xL)
84

DETAIL J3 - 1 BH DETAIL J2 - 2 BH
P=(2xP+2xL) SKALA 1 : 20
SKALA 1 : 20

P=(2xP+2xL)

32
32 34 32 33 20 33
33 20 33 33 20 33

3
3
KETERANGAN Kaca bening 5 mm

46
40
Kaca bening 5 mm

46
40

3
3
13

18
13

18
Kayu 6/13

6
Kayu 6/13 Kayu 3/8

6
Kayu 3/8
Kaca bening 5 mm
Kaca bening 5 mm

100
112
100
112

6
6
Kayu 3/8 13
Kaca bening 5 mm
Kayu 3/8 13
Kaca bening 5 mm

13
13
6 6 60 6 6
84
6 6 60 6 60 66
150

DETAIL J4 - 1 BH
DETAIL J1 - 3 BH SKALA 1 : 20

SKALA 1 : 20
KETERANGAN

11.63
1.50 1.00 3.00 1.00 5.00

K2

Jumlah volume K1 + Jumlah kuda-kuda K1

3.00
5.00
K2

1.01
1/2K3 K3

2.75
1.00
1/2K1

K2 K1
K2
14.63

14.63
1.01
3.00

K1
1.00

1/2K2

Jumlah volume 1/2k1 + Jumlah kuda-

6.75
1/2K1

kuda1/2K1
3.50

K2
1.00

1.50 3.00 1.00 3.00 1.00 2.00


11.63
1.50 3.00 1.00 3.00 1.00 2.00

11.63

Jumlah volume K2 + Jumlah kuda-kuda K2

Jumlah volume 1/2 K2 + Jumlah kuda-kuda


1/2 K2

Bubungan seng BJLS 0.20


Hanger 6/12
Sokong 6/12
Jumlah volume K3 + Jumlah kuda-kuda K3 Kaki kuda-kuda 6/12
Balok bint 2 x 5/15
Gording 5/10
73 Atap seng BJLS 0.20
Plafond plywood 100 x 100 cm
Balok bint 2 x 5/15
Gording 5/10
73 Atap seng BJLS 0.20
Plafond plywood 100 x 100 cm

303
124

240

15/20

Kayu 5/7 Kayu 5/5

Jumlah volume 1/2 K3 + Jumlah kuda-kuda 30 Kayu 5/7 Kayu 5/7


30

1/2 K3

volume k1 +1/2k1+k2+1/2k2+K3+1/2k3
100 275 100

DETAIL KUDA-KUDA TYPE K3 - 1 BH


SKALA 1 : 25

volume kuda-kuda + gording


panjang keliling listplank x lebar papan
Kayu 6/13

6
luas keliling atap*panjang sisi miring seng Kaca bening 5 mm

52
40 6
Kayu 6/13 13
Kaca bening 5 mm

13
KETERANGAN 6 6 55 6 55 6 6
140

DETAIL V - 2 BH
SKALA 1 : 20
11.63
1.50 1.00 3.00 1.00 5.00

3.00
5.00

1.01
KETERANGAN

2.75
1.00
14.63

14.63
1.01
3.00
1.00

6.75
3.50
1.00

1.50 3.00 1.00 3.00 1.00 2.00

11.79

DENAH PLAFOND/INST. LISTRIK


SKALA 1 : 100
KETERANGAN

KETERANGAN
Kayu 6/13
Kayu 3/12

Panel jadi

13

Kaca bening 5 mm

13

Kayu 6/13
Kayu 3/8

Kaca bening 5 mm

13
13

Kaca bening 5 mm

Kayu 6/13
Kayu 3/8

Kaca bening 5 mm

3
RENCANA ANGGARAN BIAYA

PROYEK : PERUMAHAN TYPE-70


LOKASI : BANDA ACEH
PROVINSI : ACEH

No Uraian Pekerjaan Analisa Volume Satuan


1 2 3 4 5

I. PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Kerja RSNI.T-12-2002 (B.8) 317.75 m²
2 Pengukuran Bouwplank RSNI.T-12-2002 (B.4) 56.00 m¹

II. PEKERJAAN PONDASI


1 Galian tanah SNI.DT-91-006-2007 (6.1) 34.21 m³
2 Urugan kembali SNI.2835 : 2008 (6.9) 8.55 m³
3 Timbunan Pasir dibawah pondasi SNI.DT-91-0006-2007 (6.11) 2.28 m³
4 Aanstamping SNI.DT-91-0007-2007 (6.9) 4.56 m³
5 Pasangan pondasi SNI.DT-91-0009-2007 (6.7) 14.20 m³
6 Urugan Tanah /Timbunan tanah SNI.DT-91-0006-2007 (6.11-b) 38.76 m³
7 Urugan Pasir dibawah lantai SNI.DT-91-0006-2007 (6.11) 67.39 m³

III. PEKERJAAN BETON


1 Balok Sloof SNI 7394 : 2008 2.57 m³
2 Kolom SNI 7394 : 2008 (6.31) 1.42 m³
3 Ring Balk SNI 7394 : 2008 (6.31) 1.71 m³
4 Lantai Beton Tumbuk 1 : 3 : 5 m³

IV. PEKERJAAN PASANGAN


1 Pasangan Bata Merah 1 : 2 SNI.DT-91-0009-2007 (6.7) 179.83 m²
2 Plesteran 1 : 2 SNI.DT-91-0010-2007 (6.2) 359.65 m²

V. PEKERJAAN KUSEN PINTU DAN


JENDELA
1 Kayu Kusen Pintu dan Jendela SNI.DT-91-0011-2007 (6.1) 0.94 m³
2 Daun Pintu dan Jendela
▪ Daun Pintu Panel Kayu SNI _ 2008 9.40 m²
▪ Daun Jendela dan Ventilasi Kaca SNI _ 2008 13.70 m²

VI. PEKERJAAN ATAP


1 Penutup Atap Seng BJLS 0.20 SNI.03-3436-2002 (6.38) 317.60 m²
2 Bubungan Seng BJLS 0.20 SNI.03-3436-2002 (6.36) 6.26 lbr
3 Papan Listplank Anl F.38 1.39 m²

VII. PEKERJAAN PLAFOND


1 Plafond Triplek 3 mm SNI 2839 : 2008 (6.5) 76.03 m²

VIII. PEKERJAAN LANTAI


1 Lantai Keramik 40 x 40 cm SNI 03-2838-2002-5b 3.00 m²
2 Lantai Keramik 60 x 60 cm SNI 03-2838-2002-5a 73.03 m²

VIII. PEKERJAAN PENGECATAN


1 Pengecatan Dinding/Tiang Teras 359.65 m²
2 Pengecatan Plafond dan List Profil 76.03 m²
3 Pengecatan Listplank m²
4 Pengecatan Pintu dan Jendela 0.94 m²

IX. PEKERJAAN KUNCI DAN


PENGGANTUNG
1 Kunci Pintu RSNI T-30-200-B.4 6.00 bh
2 Engsel Pintu RSNI T-30-200-B.5 12.00 bh
3 Engsel Jendela RSNI T-30-200-B.6 18.00 bh
4 Tarikan Jendela RSNI T-30-200-B.26 18.00 bh
5 Pacok/Grendel Jendela RSNI T-30-200-B.25 9.00 bh

X. PEKERJAAN INSTALASI LISTRIK

1 Pasangan Instalasi Dalam Taksir 7.00 ttk


2 Lampu pijar Taksir 3.00 bh
3 Lampu TL Taksir 6.00 bh
4 Lampu pijar 40 watt Taksir 3.00 bh
5 Lampu TL WST 1 x 20 watt Taksir 6.00 bh
6 Box Zekering 2 Group Taksir 1.00 ttk
7 Stop Kontak Taksir 6.00 bh
8 Sakelar Tunggal Taksir 5.00 bh
9 Sakelar Ganda Taksir 2.00 bh

XI. PEKERJAAN SANITASI AIR


1 Closet Jongkok Taksir 1.00 bh
2 Bak Air Taksir 1.00 bh
3 Pipa Air Bersih Taksir 1.00 Ls
4 Pipa Air Kotor Taksir 1.00 Ls
5 Kran Air Taksir 3.00 bh
6 Floor Drain Taksir 2.00 bh
8 Bak Kontrol Taksir 1.00 unit
Septictank Taksir 1.00 unit

XII. PEKERJAAN LAIN-LAIN


1 Dokumentasi Taksir 1.00 Ls
2 Administrasi Taksir 1.00 Ls
Harga Satuan (Rp) Jumlah Harga (Rp)
6 7

Rp 4,075.00 Rp 1,294,831.25
Rp 28,164.00 Rp 1,577,184.00
Jumlah Rp 2,872,015.25

Rp 21,880.00 Rp 748,427.28
Rp 10,488.00 Rp 89,688.13
Rp 149,950.00 Rp 341,945.98
Rp 266,700.00 Rp 1,216,365.36
Rp 551,765.00 Rp 7,832,574.54
Rp 74,970.00 Rp 2,905,462.35
Rp 149,950.00 Rp 10,105,383.92
Jumlah Rp 23,239,847.56

Rp 5,023,790.00 Rp 12,888,282.06
Rp 5,928,304.40 Rp 8,410,811.51
Rp 5,928,304.40 Rp 10,139,179.02
Rp -
Jumlah Rp 31,438,272.58

Rp 86,804.75 Rp 15,609,716.25
Rp 33,822.60 Rp 12,164,338.68
Jumlah Rp 27,774,054.93

Rp 6,792,600.00 Rp 6,375,887.58

Rp 406,000.00 Rp 3,816,400.00
Rp 450,015.00 Rp 6,165,205.50
Jumlah Rp 16,357,493.08

Rp 52,000.00 Rp 16,515,439.20
Rp 236,185.00 Rp 1,479,462.84
Rp 76,366.00 Rp 105,957.83
Jumlah Rp 18,100,859.87

Rp 36,088.50 Rp 2,743,808.66
Jumlah Rp 2,743,808.66

Rp 97,545.90 Rp 292,637.70
Rp 111,845.90 Rp 8,168,106.08
Jumlah Rp 8,460,743.78

Rp 18,826.40 Rp 6,770,937.35
Rp 28,261.00 Rp 2,148,683.83
Rp 28,261.00 Rp -
Rp 28,261.00 Rp 26,527.24
Jumlah Rp 8,946,148.43

Rp 158,300.00 Rp 949,800.00
Rp 71,500.00 Rp 858,000.00
Rp 29,200.00 Rp 525,600.00
Rp 28,000.00 Rp 504,000.00
Rp 30,000.00 Rp 270,000.00
Jumlah Rp 3,107,400.00

Rp 128,000.00 Rp 896,000.00
Rp 18,000.00 Rp 54,000.00
Rp 28,000.00 Rp 168,000.00
Rp 28,000.00 Rp 84,000.00
Rp 28,000.00 Rp 168,000.00
Rp 166,200.00 Rp 166,200.00
Rp 143,000.00 Rp 858,000.00
Rp 15,000.00 Rp 75,000.00
Rp 23,000.00
Jumlah Rp 2,469,200.00

Rp 130,000.00 Rp 130,000.00
Rp 1,898,800 Rp 1,898,800.00
Rp 31,000.00 Rp 31,000.00
Rp 31,000.00 Rp 31,000.00
Rp 20,000.00 Rp 60,000.00
Rp 18,600.00 Rp 37,200.00
Rp 1,500,000.00 Rp 1,500,000.00
Rp 1,500,000.00 Rp 1,500,000.00
Jumlah Rp 3,688,000.00

Rp 100,000.00 Rp 100,000.00
Rp 500,000.00 Rp 500,000.00
Jumlah Rp 600,000.00
REKAPITULASI

PROYEK : PERUMAHAN TYPE-70


LOKASI : BANDA ACEH
PROVINSI : ACEH

NO URAIAN JUMLAH
1 PEKERJAAN PERSIAPAN Rp 2,872,015.25
2 PEKERJAAN PONDASI Rp 23,239,847.56
3 PEKERJAAN BETON Rp 31,438,272.58
4 PEKERJAAN PASANGAN Rp 27,774,054.93
5 PEKERJAAN KUSEN PINTU DAN JENDELA Rp 16,357,493.08
6 PEKERJAAN ATAP Rp 18,100,859.87
7 PEKERJAAN PLAFOND Rp 2,743,808.66
8 PEKERJAAN LANTAI Rp 8,460,743.78
9 PEKERJAAN PENGECATAN Rp 8,946,148.43
10 PEKERJAAN KUNCI DAN PENGGANTUNG Rp 3,107,400.00
11 PEKERJAAN INSTALASI LISTRIK Rp 2,469,200.00
12 PEKERJAAN SANITASI AIR Rp 3,688,000.00
13 PEKERJAAN LAIN-LAIN Rp 600,000.00

TOTAL Rp 149,797,844.11
DIBULATKAN Rp 149,797,800.00
Terbilang : Seratus Empatr Puluh Sembilan Juta Tujuh Ratus
Sembilan Puluh Tujuh Ribu Delapan Ratus rupiah
3.6 Tabel Perhitungan Biaya

No Uraian Pekerjaan Analisa Volume Satuan Harga Satuan (Rp) Jumlah Harga (Rp)
I. PEKERJAAN PONDASI
1 Galian tanah SNI.DT-91-006-2007 (6.1) 34.21 m³ Rp 21,880.00 Rp 748,514.80
3 Timbunan Pasir dibawah pondasi SNI.DT-91-0006-2007 (6.11) 2.28 m³ Rp 149,950.00 Rp 341,886.00
4 Aanstamping SNI.DT-91-0007-2007 (6.9) 4.56 m³ Rp 266,700.00 Rp 1,216,152.00
5 Pasangan pondasi SNI.DT-91-0009-2007 (6.7) 14.20 m³ Rp 57,200.00 Rp 812,240.00
6 Penimbunan Kembali SNI.2835 : 2008 (6.9) 13.17 m³ Rp 10,488.00 Rp 138,126.96
6 Urugan Tanah /Timbunan tanah SNI.DT-91-0006-2007 (6.11-b) 38.76 m³ Rp 74,970.00 Rp 2,905,837.20
7 Urugan Pasir dibawah lantai SNI.DT-91-0006-2007 (6.11) 67.39 m³ Rp 149,950.00 Rp 10,105,383.92
Jumlah Rp 16,268,140.88
II. PEKERJAAN BETON
1 Bekisting Sloof SNI 7394 : 2008 no.6.21 28.50 m³ Rp 249,760.00 Rp 7,118,160.00
2 Pembesian sloof SNI 7394 : 2008 253.71 kg Rp 15,318.20 Rp 3,886,380.52
3 Pengecoran Sloof SNI 7394 : 2008 2.57 m³ Rp 547,079.00 Rp 1,405,993.03
4 Bekisting kolom
5 Pembesian Kolom
6 Kolom SNI 7394 : 2008 (6.31) 1.42 m³ Rp 5,928,304.40 Rp 8,418,192.25
7 Beskisting Ring Balok
8 Pembesian Ring Balok
9 Ring Balk SNI 7394 : 2008 (6.31) 1.71 m³ Rp 5,928,304.40 Rp 10,137,400.52
10 Lantai Beton Tumbuk 1 : 3 : 5 11.02 m³ Rp 1,532,076.00 Rp 16,883,477.52
Jumlah Rp 36,845,063.32
IV. PEKERJAAN PASANGAN
1 Pasangan Bata Merah 1 : 2 SNI.DT-91-0009-2007 (6.7) 159.68 m² Rp 86,804.75 Rp 13,861,242.89
2 Plesteran 1 : 2 SNI.DT-91-0010-2007 (6.2) 319.37 m² Rp 33,822.60 Rp 10,801,788.47
Jumlah Rp 24,663,031.37
Durasi Biaya Bobot
No. Uraian Pekerjaan Minggu ke 1 Minggu ke 2
(hari) Rp % 1 2 3 4 5 6 7 8 9
A Galian Tanah 2 Rp 748,515 1.000%
B Urugan Pasir 1 Rp 341,886 0.457%
C Pasangan Batu Kosong 1 Rp 1,216,152 1.624%
D Pondasi Batu Gunung 1 Rp 812,240 1.085%
E Penimbunan Kembali 1 Rp 138,127 0.184%
F Sloof 15/20 3 Rp 1,405,993 1.878%
G Urugan Pasir Dibawah Lantai 2 Rp 10,105,384 13.497%
H Pasangan Bata 10 Rp 13,861,243 18.514%
I Kolom 13/13 5 Rp 8,418,192 11.244% 38.239%
J Reng Balok 3 Rp 10,137,401 13.540%
K Pekerjaan Plasteran 1 Rp 10,801,788 14.427%
19.725%
L Pekerjaan Lantai 1 Rp 16,883,478 22.550%
Jumlah Harga Rp 74,870,398 100% 4.166% 4.350% 6.228%
1.000% 1.456%

13.497%
1.000%

0.457%

2.709%

0.184%

1.878%

19.725%
1.000%

1.456%

4.166%

4.350%

6.228%
6.9052108108
Waktu Pelaksanaan
Minggu ke 2 Minggu ke 3 Minggu ke 4 Minggu Ke 5
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

100.000%

77.450%

63.022%

49.482%

38.239%

19.725%
13.497%

18.514%

11.244%

13.540%

14.427%

22.550%
100.000%
19.725%

38.239%

49.482%

63.022%

77.450%
Waktu
Waktu Tenaga
No. Jenis Pekerjaan Volume Minggu ke 1 Minggu ke 2
(Hari) Kerja
1 2 3 4 5 6 7 8 9 10 11 12
1 Galian Tanah 34.21 2 4
2 Urugan Pasir 2.28 1 2
3 Pasangan Batu Kosong 4.56 1 5
4 Pondasi Batu Gunung 14.2 1 5
5 Penimbunan Kembali 13.17 1 3
6 Sloof 15/20 2.57 3 15
7 Urugan Pasir Dibawah Lantai 38.76 2 5
8 Pasangan Bata 159.683 10 5
9 Kolom 13/13 1.418 5 15
10 Reng Balok 1.71 3 15
11 Pekerjaan Plasteran 319.366 1 5
12 Pekerjaan Lantai 11.02 1 3
4 4 2 10 3 15 15 15 5 5 5 5
Waktu Pekerjaan
ggu ke 2 Minggu ke 3 Minggu ke 4 Minggu ke 5
13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
16

14

12

10

0
5 5 5 5 5 5 5 5 15 15 15 15 15 15 15 15 5 3
DURASI BIAYA
URAIAN PEKERJAAN
(HARI) (Rp)
1. Pekerjaan Pembersihan Lapangan 1 Rp 1,294,831.25
2. Pekerjaan Pengukuran Bouwplank 1 Rp 1,577,184.00
3. Pekerjaan Galian Tanah 1 Rp 748,427.28
4. Pekerjaan Urugan Kembali 1 Rp 89,688.13
5. Pekerjaan Timbunan Pasir Dibawah Pondasi 1 Rp 341,945.98
6. Pekerjaan Anstamping 2 Rp 1,216,365.36
7. Pekerjaan Pasangan Pondasi 2 Rp 7,832,574.54
8. Pekerjaan Urugan Tanah / Timbunan Tanah 1 Rp 2,905,462.35
9. Pekerjaan Urugan Pasir 1 Rp 10,105,383.92
10. Pekerjaan Balok Sloof 4 Rp 12,888,282.06
11. Pekerjan Kolom 5 Rp 8,410,811.51
12. Pekerjaan Ring Balok 4 Rp 10,139,179.02
13. Pekerjaan Pasangan Bata Merah 1:2 13 Rp 15,609,716.25
14. Pekerjaan Plasteran 1:2 3 Rp 12,164,338.68
15. Pekerjaan Kusen Pintu dan Jendela 1 Rp 16,357,493.08
16. Pekerjaan Penutup Atap Seng BJLS 0,20 1 Rp 16,515,439.20
17. Pekerjaan Bubungan Seng BJLS 0,20 1 Rp 1,479,462.84
18. Pekerjaan Lisplank 1 Rp 105,957.83
Jumlah Pekerjaan Rp 119,782,543.26
BOBOT
Minggu 1
(%) 1 2 3 4 5 6 7 1
1.0810
1.3167
0.6248
0.0749
0.2855
1.0155
6.5390
2.4256
8.4364
10.7597
7.0217
8.4647
13.0317
10.1554
13.6560
13.7879
1.2351
0.0885
100.0000

0 1.0810 1.3167 0.6248 0.0749 0.2855 1.0155 6.5390

0 1.0810 2.3977 3.0225 3.0974 3.3829 4.3983 10.9373


Minggu 2 Minggu 3
2 3 4 5 6 7 1 2 3 4

6.5390 2.4256 8.4364 13.5597 9.43

10.9373 13.3629 21.7994 35.3591 44.7891


Waktu Pelaksanaan
Minggu 3 Minggu 4
5 6 7 1 2 3 4 5 6 7

6.23 10.03

51.0191 61.0491
Waktu Pelaksanaan
Minggu 5
1 2 3 4 5 6 7

10.1554 27.4438 1.3236

71.2045 98.6483 99.9719


DURASI BIAYA
URAIAN PEKERJAAN
(HARI) (Rp)
1. Pekerjaan Pembersihan Lapangan Rp 1,294,831.25
2. Pekerjaan Pengukuran Bouwplank Rp 1,577,184.00
3. Pekerjaan Galian Tanah Rp 748,427.28
4. Pekerjaan Urugan Kembali Rp 89,688.13
5. Pekerjaan Timbunan Pasir Dibawah Pondasi Rp 341,945.98
6. Pekerjaan Anstamping Rp 1,216,365.36
7. Pekerjaan Pasangan Pondasi Rp 7,832,574.54
8. Pekerjaan Urugan Tanah / Timbunan Tanah Rp 2,905,462.35
9. Pekerjaan Urugan Pasir Rp 10,105,383.92
10. Pekerjaan Balok Sloof Rp 12,888,282.06
11. Pekerjan Kolom Rp 8,410,811.51
12. Pekerjaan Ring Balok Rp 10,139,179.02
13. Pekerjaan Pasangan Bata Merah 1:2 Rp 15,609,716.25
14. Pekerjaan Plasteran 1:2 Rp 12,164,338.68
15. Pekerjaan Kusen Pintu dan Jendela Rp 16,357,493.08
16. Pekerjaan Penutup Atap Seng BJLS 0,20 Rp 16,515,439.20
17. Pekerjaan Bubungan Seng BJLS 0,20 Rp 1,479,462.84
18. Pekerjaan Lisplank Rp 105,957.83
19. Pekerjaan Plafon Triplek 3 mm Rp 2,743,808.66
20. Pekerjaan Keramik 40 x 40 cm Rp 292,637.70
21. Pekerjaan Keramik 60 x 60 Rp 8,168,106.08
22. Pekerjaan Pengecatan Dinding/Tiang Teras Rp 6,770,937.35
23. Pengecatan Plafond dan List Profil Rp 2,148,683.83
24. Pengecatan Lisplank Rp -
25. Pengecatan Pintu dan Jendela Rp 26,527.24
26. Pemasangan Kunci Pintu Rp 949,800.00
27. Pemasangan Engsel Pintu Rp 858,000.00
28. Pemasangan Tarikan Jendela Rp 525,600.00
29. Pemasangan Grendel Jendela Rp 504,000.00
30. Pasangan Instalasi Dalam Rp 896,000.00
31. Pemasangan Lampu Pijar Rp 54,000.00
32. Pemasangan Lampu TL Rp 168,000.00
33. Pemasangan Lampu Pijar 40 watt Rp 84,000.00
34. Pemasangan Lampu TL WST 1 x 20 watt Rp 168,000.00
35. Pemasangan Box Zekering 2 Group Rp 166,200.00
36. Pemasangan Stop Kontak Rp 858,000.00
37. Pemasangan Sakelar Tunggal Rp 75,000.00
38. Pemasangan Sakelar Ganda Rp -
39. Pemasangan Closet Jongkok Rp 130,000.00
40. Pemasangan Bak Air Rp 1,898,800.00
41. Pemasangan Pipa Air Bersih Rp 31,000.00
42. Pemasangan Pipa Air Kotor Rp 31,000.00
43. Pemasangan Kran Air Rp 60,000.00
44. Pemasangan Floor Drain Rp 37,200.00
45. Pekerjaan Septictank Rp 1,500,000.00
Jumlah Pekerjaan Rp 149,797,800.00
BOBOT
Minggu 1 Mingg
(%) 1 2 3 4 5 6 7 1 2
0.8644
1.0529
0.4996
0.0599
0.2283
0.8120
5.2288
1.9396
6.7460
8.6038
5.6148
6.7686
10.4205
8.1205
10.9197
11.0252
0.9876
0.0707
1.8317
0.1954
5.4528
4.5201
1.4344
0.0000
0.0177
0.6341
0.5728
0.3509
0.3365
0.5981
0.0360
0.1122
0.0561
0.1122
0.1109
0.5728
0.0501
0.0000
0.0868
1.2676
0.0207
0.0207
0.0401
0.0248
1.0013
99.4192
Minggu 2 Minggu 3
3 4 5 6 7 1 2 3 4 5
Waktu Pelaksanaan
3 Minggu 4
6 7 1 2 3 4 5 6 7 1
elaksanaan
Minggu 5 Minggu 6
2 3 4 5 6 7 1 2 3 4
Minggu 6 Minggu 7
5 6 7 1 2 3 4 5 6 7
Minggu 8
1 2 3 4 5 6 7