Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

QUARTERLY PROGRESS REPORT Document No.

XXXX-PMC-QPR-Q1
Rev. 0

BUDGET Status
Task Budgets Original Current Expenditures Anticipated
Remaining
Authorized Authorized till Date
Budget Budget
Budget Cost

Design and Engineering


Construction Contract(s)
Construction Contingency
Non-Contract Construction
Land Acquisition
Inspection
Project Administration
Indirect Costs
Credit
Escalation
Total 0.0 0.0 0.0 0.0

Milestones Status Date


Planned Forecast Actual Remarks
1. FEED
a)
b)
2. Detail Engineering
a)
b)
3. Procurement
a) Ordering
b) Manufacturing & Delivery
4. Sub-Contracting
a)
5. Construction
a) WBS - #
6. Pre-Commissioning
a)
7. Commissioning
a)

Page 2 of 5

You might also like