Professional Documents
Culture Documents
QC Orgn. Structure-Updated
QC Orgn. Structure-Updated
INWARD AB Inspection
PROCESS CONTROL PROCESS CONTROL (Cold TPI INCHARGE MTC, QAP INSPECTION, 1.DIBYENDU PAL,
(Hot Mill) MILL, VDI, ECT, HYDRO) RAM PRASAD JANA INCHARGE METT LAB,
2.SUPRAKASH
SURAJIT MOHAPATRA VACANT Jr. Engineer - QC KALI PADA SAMANTA PIJUSH MAITY
Jr. Engineer – QC MOHAPATRA
Jr. Engineer – QC Jr. Engineer - QA Jr. Engineer - QC GET – QC
WORKMEN
HOT MILL RFD & DAILY Helper - 1
VDI FOREMAN ECT, UST HYDRO WORKMEN
INSPECTION REPORTING
1.Vinay Kumar INCHARGE INCHARGE ABP –1, SAB - 1
TEAM 1.Kartik Manna
2. Shibsankar 1.Prem Pankaj 1.Sanatan Das LAB ASSITANT
Semi Skilled – 6 Nos, 2.Rakesh
3. Vacant 2. Pratik Bera 2. Kaushik Ghosh 1.Manas Ranjan Das
Unskilled – 3 Nos
3. Kuldeep Ram 3. Vacant 2.Saikat Ghosh
(Q1 & Q2 for all 3
Shifts) INSPECTION 3. Tanmoy Roy Helper - 1
TEAM INSPECTION
Semi Skilled – 1 TEAM
Nos, Unskilled – 7 Helper – 1 Nos
Nos,
Prepared by Approved by