Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

DEMALISH OF G G P S KAHI PK 42 Disst HANGU

1 Dismantling of B.B Work cm 1;6 complt (04-13)


Description Nos. L B H/ D Qtty (Ft) Qtty (M)
L/Wall 12 26.5 0.75 14.00 3339.00
7 16 0.75 14.00 1176.00
4515.00 127.83

2 Febrication of heavy steel tee iron and girder complt (25-10)

Description Nos. Bars Length Lbs/Rft Qtty (lbs) Qtty (Ton)

gider 6 4 17.50 8 3360.00


1 12 10.00 6 720.00
tee iron 6 15 26.50 3.00 7155.00
3 7 27.00 3.00 1701.00
Total 12936.00
5.87

3 Dismantling of second clss tile on roof complt (04-22-b)


Description Nos. Walls L H/ D Qtty (Ft) Qtty (M)
155.25 26.5 4114.13
0.00
4114.13 382.35
Unit Rate Amount

M³ 938.05 119912.11

Unit Rate Amount

Ton 158340.00 929349.47

Unit Rate Amount

m2 208.31 79648.08

Total Rs. 1128909.67