Professional Documents
Culture Documents
Khurmala Field Field Department Drilling Deve. Oil Wells Project TU Location
Khurmala Field Field Department Drilling Deve. Oil Wells Project TU Location
Khurmala Field
FIELD DEPARTMENT
DRILLING DEVE. OIL WELLS PROJECT
TU Location
References RTKB
Well KDN-21(K-448)
Depth (mMD) 406.5
Upper Fars Formation
Current Formation
Totco
Totco
Last Survey m MD
MW(kg/l)
MW(kg/l)
MW(kg/l)
MW(kg/l)
MW(kg/l)
(m)
Interval m. MD
Peak Gas
Trip Gas
Kick Gas
Connection Gas
Wiper Trip Gas
Prog. MD (m Prog. TVD (m
PROVISIONAL FORMATION PICKS
RTKB) Depth RTKB) Depth
Formations
Upper Midle Fars in part
Lower Fars (URB) 750
Upper Red Bed 750
Ao 750
R6
R7
R8
R9
Operations 00:00–06:00
Overall Comments
ENTRY DATA
318 GL 309 Rig
Date 21/8/2018 day spud 10/8/2018
Depth (mTVD RT 406.5 Progress
per Fars Formation
eed off the closing unit pressure and disconnect hydraulic lines Remove bell nipple
gin to tighten all studs and bolts.Connect choke line co-flex hose in between choke manifold and si
ss.Install 20" bell nipple and weld flow line.Connect hydraulic lines in between closing unit and BOP
t of pipe ram, blind ram, annular ram and HCR valve on choke line.OK
Shows
Description
GAS DATA
Total C1 C2 C3
(%) ppm ppm ppm
Team Crew
Days on Ranjdar Ahmed
Days on Ahmed Adnan
Days on Hemn salih
Basis of Pick
ng again