Safety Integrity Level Study

The application of the Layers of Protection Analysis to determine Safety Integrity


Levels requires the use of risk acceptance criteria. Risk acceptance criteria
represent the desired level of risk from the specific hazard scenario after the
application of all the relevant layers of protection. This includes the Safety
Instrumented Function. The risk levels used during the SIL evaluation are shown below

Risk Matrix for SIL Evaluation


Property Damage and/ or Loss of Revenue
LOPA Entry Target Frequency Safety LOPA Entry Environmental/ Public LOPA Entry
LOPA Entry

1 1.00E-02 1 in every 100 years Minor on-site injuries (first-aid and non-disabling Minor: Property damage and/ or loss of revenue less Minor: No remediation. No off-site impact/ damage
reportable injuries) than US$500,000

2 1.00E-03 1 in every 1,000 years Moderate: Serious on-site injuries (temporary disabling Moderate: Property damage and/ or loss of revenue Moderate: Clean-up/ remediation is immediate; no
worker injuries) ranging from US$500,000 to US$10 million lasting impact on food chain, terrestrial or aquatic life.
Minor off-site impact (noise, smoke, odor, etc.)
Possible adverse public reaction

3 1.00E-04 1 in every 10,000 years Major: One permanent disabling on-site injury or fatality Major: Property damage and/ or loss of revenue Major: Clean-up or remediation complete within 1 year;
(e. g., facility manned part-time, off-line maintenance ranging from US$10 million to US$25 million minor impact on food chain, terrestrial and/ or aquatic
activities performed) life. Moderate off-site impact limited to property
damage or minor health effects. Adverse public
reaction

4 1.00E-05 1 in every 100,000 years Critical: Two to three onsite fatalities or four permanent Critical: Property damage and/ or loss of revenue Critical: Clean-up/ remediation requires more than 1
disabling injuries (e. g., facility manned full time, on-line ranging from US$25 million to US$100 million year; moderate impact on food chain, terrestrial and/ or
maintenance activities having immediate effects) aquatic life. Major off-site property damage or short-
term health effects on the public. Major public concern/
reaction

5 1.00E-06 1 in every 1000,000 years Catastrophic: Four or more onsite fatalities and/ or Catastrophic: Property damage and/ or loss of revenue Catastrophic:Clean-up/ remediation may not be
disabling injuries in excess of US$100 million possible; major damage to food chain; loss of terrestrial
and/ or aquatic life. Public fatality and/ or serious injury
or extensive offsite property damage. Severe adverse
public reaction threatening facility operation

Note 1.Use the lopa entry columns (B,D,F) for entering data in lopa tables column 7
2. Use the Total Frequency for scenario where there are more than one Initiator. Add the Inter
mediate event
The target Likelihood
frequency wouldfrequencies
not changeand get consequnce
as the the SIL is the same
3. Loss of production is assumed to cost USD $ 2 million /week

100
1000
10000
100000
1000000
Layer of Protection Analysis
Project
(IEC 61508/61511 Compliant) Third Party Gas Interconnecting Facility Project Target SIL Target AIL Target EIL
SIF No. SIF-1 SIL2 AIL2 EIL 0
SIF Tag No. 2000PAHH0080C
Event Consequence Potential for PAHH 0080C fail to close ESDV 0080 / 0081A/B leading to release of flammable material to atmoshpere potential for fire explosion and asset damage

Target Freq. Safety Err:508 (events/year) Catastrophic: Four or more onsite fatalities and/ or
disabling injuries
Target Freq. Property/ Revenue Err:508 Catastrophic: Property damage and/ or loss of revenue
in excess of US$100 million
Target Freq. Environment Err:508 Minor: No remediation. No off-site impact/ damage

SIF Description High high pressure in gas pipe line between DEL & QP to trip PSD 3.0.21 to prevent overpressurization of EGC suction header

P&ID RLE-2000-PPI-57002

Independent Protection Layers (IPLs) Conditional Modifiers


1 2 3 4 5 6 7 8 9

Unmitigated
Initiating Description of Initiating Cause Initiating Cause PAHH 0098 Mitigated Event
Cause F&G detection including Hazardous area Freq (/yr)
Freq (/yr) PSV's are availaable PSV's activation of ESD-1and Deluge classifcation drawings : (2oo3)initiates the Load sharing PSV 0093 A/B/C Probabilty of Probability of Risk Probability of
0081A/B/C ESD- 1 of FZ-30 & control source of Ignition of Injury personnel present
system automatically Ignition control 32

A More flow from upstream (Failure of QP 0.10 0.01 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-04
pressure controller)

No credit taken
Clean service since there is a Zone 2 Area 180 min/(24
isolation between hours*60 min)
FZ -30 &FZ-32

B FV 0016A fail open 0.10 0.01 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-04

180 min/(24
Clean service Zone 2 Area hours*60 min)

C Down stream no consumption due to 0.10 0.01 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-04
compressor trip

Clean service Zone 2 Area 180 min/(24


hours*60 min)

D 1.00 1.00 1.00 1.00 1.00 1.00 0.00E+00

E 1.00 1.00 1.00 1.00 1.00 1.00 0.00E+00

Total Mitigated Event Frequency, Fe (/year) 3.75E-04


Max PFDavg for Safety (Ft_s/Fe) 2.67E-03
Max PFDavg for Assests/Economic (Ft_e/Fe) 2.67E-03
Max PFDavg for Environment (Ft_a/Fe) 2.67E+01
Target SIL SIL2
Target AIL AIL2
Target EIL EIL 0
10% of maximum Calculated Value Calculated Value
value (S) (A) Calculated Value (E)
SIL Classification
SIL 0 <10 <9 0.0375
SIL 1 >10 to <100 >9.1 to <90
SIL 2 >100 to <1,000 >91 to <900 375 375
SIL 3 >1,000 to <10,000 >901 to <9,000
SIL 4 >10,000 to
<100,000 >9,001 to <90,000
Layer of Protection Analysis
Project
(IEC 61508/61511 Compliant) Third Party Gas Interconnecting Facility Project Target SIL Target AIL Target EIL
SIF No. SIF-2 SIL2 AIL2 EIL 0
SIF Tag No. 2000PAHH0080C
Event Consequence Potential for PAHH 0080C fail to close SDV 0142 leading to release of flammable material to atmoshpere potential for fire explosion and asset damage

Target Freq. Safety Err:508 (events/year) Catastrophic: Four or more onsite fatalities and/ or
disabling injuries
Target Freq. Property/ Revenue Err:508 Catastrophic: Property damage and/ or loss of revenue
in excess of US$100 million
Target Freq. Environment Err:508 Minor: No remediation. No off-site impact/ damage

SIF Description High high pressure in gas pipe line between DEL & QP to trip PSD 3.0.21 to prevent overpressurization of QP pipeline down stream of FV-0017

P&ID RLE-2000-PPI-57002

Independent Protection Layers (IPLs) Conditional Modifiers


1 2 3 4 5 6 7 8 9
Unmitigated
Initiating Description of Initiating Cause Initiating Cause Mitigated Event
Cause Freq (/yr)
Hazardous area F&G detection including Probabilty of Probability of Risk Probability of Freq (/yr)
PSV 0082 A/B/C classifcation activation of ESD-1and
source of Ignition of Injury personnel present
drawings Deluge system

A 0.01 0.01 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-05
ESDV 0080 closed

180 min/(24
Clean service Zone 2 Area hours*60 min)

B ESDV 0081A closed 0.01 0.01 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-05

180 min/(24
Clean service Zone 2 Area hours*60 min)

C FV 0017 fail open 0.10 0.01 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-04

Clean service Zone 2 Area 180 min/(24


hours*60 min)

D 1.00 1.00 1.00 1.00 1.00 1.00 0.00E+00

E 1.00 1.00 1.00 1.00 1.00 1.00 0.00E+00

Total Mitigated Event Frequency, Fe (/year) 1.50E-04


Max PFDavg for Safety (Ft_s/Fe) 6.67E-03
Max PFDavg for Assests/Economic (Ft_e/Fe) 6.67E-03
Max PFDavg for Environment (Ft_a/Fe) 6.67E+01
Target SIL SIL2
Target AIL AIL2
Target EIL EIL 0
10% of maximum Calculated Value Calculated Value Calculated Value (E)
SIL Classification value (S) (A)
SIL 0 <10 <9 0.015
SIL 1 >10 to <100 >9.1 to <90
SIL 2 >100 to <1,000 >91 to <900 150 150
SIL 3 >1,000 to <10,000 >901 to <9,000
SIL 4 >10,000 to
<100,000 >9,001 to <90,000
Layer of Protection Analysis
(IEC 61508/61511 Compliant) Project Export Gas Compression Facilities Upgrade Project Target SIL Target AIL Target EIL
SIF No. SIF-24 Err:508 Err:508 Err:508
SIF Tag No. 200JVAHH-0131A2
Event Consequence

Target Freq. Safety Err:508 (events/year) Two to three onsite fatalities or four permanent
Err:508 disabling injuries and/
Property damage (e. g.,orfacility
loss ofmanned
revenuefull
in time,
excesson-of
Target Freq. Property/ Revenue line maintenance
US$100 million activities having immediate effects)
Target Freq. Environment Err:508 No remediation. No off-site impact/ damage

SIF Description Vibration high-high sensed by Vibrating switch - Fan A2 will trip EGC Train no. J interstage Aircooler Fan A2 200J-A0130-A2

P&ID RLE-2007-PPI-54305

Independent Protection Layers (IPLs) Conditional Modifiers


1 2 3 4 5 6 7 8 9
Unmitigated
Initiating Description of Initiating Cause Mitigated Event
Cause Initiating Cause Freq (/yr)
Freq (/yr) Probabilty of Probability of Risk Probability of
source of Ignition of Injury personnel present

A 0.00 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 0.00E+00

Zone 2 Area 180 min/(24


hours*60 min)

B 0.00 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 0.00E+00

Zone 2 Area 180 min/(24


hours*60 min)
C 1.00 1.00 1.00 1.00 0.00E+00

D 1.00 1.00 1.00 1.00 0.00E+00

E 1.00 1.00 1.00 1.00 0.00E+00

Total Mitigated Event Frequency, Fe (/year) 0.00E+00


REMARK: VIBRATION SWITCHES ON FIN FAN WERE NOT INCLUDED IN THE HAZOP STUDY SINCE CONSEQUENCES ARE MINIMAL IN CASE OF SINGLE MOTOR FAILURE Max PFDavg for Safety (Ft_s/Fe) Err:508
Max PFDavg for Environment(Ft_e/Fe) Err:508
Max PFDavg for Assests/Economic(Ft_a/Fe) Err:508
Target SIL Err:508
Target AIL Err:508
Target EIL Err:508
SIL Classification
SIL-1 1 in 10 to 1 in 100 0.1 to 0.01
SIL-2 1 in 100 to 1 in 1000 0.01 to 0.001
SIL-3 1 in 1000 to 1 in 10000 0.001 to 0.0001
SIL-4 1 in 10000 to 1 in 100000 0.0001 to 0.00001

If PFDavg >0.1 then SIL=0 or Unclassified


Layer of Protection Analysis
(IEC 61508/61511 Compliant) Project Export Gas Compression Facilities Upgrade Project Target SIL Target AIL Target EIL
SIF No. SIF-26 Err:508 Err:508 Err:508
SIF Tag No. 200JVAHH-0131B2
Event Consequence

Target Freq. Safety Err:508 (events/year) Two to three onsite fatalities or four permanent
Err:508 disabling injuries and/
Property damage (e. g.,orfacility
loss ofmanned
revenuefull
in time,
excesson-of
Target Freq. Property/ Revenue line maintenance
US$100 million activities having immediate effects)
Target Freq. Environment Err:508 No remediation. No off-site impact/ damage

SIF Description Vibration high-high sensed by Vibrating switch - Fan B2 will trip EGC Train no. J interstage Aircooler Fan B2 200J-A0130-B2

P&ID RLE-2007-PPI-54305

Independent Protection Layers (IPLs) Conditional Modifiers


1 2 3 4 5 6 7 8 9
Unmitigated
Initiating Description of Initiating Cause Mitigated Event
Cause Initiating Cause Freq (/yr)
Freq (/yr) Probabilty of Probability of Risk Probability of
source of Ignition of Injury personnel present

A 0.10 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-03

Zone 2 Area 180 min/(24


hours*60 min)

B 0.01 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-04

Zone 2 Area 180 min/(24


hours*60 min)
C 1.00 1.00 1.00 1.00 0.00E+00

D 1.00 1.00 1.00 1.00 0.00E+00

E 1.00 1.00 1.00 1.00 0.00E+00

Total Mitigated Event Frequency, Fe (/year) 1.38E-03


Max PFDavg for Safety (Ft_s/Fe) Err:508
Max PFDavg for Environment(Ft_e/Fe) Err:508
Max PFDavg for Assests/Economic(Ft_a/Fe) Err:508
Target SIL Err:508
Target AIL Err:508
Target EIL Err:508
SIL Classification
SIL-1 1 in 10 to 1 in 100 0.1 to 0.01
SIL-2 1 in 100 to 1 in 1000 0.01 to 0.001
SIL-3 1 in 1000 to 1 in 10000 0.001 to 0.0001
SIL-4 1 in 10000 to 1 in 100000 0.0001 to 0.00001

If PFDavg >0.1 then SIL=0 or Unclassified


Layer of Protection Analysis
(IEC 61508/61511 Compliant) Project Export Gas Compression Facilities Upgrade Project Target SIL Target AIL Target EIL
SIF No. SIF-27 Err:508 Err:508 Err:508
SIF Tag No. 200JVAHH-0131C1
Event Consequence

Target Freq. Safety Err:508 (events/year) Two to three onsite fatalities or four permanent
Err:508 disabling injuries and/
Property damage (e. g.,orfacility
loss ofmanned
revenuefull
in time,
excesson-of
Target Freq. Property/ Revenue line maintenance
US$100 million activities having immediate effects)
Target Freq. Environment Err:508 No remediation. No off-site impact/ damage

SIF Description Vibration high-high sensed by Vibrating switch - Fan C1 will trip EGC Train no. J interstage Aircooler Fan C1 200J-A0130-C1

P&ID RLE-2007-PPI-54305

Independent Protection Layers (IPLs) Conditional Modifiers


1 2 3 4 5 6 7 8 9
Unmitigated
Initiating Description of Initiating Cause Mitigated Event
Cause Initiating Cause Freq (/yr)
Freq (/yr) Probabilty of Probability of Risk Probability of
source of Ignition of Injury personnel present

A 0.10 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-03

Zone 2 Area 180 min/(24


hours*60 min)

B 0.01 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-04

Zone 2 Area 180 min/(24


hours*60 min)
C 1.00 1.00 1.00 1.00 0.00E+00

D 1.00 1.00 1.00 1.00 0.00E+00

E 1.00 1.00 1.00 1.00 0.00E+00

Total Mitigated Event Frequency, Fe (/year) 1.38E-03


Max PFDavg for Safety (Ft_s/Fe) Err:508
Max PFDavg for Environment(Ft_e/Fe) Err:508
Max PFDavg for Assests/Economic(Ft_a/Fe) Err:508
Target SIL Err:508
Target AIL Err:508
Target EIL Err:508
SIL Classification
SIL-1 1 in 10 to 1 in 100 0.1 to 0.01
SIL-2 1 in 100 to 1 in 1000 0.01 to 0.001
SIL-3 1 in 1000 to 1 in 10000 0.001 to 0.0001
SIL-4 1 in 10000 to 1 in 100000 0.0001 to 0.00001

If PFDavg >0.1 then SIL=0 or Unclassified


Layer of Protection Analysis
(IEC 61508/61511 Compliant) Project Export Gas Compression Facilities Upgrade Project Target SIL Target AIL Target EIL
SIF No. SIF-28 Err:508 Err:508 Err:508
SIF Tag No. 200JVAHH-0131C2
Event Consequence

Target Freq. Safety Err:508 (events/year) Two to three onsite fatalities or four permanent
Err:508 disabling injuries and/
Property damage (e. g.,orfacility
loss ofmanned
revenuefull
in time,
excesson-of
Target Freq. Property/ Revenue line maintenance
US$100 million activities having immediate effects)
Target Freq. Environment Err:508 No remediation. No off-site impact/ damage

SIF Description Vibration high-high sensed by Vibrating switch - Fan C2 will trip EGC Train no. J interstage Aircooler Fan C2 200J-A0130-C2

P&ID RLE-2007-PPI-54305

Independent Protection Layers (IPLs) Conditional Modifiers


1 2 3 4 5 6 7 8 9
Unmitigated
Initiating Description of Initiating Cause Mitigated Event
Cause Initiating Cause Freq (/yr)
Freq (/yr) Probabilty of Probability of Risk Probability of
source of Ignition of Injury personnel present

A 0.10 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-03

Zone 2 Area 180 min/(24


hours*60 min)

B 0.01 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-04

Zone 2 Area 180 min/(24


hours*60 min)
C 1.00 1.00 1.00 1.00 0.00E+00

D 1.00 1.00 1.00 1.00 0.00E+00

E 1.00 1.00 1.00 1.00 0.00E+00

Total Mitigated Event Frequency, Fe (/year) 1.38E-03


Max PFDavg for Safety (Ft_s/Fe) Err:508
Max PFDavg for Environment(Ft_e/Fe) Err:508
Max PFDavg for Assests/Economic(Ft_a/Fe) Err:508
Target SIL Err:508
Target AIL Err:508
Target EIL Err:508
SIL Classification
SIL-1 1 in 10 to 1 in 100 0.1 to 0.01
SIL-2 1 in 100 to 1 in 1000 0.01 to 0.001
SIL-3 1 in 1000 to 1 in 10000 0.001 to 0.0001
SIL-4 1 in 10000 to 1 in 100000 0.0001 to 0.00001

If PFDavg >0.1 then SIL=0 or Unclassified


Layer of Protection Analysis
(IEC 61508/61511 Compliant) Project Export Gas Compression Facilities Upgrade Project Target SIL Target AIL Target EIL
SIF No. SIF-29 Err:508 Err:508 Err:508
SIF Tag No. 200JVAHH-0131D1
Event Consequence

Target Freq. Safety Err:508 (events/year) Two to three onsite fatalities or four permanent
Err:508 disabling injuries and/
Property damage (e. g.,orfacility
loss ofmanned
revenuefull
in time,
excesson-of
Target Freq. Property/ Revenue line maintenance
US$100 million activities having immediate effects)
Target Freq. Environment Err:508 No remediation. No off-site impact/ damage

SIF Description Vibration high-high sensed by Vibrating switch - Fan D1 will trip EGC Train no. J interstage Aircooler Fan D1 200J-A0130-D1

P&ID RLE-2007-PPI-54305

Independent Protection Layers (IPLs) Conditional Modifiers


1 2 3 4 5 6 7 8 9
Unmitigated
Initiating Description of Initiating Cause Mitigated Event
Cause Initiating Cause Freq (/yr)
Freq (/yr) Probabilty of Probability of Risk Probability of
source of Ignition of Injury personnel present

A 0.10 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-03

Zone 2 Area 180 min/(24


hours*60 min)

B 0.01 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-04

Zone 2 Area 180 min/(24


hours*60 min)
C 1.00 1.00 1.00 1.00 0.00E+00

D 1.00 1.00 1.00 1.00 0.00E+00

E 1.00 1.00 1.00 1.00 0.00E+00

Total Mitigated Event Frequency, Fe (/year) 1.38E-03


Max PFDavg for Safety (Ft_s/Fe) Err:508
Max PFDavg for Environment(Ft_e/Fe) Err:508
Max PFDavg for Assests/Economic(Ft_a/Fe) Err:508
Target SIL Err:508
Target AIL Err:508
Target EIL Err:508
SIL Classification
SIL-1 1 in 10 to 1 in 100 0.1 to 0.01
SIL-2 1 in 100 to 1 in 1000 0.01 to 0.001
SIL-3 1 in 1000 to 1 in 10000 0.001 to 0.0001
SIL-4 1 in 10000 to 1 in 100000 0.0001 to 0.00001

If PFDavg >0.1 then SIL=0 or Unclassified


Layer of Protection Analysis
(IEC 61508/61511 Compliant) Project Export Gas Compression Facilities Upgrade Project Target SIL Target AIL Target EIL
SIF No. SIF-30 Err:508 Err:508 Err:508
SIF Tag No. 200JVAHH-0131D2
Event Consequence

Target Freq. Safety Err:508 (events/year) Two to three onsite fatalities or four permanent
Err:508 disabling injuries and/
Property damage (e. g.,orfacility
loss ofmanned
revenuefull
in time,
excesson-of
Target Freq. Property/ Revenue line maintenance
US$100 million activities having immediate effects)
Target Freq. Environment Err:508 No remediation. No off-site impact/ damage

SIF Description Vibration high-high sensed by Vibrating switch - Fan D2 will trip EGC Train no. J interstage Aircooler Fan D2 200J-A0130-D2

P&ID RLE-2007-PPI-54305

Independent Protection Layers (IPLs) Conditional Modifiers


1 2 3 4 5 6 7 8 9
Unmitigated
Initiating Description of Initiating Cause Mitigated Event
Cause Initiating Cause Freq (/yr)
Freq (/yr) Probabilty of Probability of Risk Probability of
source of Ignition of Injury personnel present

A 0.10 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-03

Zone 2 Area 180 min/(24


hours*60 min)

B 0.01 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-04

Zone 2 Area 180 min/(24


hours*60 min)
C 1.00 1.00 1.00 1.00 0.00E+00

D 1.00 1.00 1.00 1.00 0.00E+00

E 1.00 1.00 1.00 1.00 0.00E+00

Total Mitigated Event Frequency, Fe (/year) 1.38E-03


Max PFDavg for Safety (Ft_s/Fe) Err:508
Max PFDavg for Environment(Ft_e/Fe) Err:508
Max PFDavg for Assests/Economic(Ft_a/Fe) Err:508
Target SIL Err:508
Target AIL Err:508
Target EIL Err:508
SIL Classification
SIL-1 1 in 10 to 1 in 100 0.1 to 0.01
SIL-2 1 in 100 to 1 in 1000 0.01 to 0.001
SIL-3 1 in 1000 to 1 in 10000 0.001 to 0.0001
SIL-4 1 in 10000 to 1 in 100000 0.0001 to 0.00001

If PFDavg >0.1 then SIL=0 or Unclassified


Layer of Protection Analysis
(IEC 61508/61511 Compliant) Project Export Gas Compression Facilities Upgrade Project Target SIL Target AIL Target EIL
SIF No. SIF-31 Err:508 Err:508 Err:508
SIF Tag No. 200JVAHH-0141A1
Event Consequence

Target Freq. Safety Err:508 (events/year) Two to three onsite fatalities or four permanent
Err:508 disabling injuries and/
Property damage (e. g.,orfacility
loss ofmanned
revenuefull
in time,
excesson-of
Target Freq. Property/ Revenue line maintenance
US$100 million activities having immediate effects)
Target Freq. Environment Err:508 No remediation. No off-site impact/ damage

SIF Description Vibration high-high sensed by Vibrating switch - Fan A1 will trip EGC Train no. J interstage Aircooler Fan A1 200J-A0140-A1

P&ID RLE-2007-PPI-54308

Independent Protection Layers (IPLs) Conditional Modifiers


1 2 3 4 5 6 7 8 9
Unmitigated
Initiating Description of Initiating Cause Mitigated Event
Cause Initiating Cause Freq (/yr)
Freq (/yr) Probabilty of Probability of Risk Probability of
source of Ignition of Injury personnel present

A 0.10 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-03

Zone 2 Area 180 min/(24


hours*60 min)

B 0.01 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-04

Zone 2 Area 180 min/(24


hours*60 min)
C 1.00 1.00 1.00 1.00 0.00E+00

D 1.00 1.00 1.00 1.00 0.00E+00

E 1.00 1.00 1.00 1.00 0.00E+00

Total Mitigated Event Frequency, Fe (/year) 1.38E-03


Max PFDavg for Safety (Ft_s/Fe) Err:508
Max PFDavg for Environment(Ft_e/Fe) Err:508
Max PFDavg for Assests/Economic(Ft_a/Fe) Err:508
Target SIL Err:508
Target AIL Err:508
Target EIL Err:508
SIL Classification
SIL-1 1 in 10 to 1 in 100 0.1 to 0.01
SIL-2 1 in 100 to 1 in 1000 0.01 to 0.001
SIL-3 1 in 1000 to 1 in 10000 0.001 to 0.0001
SIL-4 1 in 10000 to 1 in 100000 0.0001 to 0.00001

If PFDavg >0.1 then SIL=0 or Unclassified


Layer of Protection Analysis
(IEC 61508/61511 Compliant) Project Export Gas Compression Facilities Upgrade Project Target SIL Target AIL Target EIL
SIF No. SIF-32 Err:508 Err:508 Err:508
SIF Tag No. 200JVAHH-0141A2
Event Consequence

Target Freq. Safety Err:508 (events/year) Two to three onsite fatalities or four permanent
Err:508 disabling injuries and/
Property damage (e. g.,orfacility
loss ofmanned
revenuefull
in time,
excesson-of
Target Freq. Property/ Revenue line maintenance
US$100 million activities having immediate effects)
Target Freq. Environment Err:508 No remediation. No off-site impact/ damage

SIF Description Vibration high-high sensed by Vibrating switch - Fan A2 will trip EGC Train no. J interstage Aircooler Fan A2 200J-A0140-A2

P&ID RLE-2007-PPI-54308

Independent Protection Layers (IPLs) Conditional Modifiers


1 2 3 4 5 6 7 8 9
Unmitigated
Initiating Description of Initiating Cause Mitigated Event
Cause Initiating Cause Freq (/yr)
Freq (/yr) Probabilty of Probability of Risk Probability of
source of Ignition of Injury personnel present

A 0.10 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-03

Zone 2 Area 180 min/(24


hours*60 min)

B 0.01 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-04

Zone 2 Area 180 min/(24


hours*60 min)
C 1.00 1.00 1.00 1.00 0.00E+00

D 1.00 1.00 1.00 1.00 0.00E+00

E 1.00 1.00 1.00 1.00 0.00E+00

Total Mitigated Event Frequency, Fe (/year) 1.38E-03


Max PFDavg for Safety (Ft_s/Fe) Err:508
Max PFDavg for Environment(Ft_e/Fe) Err:508
Max PFDavg for Assests/Economic(Ft_a/Fe) Err:508
Target SIL Err:508
Target AIL Err:508
Target EIL Err:508
SIL Classification
SIL-1 1 in 10 to 1 in 100 0.1 to 0.01
SIL-2 1 in 100 to 1 in 1000 0.01 to 0.001
SIL-3 1 in 1000 to 1 in 10000 0.001 to 0.0001
SIL-4 1 in 10000 to 1 in 100000 0.0001 to 0.00001

If PFDavg >0.1 then SIL=0 or Unclassified


Layer of Protection Analysis
(IEC 61508/61511 Compliant) Project Export Gas Compression Facilities Upgrade Project Target SIL Target AIL Target EIL
SIF No. SIF-33 Err:508 Err:508 Err:508
SIF Tag No. 200JVAHH-0141B1
Event Consequence

Target Freq. Safety Err:508 (events/year) Two to three onsite fatalities or four permanent
Err:508 disabling injuries and/
Property damage (e. g.,orfacility
loss ofmanned
revenuefull
in time,
excesson-of
Target Freq. Property/ Revenue line maintenance
US$100 million activities having immediate effects)
Target Freq. Environment Err:508 No remediation. No off-site impact/ damage

SIF Description Vibration high-high sensed by Vibrating switch - Fan B1 will trip EGC Train no. J interstage Aircooler Fan B1 200J-A0140-B1

P&ID RLE-2007-PPI-54308

Independent Protection Layers (IPLs) Conditional Modifiers


1 2 3 4 5 6 7 8 9
Unmitigated
Initiating Description of Initiating Cause Mitigated Event
Cause Initiating Cause Freq (/yr)
Freq (/yr) Probabilty of Probability of Risk Probability of
source of Ignition of Injury personnel present

A 0.10 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-03

Zone 2 Area 180 min/(24


hours*60 min)

B 0.01 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-04

Zone 2 Area 180 min/(24


hours*60 min)
C 1.00 1.00 1.00 1.00 0.00E+00

D 1.00 1.00 1.00 1.00 0.00E+00

E 1.00 1.00 1.00 1.00 0.00E+00

Total Mitigated Event Frequency, Fe (/year) 1.38E-03


Max PFDavg for Safety (Ft_s/Fe) Err:508
Max PFDavg for Environment(Ft_e/Fe) Err:508
Max PFDavg for Assests/Economic(Ft_a/Fe) Err:508
Target SIL Err:508
Target AIL Err:508
Target EIL Err:508
SIL Classification
SIL-1 1 in 10 to 1 in 100 0.1 to 0.01
SIL-2 1 in 100 to 1 in 1000 0.01 to 0.001
SIL-3 1 in 1000 to 1 in 10000 0.001 to 0.0001
SIL-4 1 in 10000 to 1 in 100000 0.0001 to 0.00001

If PFDavg >0.1 then SIL=0 or Unclassified


Layer of Protection Analysis
(IEC 61508/61511 Compliant) Project Export Gas Compression Facilities Upgrade Project Target SIL Target AIL Target EIL
SIF No. SIF-34 Err:508 Err:508 Err:508
SIF Tag No. 200JVAHH-0141B2
Event Consequence

Target Freq. Safety Err:508 (events/year) Two to three onsite fatalities or four permanent
Err:508 disabling injuries and/
Property damage (e. g.,orfacility
loss ofmanned
revenuefull
in time,
excesson-of
Target Freq. Property/ Revenue line maintenance
US$100 million activities having immediate effects)
Target Freq. Environment Err:508 No remediation. No off-site impact/ damage

SIF Description Vibration high-high sensed by Vibrating switch - Fan B2 will trip EGC Train no. J interstage Aircooler Fan B2 200J-A0140-B2

P&ID RLE-2007-PPI-54308

Independent Protection Layers (IPLs) Conditional Modifiers


1 2 3 4 5 6 7 8 9
Unmitigated
Initiating Description of Initiating Cause Mitigated Event
Cause Initiating Cause Freq (/yr)
Freq (/yr) Probabilty of Probability of Risk Probability of
source of Ignition of Injury personnel present

A 0.10 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-03

Zone 2 Area 180 min/(24


hours*60 min)

B 0.01 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-04

Zone 2 Area 180 min/(24


hours*60 min)
C 1.00 1.00 1.00 1.00 0.00E+00

D 1.00 1.00 1.00 1.00 0.00E+00

E 1.00 1.00 1.00 1.00 0.00E+00

Total Mitigated Event Frequency, Fe (/year) 1.38E-03


Max PFDavg for Safety (Ft_s/Fe) Err:508
Max PFDavg for Environment(Ft_e/Fe) Err:508
Max PFDavg for Assests/Economic(Ft_a/Fe) Err:508
Target SIL Err:508
Target AIL Err:508
Target EIL Err:508
SIL Classification
SIL-1 1 in 10 to 1 in 100 0.1 to 0.01
SIL-2 1 in 100 to 1 in 1000 0.01 to 0.001
SIL-3 1 in 1000 to 1 in 10000 0.001 to 0.0001
SIL-4 1 in 10000 to 1 in 100000 0.0001 to 0.00001

If PFDavg >0.1 then SIL=0 or Unclassified


Layer of Protection Analysis
(IEC 61508/61511 Compliant) Project Export Gas Compression Facilities Upgrade Project Target SIL Target AIL Target EIL
SIF No. SIF-35 Err:508 Err:508 Err:508
SIF Tag No. 200JVAHH-0141C1
Event Consequence

Target Freq. Safety Err:508 (events/year) Two to three onsite fatalities or four permanent
Err:508 disabling injuries and/
Property damage (e. g.,orfacility
loss ofmanned
revenuefull
in time,
excesson-of
Target Freq. Property/ Revenue line maintenance
US$100 million activities having immediate effects)
Target Freq. Environment Err:508 No remediation. No off-site impact/ damage

SIF Description Vibration high-high sensed by Vibrating switch - Fan C1 will trip EGC Train no. J interstage Aircooler Fan C1 200J-A0140-C1

P&ID RLE-2007-PPI-54308

Independent Protection Layers (IPLs) Conditional Modifiers


1 2 3 4 5 6 7 8 9
Unmitigated
Initiating Description of Initiating Cause Mitigated Event
Cause Initiating Cause Freq (/yr)
Freq (/yr) Probabilty of Probability of Risk Probability of
source of Ignition of Injury personnel present

A 0.10 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-03

Zone 2 Area 180 min/(24


hours*60 min)

B 0.01 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-04

Zone 2 Area 180 min/(24


hours*60 min)
C 1.00 1.00 1.00 1.00 0.00E+00

D 1.00 1.00 1.00 1.00 0.00E+00

E 1.00 1.00 1.00 1.00 0.00E+00

Total Mitigated Event Frequency, Fe (/year) 1.38E-03


Max PFDavg for Safety (Ft_s/Fe) Err:508
Max PFDavg for Environment(Ft_e/Fe) Err:508
Max PFDavg for Assests/Economic(Ft_a/Fe) Err:508
Target SIL Err:508
Target AIL Err:508
Target EIL Err:508
SIL Classification
SIL-1 1 in 10 to 1 in 100 0.1 to 0.01
SIL-2 1 in 100 to 1 in 1000 0.01 to 0.001
SIL-3 1 in 1000 to 1 in 10000 0.001 to 0.0001
SIL-4 1 in 10000 to 1 in 100000 0.0001 to 0.00001

If PFDavg >0.1 then SIL=0 or Unclassified


Layer of Protection Analysis
(IEC 61508/61511 Compliant) Project Export Gas Compression Facilities Upgrade Project Target SIL Target AIL Target EIL
SIF No. SIF-36 Err:508 Err:508 Err:508
SIF Tag No. 200JVAHH-0141C2
Event Consequence

Target Freq. Safety Err:508 (events/year) Two to three onsite fatalities or four permanent
Err:508 disabling injuries and/
Property damage (e. g.,orfacility
loss ofmanned
revenuefull
in time,
excesson-of
Target Freq. Property/ Revenue line maintenance
US$100 million activities having immediate effects)
Target Freq. Environment Err:508 No remediation. No off-site impact/ damage

SIF Description Vibration high-high sensed by Vibrating switch - Fan C2 will trip EGC Train no. J interstage Aircooler Fan C2 200J-A0140-C2

P&ID RLE-2007-PPI-54308

Independent Protection Layers (IPLs) Conditional Modifiers


1 2 3 4 5 6 7 8 9
Unmitigated
Initiating Description of Initiating Cause Mitigated Event
Cause Initiating Cause Freq (/yr)
Freq (/yr) Probabilty of Probability of Risk Probability of
source of Ignition of Injury personnel present

A 0.10 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-03

Zone 2 Area 180 min/(24


hours*60 min)

B 0.01 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-04

Zone 2 Area 180 min/(24


hours*60 min)
C 1.00 1.00 1.00 1.00 0.00E+00

D 1.00 1.00 1.00 1.00 0.00E+00

E 1.00 1.00 1.00 1.00 0.00E+00

Total Mitigated Event Frequency, Fe (/year) 1.38E-03


Max PFDavg for Safety (Ft_s/Fe) Err:508
Max PFDavg for Environment(Ft_e/Fe) Err:508
Max PFDavg for Assests/Economic(Ft_a/Fe) Err:508
Target SIL Err:508
Target AIL Err:508
Target EIL Err:508
SIL Classification
SIL-1 1 in 10 to 1 in 100 0.1 to 0.01
SIL-2 1 in 100 to 1 in 1000 0.01 to 0.001
SIL-3 1 in 1000 to 1 in 10000 0.001 to 0.0001
SIL-4 1 in 10000 to 1 in 100000 0.0001 to 0.00001

If PFDavg >0.1 then SIL=0 or Unclassified


Layer of Protection Analysis
(IEC 61508/61511 Compliant) Project Export Gas Compression Facilities Upgrade Project Target SIL Target AIL Target EIL
SIF No. SIF-37 Err:508 Err:508 Err:508
SIF Tag No. 200JVAHH-0141D1
Event Consequence

Target Freq. Safety Err:508 (events/year) Two to three onsite fatalities or four permanent
Err:508 disabling injuries and/
Property damage (e. g.,orfacility
loss ofmanned
revenuefull
in time,
excesson-of
Target Freq. Property/ Revenue line maintenance
US$100 million activities having immediate effects)
Target Freq. Environment Err:508 No remediation. No off-site impact/ damage

SIF Description Vibration high-high sensed by Vibrating switch - Fan D1 will trip EGC Train no. J interstage Aircooler Fan D1 200J-A0140-D1

P&ID RLE-2007-PPI-54308

Independent Protection Layers (IPLs) Conditional Modifiers


1 2 3 4 5 6 7 8 9
Unmitigated
Initiating Description of Initiating Cause Mitigated Event
Cause Initiating Cause Freq (/yr)
Freq (/yr) Probabilty of Probability of Risk Probability of
source of Ignition of Injury personnel present

A 0.10 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-03

Zone 2 Area 180 min/(24


hours*60 min)

B 0.01 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-04

Zone 2 Area 180 min/(24


hours*60 min)
C 1.00 1.00 1.00 1.00 0.00E+00

D 1.00 1.00 1.00 1.00 0.00E+00

E 1.00 1.00 1.00 1.00 0.00E+00

Total Mitigated Event Frequency, Fe (/year) 1.38E-03


Max PFDavg for Safety (Ft_s/Fe) Err:508
Max PFDavg for Environment(Ft_e/Fe) Err:508
Max PFDavg for Assests/Economic(Ft_a/Fe) Err:508
Target SIL Err:508
Target AIL Err:508
Target EIL Err:508
SIL Classification
SIL-1 1 in 10 to 1 in 100 0.1 to 0.01
SIL-2 1 in 100 to 1 in 1000 0.01 to 0.001
SIL-3 1 in 1000 to 1 in 10000 0.001 to 0.0001
SIL-4 1 in 10000 to 1 in 100000 0.0001 to 0.00001

If PFDavg >0.1 then SIL=0 or Unclassified


Layer of Protection Analysis
(IEC 61508/61511 Compliant) Project Export Gas Compression Facilities Upgrade Project Target SIL Target AIL Target EIL
SIF No. SIF-38 Err:508 Err:508 Err:508
SIF Tag No. 200JVAHH-0141D2
Event Consequence

Target Freq. Safety Err:508 (events/year) Two to three onsite fatalities or four permanent
Err:508 disabling injuries and/
Property damage (e. g.,orfacility
loss ofmanned
revenuefull
in time,
excesson-of
Target Freq. Property/ Revenue line maintenance
US$100 million activities having immediate effects)
Target Freq. Environment Err:508 No remediation. No off-site impact/ damage

SIF Description Vibration high-high sensed by Vibrating switch - Fan D2 will trip EGC Train no. J interstage Aircooler Fan D2 200J-A0140-D2

P&ID RLE-2007-PPI-54308

Independent Protection Layers (IPLs) Conditional Modifiers


1 2 3 4 5 6 7 8 9
Unmitigated
Initiating Description of Initiating Cause Mitigated Event
Cause Initiating Cause Freq (/yr)
Freq (/yr) Probabilty of Probability of Risk Probability of
source of Ignition of Injury personnel present

A 0.10 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-03

Zone 2 Area 180 min/(24


hours*60 min)

B 0.01 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-04

Zone 2 Area 180 min/(24


hours*60 min)
C 1.00 1.00 1.00 1.00 0.00E+00

D 1.00 1.00 1.00 1.00 0.00E+00

E 1.00 1.00 1.00 1.00 0.00E+00

Total Mitigated Event Frequency, Fe (/year) 1.38E-03


Max PFDavg for Safety (Ft_s/Fe) Err:508
Max PFDavg for Environment(Ft_e/Fe) Err:508
Max PFDavg for Assests/Economic(Ft_a/Fe) Err:508
Target SIL Err:508
Target AIL Err:508
Target EIL Err:508
SIL Classification
SIL-1 1 in 10 to 1 in 100 0.1 to 0.01
SIL-2 1 in 100 to 1 in 1000 0.01 to 0.001
SIL-3 1 in 1000 to 1 in 10000 0.001 to 0.0001
SIL-4 1 in 10000 to 1 in 100000 0.0001 to 0.00001

If PFDavg >0.1 then SIL=0 or Unclassified


Layer of Protection Analysis
(IEC 61508/61511 Compliant) Project Export Gas Compression Facilities Upgrade Project Target SIL Target AIL Target EIL
SIF No. SIF-41 Err:508 Err:508 Err:508
SIF Tag No. 1720EXS0326B1&B2
Event Consequence

Target Freq. Safety Err:508 (events/year) Two to three onsite fatalities or four permanent
Err:508 disabling injuries and/
Property damage (e. g.,orfacility
loss ofmanned
revenuefull
in time,
excesson-of
Target Freq. Property/ Revenue line maintenance
US$100 million activities having immediate effects)
Target Freq. Environment Err:508 No remediation. No off-site impact/ damage

SIF Description UPS low voltage for AC supply

P&ID -

Independent Protection Layers (IPLs) Conditional Modifiers


1 2 3 4 5 6 7 8 9
Unmitigated
Initiating Description of Initiating Cause Mitigated Event
Cause Initiating Cause Freq (/yr)
Freq (/yr) Probabilty of Probability of Risk Probability of
source of Ignition of Injury personnel present

A 0.10 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-03

Zone 2 Area 180 min/(24


hours*60 min)

B 0.01 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-04

Zone 2 Area 180 min/(24


hours*60 min)
C 1.00 1.00 1.00 1.00 0.00E+00

D 1.00 1.00 1.00 1.00 0.00E+00

E 1.00 1.00 1.00 1.00 0.00E+00

Total Mitigated Event Frequency, Fe (/year) 1.38E-03


Max PFDavg for Safety (Ft_s/Fe) Err:508
Max PFDavg for Environment(Ft_e/Fe) Err:508
Max PFDavg for Assests/Economic(Ft_a/Fe) Err:508
Target SIL Err:508
Target AIL Err:508
Target EIL Err:508
SIL Classification
SIL-1 1 in 10 to 1 in 100 0.1 to 0.01
SIL-2 1 in 100 to 1 in 1000 0.01 to 0.001
SIL-3 1 in 1000 to 1 in 10000 0.001 to 0.0001
SIL-4 1 in 10000 to 1 in 100000 0.0001 to 0.00001

If PFDavg >0.1 then SIL=0 or Unclassified


Layer of Protection Analysis
(IEC 61508/61511 Compliant) Project Export Gas Compression Facilities Upgrade Project Target SIL Target AIL Target EIL
SIF No. SIF-42 Err:508 Err:508 Err:508
SIF Tag No. 1720EXS032081A&B
Event Consequence

Target Freq. Safety Err:508 (events/year) Two to three onsite fatalities or four permanent
Err:508 disabling injuries and/
Property damage (e. g.,orfacility
loss ofmanned
revenuefull
in time,
excesson-of
Target Freq. Property/ Revenue line maintenance
US$100 million activities having immediate effects)
Target Freq. Environment Err:508 No remediation. No off-site impact/ damage

SIF Description UPS low voltage for DC supply

P&ID -

Independent Protection Layers (IPLs) Conditional Modifiers


1 2 3 4 5 6 7 8 9
Unmitigated
Initiating Description of Initiating Cause Mitigated Event
Cause Initiating Cause Volume bottles are
Freq (/yr)
available for critical Probabilty of Probability of Risk Probability of
Freq (/yr) Discrepancy alarm will alert
valves (ESDVs, BDVs SIL rated valve
the operator.
and SDVs)-revenue source of Ignition of Injury personnel present
only (for loss of IA)

A 0.10 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-03
BDV 2215 fails open when needs to be closed
Zone 2 Area 180 min/(24
hours*60 min)

B 0.01 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-04

Zone 2 Area 180 min/(24


hours*60 min)
C 1.00 1.00 1.00 1.00 0.00E+00

D 1.00 1.00 1.00 1.00 0.00E+00

E 1.00 1.00 1.00 1.00 0.00E+00

Total Mitigated Event Frequency, Fe (/year) 1.38E-03


Max PFDavg for Safety (Ft_s/Fe) Err:508
Max PFDavg for Environment(Ft_e/Fe) Err:508
Max PFDavg for Assests/Economic(Ft_a/Fe) Err:508
Target SIL Err:508
Target AIL Err:508
Target EIL Err:508
SIL Classification
SIL-1 1 in 10 to 1 in 100 0.1 to 0.01
SIL-2 1 in 100 to 1 in 1000 0.01 to 0.001
SIL-3 1 in 1000 to 1 in 10000 0.001 to 0.0001
SIL-4 1 in 10000 to 1 in 100000 0.0001 to 0.00001

If PFDavg >0.1 then SIL=0 or Unclassified


Layer of Protection Analysis
(IEC 61508/61511 Compliant) Project Export Gas Compression Facilities Upgrade Project Target SIL Target AIL Target EIL
SIF No. SIF-43 Err:508 Err:508 Err:508
SIF Tag No. 1720EXS032082A&B
Event Consequence

Target Freq. Safety Err:508 (events/year) Two to three onsite fatalities or four permanent
Err:508 disabling injuries and/
Property damage (e. g.,orfacility
loss ofmanned
revenuefull
in time,
excesson-of
Target Freq. Property/ Revenue line maintenance
US$100 million activities having immediate effects)
Target Freq. Environment Err:508 No remediation. No off-site impact/ damage

SIF Description UPS low voltage for DC supply

P&ID -

Independent Protection Layers (IPLs) Conditional Modifiers


1 2 3 4 5 6 7 8 9
Unmitigated
Initiating Mitigated Event
Description of Initiating Cause Initiating Cause Volume bottles are
Cause available for critical Probabilty of Probability of Risk Probability of Freq (/yr)
Freq (/yr) Discrepancy alarm will alert
valves (ESDVs, BDVs SIL rated valve
the operator.
and SDVs)-revenue source of Ignition of Injury personnel present
only (for loss of IA)

A 0.10 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-03
BDV 2215 fails open when needs to be closed
Zone 2 Area 180 min/(24
hours*60 min)

B 0.01 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-04

180 min/(24
Zone 2 Area
hours*60 min)
C 1.00 1.00 1.00 1.00 0.00E+00

D 1.00 1.00 1.00 1.00 0.00E+00

E 1.00 1.00 1.00 1.00 0.00E+00

Total Mitigated Event Frequency, Fe (/year) 1.38E-03


Max PFDavg for Safety (Ft_s/Fe) Err:508
Max PFDavg for Environment(Ft_e/Fe) Err:508
Max PFDavg for Assests/Economic(Ft_a/Fe) Err:508
Target SIL Err:508
Target AIL Err:508
Target EIL Err:508
SIL Classification
SIL-1 1 in 10 to 1 in 100 0.1 to 0.01
SIL-2 1 in 100 to 1 in 1000 0.01 to 0.001
SIL-3 1 in 1000 to 1 in 10000 0.001 to 0.0001
SIL-4 1 in 10000 to 1 in 100000 0.0001 to 0.00001

If PFDavg >0.1 then SIL=0 or Unclassified


Layer of Protection Analysis
(IEC 61508/61511 Compliant) Project Export Gas Compression Facilities Upgrade Project Target SIL Target AIL Target EIL
SIF No. SIF-44 Err:508 Err:508 Err:508
SIF Tag No. 1720EXS032131
Event Consequence

Target Freq. Safety Err:508 (events/year) Two to three onsite fatalities or four permanent
Err:508 disabling injuries and/
Property damage (e. g.,orfacility
loss ofmanned
revenuefull
in time,
excesson-of
Target Freq. Property/ Revenue line maintenance
US$100 million activities having immediate effects)
Target Freq. Environment Err:508 No remediation. No off-site impact/ damage

SIF Description Electricity power failure

P&ID -

Independent Protection Layers (IPLs) Conditional Modifiers


1 2 3 4 5 6 7 8 9
Unmitigated
Initiating Description of Initiating Cause Mitigated Event
Cause Initiating Cause Freq (/yr)
Freq (/yr) Probabilty of Probability of Risk Probability of
source of Ignition of Injury personnel present

A 0.10 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-03

Zone 2 Area 180 min/(24


hours*60 min)

B 0.01 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-04

Zone 2 Area 180 min/(24


hours*60 min)
C 1.00 1.00 1.00 1.00 0.00E+00

D 1.00 1.00 1.00 1.00 0.00E+00

E 1.00 1.00 1.00 1.00 0.00E+00

Total Mitigated Event Frequency, Fe (/year) 1.38E-03


Max PFDavg for Safety (Ft_s/Fe) Err:508
Max PFDavg for Environment(Ft_e/Fe) Err:508
Max PFDavg for Assests/Economic(Ft_a/Fe) Err:508
Target SIL Err:508
Target AIL Err:508
Target EIL Err:508
SIL Classification
SIL-1 1 in 10 to 1 in 100 0.1 to 0.01
SIL-2 1 in 100 to 1 in 1000 0.01 to 0.001
SIL-3 1 in 1000 to 1 in 10000 0.001 to 0.0001
SIL-4 1 in 10000 to 1 in 100000 0.0001 to 0.00001

If PFDavg >0.1 then SIL=0 or Unclassified


Layer of Protection Analysis
Project
(IEC 61508/61511 Compliant) Third Party Gas Interconnecting Facility Project Target SIL Target AIL Target EIL
SIF No. SIF-3 SIL 0 AIL 0 EIL 0
SIF Tag No. LALL 9667
Event Consequence Failure of LALL 9667 to trip the HPU pumps leading to damage of HPU pump.

Target Freq. Safety Err:508 (events/year) Moderate: Serious on-site injuries (temporary disabling
worker injuries)
Target Freq. Property/ Revenue Err:508 Minor: Property damage and/ or loss of revenue less
than US$500,000
Target Freq. Environment Err:508 Minor: No remediation. No off-site impact/ damage

SIF Description Low low liquid level in 2000-T 9661 will trip 3.0.22 to trip the HPU pumps.

P&ID RLE-2000-PPI-54010

Independent Protection Layers (IPLs) Conditional Modifiers


1 2 3 4 5 6 7 8 9
Unmitigated
Initiating Description of Initiating Cause Initiating Cause Accumulator tank is available Mitigated Event
Cause Freq (/yr) Probabilty of Probability of Risk Probability of Freq (/yr)
to keep pressure for valve PALL 9677 source of Ignition of Injury personnel present
operation

A 0.01 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-03
Leak in hydraulic oil system leading to low
low level

180 min/(24
Zone 2 Area hours*60 min)

B 0.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00E+00

C 0.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00E+00

D 1.00 1.00 1.00 1.00 1.00 1.00 0.00E+00

E 1.00 1.00 1.00 1.00 1.00 1.00 0.00E+00

Total Mitigated Event Frequency, Fe (/year) 1.25E-03


Max PFDavg for Safety (Ft_s/Fe) 8.00E-01
Max PFDavg for Assests/Economic (Ft_e/Fe) 8.00E+00
Max PFDavg for Environment (Ft_a/Fe) 8.00E+00
Target SIL SIL 0
Target AIL AIL 0
Target EIL EIL 0
10% of maximum Calculated Value Calculated Value
value (S) (A) Calculated Value (E)
SIL Classification
SIL 0 <10 <9 1.25 0.125 0.125
SIL 1 >10 to <100 >9.1 to <90
SIL 2 >100 to <1,000 >91 to <900
SIL 3 >1,000 to <10,000 >901 to <9,000
SIL 4 >10,000 to
<100,000 >9,001 to <90,000
Layer of Protection Analysis
Project
(IEC 61508/61511 Compliant) Third Party Gas Interconnecting Facility Project Target SIL Target AIL Target EIL
SIF No. SIF-4 SIL 0 AIL 0 EIL 0
SIF Tag No. LALL 9668
Event Consequence Failure of LALL 9668 to trip the HPU pumps leading to damage of HPU pump.

Target Freq. Safety Err:508 (events/year) Moderate: Serious on-site injuries (temporary disabling
worker injuries)
Target Freq. Property/ Revenue Err:508 Minor: Property damage and/ or loss of revenue less
than US$500,000
Target Freq. Environment Err:508 Minor: No remediation. No off-site impact/ damage

SIF Description Low low liquid level in 2000-T 9662 will trip 3.0.25 to trip the HPU pumps.

P&ID RLE-2000-PPI-54011

Independent Protection Layers (IPLs) Conditional Modifiers


1 2 3 4 5 6 7 8 9
Unmitigated
Initiating Description of Initiating Cause Initiating Cause Accumulator tank is available Mitigated Event
Cause Freq (/yr) Probabilty of Probability of Risk Probability of Freq (/yr)
to keep pressure for valve PALL 9678 source of Ignition of Injury personnel present
operation

A 0.01 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-03
Leak in hydraulic oil system leading to low
low level

180 min/(24
Zone 2 Area hours*60 min)

B 0.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00E+00

C 0.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00E+00

D 1.00 1.00 1.00 1.00 1.00 1.00 0.00E+00

E 1.00 1.00 1.00 1.00 1.00 1.00 0.00E+00

Total Mitigated Event Frequency, Fe (/year) 1.25E-03


Max PFDavg for Safety (Ft_s/Fe) 8.00E-01
Max PFDavg for Assests/Economic (Ft_e/Fe) 8.00E+00
Max PFDavg for Environment (Ft_a/Fe) 8.00E+00
Target SIL SIL 0
Target AIL AIL 0
Target EIL EIL 0
10% of maximum Calculated Value Calculated Value
value (S) (A) Calculated Value (E)
SIL Classification
SIL 0 <10 <9 1.25 0.125 0.125
SIL 1 >10 to <100 >9.1 to <90
SIL 2 >100 to <1,000 >91 to <900
SIL 3 >1,000 to <10,000 >901 to <9,000
SIL 4 >10,000 to
<100,000 >9,001 to <90,000
Layer of Protection Analysis
Project
(IEC 61508/61511 Compliant) Third Party Gas Interconnecting Facility Project Target SIL Target AIL Target EIL
SIF No. SIF-5 SIL 0 AIL 0 EIL 0
SIF Tag No. PALL 9667
Event Consequence Failure of PALL 9677 to trip the HPU pumps leading to damage of HPU pump.

Target Freq. Safety Err:508 (events/year) Moderate: Serious on-site injuries (temporary disabling
worker injuries)
Target Freq. Property/ Revenue Err:508 Minor: Property damage and/ or loss of revenue less
than US$500,000
Target Freq. Environment Err:508 Minor: No remediation. No off-site impact/ damage

SIF Description Low low hydraulic oil pressure in HPU will trip 3.0.22 to trip the HPU pumps.

P&ID RLE-2000-PPI-54010

Independent Protection Layers (IPLs) Conditional Modifiers


1 2 3 4 5 6 7 8 9
Unmitigated
Initiating Description of Initiating Cause Initiating Cause Accumulator tank is available Mitigated Event
Cause Freq (/yr) Probabilty of Probability of Risk Probability of Freq (/yr)
to keep pressure for valve LALL 9667 source of Ignition of Injury personnel present
operation

A 0.01 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-03
Leak in hydraulic oil system leading to low
low level

180 min/(24
Zone 2 Area hours*60 min)

B 0.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00E+00

C 0.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00E+00

D 1.00 1.00 1.00 1.00 1.00 1.00 0.00E+00

E 1.00 1.00 1.00 1.00 1.00 1.00 0.00E+00

Total Mitigated Event Frequency, Fe (/year) 1.25E-03


Max PFDavg for Safety (Ft_s/Fe) 8.00E-01
Max PFDavg for Assests/Economic (Ft_e/Fe) 8.00E+00
Max PFDavg for Environment (Ft_a/Fe) 8.00E+00
Target SIL SIL 0
Target AIL AIL 0
Target EIL EIL 0
10% of maximum Calculated Value Calculated Value
value (S) (A) Calculated Value (E)
SIL Classification
SIL 0 <10 <9 1.25 0.125 0.125
SIL 1 >10 to <100 >9.1 to <90
SIL 2 >100 to <1,000 >91 to <900
SIL 3 >1,000 to <10,000 >901 to <9,000
SIL 4 >10,000 to
<100,000 >9,001 to <90,000
Layer of Protection Analysis
Project
(IEC 61508/61511 Compliant) Third Party Gas Interconnecting Facility Project Target SIL Target AIL Target EIL
SIF No. SIF-6 SIL 0 AIL 0 EIL 0
SIF Tag No. PALL 9668
Event Consequence Failure of PALL 9678 to trip the HPU pumps leading to damage of HPU pump.

Target Freq. Safety Err:508 (events/year) Moderate: Serious on-site injuries (temporary disabling
worker injuries)
Target Freq. Property/ Revenue Err:508 Minor: Property damage and/ or loss of revenue less
than US$500,000
Target Freq. Environment Err:508 Minor: No remediation. No off-site impact/ damage

SIF Description Low low hydraulic oil pressure in HPU will trip 3.0.25 to trip the HPU pumps.

P&ID RLE-2000-PPI-54011

Independent Protection Layers (IPLs) Conditional Modifiers


1 2 3 4 5 6 7 8 9
Unmitigated
Initiating Description of Initiating Cause Initiating Cause Accumulator tank is available Mitigated Event
Cause Freq (/yr) Probabilty of Probability of Risk Probability of Freq (/yr)
to keep pressure for valve LALL 9668 source of Ignition of Injury personnel present
operation

A 0.01 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.125 1.25E-03
Leak in hydraulic oil system leading to low
low level

180 min/(24
Zone 2 Area hours*60 min)

B 0.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00E+00

C 0.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00E+00

D 1.00 1.00 1.00 1.00 1.00 1.00 0.00E+00

E 1.00 1.00 1.00 1.00 1.00 1.00 0.00E+00

Total Mitigated Event Frequency, Fe (/year) 1.25E-03


Max PFDavg for Safety (Ft_s/Fe) 8.00E-01
Max PFDavg for Assests/Economic (Ft_e/Fe) 8.00E+00
Max PFDavg for Environment (Ft_a/Fe) 8.00E+00
Target SIL SIL 0
Target AIL AIL 0
Target EIL EIL 0
10% of maximum Calculated Value Calculated Value
value (S) (A) Calculated Value (E)
SIL Classification
SIL 0 <10 <9 1.25 0.125 0.125
SIL 1 >10 to <100 >9.1 to <90
SIL 2 >100 to <1,000 >91 to <900
SIL 3 >1,000 to <10,000 >901 to <9,000
SIL 4 >10,000 to
<100,000 >9,001 to <90,000
Layer of Protection Analysis
Project
(IEC 61508/61511 Compliant) Third Party Gas Interconnecting Facility Project Target SIL Target AIL Target EIL
SIF No. SIF-6 0 AIL2 EIL3
SIF Tag No. PALL 9668
Event Consequence Failure of PALL 9678 to trip the HPU pumps leading to damage of HPU pump.

Target Freq. Safety Err:508 (events/year) Catastrophic: Four or more onsite fatalities and/ or
disabling injuries
Target Freq. Property/ Revenue Err:508 Moderate: Property damage and/ or loss of revenue
ranging from US$500,000 to US$10 million
Target Freq. Environment Err:508 Major: Clean-up or remediation complete within 1 year;
minor impact on food chain, terrestrial and/ or aquatic
SIF Description Low low hydraulic oil pressure in HPU will trip 3.0.25
life. to trip off-site
Moderate the HPUimpact
pumps.limited to property
damage or minor health effects. Adverse public
reaction
P&ID RLE-2000-PPI-54011

Independent Protection Layers (IPLs) Conditional Modifiers


1 2 3 4 5 6 7 8 9
Unmitigated
Initiating Description of Initiating Cause Initiating Cause Accumulator tank is available Mitigated Event
Cause Freq (/yr) Probabilty of Probability of Risk Probability of Freq (/yr)
to keep pressure for valve LALL 9668 source of Ignition of Injury personnel present
operation

A 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.000 1.00E-04
Leak in hydraulic oil system leading to low
low level

180 min/(24
Zone 2 Area hours*60 min)

B 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.000 1.00E-01

C 0.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00E+00

D 1.00 1.00 1.00 1.00 1.00 1.00 0.00E+00

E 1.00 1.00 1.00 1.00 1.00 1.00 0.00E+00

Total Mitigated Event Frequency, Fe (/year) 1.00E-01


Max PFDavg for Safety (Ft_s/Fe) 9.99E-06
Max PFDavg for Assests/Economic (Ft_e/Fe) 9.99E-03
Max PFDavg for Environment (Ft_a/Fe) 9.99E-04
Target SIL 0
Target AIL AIL2
Target EIL EIL3
10% of maximum Calculated Value Calculated Value
value (S) (A) Calculated Value (E)
SIL Classification
SIL 0 <10 <9 1.25 0.125 0.125
SIL 1 >10 to <100 >9.1 to <90
SIL 2 >100 to <1,000 >91 to <900
SIL 3 >1,000 to <10,000 >901 to <9,000
SIL 4 >10,000 to
<100,000 >9,001 to <90,000