CS AT 0+000 (Compacted)

ABC Top Line


Ground Line

ABC
C/L

DATUM = 99.0000m
99.230 99.266

99.177 99.231

99.140 99.209
F.R.L.
99.185

99.166
E.G.L.
2.25

1.00

0.00

1.00

2.25
OFFSET

ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+010 (Compacted)
ABC Top Line
Ground Line

ABC
C/L

DATUM = 99.0000m
99.154 99.171

99.082 99.129

99.063 99.125
F.R.L.
99.083

99.076
E.G.L.
2.25

1.00

0.00

1.00

2.25
OFFSET

ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+020 (Compacted)
ABC Top Line
Ground Line

ABC
C/L

DATUM = 99.0000m
99.108 99.172

99.063 99.138

99.063 99.137
F.R.L.
99.079

99.075
E.G.L.
2.25

1.00

0.00

1.00

2.25
OFFSET

ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+030 (Compacted)
ABC Top Line
Ground Line

ABC C/L

DATUM = 99.0000m
99.174 99.221

99.101 99.204

99.066 99.181
F.R.L.
99.130

99.130
E.G.L.
2.25

1.00

0.00

1.00

2.25
OFFSET

ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+040 (Compacted)
ABC Top Line
Ground Line
C/L
ABC

DATUM = 99.0000m
99.178 99.260

99.135 99.254

99.176 99.251
F.R.L.
99.138

99.148
E.G.L.
2.25

1.00

0.00

1.00

2.25
OFFSET

ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+050 (Compacted)
ABC Top Line
Ground Line
C/L
ABC

DATUM = 99.0000m
99.224 99.311

99.180 99.296

99.208 99.303
F.R.L.
99.186

99.109
E.G.L.
2.25

1.00

0.00

1.00

2.25
OFFSET

ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+060 (Compacted)
ABC Top Line
Ground Line
C/L
ABC

DATUM = 99.0000m
99.202 99.290

99.179 99.297

99.229 99.306
F.R.L.
99.161

99.162
E.G.L.
2.25

1.00

0.00

1.00

2.25
OFFSET

ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+070 (Compacted)
ABC Top Line
Ground Line
C/L
ABC

DATUM = 99.0000m
99.186 99.271

99.273 99.278

99.202 99.279
F.R.L.
99.271

99.257
E.G.L.
2.25

1.00

0.00

1.00

2.25
OFFSET

ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+080 (Compacted)
ABC Top Line
Ground Line
ABC C/L

DATUM = 99.0000m
99.202 99.300

99.274 99.301

99.286 99.290
F.R.L.
99.265

99.280
E.G.L.
2.25

1.00

0.00

1.00

2.25
OFFSET

ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+090 (Compacted)
ABC Top Line
Ground Line
C/L
ABC

DATUM = 99.0000m
99.226 99.310

99.266 99.311

99.251 99.303
F.R.L.
99.260

99.263
E.G.L.
2.25

1.00

0.00

1.00

2.25
OFFSET

ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+100 (Compacted)
ABC Top Line
Ground Line
ABC C/L

DATUM = 99.0000m
99.270 99.321

99.267 99.301

99.186 99.304
F.R.L.
99.224

99.196
E.G.L.
2.25

1.00

0.00

1.00

2.25
OFFSET

ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+110 (Compacted)
ABC Top Line
Ground Line
ABC C/L

DATUM = 99.0000m
99.266 99.356

99.206 99.317

99.251 99.295
F.R.L.
99.223

99.204
E.G.L.
2.25

1.00

0.00

1.00

2.25
OFFSET

ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+120 (Compacted)
ABC Top Line
Ground Line
ABC C/L

DATUM = 99.0000m
99.376 99.346

99.286 99.299

99.256 99.255
F.R.L.
99.315

99.266
E.G.L.
2.25

1.00

0.00

1.00

2.25
OFFSET

ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+130 (Compacted)
ABC Top Line
Ground Line

ABC C/L

DATUM = 99.0000m
99.154 99.299

99.067 99.251

99.029 99.191
F.R.L.
99.097

99.062
E.G.L.
2.25

1.00

0.00

1.00

2.25
OFFSET

ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+140 (Compacted)
ABC Top Line
ABC Ground Line
C/L

DATUM = 98.8000m
99.155 99.245

99.072 99.221

98.967 99.189
F.R.L. 99.114

99.025
E.G.L.
2.25

1.00

0.00

1.00

2.25
OFFSET

ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+150 (Compacted)
ABC Top Line
Ground Line

ABC C/L

DATUM = 99.0000m
99.201 99.269

99.076 99.221

99.024 99.181
F.R.L.
99.153

99.061
E.G.L.
2.25

1.00

0.00

1.00

2.25
OFFSET

ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+160 (Compacted)
ABC Top Line
Ground Line

ABC C/L

DATUM = 99.0000m
99.176 99.280

99.122 99.232

99.167 99.231
F.R.L.
99.134

99.154
E.G.L.
2.25

1.00

0.00

1.00

2.25
OFFSET

ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+170 (Compacted)
ABC Top Line
Ground Line
C/L
ABC

DATUM = 99.0000m
99.241 99.326

99.176 99.306

99.126 99.301
F.R.L.
99.181

99.240
E.G.L.
2.25

1.00

0.00

1.00

2.25
OFFSET

ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+180 (Compacted)
ABC Top Line

ABC Ground Line


C/L

DATUM = 99.0000m
99.371 99.383

99.281 99.351

99.281 99.353
F.R.L.
99.276

99.271
E.G.L.
2.25

1.00

0.00

1.00

2.25
OFFSET

ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+190 (Compacted)
ABC Top Line
Ground Line
ABC
C/L

DATUM = 99.0000m
99.316 99.383

99.266 99.353

99.256 99.363
F.R.L.
99.266

99.271
E.G.L.
2.25

1.00

0.00

1.00

2.25
OFFSET

ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+200 (Compacted)
ABC Top Line
Ground Line
ABC C/L

DATUM = 99.0000m
99.306 99.333

99.236 99.338

99.194 99.333
F.R.L.
99.276

99.226
E.G.L.
2.25

1.00

0.00

1.00

2.25
OFFSET

ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+210 (Compacted)
ABC Top Line
Ground Line
ABC C/L

DATUM = 99.0000m
99.297 99.373

99.216 99.338

99.166 99.313
F.R.L.
99.246

99.216
E.G.L.
2.25

1.00

0.00

1.00

2.25
OFFSET

ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+220 (Compacted)
ABC Top Line
Ground Line
ABC C/L

DATUM = 99.0000m
99.286 99.368

99.221 99.333

99.170 99.293
F.R.L.
99.251

99.190
E.G.L.
2.25

1.00

0.00

1.00

2.25
OFFSET

ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+230 (Compacted)
ABC Top Line
Ground Line
ABC C/L

DATUM = 99.0000m
99.256 99.345

99.201 99.312

99.131 99.293
F.R.L.
99.226

99.163
E.G.L.
2.25

1.00

0.00

1.00

2.25
OFFSET

ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+240 (Compacted)
ABC Top Line
Ground Line
ABC C/L

DATUM = 99.0000m
99.260 99.334

99.226 99.313

99.184 99.291
F.R.L.
99.253

99.194
E.G.L.
2.25

1.00

0.00

1.00

2.25
OFFSET

ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+250 (Compacted)
ABC Top Line
Ground Line
ABC C/L

DATUM = 99.0000m
99.211 99.317

99.136 99.278

99.140 99.250
F.R.L.
99.136

99.126
E.G.L.
2.25

1.00

0.00

1.00

2.25
OFFSET

ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+260 (Compacted)
ABC Top Line
Ground Line
C/L
ABC

DATUM = 99.0000m
99.206 99.278

99.112 99.273

99.068 99.229
F.R.L.
99.156

99.114
E.G.L.
2.25

1.00

0.00

1.00

2.25
OFFSET

ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+270 (Compacted)
ABC Top Line
Ground Line
ABC C/L

DATUM = 99.0000m
99.206 99.310

99.162 99.288

99.026 99.268
F.R.L.
99.191

99.156
E.G.L.
2.25

1.00

0.00

1.00

2.25
OFFSET

ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+280 (Compacted)
ABC Top Line
ABC
Ground Line
C/L

DATUM = 99.0000m
99.400 99.483

99.352 99.408

99.242 99.341
F.R.L.
99.372

99.278
E.G.L.
2.25

1.00

0.00

1.00

2.25
OFFSET

ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+290 (Compacted)
ABC Top Line
Ground Line
ABC
C/L

DATUM = 99.2000m
99.562 99.586

99.432 99.531

99.312 99.469
F.R.L.
99.497

99.382
E.G.L.
2.25

1.00

0.00

1.00

2.25
OFFSET

ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+300 (Compacted)
ABC Top Line
Ground Line
C/L
ABC

DATUM = 99.4000m
99.567 99.606

99.555 99.583

99.522 99.576
F.R.L.
99.530

99.552
E.G.L.
2.25

1.00

0.00

1.00

2.25
OFFSET

ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :

You might also like