CS AT 0+000: ABC Laying Works at Maha Ambalangoda Delduwa Temple Road
CS AT 0+000: ABC Laying Works at Maha Ambalangoda Delduwa Temple Road
ABC
C/L
DATUM = 99.0000m
99.230 99.266
99.177 99.231
99.140 99.209
F.R.L.
99.185
99.166
E.G.L.
2.25
1.00
0.00
1.00
2.25
OFFSET
ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+010 (Compacted)
ABC Top Line
Ground Line
ABC
C/L
DATUM = 99.0000m
99.154 99.171
99.082 99.129
99.063 99.125
F.R.L.
99.083
99.076
E.G.L.
2.25
1.00
0.00
1.00
2.25
OFFSET
ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+020 (Compacted)
ABC Top Line
Ground Line
ABC
C/L
DATUM = 99.0000m
99.108 99.172
99.063 99.138
99.063 99.137
F.R.L.
99.079
99.075
E.G.L.
2.25
1.00
0.00
1.00
2.25
OFFSET
ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+030 (Compacted)
ABC Top Line
Ground Line
ABC C/L
DATUM = 99.0000m
99.174 99.221
99.101 99.204
99.066 99.181
F.R.L.
99.130
99.130
E.G.L.
2.25
1.00
0.00
1.00
2.25
OFFSET
ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+040 (Compacted)
ABC Top Line
Ground Line
C/L
ABC
DATUM = 99.0000m
99.178 99.260
99.135 99.254
99.176 99.251
F.R.L.
99.138
99.148
E.G.L.
2.25
1.00
0.00
1.00
2.25
OFFSET
ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+050 (Compacted)
ABC Top Line
Ground Line
C/L
ABC
DATUM = 99.0000m
99.224 99.311
99.180 99.296
99.208 99.303
F.R.L.
99.186
99.109
E.G.L.
2.25
1.00
0.00
1.00
2.25
OFFSET
ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+060 (Compacted)
ABC Top Line
Ground Line
C/L
ABC
DATUM = 99.0000m
99.202 99.290
99.179 99.297
99.229 99.306
F.R.L.
99.161
99.162
E.G.L.
2.25
1.00
0.00
1.00
2.25
OFFSET
ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+070 (Compacted)
ABC Top Line
Ground Line
C/L
ABC
DATUM = 99.0000m
99.186 99.271
99.273 99.278
99.202 99.279
F.R.L.
99.271
99.257
E.G.L.
2.25
1.00
0.00
1.00
2.25
OFFSET
ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+080 (Compacted)
ABC Top Line
Ground Line
ABC C/L
DATUM = 99.0000m
99.202 99.300
99.274 99.301
99.286 99.290
F.R.L.
99.265
99.280
E.G.L.
2.25
1.00
0.00
1.00
2.25
OFFSET
ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+090 (Compacted)
ABC Top Line
Ground Line
C/L
ABC
DATUM = 99.0000m
99.226 99.310
99.266 99.311
99.251 99.303
F.R.L.
99.260
99.263
E.G.L.
2.25
1.00
0.00
1.00
2.25
OFFSET
ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+100 (Compacted)
ABC Top Line
Ground Line
ABC C/L
DATUM = 99.0000m
99.270 99.321
99.267 99.301
99.186 99.304
F.R.L.
99.224
99.196
E.G.L.
2.25
1.00
0.00
1.00
2.25
OFFSET
ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+110 (Compacted)
ABC Top Line
Ground Line
ABC C/L
DATUM = 99.0000m
99.266 99.356
99.206 99.317
99.251 99.295
F.R.L.
99.223
99.204
E.G.L.
2.25
1.00
0.00
1.00
2.25
OFFSET
ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+120 (Compacted)
ABC Top Line
Ground Line
ABC C/L
DATUM = 99.0000m
99.376 99.346
99.286 99.299
99.256 99.255
F.R.L.
99.315
99.266
E.G.L.
2.25
1.00
0.00
1.00
2.25
OFFSET
ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+130 (Compacted)
ABC Top Line
Ground Line
ABC C/L
DATUM = 99.0000m
99.154 99.299
99.067 99.251
99.029 99.191
F.R.L.
99.097
99.062
E.G.L.
2.25
1.00
0.00
1.00
2.25
OFFSET
ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+140 (Compacted)
ABC Top Line
ABC Ground Line
C/L
DATUM = 98.8000m
99.155 99.245
99.072 99.221
98.967 99.189
F.R.L. 99.114
99.025
E.G.L.
2.25
1.00
0.00
1.00
2.25
OFFSET
ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+150 (Compacted)
ABC Top Line
Ground Line
ABC C/L
DATUM = 99.0000m
99.201 99.269
99.076 99.221
99.024 99.181
F.R.L.
99.153
99.061
E.G.L.
2.25
1.00
0.00
1.00
2.25
OFFSET
ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+160 (Compacted)
ABC Top Line
Ground Line
ABC C/L
DATUM = 99.0000m
99.176 99.280
99.122 99.232
99.167 99.231
F.R.L.
99.134
99.154
E.G.L.
2.25
1.00
0.00
1.00
2.25
OFFSET
ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+170 (Compacted)
ABC Top Line
Ground Line
C/L
ABC
DATUM = 99.0000m
99.241 99.326
99.176 99.306
99.126 99.301
F.R.L.
99.181
99.240
E.G.L.
2.25
1.00
0.00
1.00
2.25
OFFSET
ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+180 (Compacted)
ABC Top Line
DATUM = 99.0000m
99.371 99.383
99.281 99.351
99.281 99.353
F.R.L.
99.276
99.271
E.G.L.
2.25
1.00
0.00
1.00
2.25
OFFSET
ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+190 (Compacted)
ABC Top Line
Ground Line
ABC
C/L
DATUM = 99.0000m
99.316 99.383
99.266 99.353
99.256 99.363
F.R.L.
99.266
99.271
E.G.L.
2.25
1.00
0.00
1.00
2.25
OFFSET
ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+200 (Compacted)
ABC Top Line
Ground Line
ABC C/L
DATUM = 99.0000m
99.306 99.333
99.236 99.338
99.194 99.333
F.R.L.
99.276
99.226
E.G.L.
2.25
1.00
0.00
1.00
2.25
OFFSET
ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+210 (Compacted)
ABC Top Line
Ground Line
ABC C/L
DATUM = 99.0000m
99.297 99.373
99.216 99.338
99.166 99.313
F.R.L.
99.246
99.216
E.G.L.
2.25
1.00
0.00
1.00
2.25
OFFSET
ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+220 (Compacted)
ABC Top Line
Ground Line
ABC C/L
DATUM = 99.0000m
99.286 99.368
99.221 99.333
99.170 99.293
F.R.L.
99.251
99.190
E.G.L.
2.25
1.00
0.00
1.00
2.25
OFFSET
ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+230 (Compacted)
ABC Top Line
Ground Line
ABC C/L
DATUM = 99.0000m
99.256 99.345
99.201 99.312
99.131 99.293
F.R.L.
99.226
99.163
E.G.L.
2.25
1.00
0.00
1.00
2.25
OFFSET
ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+240 (Compacted)
ABC Top Line
Ground Line
ABC C/L
DATUM = 99.0000m
99.260 99.334
99.226 99.313
99.184 99.291
F.R.L.
99.253
99.194
E.G.L.
2.25
1.00
0.00
1.00
2.25
OFFSET
ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+250 (Compacted)
ABC Top Line
Ground Line
ABC C/L
DATUM = 99.0000m
99.211 99.317
99.136 99.278
99.140 99.250
F.R.L.
99.136
99.126
E.G.L.
2.25
1.00
0.00
1.00
2.25
OFFSET
ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+260 (Compacted)
ABC Top Line
Ground Line
C/L
ABC
DATUM = 99.0000m
99.206 99.278
99.112 99.273
99.068 99.229
F.R.L.
99.156
99.114
E.G.L.
2.25
1.00
0.00
1.00
2.25
OFFSET
ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+270 (Compacted)
ABC Top Line
Ground Line
ABC C/L
DATUM = 99.0000m
99.206 99.310
99.162 99.288
99.026 99.268
F.R.L.
99.191
99.156
E.G.L.
2.25
1.00
0.00
1.00
2.25
OFFSET
ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+280 (Compacted)
ABC Top Line
ABC
Ground Line
C/L
DATUM = 99.0000m
99.400 99.483
99.352 99.408
99.242 99.341
F.R.L.
99.372
99.278
E.G.L.
2.25
1.00
0.00
1.00
2.25
OFFSET
ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+290 (Compacted)
ABC Top Line
Ground Line
ABC
C/L
DATUM = 99.2000m
99.562 99.586
99.432 99.531
99.312 99.469
F.R.L.
99.497
99.382
E.G.L.
2.25
1.00
0.00
1.00
2.25
OFFSET
ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :
CS AT 0+300 (Compacted)
ABC Top Line
Ground Line
C/L
ABC
DATUM = 99.4000m
99.567 99.606
99.555 99.583
99.522 99.576
F.R.L.
99.530
99.552
E.G.L.
2.25
1.00
0.00
1.00
2.25
OFFSET
ABC Laying Works At Maha Ambalangoda Delduwa ALL DIMENSIONS ARE IN METERS
Temple Road H 1 : 100
Drg. No. : SCALE
V 1 : 50
Drawn By : Nalaka Approved By :
Contractor :- EHL Construction Checked By : Date :