MARKING SCHEME DQS201 - DEC18

1 (a) 1(b)

Item DESCRIPTIONS Total Item DESCRIPTION Unit Unit Des Sidecast Dim Total
1 Concrete for Column C1 M3 1 3 3 3 10
Take off In Schedule
2 Formworks for Column C1 M2 1 3 3 3 10
1a SOIL WASTE AND VENT PIPE
3 Reinforcement for Column C1 Kg 1 3 3 3 10
1 Excavate trench 3
4 Concrete for FFB1 M3 1 3 3 3 10
Laid in trench
2 50 mm dia waste pipe 3 5 Formworks for FFB1 M2 1 3 3 3 10

In concrete slab 6 Reinforcement for FFB1 KG 1 3 3 3 10

3 50 mm dia waste pipe 3

4 32 mm dia waste pipe 3

Fixed to brickwall

5 100 mm dia vent pipe 3

6 32 mm dia waste pipe 3

Fittings

7 Pedestal water closet 3


8 Squatting 3
9 Basin 3
9 Sink 3
10 Floor trap 3
11 Bend 3
12 Bottle trap 3 Sub Total 1(b) 60
13 S trap 3

14 Testing 3

Sub Total (1a) 45

1(a) Schedule 1(b) Taking Off


1. Taking off Total reduced to 20% 45 X 18% 18%
45

Billing Taking off 60 X 40% = 40%


2. Description for each item 14 items x 2 point 28% 60
Taking off list 3.00%
4. Taking off list 2% Query list 3.00%
5. Query List 2% Principle 2%
Accurancy 2%
Total 1(a) 50% Total 1(b) 50% Grand Total (1a+1b) 100%