SL Gen Loss Root Cause and Remedial Measures 1 Nil Nil Nil Equiptment Data
SL Gen Loss Root Cause and Remedial Measures 1 Nil Nil Nil Equiptment Data
SL Gen Loss Root Cause and Remedial Measures 1 Nil Nil Nil Equiptment Data
Equiptment
Sl Gen Loss Root Cause And Remedial Measures
Data
Equipt /
Test Observation Perodicity Responsibility
And Action Plan
DG Analysis of Power
AS PER 18.4
Transformers
Sywd
Monthly EM Swyd
Equiptment
GT Transformers
Monthly EM Trafo & Lab
Thermo Done
Vision Scanning.
LT Swgr & Motor Quartely EM LT
HT Swgr &
Monthly EM HT
Motors
Others
Observation
Transformers No abnormality
LT Swgr &
No abnormality
motors
NIL
Note: Include the name of transformers/reactors undergoing DGA analysis according to the Stations configuration
U1
LT Motors >100 KW/Breaker is U2
5 to be provided for all motors > PR (200070622) Initiated.
100 KW. U3
U4
Failure of Generator tap-off
busduct seal-off bushing of
LAVT panel. Seal-off bushings U1,U2,U3,
6 Inspection during unit Overhaul
of Bus ducts to be physically U4
inspected for damages/ cracks
during shutdown of units
FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 13 (ELECTRICAL) Sheet 1 of 1
OPERATION SERVICES
Failure of Generator tap-off
busduct seal-off bushing of
LAVT panel. Seal-off bushings U1,U2,U3,
6 Inspection during unit Overhaul
of Bus ducts to be physically U4
inspected for damages/ cracks
during shutdown of units
REPLACEMENT OF
ELECTROMECH. RELAYS/All STG-1 Distance Realys : 7 out of 8 replaced. PR to
GRP, Switchyard & be initiated for remaining 1 relay
7 Switchgears Electromechanical SWYD STANDBY TRF Relays along with panel : PR
relays are to be replaced by to be initiated.Approved under Capital Budget 2017-
Numerical Relays.Unit wise 18.
status/progr
U1
Safety/ELCB for welding & U2 All the material against the PO (4000177578)
8
hand held tools supplies received .Unit#1, 2,3, 4 completed.
U3
REPLACEMENT OF
ELECTROMECH. RELAYS/All
GRP Relay Panels for unit-1 : Material available at
GRP & Switchgears GRP and
10 site; Switchgear relay replacement :P.O Placement
Electromechanical relays are to Swgr
in Progress
be replaced by Numerical
Relays.Unit wise status/progr
Target
Date
Nil
Target
Date
10-Dec-18
11-Dec-18
14-Oct-18
19-Dec-18
240.00
240.00
27.97
28.08
239.30
240.40
28.24
28.33
239.40
240.50
27.11
27.09
27.05
270.70
26.63
26.65
240.50
240.80
26.99
27.02
27.11
26.98
26.82
26.79
233.00
232.40
52.54
53.25
Nil
ations configuration.
DGA
BATTERY HEALTHINESS
Score 95.96%
HOD EM Completed
HOD EM Completed
HOD EM
SWGR U-1: AOH:2019-2020
U-2 : AOH: 2019-2020
TARGET DATE
31.03.2019
31.03.2019
30.04.2019.