As Of: 13-Sep-17

Level PROGRAM WBS Duration Work


2 RELEASE 0000
3 Apportioned Cost MA00
4 Project Tracking and Oversight (TO) MAA0
4 Configuration Management (CM) MAB0
4 Software Contract Management (KM) MAC0
4 ISP Management MAJ0
4 Cybersecurity RMF Management MAD0
4 Quality Assurance (QA) MAE0
4 Management Reviews (RV) MAF0
4 Training MAG0
4 Administration and Clerical MAH0
4 Test Management MAI0
4 Risk and Issue Management MAJ0
3 Oversight and Review Products M000
4 Title 40/CCA DoD CIO Confirmation (for MDAPs and MAIS) MDD0
4 Lessons Learned MDD1
Title 40/Clinger-Cohen Act (CCA) Compliance and Component CIO
4
Confirmation (for all IT) MDD2
4 Acquisition Decision Memorandum (ADM) MDD3
4 Review Decision Memorandum for DNR MDD4
4 Review Decision Memorandum for DR MDD5
4 Review Decision Memorandum for Post-PDR A MDD9
4 Review Decision Memorandum for Post-CDR A MDDA
4 Review Decision Memorandum for FDD MDD6
Integrated Product Team Charter and Peer Review Minutes (only if contracted
4
out) MDD7
Authorization To Operate (ATO) or Authorization to Connect (ATC) includes
4
interim approval (IATT) MDD8
4 AoA Study Plan MDP1
4 Intergroup Coordination Checklist MDP2
4 Project Specific Training Plan or IDP in MIS MDP3
4 Iterative Development Plan (Iteration Plan) MDP6
4 Release Request Letter MDP7
4 Risk Assessment and Peer Review Minutes MDS1
4 Acquisition Strategy and Approval MDS3
4 Quick-Pass and Acquisition Strategy Panel Review and Minutes MDS4
4 Engineering Go/NoGo document MDR1
4 Define Need Review (DNR) MDR5
4 Design Review (DR) MDR6
4 Full Deployment Decision Review (FDDR) MDR2
4 Integrated Baseline Review (IBR) and Minutes MDR3
4 Configuration Control Board's Directive (CCD) MDR4
3 Contracting Q000
4 Request for Information (RFI) and Peer Review Minutes (Optional) QDD1
4 Acquisition Plan (derived from (TDS) QDP1
4 Source Selection Plan and Peer Review Minutes QDP2
4 Life Cycle Management Plan QDP3
4 Request for Proposal (RFP) QDS2
3 Logistics / Sustainment L000
Alternative Maintenance and Logistics Concept (derived from the ICD and AoA
4
Study Plan) and Peer Review Minutes LDC0
Support and Maintenance Concepts and Technology (Part of the Preferred
4
Technical Solution) LDC1
4 Economic Analysis (EA) (MAIS only) LDE0
4 Programmatic Environment, Safety and Occupational Health Evaluation LDE1
Level PROGRAM WBS Duration Work
2 RELEASE 0000
4 Affordability Assessment and peer review minutes LDE2
4 Initial Technical Review (ITR) and Minutes LDR0
4 Alternative System Review (ASR) and Minutes LDR1
4 Information Support Plan (ISP) and Peer Review Minutes LDX2
4 Footprint Reduction LDP4
4 Life Cycle Sustainment Plan (LCSP) LDP2
System Support and Maintenance Objectives and Requirements Validation
4
and Minutes LDP3
3 Technical
4 Concept of Operations (ConOps) and Peer Review Minutes AD10
4 System Subsystem Specifications (SSS) and Peer Review Minutes AD20
4 Software Requirements Specifications (SRS) and Peer Review Minutes AD30
4 Minutes - Joint Application Design (JAD) Sessions AD71
4 Risk Management Plan (RMP) and Peer Review Minutes AD76
4 Software Development File AD80
4 Software Development Plan (SDP) and Peer Review Minutes AD50
4 Analysis of Alternatives (AoA) ADR1
4 Alternative System Review (ASR) & Minutes ADR3
4 Preliminary System Specifications and Peer Review Minutes ADX1
4 Defense business system certification and approval (>$1M) ADX3
4 Database CD00
4 CI #N - Component C000
5 Module #M, Code and Peer Review Minutes CS10
5 Module #M Component Validation and Integration (CV&I) CS20
4 Technology Development Strategy (TDS) CDS1
RT Develop Technical Solution and Peer Review Minutes CDX1
4 User Manual (or Online Help) CD20
4 Operator Manual CD30
4 System Security Authorization Agreement (SSAA) CD62
4 ITIPS Documentation DD11
General Requirements Specification (Complete either a GRS or Documents
4
DD70, DD50 and DD90) DD30
4 Test Scripts for all Tests DD40
4 Requirements Traceability Matrix (RTM) DD50
4 Interface Requirements Agreement (IRA) DD70
4 System Performance Specification DDX4
4 Architectural Views DDX5
4 Build and Test Environment Definition DDX6
4 Design Environment Definition DDX7
4 Database Specification (and Prelim Spec) DD80
4 Design Document (DD) DD90
4 Preliminary Design Review (PDR) + Minutes DDR1
Interface Control Working Group (ICWG) Minutes DDR2
4 Critical Design Review (CDR) + Minutes DD62
Overall System Concepts, trade space and risks associated with program
4
constraints DDX1
4 Configuration Management Plan (CMP) PD10
4 Integrated Test Plan (ITP) and Peer Review Minutes PD40
4 Test and Evaluation Master Plan (TEMP) and Peer Review Minutes PD50
4 Integrated Test Description (ITD) and Peer Review Minutes PD45
4 Implementation Plan (IP) and Peer Review Minutes PD60
4 Site Survey Form PD70
4 CIE Support Agreement PD80
4 Systems Engineering Plan and Peer Review Minutes PDP1
4 Technical Working Plan (TWP) PDP2
4 Risk and Issue Management Strategy PDS1
Level PROGRAM WBS Duration Work
2 RELEASE 0000
4 Configuration Management Strategy PDS2
4 Stakeholder Identification and Assessment PDS3
4 Program Protection Plan (PPP) PDX3
4 Documented Requirement RD10
4 System Requirements Review (SRR) Minutes RDR1
4 Configuration Control Board (CCB) Minutes RDR2
4 Functional Baseline RDR3
4 Functional Review Board (FRB) RD22
4 System Functional Review (SFR) RD23
4 Technology Readiness Assessment (TRA) RDD2
4 Requirements Management Checklist RDD3
Preferred System Concept (derived from Preliminary Integrated Architecture,
4
Best Material Approaches, and AoA) RDX2
Capabilities Development Document (CDD) and Peer Review Minutes
4
(derived from the ICD) RDX3
4 Products for System Concepts Evaluation RDX4
4 Initial Capabilities Document (ICD) RDX5
4 Integrated Test Report (ITR) and Peer Review Minutes RTD1
4 Deficiency Report (DR) RDD1
4 Initial Schedule (Set of CACs) RDP8
4 BPD Tailoring Worksheet RDP1
4 High-Level Schedule RDP3
4 Work Breakdown Structure (WBS) RDP6
4 Schedule and Cost RDP7
4 Integrated Test Team (ITT) Charter TDD1
5 Test &Environment
Evaluation Definition for Hardware
Strategy and andMinutes
Peer Review Software
(Part of the Preferred TDD2
4 Technical Solution) TDS1
4 Sufficiency Review (for Component Validation and Integration (CV&I)) TDX1
4 Test Readiness Review I (TRR I) (and Minutes) CD65
4 Sufficiency Review (for Qualification Test and Evaluation (QT&E)) TD40
4 Test Readiness Review II (TRR II) (and Minutes) TD41
4 CIE Package Go/No-Go Recommendation Memorandum TD42
4 CIE Deployment Go/No-Go Recommendation Memorandum TD43
4 CIE Final Go/No-Go Recommendation Memorandum TD44
4 Deficiency Review Board (DRB) and Minutes TD46
4 Operational Test Readiness Review (OTRR) TD47
4 Release Package TD10
4 Functional Configuration Audit (FCA) Report TD20
4 Physical Configuration Audit (PCA) Report TD30
Operational Safety, Suitability, and Effectiveness (OSS&E) Baseline
4
Document (OBD) TD70
4 Operational Testing and Evaluation (OT&E) TDD3
4 Execute the Implementation Plan IZ10
4 Integrated Developmental Test and Evaluation CT00
5 ITR Inputs for Component Validation and Integration (CV&I) CT30
6 ITR Inputs for Individual Component Validation (ICV) CT31
6 ITR Inputs for Component Integration Test CT32
6 ITR Inputs for Data Management (DM) (CV&I) CT33
6 ITR Inputs for Requirements Operability Test (ROT) CT34
6 ITR Inputs for Performance Evaluation Test (PET) (CV&I) CT35
6 ITR Inputs for Information Assurance Evaluation (IAE) (CV&I) CT36
6 ITR Inputs for System Integration Test (SIT) (CV&I) CT37
6 ITR Inputs for User Evaluation Test (UET) (CV&I) CT38
5 ITR Inputs for Qualification Test and Evaluation (QT&E) TD50
6 ITR Inputs for SIT (QT&E) TD51
6 ITR Inputs for DM (QT&E) TD52
Level PROGRAM WBS Duration Work
2 RELEASE 0000
6 ITR Inputs for System Operability Evaluation (SOE) TD53
6 ITR Inputs for PET (QT&E) TD54
6 ITR Inputs for IAE (QT&E) TD55
6 ITR Inputs for UET (QT&E) TD56
6 ITR Inputs for SIT (Limited Deployment) TD59
6 ITR Inputs for System Acceptance Test (SAT) (Limited Deployment) TD60
2 IS SUPPORT (Direct Services/Customer Support) M000
3 IS SPT/CUSTOMER SUPPORT M600
4 IS SPT/CUSTOMER SPT/FUNCTIONAL M610
4 IS SPT/CUSTOMER SPT/CLERICAL M620
4 IS SPT/CUSTOMER SPT/FAB CALLS M630
4 IS SPT/CUSTOMER SPT/ADPE M640
3 IS SPT/SYSTEM ENGINEERING ME00
3 IS SPT/FINANCIAL MF00
4 IS SPT/FINANCIAL/ACCOUNTING OPERATIONS MFA0
4 IS SPT/FINANCIAL/BUDGET OPERATIONS MFB0
3 IS SPT/SYSTEM ADMINISTRATION MG00
3 IS SPT/CONTRACTING MK00
3 IS SPT/PROGRAM MGT MP00
4 IS SPT/PRG MGT/SUPERVISION MPA0
4 IS SPT/PRG MGT/REQUIREMENTS PROCESSING MPB0
4 IS SPT/PRG MGT/EMA AND MARKETING MPC0
4 IS SPT/PRG MGT/MEETINGS MPD0
4 IS SPT/PRG MGT/OTHER MPE0
4 IS SPT/PRG MGT/QUALITY ASSURANCE (QAP) MPF0
4 IS SPT/PRG MGT/CONFIGURATION MGT (CM) MPG0
3 IS SPT/TEST MT00
4 IS SPT/TEST/ADMIN MTA0
4 IS SPT/TEST/REVIEW & EVAL MTB0
4 IS SPT/TEST/PLANNING MTC0
4 IS SPT/TEST/TEST & EVAL MTD0
4 IS SPT/TEST/NETWORK MTE0
4 IS SPT/TEST/SPECIAL TEST SPT MTF0
2 IS TRAINING T000
3 IS TNG/COURSE TC00
4 IS TNG/CRS/DEVELOP TCA0
4 IS TNG/CRS/DELIVER TCB0
4 IS TNG/CRS/PROGRAM SPECIFIC TCC0
4 IS TNG/CRS/OTHER TCD0