Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 4

Training Activity Matrix Day 1

Set-up Computer Networks


Facilities/T Venue
Training Date &
Trainee ools and Remarks
Activity (Workstation/ Time
Equipment
Area)
ABANES,
REYNOLD C.
Ethernet
ABES, MARK
cables,
JUSTINE B.
crimping
tools, rj45,
ALARDE,
Modular Trainee is
ALRDRIN S.
box (rj45), June 8, ready to
Practical
Create cable 2017 transfer
ARCILLO, JOHN work area in
Network tester, 8:00am- to
VON M. Network
cables computr 10:00am Configure
cabling
system, Network
AUSTRIA,
wireless Connectio
GERALD E.
access n
point/repe
BARRA, KIAN R.
ater
BARTOLOME,
ROSE ANN A.

BERNAL,
YVHETTE B.

CAMBRONERO,
Trainee is
MARVIN A.
ready to
transfer
DE LEON, June 8,
Practical to
Configure ALDRIN N. Ethernet 2017
work area in Configure
Network cables, 10:00am
computer router/ei-
connection DE LEON, cable to
networking fi/wireles
CHARMELLE T. 11:00am
s access
point/rep
DICHOSO,
eater
JASMINE A.

DINGLASAN,
LAYSA D.
ECHANO,
DENVER J.

LUZANDE,
REYNALYN E.
Trainee is
Configure Computer June 8, ready to
MANLIQUEZ,
router/ei- system,wir Practical 2017 transfer
SHARMAINE E.
fi/wireless eless work area in 11:00am to Test
access access computer to configure
NOLASCO,
point/repeat point/repe networking 12:00nn d
JESSA MAY R.
er ater computer
networks
NORTE, JOANA
PRINCESS M.

PACAO,
MERWIN M.

PASCUAL,
KRISTALYN R.

POSADA,
CATHERINE M.
Trainee is
RAMOS, YVAN Y. June 8,
Test Computer Practical ready to
2017
configured system, work area in transfer
SABACO, 12:00nn
computer ethernet computer to Create
AMONS R. to
networks cables networking Network
1:00pm
cables
SUMANGAN,
SITTIE ALMIRA
A.

VILLAMARZO,
ANDRE M.
Training Activity Matrix Day 2
Set-up Computer Networks
Facilities/T Venue
Training Date &
Trainee ools and Remarks
Activity (Workstation/ Time
Equipment
Area)

PASCUAL,
KRISTALYN R. Ethernet
cables,
POSADA, crimping
CATHERINE M. tools, rj45,
Modular Trainee is
RAMOS, YVAN Y. box (rj45), June 9, ready to
Practical
Create cable 2017 transfer
work area in
Network SABACO, tester, 8:00am- to
Network
cables AMONS R. computr 10:00am Configure
cabling
system, Network
SUMANGAN, wireless Connectio
SITTIE ALMIRA access n
A. point/repe
ater
VILLAMARZO,
ANDRE M.

ABANES,
REYNOLD C.

ABES, MARK
JUSTINE B.
Trainee is
ALARDE, ready to
ALRDRIN S. transfer
June 9,
Practical to
Configure Ethernet 2017
ARCILLO, JOHN work area in Configure
Network cables, 10:00am
VON M. computer router/ei-
connection cable to
networking fi/wireles
11:00am
AUSTRIA, s access
GERALD E. point/rep
eater
BARRA, KIAN R.

BARTOLOME,
ROSE ANN A.
BERNAL,
YVHETTE B.

CAMBRONERO,
MARVIN A.
Trainee is
Configure Computer June 9, ready to
DE LEON,
router/ei- system,wir Practical 2017 transfer
ALDRIN N.
fi/wireless eless work area in 11:00am to Test
access access computer to configure
DE LEON,
point/repeat point/repe networking 12:00nn d
CHARMELLE T.
er ater computer
networks
DICHOSO,
JASMINE A.

DINGLASAN,
LAYSA D.

ECHANO,
DENVER J.

LUZANDE,
REYNALYN E.
Trainee is
MANLIQUEZ, June 9,
Test Computer Practical ready to
SHARMAINE E. 2017
configured system, work area in transfer
12:00nn
computer ethernet computer to Create
NOLASCO, to
networks cables networking Network
JESSA MAY R. 1:00pm
cables
NORTE, JOANA
PRINCESS M.

PACAO,
MERWIN M.

You might also like