Download as pdf
Download as pdf
You are on page 1of 51
Effective Date : 01/02/2012 ay, Guideline Procedure: GL.GN.02 <2 For Tasue:2 Revision: 1 Page lof 51 Design, Testing and Installation res OF LV Switchgear vit auto ph ‘Abu Dhabi Distribution Co. erate Design, Testing and Installation Of LV Switchgear ei a Prepared by: VP Murali Date: 22.01.2012 for LV Switchgear Committee = Reviewed by: Adel Marzougi cx Date: 22.01.2012 0 for LV Switchgear Comt Approved by: Ali Al Menhi Date: 22.01.2012 Chairman, mittee SWITCHGEAR COMMITTEE \ ‘CHAIRMAN ) ‘Leah’ isrowion Effective Date: 01/02/2012 ‘This Doeuset isthe property of ADDL, aad camo be used nar given to ois party without pie athoristin. Pit out rom soft copes se Ureonsola,uns stamped in ds “Controle Copy Effective Date: 01/02/2012 Guideline Proceire No: GLGN.2 Issue [Revision : 1 For [issues 2 = Design, Testing and Installation Page 2of 51 Of LY Switchgear Approved by: GL.GN.02 AMENDMENTS SHEET ISSUE/ | PAGE SUBJECT OF THE AMENDMENT APPROVED | DATE REV. | NUMBER BY Issue2 | FullDoc. | The guideline is revised based on 22.01.2012 -Rev1 the clarification received from RSB, Certifying Authorities, and Manufacturers on Issue 1 - Rev 0. Major Changes: Rated insulation level Updated the name of the approved certifying authorities Detailed Specification for the LV capacitor Panel is included. Short circuit level for the LV Switchgear, were reviewed and revised as per installation conditions. Form of Construction and IP classifications were reviewed and revised as per installation conditions. This Document isthe property of ADE, sb eagaot be used nr geno outside pty without pir authorisation. Print ots from sot copie ae Unsorinie, uns tampa in ted as “Coated Copy” Effective Date : 01/02/2012 Wy Guideline Procedure No: GL.GN02 Z For Issue: 2 [ Revision 1 Ss Design, Testing and Installation ee Of LY Switchgear Emre Evin natal Ay eS eS GL.GN.02 List of Contents Chapters and Appendices 1 Introduction 2 LV Items that are covered under Prequalification by ADDC LV Switchgear Committee 3 Objective of the prequalification process 4 International Standards Definition of Manufacturer, Assembly Manufacturer and Supplier 5.1. Original Equipment Manufacturer (OEM) 5.2 ASSEMBLY Manufacturer 5.3 Supplier General requirements 6.1 ADDC LV System Characteristics 6.2 Ambient Conditions 10 6.3 Degree of Protection 10 6.4 Forced cooling 10 Manufacturer/Suppliers Responsibility 1" Guideline for carrying out type test "1 8.1 ADDC Approved Third Party Inspectors/Certifying Agents " 82 Test Requirements 12 Type test Performa 13 ‘Specification of the LV Switchgear 13 10.1 General 13 10.2 Diversity Factor (DF) Applied 14 10.3 Orientation of the Breakers 14 This Dociment she property of ADDC, and cant We wed or given to outside pry witout prior athorslion. Print cuts lm so copies se Uncenrolled unis stamp in eda "Conoled Copy”

You might also like