Effective Date : 01/02/2012
ay, Guideline Procedure: GL.GN.02
<2 For Tasue:2 Revision: 1
Page lof 51
Design, Testing and Installation
res
OF LV Switchgear
vit auto ph
‘Abu Dhabi Distribution Co. erate
Design, Testing and Installation
Of LV Switchgear
ei a
Prepared by: VP Murali Date: 22.01.2012
for LV Switchgear Committee
=
Reviewed by: Adel Marzougi cx Date: 22.01.2012
0
for LV Switchgear Comt
Approved by: Ali Al Menhi Date: 22.01.2012
Chairman, mittee
SWITCHGEAR COMMITTEE
\ ‘CHAIRMAN )
‘Leah’ isrowion
Effective Date:
01/02/2012
‘This Doeuset isthe property of ADDL, aad camo be used nar given to ois party without pie athoristin. Pit out rom soft
copes se Ureonsola,uns stamped in ds “Controle CopyEffective Date: 01/02/2012
Guideline Proceire No: GLGN.2
Issue [Revision : 1
For [issues 2
= Design, Testing and Installation Page 2of 51
Of LY Switchgear Approved by:
GL.GN.02
AMENDMENTS SHEET
ISSUE/ | PAGE SUBJECT OF THE AMENDMENT APPROVED | DATE
REV. | NUMBER BY
Issue2 | FullDoc. | The guideline is revised based on 22.01.2012
-Rev1 the clarification received from RSB,
Certifying Authorities, and
Manufacturers on Issue 1 - Rev 0.
Major Changes:
Rated insulation level
Updated the name of the
approved certifying
authorities
Detailed Specification for the
LV capacitor Panel is
included.
Short circuit level for the LV
Switchgear, were reviewed
and revised as per installation
conditions.
Form of Construction and IP
classifications were reviewed
and revised as per installation
conditions.
This Document isthe property of ADE, sb eagaot be used nr geno outside pty without pir authorisation. Print ots from sot
copie ae Unsorinie, uns tampa in ted as “Coated Copy”Effective Date : 01/02/2012
Wy Guideline Procedure No: GL.GN02
Z For Issue: 2 [ Revision 1
Ss Design, Testing and Installation ee
Of LY Switchgear Emre
Evin natal Ay
eS eS GL.GN.02
List of Contents
Chapters and Appendices
1 Introduction
2 LV Items that are covered under Prequalification by ADDC LV Switchgear
Committee
3 Objective of the prequalification process
4 International Standards
Definition of Manufacturer, Assembly Manufacturer and Supplier
5.1. Original Equipment Manufacturer (OEM)
5.2 ASSEMBLY Manufacturer
5.3 Supplier
General requirements
6.1 ADDC LV System Characteristics
6.2 Ambient Conditions 10
6.3 Degree of Protection 10
6.4 Forced cooling 10
Manufacturer/Suppliers Responsibility 1"
Guideline for carrying out type test "1
8.1 ADDC Approved Third Party Inspectors/Certifying Agents "
82 Test Requirements 12
Type test Performa 13
‘Specification of the LV Switchgear 13
10.1 General 13
10.2 Diversity Factor (DF) Applied 14
10.3 Orientation of the Breakers 14
This Dociment she property of ADDC, and cant We wed or given to outside pry witout prior athorslion. Print cuts lm so copies