More About Handling Units in Production Planning Perspective

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 9

1/22/2017 More about handling units in Production Planning perspective | SAP Blogs

Get Started
 
Solutions  Support Training Community  Developer 

Partner  About 

Community  /  Blogs

More about handling units in
Production Planning perspective
November 21, 2016   |  166 Views  |
Raghava Garre
more by this author

MAN Production Planning (PP)

share
0 share
0 tweet share
1
          

Follow

Previous

I. Maintaining Handling units
1. HU02
To Create, Change handling units

https://blogs.sap.com/2016/11/21/more­about­handling­units­in­production­planning­perspective/ 1/9
1/22/2017 More about handling units in Production Planning perspective | SAP Blogs

2. HU03
To display handling units

3. HUMO
Search HU by using any of fields in the selection screen of HU monitor
transaction

Also from HUMO, HU can be locked/unlocked.
HU postings can also be executed from HUMO and VLMOVE as well.

4. MMBE
https://blogs.sap.com/2016/11/21/more­about­handling­units­in­production­planning­perspective/ 2/9
1/22/2017 More about handling units in Production Planning perspective | SAP Blogs

Enter material and plant and execute, go to environment à Handling
unit

After opening the HU by any of above ways, all the details of HU can
be maintained.

II. Reverse goods movements with HU
1. HUCANC
Put the HU number and simulate (run in test mode)

If its success, you can click on execute to reverse goods movement of
this HU

This reversed HU cannot be used by other orders, as this will be still
assigned to the production order. COPAWA needs to be executed
after this step if HU needs to be used in another order.
https://blogs.sap.com/2016/11/21/more­about­handling­units­in­production­planning­perspective/ 3/9
1/22/2017 More about handling units in Production Planning perspective | SAP Blogs

III. PACK/UNPACK/REPACK
1. Pack HU – HU02
Enter material, handling unit details and click on “Pack” button to pack
the HU.

2. Unpack/Empty HU – HU02
In case of any damages to HU unpack/Empty the old HU and repack
the material into new HU.

Or

https://blogs.sap.com/2016/11/21/more­about­handling­units­in­production­planning­perspective/ 4/9
1/22/2017 More about handling units in Production Planning perspective | SAP Blogs

3. Repack HU – HU02
Select material, new handling unit and click on pack HU button. You
can delete old HU if not required.

https://blogs.sap.com/2016/11/21/more­about­handling­units­in­production­planning­perspective/ 5/9
1/22/2017 More about handling units in Production Planning perspective | SAP Blogs

And save the transaction.

IV. HU goods issue
After creating and confirming the production order, follow below steps
to pack order components

1. COPAWA
Enter Production order and click Enter

Select component to be picked and click on Copy

It will be copied to materials tab

https://blogs.sap.com/2016/11/21/more­about­handling­units­in­production­planning­perspective/ 6/9
1/22/2017 More about handling units in Production Planning perspective | SAP Blogs

Select packing material and component and click on Pack

Save

Other options in COPAWA

Assign HU – Manually created HU can be added here. For example
HU created in HU01.

Assign – Click on this button to assign HU to production order

No Part. GI allowed – Partial GI for this HU will not be allowed if this is
selected

Partial GI allowed – Partial GI is allowed for HU

Delete HU assignment – Delete the HU assignment to this order, so
that it can be used for other order.

https://blogs.sap.com/2016/11/21/more­about­handling­units­in­production­planning­perspective/ 7/9
1/22/2017 More about handling units in Production Planning perspective | SAP Blogs

Delete Assignment – Click on this button to delete HU assignment to
production order

2. COWBHUWA
Enter Order Number and click on “Propose HU”. All the HU’s assigned
to order will be displayed.

Selected the component to be issued and click on “Partial GI”

https://blogs.sap.com/2016/11/21/more­about­handling­units­in­production­planning­perspective/ 8/9
1/22/2017 More about handling units in Production Planning perspective | SAP Blogs

Enter the partial amount of quantity to be issued and hit enter

Save

Other option of partial GI

Previous/next HU – Display of further HUs that are selected for the
partial goods issue posting

Superior/subordinate HU – Display of the hierarchically lower HUs that
are packed in an HU or display of the hierarchically higher HU.

No GI posting – This option will set the content quantity of the
selected HU to zero. A partial goods issue posting is not possible.

Alert Moderator

Be the first to leave a comment
You must be Logged on to comment or reply to a post.

Share & Follow               


Privacy  Terms of Use  Legal Disclosure  Copyright  Trademark  Sitemap  Newsletter

https://blogs.sap.com/2016/11/21/more­about­handling­units­in­production­planning­perspective/ 9/9

You might also like