Quantity Survey

I.EXCAVATION
DEPTH OF
VOLU NO. OF
ITEM WIDTH LENGTH EXCAVATIO AREA VALUE UNIT
ME SETS
N
FOOTING:
F1 1.0 1.0 1.0 1.0 0.25 1.0 0.25 cu.m
WALL FOOTING:
0.277
Along A-A’ 0.30 0.925 0.40 0.111 1.0 0.111 cu.m
5
Along A-B 0.30 3.85 0.40 1.155 0.462 1.0 0.462 cu.m
Along B-C 0.30 3.85 0.40 1.155 0.462 1.0 0.462 cu.m
Along 2-2’ 0.30 1.35 0.40 0.405 0.162 1.0 0.162 cu.m
TIE BEAM:
Along A-B 0.30 3.70 0.70 1.110 0.777 3.0 0.999 cu.m
Along B-C 0.30 3.70 0.70 1.110 0.77 3.0 0.999 cu.m
Along 1-2 0.30 3.70 0.70 1.110 0.77 3.0 0.999 cu.m
Along 2-3 0.30 4.20 0.70 1.260 0.882 3.0 1.134 cu.m
I. CONCRETE WORKS CEMENT SAND GRAVEL CEMENT SAND GRAVEL CEMENT SAND GRAVEL
(9.0) (0.50) (1.0) (7.50) (0.50) (1.0) (6.0) (0.50) (1.0)
FOOTING:
F1 0.25 cu.m 2.25 0.125 0.25 1.875 0.125 0.25 1.5 0.125 0.25
WALL FOOTING:
Along A-A’ 0.0833 cu.m 0.7497 0.0416 0.0833 0.6244 0.0416 0.0833 0.4998 0.0416 0.0833
Along A-B 0.3456 cu.m 3.1104 0.1728 0.3456 2.592 0.1728 0.3456 2.074 0.1728 0.3456
Along B-C 0.3456 cu.m 3.1104 0.1728 0.3456 2.592 0.1728 0.3456 2.074 0.1728 0.3456
Along 2-2’ 0.1215 cu.m 1.0935 0.0608 0.1215 0.9113 0.0608 0.1215 0.729 0.0608 0.1215
TIE BEAM:
Along A-B 0.999 cu.m 8.991 0.4995 0.999 7.4925 0.4995 0.999 5.994 0.4995 0.999
Along B-C 0.999 cu.m 8.991 0.4995 0.999 7.4925 0.4995 0.999 5.994 0.4995 0.999
Along 1-2 0.999 cu.m 8.991 0.4995 0.999 7.4925 0.4995 0.999 5.994 0.4995 0.999
Along 2-3 1.134 cu.m 10.21 0.567 1.134 8.505 0.567 1.134 6.804 0.567 1.134
COLUMNS:
C1 4.455 cu.m 40.10 2.228 4.455 33.413 2.228 4.455 26.73 2.228 4.455
REINFORCED BEAM:
Along A-B 0.666 cu.m 5.994 0.333 0.666 4.995 0.333 0.666 3.996 0.333 0.666
Along B-C 0.666 cu.m 5.994 0.333 0.666 4.995 0.333 0.666 3.996 0.333 0.666
Along 1-2 0.666 cu.m 5.994 0.333 0.666 4.995 0.333 0.666 3.996 0.333 0.666
Along 2-3 0.756 cu.m 6.804 0.3758 0.756 5.67 0.3758 0.756 4.536 0.3758 0.756
CANOPY:
W-1 0.532 cu.m 4.788 0.266 0.532 3.99 0.266 0.532 3.192 0.266 0.532
W-2 0.032 cu.m 0.288 0.016 0.32 0.24 0.016 0.32 0.192 0.016 0.32

FLOORING 12.7 cu.m 114.3 6.35 12.7 95.25 6.35 12.7 76.2 6.35 12.7

SLAB 6.8 cu.m 61.2 3.4 6.8 51 3.4 6.8 40.8 3.4 6.8
TOTAL 32.20 cu.m 292.96 bags 16.27 cu.m 32.20 cu.m 244.13 bags 16.27 cu.m 32.20 cu.m 195.30 bags 16.27 cu.m 32.20 cu.m
Masonry Works A = 3.2 m x 20.075 m
A = (64.24) – (9.67)
A. Concrete Hallow Blocks ( EXTERIOR ) A = 54.57 sq. m.
1. Solve for the area 4. Referring to Table 2-2
1. Divide the height of the fence by the height
of one block. A = 3.0 m x 33 m Multiply:
P =33 m. A = (99) – (15.83) – (6.24) - (0.3 x 3.0 x 4) CHB: 54.57 x 12.5 = 682.13 say 683 pcs.
2. Subtract the space occupied by the posts A = 73.33 sq. m. one face
B. Cement Mortal for Block Laying and Cell Filler
Two faces: 87.34 x 2 = 146.66 sq. m.
= 33 – ( 8 x 0.30 )
1. Referring to Table 2-2 using class “ B “ mixture 40
= 30.6 m. net length
2. Referring to Table 2-4 using class “B” mixture kg. cement
3. Solve for the area of the fence
Multiply: Multiply:
Area of Doors : Cement : 146.66 x 0.192 = 28.159 say 29 Cement : 54.57 x 0.525 = 28.65 say 29 bags
D1 ( 2.15 x 1.9 ) = 4.09 sq. m. bags. Sand : 54.57 x 0.04375 = 2.39 cu.m.
D2 ( 2.15 x 1.0 ) = 2.15 sq. m. Sand : 146.66 x 0.016 = 2.347 say 3 cu. C. Plastering of the fence to group line only
6.24 sq. m. m.
1. Solve for the area
Area of Windows: D. Footing of posts 1.0 x 1.0 square
A = 3.3 m x 20.075 m
1. Solve for the volume of the footing A = (66.25) – (9.67)
W1 ( 1.7 x 1.3 ) x 7 = 15.47 sq. m.
W2 ( 0.6 x 0.6 ) x 1 = 0.36 sq. m. V= t x w x L x No. posts A = 56.58 sq. m. one face
15.83 sq. m. V = 0.25 x 1 x 1 x 8 Two faces: 56.58 x 2 = 113.16 sq. m.
A = 3.2 m x 33 m V = 2 cu. m.
A = (105.6) – (15.83) – (6.24) 2. Referring to Table 2-4 using class “B” mixture
2. Referring to Table 1-2 class “A” mixture
A = 83.53 sq. m. Multiply:
Multiply: Cement : 113.16 x 0.192 = 21.73 say 22 bags.
4. Referring to Table 2-2 Cement : 2 x 9.0 = 18 bags Sand : 113.16 x 0.016 = 1.81 say 2 f cu. m.
Multiply: Sand : 2 x 0.5 = 1 cu. m.
CHB: 83.53 x 12.5 = 1,044.13pcs. Gravel : 2 x 1.0 = 2 cu.m. D. Footing of posts 1.0 x 1.0 square
A. Concrete Hallow Blocks ( INTERIOR )
B. Cement Mortal for Block Laying and Cell Filler 1. Solve for the volume of the footing

1. Referring to Table 2-2 using class “ B “ mixture 40


1. Divide the height of the fence by the height of one V= t x w x L x No. posts
block. V = 0.25 x 1 x 1 x 1
kg. cement
P = 20.075 m. V = 0.25 cu. m.
Multiply:
2. Subtract the space occupied by the posts
Cement : 83.53 x 0.525 = 43.85 bags 2. Referring to Table 1-2 class “A” mixture
= 20.075 m. net length
Sand : 83.53 x 0.04375 = 3.654 cu.m.
3. Solve for the area of the fence Multiply:
Cement : 0.25 x 9.0 = 2.25 say 3 bags
Area of Doors :
C. Plastering of the fence to group line only Sand : 0.25 x 0.5 = 0.125 cu. m.
D1 (2.15 x 1.9 ) = 4.085 sq. m.
Gravel : 0.25 x 1.0 = 0.25 cu. m.
D3 ( 0.9 x 2.5 x 2 ) = 4.5 sq. m.
D4 ( 0.6 x 1.8 ) = 1.08 sq. m.
9.67 sq. m.
Paint Works
CONCRETE TOTAL AREA= 446.73 sq. m.

TILE WORKS (GLAZED TILES)


Wall = (2.5) (1.5) = 3 sq.m.
FOR TOILET AND BATH : = (1.5) (1.5) = 2.25 sq.m.
UNIT COST TOTAL COST COST
QUANTITY UNIT DESCRIPTION
MATERIALS LABOR MATERIALS LABOR

18 GAL FLAT LATEX 700 245 12600 4410 17010


11 KL PATCHING COMPOUND 75 26.25 825 288.75 1113.75
20 PCS SAND PAPER #120 20 7 400 140 540
16 GAL SEMI-GLOSS PINK LATEX 700 245 11200 3920 15120
5 SETS PAINT ROLLER 6” 75 26.25 375 131.25 506.75

5 PCS PAINT BRUSH 4” 40 14 200 200 400

3 PCS PAINT BRUSH 2” 40 14 120 120 240


LTC
2 PINT 100 35 200 70 270
LIGHT GRAY
TOTAL = ₱ 35,200.50

5.25 sq.m.
Area of door = (0.6) (1.5) = 0.9 sq.m.
(UNGLAZED TILES)
= 5.25 - 0.9 = 4.35 / (0.3x0.3)
Flooring = (1.5m) (2m) = 3 sq.m. / (0.3x0.3) = 48.33 say 55 pcs
= 33 pcs say 40 pcs
FOR FLOORING OF THE HOUSE:
(UNGLZED TILES)
QUANTITY UNIT DESCRIPTION Floor Area = (8.0) (8.5) = 68 sq.m.
0.3m x 0.3m = 68 – 3 = 65 sq.m. / (0.6x0.6) (tile area)
40 PCS
UNGLAZED TILES = 180.56 pcs + 15% contingency
0.3m x 0.3m GLAZED = 180.86 pcs say 185 pcs
55 PCS
TILES
0.6m x 0.6m TILE ADHESIVE:
185 PCS = 65 + 3 + 4.35 = 72.35 sq.m. / 5 sq.m. (tile coverage)
UNGLAZED TILES
= 14.47 bags say 25 bags of 25 kl tile adhesive
25 BAGS TILE ADHESIVE
10 PACKS TILE GROUT TILE GROUT:
= 72.35 sq.m. / 8sq.m (grout coverage)
= 9.04 packs say 10 packs 2kg of tile grout

Steel Works
Time
Activity Duration ES EF LS LF Total Free Float Remarks Cost
(Days) Float (ES-EF)
(LS-ES)
1-2
Site Clearing 3 0 3 0 3 0 0 CP
and Staking
2-3
Excavation 4 3 7 3 7 0 0 CP
2-4
Tying
Reinforcing 3 3 6 3 11 0 0
Steel Bars

3-5
Undergroun
4 7 11 7 11 0 0 CP
d Installation

4-5
0 6 6 7 11 1 5
Dummy
4-6
Dummy 0 6 6 7 7 1 9

5-6
Form Works
for 4 11 15 11 15 0 0 CP
Foundation
and Column
5-7
Pouring of
Concrete for 4 11 15 11 15 0 0 CP
Foundation
and Column
6-7
0 15 15 15 15 0 0 CP
Dummy
7-8
Removal of 1 15 16 15 16 0 0 CP
Forms
8-9
Masonry 5 16 21 16 27 0 0
Works
8-10
Mechanical
and Electrical 11 16 27 16 27 0 0 CP
Services

9-11
Beam Steel 5 27 32 27 32 0 0 CP
Installation
10-9
Dummy 0 21 21 27 27 6 6

10-13
Dummy 0 21 21 27 41 6 20

10-15
Dummy 0 21 21 27 44 6 23

10-16
Dummy 0 21 21 27 45 6 24

11-12
Roof Slab
5 32 37 32 37 0 0 CP
Installation

12-13
Form Works
for Beams 4 37 41 37 41 0 0 CP
and Roof
Slab
13-14
Pouring of
Concrete for 2 41 43 41 43 0 0 CP
Beams and
Roof Slab
14-15
Ground Floor
Steel 1 43 44 43 44 0 0 CP
Installation

15-16
Pouring of
1 44 45 44 45 0 0 CP
Ground Floor
Slab
16-17
Mechanical,
4 45 49 45 49 0 0 CP
Electrical and
Fixture
17-18
Finishing and 7 49 56 49 56 0 0 CP
Paint Works
18-19
7 56 63 56 63 0 0 CP
Tile Works