G.A.D Construction P.L.C in Bahir Dar, Ethiopia: Week Days Activities

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

G.A.D Construction P.L.

C in Bahir Dar, Ethiopia


Name: Eyasu Birhanu
Department: Civil Engineering
Week No: 06 (DATA WORK WEEK) Dates; 08/08/2010 to 12/08/2010 E.C

Week days Activities

Monday  Collect daily data for 2nd floor slab and beam concrete work.
 Collect daily data for 1st floor partition wall by HCB.

Tuesday Continuing of work


 Collect daily data of the concrete work of 2nd floor slab and beam.
 Collect daily data of chiseling of the slab and column for 1st floor.

Wednesday Continuing of work


 Collect daily data of the concrete work of 2nd floor slab and beam.
 Collect daily data of 2nd floor column formwork in stole.

Thursday Continuing of work


 Collect daily data of the concrete work of 2nd floor slab and beam.
 Collect daily data of chiseling of the slab for 2nd floor.
 Collect daily data of rebar in stole at the 2nd floor
Friday Continuing of work

 Collect daily data of the concrete work of 2nd floor column.


 Collect daily data of chiseling of the slab for 2nd floor.

In this week I am much more familiar with the tasks done on the site some of them are:
 How to measure the daily worked concrete
 How to measure the daily worked formwork.
 And so …….
Fig.01 Slab concrete work at 2nd floor
Fig.02 in stole column formwork
Fig.03 In stole column rebar at 2nd floor
Fig.04 HCB work at 1st floor