CALCULATION SUMMARY

Project Name : Proyecto 001679 Project Location: PlusPetrol - RED 1

Drawing No. : City: ICA, PISCO

Design Areas
Design Area Calc. Mode Occupancy Area of Total Water Pressure @ Min. Min. Min. Calculated Hose Margin To
Name (Model) Application Source Density Pressure Flow Heads Streams Source

(ft²) (gpm) (psi) (gpm/ft²) (psi) (gpm) # (gpm) (psi)

Emb-coold-ref-frac Demand (HW) 0 80,3 172 0 174 10 8 0 -0,1

File: D:\grodriguez\Data\Desktop\Proyectos asignados\1679 (Pluspetrol)\Nuevo CH\Red 1\Semana


Date 04/12/2018 2\Emb-coold-ref-frac\Emb-coold-ref-frac - Muestra 8 - Ajustado.tyc3
Page 1
Copyright © 2002-2012 Tyco Fire Protection Products
HYDRAULIC CALCULATIONS
for
Job Information
Project Name : Proyecto 001679

Contract No. : City: ICA, PISCO

Project Location: PlusPetrol - RED 1 Date: 23/11/2018

Contractor Information
Name of Contractor: ENGINEERING SERVICES S.A.C.

Address: Av. República de Panamá 4575 Surquillo City: LIMA, PERU

Phone Number: (511) 445 8215 E-mail: www.essac.com.pe

Name of Designer: L. CHAVEZ

Authority Having Jurisdiction: CGBVP

Design
Remote Area Name Emb-coold-ref-frac

Remote Area Location

Occupancy Classification

Density (gpm/ft²) N/A (In-Rack)

Area of Application (ft²) 0

Coverage per Sprinkler (ft²) N/A (In-Rack)

Number of Calculated Sprinklers 8

In-Rack Demand (gpm)

Special Heads

Hose Streams (gpm) 0

Total Water Required (incl. Hose Streams) (gpm) 80,3

Required Pressure at Source (psi) 172,1

Type of System Wet

Volume - Entire System (gal) 210266,1 gal

Water Supply Information


Date 27/11/2018

Location

Source PBB-1660A

Notes

File: D:\grodriguez\Data\Desktop\Proyectos asignados\1679 (Pluspetrol)\Nuevo CH\Red 1\Semana


2\Emb-coold-ref-frac\Emb-coold-ref-frac - Muestra 8 - Ajustado.tyc3
Date 04/12/2018 Copyright © 2002-2012 Tyco Fire Protection Products Page 2
Job : Proyecto 001679 Node Labels: Off
Pipe Labels: Size

Diagram for Design Area : Emb-coold-ref-frac

File: D:\grodriguez\Data\Desktop\Proyectos asignados\1679 (Pluspetrol)\Nuevo CH\Red 1\Semana 2\Emb-coold-ref-frac\Emb-coold-ref-frac - Muestra 8 - Ajustado.tyc3


Date 04/12/2018 Copyright © 2002-2012 Tyco Fire Protection Products Page 3
Job : Proyecto 001679

Hydraulic Analysis for : Emb-coold-ref-frac


Calculation Info
Calculation Mode Demand
Hydraulic Model Hazen-Williams
Fluid Name Water @ 60F (15.6C)
Fluid Weight, (lb/ft³) N/A for Hazen-Williams calculation.
Fluid Dynamic Viscosity, (lb·s/ft²) N/A for Hazen-Williams calculation.

Water Supply Parameters

Supply 1 : src1 Flow (gpm) Pressure (psi)


0 172
2500 170
5000 155
7500 120

Hoses
Inside Hose Flow / Standpipe Demand (gpm) 80,3

Outside Hose Flow (gpm)

Additional Outside Hose Flow (gpm)

Other (custom defined) Hose Flow (gpm)

Total Hose Flow (gpm) 80,3

Sprinklers
Ovehead Sprinkler Flow (gpm)

InRack Sprinkler Flow (gpm)

Other (custom defined) Sprinkler Flow (gpm)

Total Sprinkler Flow (gpm)

Other
Required Margin of Safety (psi) 0

W1 - Pressure (psi) 172,1

W1 - Flow (gpm) 80,3

Demand w/o System Pump(s) N/A

File: D:\grodriguez\Data\Desktop\Proyectos asignados\1679 (Pluspetrol)\Nuevo CH\Red 1\Semana


2\Emb-coold-ref-frac\Emb-coold-ref-frac - Muestra 8 - Ajustado.tyc3
Date 04/12/2018 Copyright © 2002-2012 Tyco Fire Protection Products Page 4
Job : Proyecto 001679

Hydraulic Analysis for : Emb-coold-ref-frac

System Demand

200

180 D2
S1
S2

S3
160

140

S4

120 111,589
Pressure, psi

100

80

60

40

20

D1
0
0 2500 3000 3500 4000 4500 5000 5500 6000 6500 7000 7500 8000
Flow, gpm

File: D:\grodriguez\Data\Desktop\Proyectos asignados\1679 (Pluspetrol)\Nuevo CH\Red 1\Semana


Date 04/12/2018 2\Emb-coold-ref-frac\Emb-coold-ref-frac - Muestra 8 - Ajustado.tyc3 Page 5
Copyright © 2002-2012 Tyco Fire Protection Products
Job : Proyecto 001679

Hydraulic Analysis for : Emb-coold-ref-frac

Graph Labels
Values
Label Description
Flow (gpm) Pressure (psi)
S1 Supply point #1 - Static 0 172
S2 Supply point #2 2500 170
S3 Supply point #3 5000 155
S4 Supply point #4 7500 120
D1 Elevation Pressure 0 -1,9
D2 System Demand 80,3 172,1

Curve Intersections & Safety Margins


Intersection Safety Margin
Curve Name
Pressure (psi) Flow (gpm) Pressure (psi) @ Flow (gpm)
Supply 172 80,3 -0,1 80,3

Open Heads
Required Calculated
Head Ref. Head Type Coverage K-Factor
Density Flow Pressure Density Flow Pressure

(ft²) (gpm/psi½) (gpm/ft²) (gpm) (psi) (gpm/ft²) (gpm) (psi)

Standpipe
XV-7012 0 0 10 170 0 10,1 174
Demand

Standpipe
XV-7002 0 0 10 172 0 10,1 174
Demand

Standpipe
XV-7003 0 0 10 174 0 10 174
Demand

Standpipe
XV-7004 0 0 10 174 0 10 174
Demand

Standpipe
XV-7007 0 0 10 174 0 10 174
Demand

Standpipe
XV-7006 0 0 10 174 0 10 174
Demand

Standpipe
XV-7005 0 0 10 172 0 10,1 174
Demand

Standpipe
XV-7008 0 0 10 172 0 10,1 174
Demand

File: D:\grodriguez\Data\Desktop\Proyectos asignados\1679 (Pluspetrol)\Nuevo CH\Red 1\Semana


2\Emb-coold-ref-frac\Emb-coold-ref-frac - Muestra 8 - Ajustado.tyc3
Date 04/12/2018 Copyright © 2002-2012 Tyco Fire Protection Products Page 6
Job : Proyecto 001679 Hydraulic Calculations / Fluid Delivery Time Analysis

Node Data
Node# Type K-Fact. Discharge Coverage Tot. Pres. Req. Pres.
Elev Hgroup Open/Closed Overdischarge Density Elev. Pres. Req. Discharge
gpm ft² psi psi
gpm/psi½
ft gpm gpm/ft² psi gpm
005 Node 173,6
37,07 NODE 1,5
007 Node 174,5
34,93 NODE 2,4
008 Node 174,5
34,93 NODE 2,4
009 Node 177,6
27,84 NODE 5,5
010 Node 177,6
27,84 NODE 5,5
011 Node 177,6
27,84 NODE 5,5
012 Node 177,3
28,54 NODE 5,2
013 Node 177,6
27,89 NODE 5,4
014 Node 177,9
27,23 NODE 5,7
015 Node 177,9
27,23 NODE 5,7
016 Node 177,9
27,23 NODE 5,7
017 Node 173,6
37,19 NODE 1,4
018 Node 173,6
37,19 NODE 1,4
020 Node 173,6
37,19 NODE 1,4
021 Node 173,6
37,19 NODE 1,4
023 Node 173,5
37,35 NODE 1,3
024 Node 173,5
37,35 NODE 1,3
025 Node 178,2
26,41 NODE 6,1
030 Node 179,1
24,34 NODE 7
031 Node 179,3
23,82 NODE 7,2
032 Node 179,3
23,82 NODE 7,2
036 Node 179
24,61 NODE 6,9
037 Node 178,8
25,14 NODE 6,6
038 Node 176,2
31,15 NODE 4
039 Node 173,5
37,35 NODE 1,3
042 Node 173,5
37,35 NODE 1,3
043 Node 173,5
37,35 NODE 1,3

File: D:\grodriguez\Data\Desktop\Proyectos asignados\1679 (Pluspetrol)\Nuevo CH\Red 1\Semana


2\Emb-coold-ref-frac\Emb-coold-ref-frac - Muestra 8 - Ajustado.tyc3
Date 04/12/2018 Copyright © 2002-2012 Tyco Fire Protection Products Page 7
Job : Proyecto 001679 Hydraulic Calculations / Fluid Delivery Time Analysis

Node Data
Node# Type K-Fact. Discharge Coverage Tot. Pres. Req. Pres.
Elev Hgroup Open/Closed Overdischarge Density Elev. Pres. Req. Discharge
gpm ft² psi psi
gpm/psi½
ft gpm gpm/ft² psi gpm
044 Node 173,5
37,35 NODE 1,3
045 Node 171,6
41,62 NODE -0,5
046 Node 171,6
41,62 NODE -0,5
047 Node 173,9
36,42 NODE 1,7
050 Node 173,6
37,19 NODE 1,4
052 Node 172,8
38,88 NODE 0,7
053 Node 171,8
41,29 NODE -0,4
054 Node 178,5
25,85 NODE 6,3
055 Node 178,5
25,85 NODE 6,3
056 Node 177,6
27,84 NODE 5,5
057 Node 177,6
27,84 NODE 5,5
058 Node 177,6
27,84 NODE 5,5
096 Node 177,6
27,84 NODE 5,5
097 Node 173,1
38,12 NODE 1
098 Node 173,1
38,12 NODE 1
099 Node 172,7
39,04 NODE 0,6
101 Node 172,7
39,04 NODE 0,6
102 Node 172,7
39,04 NODE 0,6
103 Node 173,6
37,07 NODE 1,5
104 Node 174,9
34,12 NODE 2,7
105 Node 174,9
34,12 NODE 2,7
106 Node 174,6
34,78 NODE 2,5
107 Node 172
40,85 NODE -0,2
108 Node 172
40,85 NODE -0,2
109 Node 169,5
46,49 NODE -2,6
111 Node 169,6
46,26 NODE -2,5
112 Node 169,9
45,6 NODE -2,2

File: D:\grodriguez\Data\Desktop\Proyectos asignados\1679 (Pluspetrol)\Nuevo CH\Red 1\Semana


2\Emb-coold-ref-frac\Emb-coold-ref-frac - Muestra 8 - Ajustado.tyc3
Date 04/12/2018 Copyright © 2002-2012 Tyco Fire Protection Products Page 8
Job : Proyecto 001679 Hydraulic Calculations / Fluid Delivery Time Analysis

Node Data
Node# Type K-Fact. Discharge Coverage Tot. Pres. Req. Pres.
Elev Hgroup Open/Closed Overdischarge Density Elev. Pres. Req. Discharge
gpm ft² psi psi
gpm/psi½
ft gpm gpm/ft² psi gpm
113 Node 171,3
42,32 NODE -0,8
117 Node 172
40,68 NODE -0,1
118 Node 172
40,68 NODE -0,1
124 Node 168,5
48,88 NODE -3,7
125 Node 168,5
48,88 NODE -3,7
127 Node 168,5
48,88 NODE -3,7
128 Node 169,9
45,6 NODE -2,2
161 Node 171,3
42,32 NODE -0,8
162 Node 174,3
35,43 NODE 2,2
165 Node 169,6
46,26 NODE -2,5
166 Node 169,3
46,92 NODE -2,8
169 Node 169,3
46,92 NODE -2,8
184 Node 174,9
34,12 NODE 2,7
185 Node 174,3
35,43 NODE 2,2
186 Node 177,6
27,84 NODE 5,5
187 Node 174,9
34,12 NODE 2,7
188 Node 171,9
41,01 NODE -0,2
189 Node 171,9
41,01 NODE -0,2
190 Node 171,9
41,01 NODE -0,2
205 Node 177,6
27,84 NODE 5,5
206 Node 177,6
27,84 NODE 5,5
207 Node 177,6
27,84 NODE 5,5
208 Node 177,6
27,84 NODE 5,5
209 Node 177,6
27,84 NODE 5,5
210 Node 177,6
27,84 NODE 5,5
211 Node 177,6
27,84 NODE 5,5
212 Node 177,6
27,84 NODE 5,5

File: D:\grodriguez\Data\Desktop\Proyectos asignados\1679 (Pluspetrol)\Nuevo CH\Red 1\Semana


2\Emb-coold-ref-frac\Emb-coold-ref-frac - Muestra 8 - Ajustado.tyc3
Date 04/12/2018 Copyright © 2002-2012 Tyco Fire Protection Products Page 9
Job : Proyecto 001679 Hydraulic Calculations / Fluid Delivery Time Analysis

Node Data
Node# Type K-Fact. Discharge Coverage Tot. Pres. Req. Pres.
Elev Hgroup Open/Closed Overdischarge Density Elev. Pres. Req. Discharge
gpm ft² psi psi
gpm/psi½
ft gpm gpm/ft² psi gpm
XV-7012 Standpipe Demand 10,1 174 170
36,09 SDNODE Open 0,1 1,9 10
XV-7002 Standpipe Demand 10,1 174 172
36,09 SDNODE Open 0,1 1,9 10
XV-7003 Standpipe Demand 10 174 174
36,09 SDNODE Open 0 1,9 10
XV-7004 Standpipe Demand 10 174 174
36,09 SDNODE Open 0 1,9 10
XV-7007 Standpipe Demand 10 174 174
36,09 SDNODE Open 0 1,9 10
XV-7006 Standpipe Demand 10 174 174
36,09 SDNODE Open 0 1,9 10
XV-7005 Standpipe Demand 10,1 174 172
36,09 SDNODE Open 0,1 1,9 10
XV-7008 Standpipe Demand 10,1 174 172
36,09 SDNODE Open 0,1 1,9 10
253 Node 179,1
24,48 NODE 6,9
254 Node 179,1
24,41 NODE 6,9
255 Node 179,1
24,34 NODE 7
256 Node 179,1
24,28 NODE 7
257 Node 179,1
24,28 NODE 7
258 Node 179,1
24,28 NODE 7
259 Node 179,9
22,64 NODE 7,7
260 Node 179,9
22,64 NODE 7,7
261 Node 179,9
22,64 NODE 7,7
262 Node 179,9
22,64 NODE 7,7
263 Node 179,9
22,64 NODE 7,7
265 Node 179,4
23,62 NODE 7,3
266 Node 179,4
23,62 NODE 7,3
267 Node 179,4
23,62 NODE 7,3
268 Node 179,1
24,34 NODE 7
269 Node 179,1
24,34 NODE 7
298 Node 179,4
23,75 NODE 7,2
299 Node 179,1
24,28 NODE 7
n100 Node 172
40,85 NODE -0,2

File: D:\grodriguez\Data\Desktop\Proyectos asignados\1679 (Pluspetrol)\Nuevo CH\Red 1\Semana


2\Emb-coold-ref-frac\Emb-coold-ref-frac - Muestra 8 - Ajustado.tyc3
Date 04/12/2018 Copyright © 2002-2012 Tyco Fire Protection Products Page 10
Job : Proyecto 001679 Hydraulic Calculations / Fluid Delivery Time Analysis

Node Data
Node# Type K-Fact. Discharge Coverage Tot. Pres. Req. Pres.
Elev Hgroup Open/Closed Overdischarge Density Elev. Pres. Req. Discharge
gpm ft² psi psi
gpm/psi½
ft gpm gpm/ft² psi gpm
n101 Node 172
40,68 NODE -0,1
n102 Node 174,1
36,02 NODE 1,9
n103 Node 174,1
36,02 NODE 1,9
n104 Node 173,4
37,57 NODE 1,2
n160 Node 171,9
41,01 NODE -0,2
n161 Node 168,9
47,94 NODE -3,2
n162 Node 168,9
47,94 NODE -3,2
n163 Node 172,1
40,44 NODE 0
src1 Supply 172,1
-80,3
40,44 SUPPLY 0
H15 Forced Node 169,4
46,78 FNODE -2,7
n173 Node 177,6
27,84 NODE 5,5

File: D:\grodriguez\Data\Desktop\Proyectos asignados\1679 (Pluspetrol)\Nuevo CH\Red 1\Semana


2\Emb-coold-ref-frac\Emb-coold-ref-frac - Muestra 8 - Ajustado.tyc3
Date 04/12/2018 Copyright © 2002-2012 Tyco Fire Protection Products Page 11
Job name: Proyecto 001679 Sheet number:___________________

PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added(q)* Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES
T frict (Pf)

(ft) (gpm/psi½) (gpm) (ft) (ft) (psi) (psi)


(in)
XV-7003 36,09 10 50 1x(us.Tee-Br)=10 8,25 120 174
210 27,84 10 2,067 10 0,0013 3,6
18,25 0,0
210 27,84 20,2 200 2,03 120 177,6
209 27,84 30,2 8,071 0 0,0000 0
2,03 0
209 27,84 10 200 2,03 120 177,6
208 27,84 40,2 8,071 0 0,0000 0
2,03 0
208 27,84 10 200 1,97 120 177,6
207 27,84 50,2 8,071 0 0,0000 0
1,97 0
207 27,84 10 200 1,97 120 177,6
206 27,84 60,2 8,071 0 0,0000 0
1,97 0
206 27,84 10,1 200 1,97 120 177,6
205 27,84 70,2 8,071 0 0,0001 0
1,97 0
205 27,84 10,1 200 1x(us.Tee-Br)=35 11,04 120 177,6
057 27,84 80,3 8,071 35 0,0001 0
46,04 0
057 27,84 -26,3 600 47,57 150 177,6
058 27,84 54 19,375 0 0 0
47,57 0
058 27,84 -22,9 600 19,47 150 177,6
n173 27,84 31,2 19,375 0 0 0
19,47 0
n173 27,84 0 600 162,18 150 177,6
010 27,84 31,2 19,375 0 0 0
162,18 0
010 27,84 -10 600 91,88 150 177,6
011 27,84 21,1 19,375 0 0 0
91,88 0
011 27,84 10 600 50,32 150 177,6
186 27,84 31,2 19,375 0 0 0
50,32 0
186 27,84 0 600 17,8 150 177,6
185 35,43 31,2 19,375 0 0 -3,3
17,8 0
185 35,43 0 600 277,5 150 174,3
184 34,12 31,2 19,375 0 0 0,6
277,5 0
184 34,12 49,1 500 74,47 150 174,9
187 34,12 80,3 16,145 0 0 0
74,47 0
187 34,12 0 500 1x(coupling)=2,05 3,44 150 174,9
n104 37,57 80,3 16,145 2,05 0 -1,5
5,49 0
n104 37,57 0 500 3,44 120 173,4
188 41,01 80,3 19 0 0 -1,5
3,44 0
188 41,01 0 500 5,34 120 171,9
189 41,01 80,3 19 0 0 0
5,34 0
189 41,01 0 500 64,84 120 171,9
190 41,01 80,3 19 0 0 0
64,84 0

© 2006 National Fire Protection Association Page 12


Job name: Proyecto 001679 Sheet number:___________________

PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added(q)* Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES
T frict (Pf)

(ft) (gpm/psi½) (gpm) (ft) (ft) (psi) (psi)


(in)
190 41,01 0 500 53,64 120 171,9
n160 41,01 80,3 19 0 0 0
53,64 0
n160 41,01 0 500 6,93 120 171,9
n161 47,94 80,3 19 0 0 -3
6,93 0
n161 47,94 0 500 17,72 120 168,9
n162 47,94 80,3 19 0 0 0
17,72 0
n162 47,94 0 500 7,5 120 168,9
n163 40,44 80,3 19 0 0 3,2
7,5 0
n163 40,44 0 500 5,25 120 172,1
src1 40,44 80,3 19 0 0 0
5,25 0
XV-7007 36,09 10 50 1x(us.Tee-Br)=10 8,25 120 174
208 27,84 10 2,067 10 0,0013 3,6
18,25 0,0
XV-7006 36,09 10 50 1x(us.Tee-Br)=10 8,25 120 174
207 27,84 10 2,067 10 0,0013 3,6
18,25 0,0
XV-7004 36,09 10 80 1x(us.Tee-Br)=15 8,25 120 174
209 27,84 10 3,068 15 0,0002 3,6
23,25 0
XV-7002 36,09 10,1 50 1x(us.Tee-Br)=10 8,25 120 174
211 27,84 10,1 2,067 10 0,0013 3,6
18,25 0,0
211 27,84 10,1 200 1,97 120 177,6
210 27,84 20,2 8,071 0 0 0
1,97 0
XV-7005 36,09 10,1 50 1x(us.Tee-Br)=10 8,25 120 174
206 27,84 10,1 2,067 10 0,0013 3,6
18,25 0,0
XV-7008 36,09 10,1 50 1x(us.Tee-Br)=10 8,25 120 174
205 27,84 10,1 2,067 10 0,0013 3,6
18,25 0,0
XV-7012 36,09 10,1 50 1x(us.90)=5 8,25 120 174
212 27,84 10,1 2,067 5 0,0013 3,6
13,25 0,0
212 27,84 0 200 1,97 120 177,6
211 27,84 10,1 8,071 0 0 0
1,97 0
057 27,84 0 600 114,31 150 177,6
056 27,84 26,3 19,375 0 0 0
114,31 0
056 27,84 0 600 22,29 150 177,6
055 25,85 26,3 19,375 0 0 0,9
22,29 0
055 25,85 0 600 71,06 150 178,5
054 25,85 26,3 19,375 0 0 0
71,06 0
054 25,85 0 600 32,41 150 178,5
053 41,29 26,3 19,375 0 0 -6,7
32,41 0
053 41,29 -10,2 600 32,22 150 171,8
118 40,68 16,1 19,375 0 0 0,3
32,22 0

© 2006 National Fire Protection Association Page 13


Job name: Proyecto 001679 Sheet number:___________________

PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added(q)* Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES
T frict (Pf)

(ft) (gpm/psi½) (gpm) (ft) (ft) (psi) (psi)


(in)
118 40,68 0 600 1x(coupling)=2,69 10,55 150 172
117 40,68 16,1 19,375 2,69 0 0
13,24 0
117 40,68 -4,6 600 335,32 150 172
113 42,32 11,4 19,375 0 0 -0,7
335,32 0
113 42,32 0,2 600 9,89 150 171,3
161 42,32 11,6 19,375 0 0 0
9,89 0
161 42,32 0 600 14,92 150 171,3
162 35,43 11,6 19,375 0 0 3
14,92 0
162 35,43 0 600 255,44 150 174,3
102 39,04 11,6 19,375 0 0 -1,6
255,44 0
102 39,04 14,4 600 181,67 150 172,7
103 37,07 26 19,375 0 0 0,9
181,67 0
103 37,07 18,5 600 91,93 150 173,6
104 34,12 44,5 19,375 0 0 1,3
91,93 0
104 34,12 4,6 600 48,3 150 174,9
184 34,12 49,1 19,375 0 0 0
48,3 0
058 27,84 0 600 50,32 150 177,6
096 27,84 22,9 19,375 0 0 0
50,32 0
096 27,84 0 600 19,1 150 177,6
097 38,12 22,9 19,375 0 0 -4,5
19,1 0
097 38,12 0 600 31,94 150 173,1
098 38,12 22,9 19,375 0 0 0
31,94 0
098 38,12 -4,6 600 19,87 150 173,1
099 39,04 18,3 19,375 0 0 -0,4
19,87 0
099 39,04 0 600 162,14 150 172,7
101 39,04 18,3 19,375 0 0 0
162,14 0
101 39,04 -3,9 600 111,88 150 172,7
102 39,04 14,4 19,375 0 0 0
111,88 0
010 27,84 0 600 50,32 150 177,6
009 27,84 10 19,375 0 0 0
50,32 0
009 27,84 0 600 17,59 150 177,6
008 34,93 10 19,375 0 0 -3,1
17,59 0
008 34,93 0 600 31,94 150 174,5
007 34,93 10 19,375 0 0 0
31,94 0
007 34,93 4,6 600 182 150 174,5
005 37,07 14,6 19,375 0 0 -0,9
182 0
005 37,07 3,9 600 111,88 150 173,6
103 37,07 18,5 19,375 0 0 0
111,88 0

© 2006 National Fire Protection Association Page 14


Job name: Proyecto 001679 Sheet number:___________________

PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added(q)* Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES
T frict (Pf)

(ft) (gpm/psi½) (gpm) (ft) (ft) (psi) (psi)


(in)
053 41,29 0 600 68,45 150 171,8
052 38,88 10,2 19,375 0 0 1
68,45 0
052 38,88 0 600 152,16 150 172,8
050 37,19 10,2 19,375 0 0 0,7
152,16 0
050 37,19 -3,2 600 8,65 150 173,6
018 37,19 7 19,375 0 0 0
8,65 0
018 37,19 3 600 5,44 150 173,6
017 37,19 10 19,375 0 0 0
5,44 0
017 37,19 0 600 24,7 150 173,6
016 27,23 10 19,375 0 0 4,3
24,7 0
016 27,23 0 600 34,72 150 177,9
015 27,23 10 19,375 0 0 0
34,72 0
015 27,23 0 600 17,77 150 177,9
014 27,23 10 19,375 0 0 0
17,77 0
014 27,23 0 600 775,29 150 177,9
013 27,89 10 19,375 0 0 -0,3
775,29 0
013 27,89 0 600 202,49 150 177,6
012 28,54 10 19,375 0 0 -0,3
202,49 0
012 28,54 0 600 298,54 150 177,3
011 27,84 10 19,375 0 0 0,3
298,54 0
117 40,68 0 600 454,35 150 172
n101 40,68 4,6 19,375 0 0 0
454,35 0
n101 40,68 0 600 21,4 150 172
124 48,88 4,6 19,375 0 0 -3,6
21,4 0
124 48,88 0,2 600 13,46 150 168,5
125 48,88 4,8 19,375 0 0 0
13,46 0
125 48,88 0 600 211,66 150 168,5
127 48,88 4,8 19,375 0 0 0
211,66 0
127 48,88 0 600 345,06 150 168,5
128 45,6 4,8 19,375 0 0 1,4
345,06 0
128 45,6 0 600 685,78 150 169,9
112 45,6 4,8 19,375 0 0 0
685,78 0
112 45,6 -0,2 600 159,87 150 169,9
111 46,26 4,6 19,375 0 0 -0,3
159,87 0
111 46,26 -2 600 78,78 150 169,6
109 46,49 2,6 19,375 0 0 -0,1
78,78 0
109 46,49 2 350 27,09 150 169,5
n100 40,85 4,6 11,302 0 0 2,4
27,09 0

© 2006 National Fire Protection Association Page 15


Job name: Proyecto 001679 Sheet number:___________________

PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added(q)* Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES
T frict (Pf)

(ft) (gpm/psi½) (gpm) (ft) (ft) (psi) (psi)


(in)
n100 40,85 0 350 1x(elbow.22.5)=5,22 48,16 150 172
108 40,85 4,6 11,302 5,22 0 0
53,38 0
108 40,85 0 350 5,66 150 172
107 40,85 4,6 11,302 0 0 0
5,66 0
107 40,85 0 350 538,44 150 172
106 34,78 4,6 11,302 0 0 2,6
538,44 0
106 34,78 0 350 258,57 150 174,6
105 34,12 4,6 11,302 0 0 0,3
258,57 0
105 34,12 0 600 65,59 150 174,9
104 34,12 4,6 19,375 0 0 0
65,59 0
098 38,12 0 300 1x(us.Tee-Br)=41,38 181,69 150 173,1
007 34,93 4,6 10,293 41,38 0 1,4
223,07 0
101 39,04 0 300 2x(us.Tee-Br)=82,76 181,67 150 172,7
005 37,07 3,9 10,293 82,76 0 0,9
264,43 0
050 37,19 0 600 466,33 150 173,6
047 36,42 3,2 19,375 0 0 0,3
466,33 0
047 36,42 0 600 8,53 150 173,9
046 41,62 3,2 19,375 0 0 -2,3
8,53 0
046 41,62 0 600 1,03 150 171,6
045 41,62 3,2 19,375 0 0 0
1,03 0
045 41,62 -0,2 600 1x(coupling)=2,69 197,41 150 171,6
044 37,35 3 19,375 2,69 0 1,8
200,1 0
044 37,35 0 600 8,2 150 173,5
043 37,35 3 19,375 0 0 0
8,2 0
043 37,35 -0,2 600 7,48 150 173,5
042 37,35 2,8 19,375 0 0 0
7,48 0
042 37,35 0 600 482,58 150 173,5
039 37,35 2,8 19,375 0 0 0
482,58 0
039 37,35 0 600 514,69 150 173,5
038 31,15 2,8 19,375 0 0 2,7
514,69 0
038 31,15 0 600 16,24 150 176,2
037 25,14 2,8 19,375 0 0 2,6
16,24 0
037 25,14 0 600 23,65 150 178,8
036 24,61 2,8 19,375 0 0 0,2
23,65 0
036 24,61 -1,2 400 1x(elbow.22.5)=5,72 25,5 150 179
253 24,48 1,6 12,916 5,72 0 0,1
31,21 0
253 24,48 0 400 1x(elbow.22.5)=5,72 18,63 150 179,1
254 24,41 1,6 12,916 5,72 0 0,0
24,35 0

© 2006 National Fire Protection Association Page 16


Job name: Proyecto 001679 Sheet number:___________________

PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added(q)* Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES
T frict (Pf)

(ft) (gpm/psi½) (gpm) (ft) (ft) (psi) (psi)


(in)
254 24,41 0 400 1x(elbow.22.5)=5,72 14,17 150 179,1
255 24,34 1,6 12,916 5,72 0 0,0
19,89 0
255 24,34 0 400 1x(elbow.22.5)=5,72 18,63 150 179,1
256 24,28 1,6 12,916 5,72 0 0,0
24,35 0
256 24,28 0 400 186,55 150 179,1
257 24,28 1,6 12,916 0 0 0
186,55 0
257 24,28 0 400 973,21 150 179,1
258 24,28 1,6 12,916 0 0 0
973,21 0
258 24,28 0,3 350 453,63 150 179,1
259 22,64 2 11,302 0 0 0,7
453,63 0
259 22,64 1,4 350 1x(elbow.22.5)=5,22 24,66 150 179,9
260 22,64 3,4 11,302 5,22 0 0
29,88 0
260 22,64 0 350 1x(elbow.22.5)=5,22 34,92 150 179,9
261 22,64 3,4 11,302 5,22 0 0
40,14 0
261 22,64 0 350 177,28 150 179,9
262 22,64 3,4 11,302 0 0 0
177,28 0
262 22,64 -1,5 350 291,24 150 179,9
263 22,64 1,8 11,302 0 0 0
291,24 0
263 22,64 0 350 454,07 150 179,9
265 23,62 1,8 11,302 0 0 -0,4
454,07 0
265 23,62 0 350 291,24 150 179,4
266 23,62 1,8 11,302 0 0 0
291,24 0
266 23,62 1,5 350 236,22 150 179,4
267 23,62 3,4 11,302 0 0 0
236,22 0
267 23,62 -1,4 350 267,52 150 179,4
268 24,34 2 11,302 0 0 -0,3
267,52 0
268 24,34 0 350 74,46 150 179,1
269 24,34 2 11,302 0 0 0
74,46 0
269 24,34 0 350 182,71 150 179,1
030 24,34 2 11,302 0 0 0
182,71 0
030 24,34 0,9 600 450,07 150 179,1
025 26,41 2,8 19,375 0 0 -0,9
450,07 0
025 26,41 0 600 17,69 150 178,2
024 37,35 2,8 19,375 0 0 -4,7
17,69 0
024 37,35 0 600 6,01 150 173,5
023 37,35 2,8 19,375 0 0 0
6,01 0
023 37,35 0,2 600 65,7 150 173,5
021 37,19 3 19,375 0 0 0,1
65,7 0

© 2006 National Fire Protection Association Page 17


Job name: Proyecto 001679 Sheet number:___________________

PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added(q)* Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES
T frict (Pf)

(ft) (gpm/psi½) (gpm) (ft) (ft) (psi) (psi)


(in)
021 37,19 0 600 8,26 150 173,6
n102 36,02 3 19,375 0 0 0,5
8,26 0
n102 36,02 0 600 16,07 150 174,1
n103 36,02 3 19,375 0 0 0
16,07 0
n103 36,02 0 600 8,28 150 174,1
020 37,19 3 19,375 0 0 -0,5
8,28 0
020 37,19 0 600 98,77 150 173,6
018 37,19 3 19,375 0 0 0
98,77 0
112 45,6 0 600 23,43 150 169,9
113 42,32 0,2 19,375 0 0 1,4
23,43 0
111 46,26 0 600 196,63 150 169,6
165 46,26 2 19,375 0 0 0
196,63 0
165 46,26 0 600 215,03 150 169,6
166 46,92 2 19,375 0 0 -0,3
215,03 0
166 46,92 0 600 196,63 150 169,3
169 46,92 2 19,375 0 0 0
196,63 0
169 46,92 0 600 44,62 150 169,3
H15 46,78 2 19,375 0 0 0,1
44,62 0
H15 46,78 0 600 91,62 150 169,4
109 46,49 2 19,375 0 0 0,1
91,62 0
045 41,62 0 600 263,42 150 171,6
124 48,88 0,2 19,375 0 0 -3,1
263,42 0
043 37,35 0 600 474,12 150 173,5
023 37,35 0,2 19,375 0 0 0
474,12 0
036 24,61 0 600 966,65 150 179
032 23,82 1,2 19,375 0 0 0,3
966,65 0
032 23,82 -0,3 600 9,96 150 179,3
031 23,82 0,9 19,375 0 0 0
9,96 0
031 23,82 0 600 110,8 150 179,3
030 24,34 0,9 19,375 0 0 -0,2
110,8 0
262 22,64 0 350 454,07 150 179,9
266 23,62 1,5 11,302 0 0 -0,4
454,07 0
267 23,62 0 350 447,41 150 179,4
259 22,64 1,4 11,302 0 0 0,4
447,41 0
032 23,82 0 400 52,82 150 179,3
299 24,28 0,3 12,916 0 0 -0,2
52,82 0
299 24,28 0 400 1x(elbow.22.5)=5,72 54,32 150 179,1
298 23,75 0,3 12,916 5,72 0 0,2
60,03 0

© 2006 National Fire Protection Association Page 18


Job name: Proyecto 001679 Sheet number:___________________

PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added(q)* Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES
T frict (Pf)

(ft) (gpm/psi½) (gpm) (ft) (ft) (psi) (psi)


(in)
298 23,75 0 400 1x(elbow.22.5)=5,72 155,43 150 179,4
258 24,28 0,3 12,916 5,72 0 -0,2
161,14 0

* Discharge shown for flowing nodes only

© 2006 National Fire Protection Association Page 19