Karcham Wangtoo HPS (4 X 250 MW) Baspa II HPS (3 X 100 MW)
Karcham Wangtoo HPS (4 X 250 MW) Baspa II HPS (3 X 100 MW)
KWHPS..Salient features
Petrographic Analysis
Challenges ahead
2
JSW Overview..
JSW Steel is one of India’s JSW Energy operates JSW Infrastructure has an
leading integrated steel 4,531 MW (Thermal - 3140 operating capacity of 68
manufacturers with a capacity of MW & Hydel - 1,391 MW) MTPA and operates
18 MTPA. environment-friendly
seaports and terminals in
Maharashtra and Goa
3
Karcham Wangtoo HPS….Salient Features
RIVER Satluj
CATCHMENT AREA 48755 Sq.Km. (79.5% Snow Area)
DAM Concrete Gravity Dam (Height- 88m)
SEDIMENTATION CHAMBER 4 No., 30m(W)x18m(H)x494m(L)
Particle size to be removed ≥ 0.2mm
HEAD RACE TUNNEL 10.48m dia. circular x 16.925 Km Long
SURGE SHAFT: 16 /27 m dia. x 128 m height
PRESSURE SHAFTS 4 nos., 5.0m dia. ,Steel lined
POWER HOUSE CAVERN Under ground, 188m (L) x 22m (W) x 52.90m (H)
4
Karcham Wangtoo HPS…Salient Features of Turbine
5
Silt content in Satluj river..
River Satluj has been carrying substantial silt load during the monsoon months
from June to September with sediment concentration exceeding 5000 ppm to
more than 50000 ppm.
The suspended sediment load corresponding to 5000 ppm in the river typically
comprises coarse particles ( more than 0.2 mm) about 17% and medium / fine
particles less than 0.2 mm about 83%.
Water flowing through Turbine is having silt content of the order of 1000 to 5000
ppm in monsoon from July-October with particle size upto 200 microns. The silt
content mostly of hard quartz (80-90%) with hardness 6 to 7 Mho.
6
Petrographic analysis of river water
7
Petrographic analysis of river water
8
Petrographic analysis of river water
9
Petrological analysis of Turbine water
10
Effect of Silt erosion in Karcham Wangtoo
Karcham Wangtoo HPS Turbines are prone to very high silt erosion during
monsoon seasons
Average silt load that passes through the turbine are in the range of 11-12
Lakh MT/year.
Damages in Guide Vanes
7
8
Damages in Turbine parts in 2013