Portal Kantor: D1 410.230 N D2 95.010 N D2 95.010 N

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 6

PORTAL KANTOR

517

D1= 410.230 N

D2= 95.010 N D2= 95.010 N

14,1 m

BEBAN MATI (Dead Load) PORTAL KANTOR :

BEBAN MATI (D)

 Beban balok tengah = 8.728,3 kg/m


Jarak kantor = 4,7 m
Beban balok tengah x Jarak kantor = 8.728,3 x 4,7 = 41.023 kg = 410.230 N

 Beban balok tepi = 5.898,6 kg/m


Jarak kantor = 4,7 m
Beban balok tepi x Jarak kantor = 2.021,6 x 4,7 = 9.501 kg = 95.010 N

2
 Beban balok plafond = 11 kg/m
Jarak kantor = 4,7 m
2
Beban balok plafond x Jarak kantor = 51,7 kg/m = 517 N/m
PORTAL KANTOR

L1= 61.250 N

L2= 30.625 N L2= 30.625 N

14,1 m

BEBAN HIDUP (Live Load) PORTAL KANTOR :

BEBAN HIDUP (L)

 Beban balok tengah = 1.225 kg/m


Jarak = 4,7 m
Beban balok tengah x Jarak = 1.225 x 5,0 = 6.125 kg = 61.250 N

 Beban balok tepi = 612,5 kg/m


Jarak = 5,0 m
Beban balok tengah x Jarak = 612,5 x 5,0 = 3.062,5 kg = 30.625 N
PORTAL KANTOR

q1= 1.080 N q1= 1.080 N

BEBAN ANGIN (Wind Load) PORTAL KANTOR :

BEBAN ANGIN (W)

 Beban merata angin


I
q = C AB atau C BC x L x W
= 0,9 x 5,0 x 24
= 108 kg/m
= 1080 N/m

 Beban merata angin


II
q = C EF atau C FG x L x W
= 0,4 x 5,0 x 24
= 48 kg/m
= 480 N/m
PORTAL PABRIK

W2=129N

1/2W2=64,5N W3=516 N 1/2W3=258 N

W1=1.058,4N W4=470,4N

1/2W1=529,2 1/2W4=235,2
N 5,000 5,000 5,000 5,000 N

B= 20,000

BEBAN ANGIN (Wind Load) PORTAL PABRIK :

 C AB = 0,9
 C BC = 0,02λ – 0,4 = 0,02 . 22 – 0,4 = 0,04
 C CD = - 0,4
 C DE = - 0,4

BEBAN ANGIN (W)

 W1 = C AB x dr x L” x W
= 0,9 x 0,98 x 5 x 24 = 105,84 Kg = 1.058,4 N
½ W1 = ½ x 1.058,4 = 529,2 N

 W2 = C BC x dg x L” x W
= 0,1 x 1,075 x 5 x 24 = 12,9 Kg = 129 N
½ W2 = ½ x 129 = 64,5 N

 W3 = C CD x dg x L” x W
= - 0,4 x 1,075 x 5 x 24 = 51,6 Kg = 516 N
½ W3 = ½ x 516 = 258 N

 W4 = C DE x dr x L” x W
= -0,4 x 0,98 x 5 x 24 = 47,04 Kg = 470,4 N
½ W4 = ½ x 470,4 = 235,2 N
PORTAL PABRIK

L=2.236,03N

1/2L=1.118,015N 1/2L=1.118,015N

5,000 5,000 5,000 5,000

B= 20,000

BEBAN HIDUP (Live Load) PORTAL PABRIK :

Beban gording dan atap = qm x L” = 25,225 x 4,9 = 123,603 Kg = 1236,03 N

Beban PH – orang = 100 Kg = 1.000 N

BEBAN HIDUP (L) = 1.236,03 + 1.000 = 2.236,03 N

½ L = ½ x 2.236,03 = 1.118,015 N
PORTAL PABRIK

D=656,6N

1/2D=328,3N 1/2D=328,3N

5,000 5,000 5,000 5,000

B= 20,000

BEBAN MATI (Dead Load) PORTAL PABRIK :

Beban Gording = 13,4 Kg/m

Jarak portal pabrik = 4,9 m

BEBAN MATI (D) = Beban gording x jarak portal pabrik

= 13,4 x 6 = 65,66 Kg = 656,6 N

½ D = ½ x 656,6 = 328,3 N

You might also like