13 Fri and Embankment from CAD to Excel. Input the quantity of Roadway 14 Sat excavation and Embankment from CAD into Excel. 15 Sun Revise the size of median in cross- 16 Mon section. Revise the size of median in cross- 17 Tue section. Revise the size of median in cross- 18 Wed section. 19 Thu Plot cross-section. Revise Cross-section Sta. 20 Fri 39+880~42+820 Revise Cross-section Sta. 21 Sat 42+840~46+270 22 Sun Find Area of Roadway Excavation, 23 Mon Embankment and Sub-grade. (CAD) 49 stations Find Area of Roadway Excavation, 24 Tue Embankment and Sub-grade. (CAD) 58 stations Draw shop drawing of Pipe Culvert 25 Wed with diameter 1.0m (10 stations) Draw shop drawing and Quantity of 26 Thu Pipe Culvert with diameter 1.0m (Detail Would finished by 28, Oct. wingwall and apron) Draw shop drawing and Quantity of 27 Fri Pipe Culvert with diameter 1.0m (Detail First check done by CAD operator. wingwall and apron) Revise shop drawing and Quantity of 28 Sat Pipe Culvert with diameter 1.0m (Detail Not yet finished. wingwall and apron) 29 Sun