Phal Pisey's daily working record from November 13-18 shows:
1) He prepared and revised shop drawings for several pipe culverts at different stations along the road alignment.
2) He found quantities of materials needed for excavation, fill, and road construction for 31 stations that were revised.
3) By the end of the week he had upgraded the shop drawings for several culverts and resubmitted them to the consultant for approval.
Phal Pisey's daily working record from November 13-18 shows:
1) He prepared and revised shop drawings for several pipe culverts at different stations along the road alignment.
2) He found quantities of materials needed for excavation, fill, and road construction for 31 stations that were revised.
3) By the end of the week he had upgraded the shop drawings for several culverts and resubmitted them to the consultant for approval.
Phal Pisey's daily working record from November 13-18 shows:
1) He prepared and revised shop drawings for several pipe culverts at different stations along the road alignment.
2) He found quantities of materials needed for excavation, fill, and road construction for 31 stations that were revised.
3) By the end of the week he had upgraded the shop drawings for several culverts and resubmitted them to the consultant for approval.
Month : Nov 2017 Date Contents Achievement Remark -Shop drawing of pipe culvert 1-1.0m for Sta. 5+300. -Quantity 13 Mon -Revise work from Phnom Penh for Sta. -General view of Pipe Culvert 5+800, 6+373.80 and 6+632.32 -Shop drawing of pipe culvert 1-1.0m -Quantity for Sta. 10+000. -General view of Pipe Culvert 14 Tue -Preparing final submission of Pipe -Rebar detailing Culvert 1-1.0m for Sta. 11+120. -31 Stations revised -Rivise Median for 31 Stations. (OT) -Quantity -Preparing final submission of Pipe -General view of Pipe Culvert Culvert 1-1.0m for Sta. 4+420 and -Rebar detailing 15 Wed 4+500. -Submit Shop drawing for -Find Quantity of fill subgrade and Sta.11+120 to Consultant. Road excavation for 31 Stations. (OT) -Quantity for 31 Stations -Revise elevation of Pipe Culvert 1- -Quantity 1.0m for Sta. 4+420 and 4+500. -General view of Pipe Culvert -Revise rebar detailing of Pipe Culvert -Rebar detailing 16 Thu 2 cells with dia. 1.0m. -Submit Shop drawing for Sta. 4+420 -Find Quantity of AC Wearing Course, and 4+500 to Consultant. AC Binder Course and Subbase Course -Quantity for 31 Stations for 31 Stations. (OT) -Revise rebar detailing of Pipe Culvert 2 cells with dia. 1.0m. -Quantity -Revise Pipe Culvert for Sta. 11+120, -General view of Pipe Culvert 17 Fri 4+420 and 4+500. -Rebar detailing -Find Quantity of Fill Median for 31 -Quantity for 31 Stations Stations. (OT) -Upgrade shop drawing for Sta. 4+420, 4+500 and 11+120 and -Revise Pipe Culvert for Sta. 11+120, 18 Sat Submit to Consultant again. 4+420, 4+500, 4+820 and 5+300. -Prepare 4+820 and 4+500 for submission.