Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

PROCEDURE Doc No: MJE-ENGG-004

Issue No : 1
ENGINEERING Rev No :0
Date 15 May 2018

1.0 OBJECTIVE : The purpose of this document is to define a system of work


based upon customer requirements.

2.0 SCOPE : This procedure is applicable to engineering

3.0 GENERAL INFORMATION


3.1 This process will involve areas that are experienced in reviewing customer
design input drawing.
3.2 To prepare the shop drawing.

4.0 PROCEDURE :

5.0 JOB FILES INDENTIFICATION


Work orders: XXX-NNN-YY
XXX – Alphabetical code of a supplier, three letters are from supplier name.
NNN - Serial number of work order.
YY - Indicates the last two digits of the year.
PROCEDURE Doc No: MJE-ENGG-004
Issue No : 1
ENGINEERING Rev No :0
Date 15 May 2018

6.0 REFERENCES
5.1 Quality Manual

7.0 QUALITY RECORDS


7.1 MJE-FRM-005 - Material Requisition form.

8.0 REVISION HISTORY


Rev.No Date ISO 9001 : 2015 Description of Change
Affected Clause
0 15 May 2018 Update of existing procedure and forms

You might also like