SITUASI UPDATE SITE KUD MAKMUR

29 SEPTEMBER 2018
1. PIT LOW WALL

Backfill AL3-AL4 BMB

Ripping (D07)

GN & CC (E12)

OB (YM05)

CO (E20)

#. Progress Percepatan di Area Low Wall (AL3-AL4 BMB)


 YM05 : OB Exposed AL4 KUD-BMB, Disposal Backfill BMB AL3-AL4
 E20 : Coal Getting AL4 KUD
 E12 : General Stock Coal
2. PIT HIGH WALL

OB (YM08)

Elv 34.31
Elv 33.39 Elv 37.62

OB (YM06)
Elv 9.66
Elv 3.60 Elv 0.63
Elv -2.63
Elv -6.90

OB+ (E17)

Elv 46.13
Elv 37.52

CO (YM07)

Elv 26.72

#. Progress High Wall (HW)


 YM08 : Exposed High Wall Atas (Seam D-C), Disposal Mamaraya (Bawah)
 YM06 : Exposed High Wall Bawah (Seam D), Disposal Utama (Tengah)
 E17 : Extra OB Regrade Jalan & Slooping High wall Atas
 YM07 : Coal Getting (Seam G-KUD)
3. DISPOSAL DAN SUMP

Disposal Utama

Atas

Bawah
BD (E18)

Mining Road

Disposal MamaRaya

Atas Disposal Samiyo

D01HW

Bawah
SUMP UTAMA

SUMP A

SUMP C

Kolam Workshop

Waterfill Temporary

WP03-SIS

WP 03

Elev 18.35 Mdpl

RL Air Kolam -2.69 Mdpl