Version 3.1
This manual reflects the latest revisions to the Delphi Manufacturing System (DMS) manuals that were
originally published in October of 1996. The ongoing intent of the manual revisions is to enhance a
common lean process throughout Delphi. This revision incorporates the learnings of those participating in
continuous improvement activities under the guidance of lean Senseis as well as those charged with
implementing DMS. To ensure uniform application at all component manufacturing facilities, this
document will be superseded and republished on a regular basis.
This revision emphasizes the fundamentals of observation and standardization. The need to observe
existing processes to clearly determine opportunities for improvement has become increasingly apparent.
The success of these observations is contingent on the repeatability and standardization of the observed
processes.
This revision also includes the integration of the Manufacturing System Design process and the DMS
Flow Manufacturing process into a DMS Interdependent Element titled Flow Manufacturing System
Design. This enhanced process incorporates the best of both processes into a common process that
supports a focus on the operator and the effective use of capital.
Additionally, this revision includes extensive revisions to the Operational Availability How To’s. These
revisions support the Quality Network Planned Maintenance process in represented plants. Furthermore,
the revisions provide a comprehensive, stand-alone process for use in non-represented plants.
Many of the Interdependent Element How To’s are enhanced to provide additional detail and incorporate
recent Delphi learnings. It is intended that these enhanced How To’s will accelerate the implementation
process through the application of a preferred common process.
The MTT endorses the revisions to these manuals and wish to thank those implementing Lean initiatives
throughout Delphi who shared their learnings in the revision. Your efforts to continue the implementation
of a common manufacturing process across Delphi are critical to our continued success.
TABLE OF CONTENTS
MATERIAL MOVEMENT
Element Introduction
Introduction - Material Movement...................................................................................................3
Ideal Material Movement in a Plant...............................................................................................15
How To’s
MM-1 Plan for Every Part..........................................................................................................25
MM-2 Ship to Schedule Build to Plan .......................................................................................33
MM-2.1 Scheduled Window Shipping........................................................................35
MM-2.2 Production Leveling......................................................................................45
MM-3 Designated Storage .........................................................................................................57
MM-3.1 Supermarket/Bulk Storage ............................................................................59
MM-3.2 Empty Container Storage..............................................................................67
MM-4 Container Right Sizing & Supporting the Operator........................................................75
MM-4.1 Containerization............................................................................................77
MM-4.2 Repacking .....................................................................................................89
MM-4.3 Kitting ...........................................................................................................93
MM-5 Internal Pull Systems ......................................................................................................99
MM-5.1 Production Pull Systems .............................................................................105
MM-5-2 Withdrawal Pull Systems............................................................................123
MM-6 Internal Delivery Routes ...............................................................................................133
MM-7 Supplier Delivery ..........................................................................................................155
MM-7.1 Scheduled Window Receiving....................................................................159
MM-7.2 Container Return Process............................................................................169
MM-7.3 Supplier Pull................................................................................................179
MM-7.4 Lean Logistics.............................................................................................189
MM-8 Other Material Plans .....................................................................................................197
MM-8.1 Hazardous Material Plan.............................................................................199
MM-8.2 Indirect Material Plan .................................................................................203
Appendices
Appendices Index.........................................................................................................................209
Appendix A: General Considerations for Supermarkets, Pull Systems and Delivery Routes...211
Appendix B: Material Handling Design Criteria.......................................................................215
Figures
Figure MM-I-A: DMS Interdependent Elements Figure MM-5-H: Production Pull-Card Pull
Figure MM-I-B: Material Movement Depiction Figure MM-5-I: Sequencing Board
Figure MM-I-C: Flow Within Process Figure MM-5-J: Lot Forming Board
Figure MM-I-D: Flow Between Processes Figure MM-5-K: Production Pull-Container Exchange
Figure MM-I-E: Material Movement Pyramid Figure MM-5-L: Selecting a Production Pull System
Figure MM-1-A: PFEP Database Fields Figure MM-5-M: Cycle Stock (Running Stock)
Figure MM-2-A: Issues/Advice - Scheduled Window Calculation Table
Shipping Figure MM-5-N: Data Table Template
Figure MM-2-B: Scheduled Window Shipping Board Figure MM-5-O: Internal Pull Systems-Withdrawal Pull
Figure MM-2-C: Countermeasure Worksheet Figure MM-5-P: Types of Withdrawal Pull Systems
Figure MM-2-D: Workload-With/Without Leveling Figure MM-5-Q: Withdrawal Pull-Card Pull
Figure MM-2-E: Normal Distribution Figure MM-5-R: Withdrawal Pull-Container Exchange
Figure MM-2-F: Variation in Traditional vs. Level Figure MM-5-S: Selecting a Withdrawal Pull System
Scheduling Figure MM-5-T: Replenishment Factor
Figure MM-2-G: Ship Windows Figure MM-6-A: Internal Delivery Route
Figure MM-2-H: Traditional (Batch) Scheduling Figure MM-6-B: Issues/Advice - Internal Delivery Routes
Figure MM-2-I: Level Scheduling Figure MM-6-C: Sample Route Driver Work Content
Figure MM-2-J: Changeover Frequency Worksheet Analysis
Figure MM-2-K: Cycle Stock Worksheet Figure MM-6-D: Changeover - Common vs. Unique Parts
Figure MM-2-L: Design of a Buffer Figure MM-6-E: Changeover - Delivery Techniques
Figure MM-2-M:Micro Leveling Example Figure MM-6-F: Sample Operator Balance Chart for
Figure MM-3-A: Supermarket/Bulk Storage Layout Route Drivers
Pictorial Representation Figure MM-6-G: Sample Standardized Work for Tugger
Figure MM-3-B: Guidelines for Hand Carribles and Bulk Route Driver
Storage Area Figure MM-6-H: Sample Tugger Route Diagram
Figure MM-3-C: Issues/Advice - Empty Container Figure MM-6-I: Sample Tugger Route Summary Visual
Storage Control
Figure MM-3-D: Returnable Container Process Figure MM-6-J: Decoupled vs. Coupled Delivery Routes
Figure MM-4-A: Containerization Transition Figure MM-6-K: Decoupled Delivery Routes
Figure MM-4-B: Issues/Advice - Containerization Figure MM-6-L: Double Decoupled Delivery Routes
Figure MM-4-C: Returnable Container Process Figure MM-6-M: Coupled Delivery Routes
Figure MM-4-D: Decision Process for Container Right Figure MM-7-A: Issues/Advice – Supplier Delivery
Sizing and Material Movement Figure MM-7-B: Scheduled Window Receiving Board
Standards for Packaging Figure MM-7-C: Countermeasure Worksheet
Figure MM-4-E: Common Lot Strategy Example for a Figure MM-7-D: Issues/Advice - Container Return
Cell Process
Figure MM-4-G: Repacking Figure MM-7-E: Returnable Container Process
Figure MM-4-H: Issues/Advice - Repacking Figure MM-7-F: 5 Alarm Process for Empty Containers
Figure MM-4-I: Kitting Pictorial Figure MM-7-G: Sample Returnable Container Manifest
Figure MM-4-J: Issues/Advice - Kitting Figure MM-7-H: Supplier Pull
Figure MM-4-K: Guidelines for Delivery Frequency and Figure MM-7-I: Issues/Advice – Supplier Pull
Method Based on Part Characteristics Figure MM-7-J: Lean Logistics
Figure MM-5-A: Internal Pull Systems Figure MM-7-K: Closed Loop Transportation System
Figure MM-5-B: Variation vs. Probability of Success Figure MM-7-L: Issues/Advice - Lean Logistics
Figure MM-5-C: Types of Internal Pull Systems Figure MM-7-M: Lean Logistics
Figure MM-5-D: Pull Card Figure MM-8-A: Issues/Advice - Hazardous Material
Figure MM-5-E: Temporary Pull Card Plan
Figure MM-5-F: Internal Pull Systems-Production Pull Figure MM-8-B: Issues/Advice – Indirect Material Plan
Figure MM-5-G: Types of Production Pull Systems
Material Movement
Element Introduction
Ideal Material Movement in a Plant
How To’s
Appendices
Introduction
Material Movement
The Material Movement techniques introduced in this manual support the transformation of an
organization from a mass-manufacturing environment to the demand-based principles of flow
manufacturing. The ideal plant continuously reviews processes for the purpose of improving
quality, response time and reducing cost through eliminating the seven forms of waste. The
techniques introduced below and described in more detail in the How-To’s support the flow
strategy outlined in Flow Manufacturing System Design.
The goal of Material Movement is solely to support the flow of product through the value
stream. There are several techniques described, but each technique is designed to meet that goal.
The Future State Value Stream Map, described in the Implementation Guide, is the blueprint for
defining the type of Material Movement strategies to be applied in the value stream. As depicted
in Figure MM-I-B: Material Movement Depiction, the Future State Value Stream Map is used
as input into the Material Movement process that is designed to create the ideal plant.
OP OP
A place for everything and
A TL OP
everything in its place.
Measure
Why? Inspection Controls
Measure
Why? Analyze
Analyze and Proper for Quick
Why?
Why? Improve
Improve
Lubrication
improves Availability
Response Pull System
Why? Control
Control
Kaizen-Layout
Kaizen-Equipment
Kaizen-Flow & Process
Make what we need, when we need it. Standardization
Implementation Guide (IG) Observation
Plan
Implement
Start Here
Make what we need, when we need it.
6 6
Supplier
Level Box
Daily
DA1 Build to OrderBuild to Order Modularity Modularity
DA2
DA3
6 x / Day
MM-7 Delivery
MM-7 Supplier Supplier Delivery Lean Logistics
Lean Logistics
5 5 ScheduledReceiving
Scheduled Window
Window Container Container
Supplier Supplier
(Dock Boards) Return Process Pull
Frequent
Frequent Milk Milk Scheduled
Scheduled Pickup Summary
Pickup Summary
Stamping Welding Assembly Finished Goods
Receiving (Dock Boards) Return Process Pull Delivery Runs Runs Sheets
Delivery Pickup Pickup Billing
Sheets Billing
Layout MM-5
MM-5 Internal Internal
Pull Pull Systems
Systems MM -6Delivery
MM-6 Internal Internal Delivery
SystemsSystems
4 4 Buffer Standardized People Focused Changeover
Production Production
Withdrawal Withdrawal
Buffer Standardized People Focused Changeover
RoutesPractices PracticesProcess Process
Pull PullPull ManagementManagement Routes
Pull
MM-3 Designated
MM-3 Designated Storage Storage MM -4 Container
MM-4 Container Right Sizing
Right Sizing
and Supporting
and Supporting the Operator
the Operator
3 3
Supermarket
Supermarket
Visual
Visual
Addressing
Addressing Empty Container
Empty Container Standard Standard Small
Small
Common
Common
/Bulk Storage Storage Lot Lot
/Bulk Storage ManagementManagement Storage Containerization
Containerization Lot Lot
MM-1 Plan for Every Part MM -2 Ship to Schedule and Build to Plan
MM-1 Plan for Every Part MM-2 Ship to Schedule and Build to Plan
2 2 Maintenance
Maintenance
Planning
Planning Production
Production Leveling Small
Small
Lot
Buffer Scheduled Window
Buffer ManagementScheduled Window
Shipping (Dock Boards)
Leveling Lot Management Shipping (Dock Boards)
The Foundation
The Foundation
1 Leadership Knowledge
Leadership Knowledge Planning Planning Action Action
1 Commitment Support Education/Training Communication Expectations Aligned Metrics
Aligned Metrics Follow-up
Follow-up
Commitment Support Education/Training Communication Expectations
Manufacturing System
Flow
Employee Environment Workplace DelphiDelphi Manufacturing System
Manufacturing
Manufacturing System
Design Employee Environment WorkplaceOrganization Operational Availability
& Involvement Quality Material Movement
Design & Involvement Organization Quality Operational Availability Material Movement
Supplier
Receiving
Dock
SHEDULED WINDO WS HI PPIN G
Do cks
Lean Logistics
D at e
:
Tm
i e 1 2 3 et c.
a r ier 1r
C
6:0 0 AM (C u
s to mer erA )
r eri r 4
a
C
6:3 0 AM (C u
sto sto
m re F )
T
a rie ier 2
C
7:0 0 AM ( u
C s tom erm C ) P
Rec eived
T
a r ier 1r
C
7:3 0 AM (C u
s to mer erB ) S
S
a r ier 3r 3
C rC eir r 3
a
8:0 0 AM ( u
C s to m rD
(C u
e )
s to m re )D (C u
a rie r 3
C
sto m er D )
a r ier 4r
C
Mater ial
8:3 0 AM ( u sto m
C er erF )
9:0 0 AM a r ier 2r 2
C
“A”
( u
C s to m erD )D
a r ier 1r
C
9:3 0 AM a r ier r 1
C
( u
C s to m erH )H
0 :0 0A M
1
Superm arket
a rie ier 2
C
( u
C s tom erm D )
In-Process
0 :3 0A M
1 a C
C
(u
Cs u
r ier r 1
a
tso m er G )
a r ier 3r
C
(C u sto m erJ )J
1 :0 0A M
1 :3 0A M
Supermarke t
et c.
=MetWi ndow
A1
P = Pro duct ionIs s ue (Short age)
KE Y: T =T ar n
s pot at io
n Iss ue (Late / Miss)
S =S hipi ngI s ue ( Del ay)
Dept . ABC
MT’s P/N - 12 3 4 P/ N -5 6 78
vin g
5 4 3 2 1
MM EXPRESS
Dock
A2
Rece i
5 4 3 2 1
9
A3 B
8
5 4 3 2 1
“B”
Shipping In-Process
7
3 et c. Superm arket
6:0 0 AM (C us tom erm A )
a C
C r ier r 4
a
6:3 0 AM u su
(C to m er F )
T
ar rie r 2
C
7:0 0 AM ( u
C sto tom er C ) P
T
a rie ier 1
C
7:3 0 AM (C u
s tom m er B ) S
a r ier 3r
C a C
C r ier r 3
a
8:0 0 AM (C u
s to mer erD ) s( to m er D )
u
C
(C u
sto m er D )
a rie ier 4
C
8:3 0 AM ( u sto m
C er F )
9:0 0 AM a r ier 2r
C
( u
C s to m erD )
a r ier 1r
C
9:3 0 AM (C u
( u
C
s to erm H )
s to m rHe )
ar ier r 2
C
10 :0 0A M a rie r 2
C
( u
C sto tom er D )
10 :3 0A M a r ier r 1
C
(C u
s to m er G
(C ) )
a r ier 3r
C
(C u sto m rJe )
11 :0 0A M
11 :3 0A M
et c.
=Met Wi nd ow 7 8 9
P = Product ion Is sue (Short age)
KE Y:
MT’s
T =T ar n
s pot ation I s ue (L ate / Mis s)
S =S hippi ngIs sue ( Del ay)
MM EXPRESS
6
C1
PFEP
ing
5 4 3 2 1
Dock
7 8 9
Shi pp
6
C2
5 4 3 2 1
Internal
Delivery Route
Flow Manufacturing System Design describes two general types of flow: transfer lots and
container lots.
Transfer lots are represented as the flow within the individual manufacturing process boxes on
the Value Stream Map as depicted in Figure MM-I-C: Flow Within Processes.
Rolling 12-w
k Forecast
6-wk forecast
Weekly Order
Steel PC & L Customer
Supplier
Level Box
DA1
Daily
DA2
DA3
6 x / Day
Layout
Container lots are represented as the flow between the individual manufacturing process boxes
on the Value Stream Map as depicted in Figure MM-I-D: Flow Between Processes.
Level Box
DA1
Daily
DA2
DA3
6 x / Day
Layout
When applying the Delphi Manufacturing System, our direction is to make value stream
segments flow with transfer lots, combining processes in manufacturing cells where operational
availability, quality and process type permit. Flow Manufacturing System Design describes how
to accomplish this.
Those processes that cannot be managed using transfer lots, even if only in the short term, must
be managed using container lots. This is the focus of Material Movement. Material Movement
provides the process and the How To Guidelines of the movement system to support container
lots that supports transfer lot segments in the future state value stream.
works back through to the supplier with the goal of supporting Purchase or Make
Weight
Storage Method
Visual Min/Max
Standard Pack Quantity Using Location
the operators and eliminating waste in the supply chain. Container Type
Container Dimensions
Delivery Method
Average Rate of Usage
Supplier Name Usage per Assembly
Supplier Location
Ship Frequency etc.
•
Date:
Scheduled Window Shipping
Docks
Time 1 2 3 etc.
6:00 AM Carrier
Carrier 11
(Customer
(Customer
Current
7:30 AM (Customer B)D
(Customer B) D
Time Carrier
Carrier 33 Carrier
Carrier 33
8:00 AM (Customer
(Customer D)
Carrier
Carrier 11
9:30 AM (Customer
(Customer H) H)
11:00 AM
11:30 AM
etc.
= Met Window
PP = Production Issue (Shortage)
KEY: T
T = TranspotationIssue (Late/Miss)
D = Dock Issue (Delay)
• Production Leveling
A technique that buffers the Production
Resources
Without
Leveling
Production
Resources
With Leveling
Designated Storage
Areas utilized to store material (purchased, in-process and finished, both hand carriable and
bulk) or empty returnable containers received from customers and/or staged for shipment to
suppliers.
• Supermarket/Bulk Storage ROW
D 1 2 3
Stocking Aisle
4 5 6 7 8 9
Stocking Aisle
10 11 12 13 14 15 16 17 18
ROW
D
Picking Aisle Traffic Flow Picking Aisle
ROW ROW
SUPERMARKET
Min____________ Max____________ Min____________ Max____________ Min____________ Max____________
Row
StoreLoc_______ UseLoc________ StoreLoc_______ UseLoc________ StoreLoc_______ UseLoc________
Supplier________________________ Supplier________________________ Supplier________________________
DeliveryDate- M- T- W-T- F- S DeliveryDate- M- T- W-T- F- S DeliveryDate- M- T- W-T- F- S
Time___________________________ Time___________________________ Time___________________________
C C
2 B
B B
T64-A1-A-05
Part number
22152297
Name
P90 Drum brake Adjusting screw
Pack
60
Market Attendant
picks carton based
A A
1 2 3
• Containerization
The process of packaging parts in the
smallest lot possible resulting in the Large
Container
• Repacking
The process of transferring parts from one container
into a more appropriate size or type of container to
satisfy the needs of the next using customer. This is
Large Container Small Container
often done as an interim solution to containerization.
• Kitting Line Flow
operation.
Operation 1 Operation 2
Pull Systems
A method of controlling the flow of resources by replacing only what has been consumed.
• Withdrawal Pull
Authorizes the movement of material from storage to the point-of-use.
• Production Pull
Authorizes the manufacture or assembly of component parts or finished product at the
request of the next point-of-use
Super- Customer
Supplying
market
Process Process
C1
and material (purchased, in-process and finished
6
5 4 3 2 1
C2
predetermined delivery path and fixed start times
6
5 4 3 2 1
Supplier Delivery
The process of managing materials received from suppliers and materials returned to suppliers
(containers and dunnage). SCHEDULED WINDOW RECEIVING
Date: Docks
Time 1 2 3 etc.
6:00 AM
Carr ier 11
Carrier
(Supplier A)
(Supplier A)
•
Carr ier 44
Carrier
6:30 AM
Carrier
Carr ier 22
T
7:00 AM (Supplier C)
(Supplier C)
S
Car
Carrrie r 11
ier
T
7:30 AM (Supplier B)
(Supplier B)
D
Current Carrier
Carr ier 33 Carr ier 33
Time
Carrier
8:00 AM (Supplie r D)
(Su pplier D) (Supplier D)
(Supplier D)
(8:45 AM)
8:30 AM
(Supplier F)
(Supplier F)
Carr ier 22
Carrier
9:00 AM (Supplier D)
(Supplier D)
Carrier
Carrier 11
10:00 AM Carrier
Carr ier 22
(Supplier
(Supplier D)
D)
Car rie r 11
Carrier Carr ier 33
Carrier
10:30 AM (Supplier G
(Supplier G)) (Supp lierr J)
(Supplie J)
11:30 AM
etc.
= Met Window
The orderly process of collecting, sorting, staging and returning damage-free reusable
containers and dunnage to our suppliers in a timely manner.
• Supplier Pull
A process that uses pull signals based on consumption to
authorize replenishment of material from suppliers.
• Lean Logistics
A closed-loop system of material delivery and container
return from suppliers to customers managed by a Lead
Logistics Provider (LLP).
Purpose
The purpose of Material Movement is to support flow manufacturing by moving material from
the supplier, through the plant and to the customer in the smallest lot size possible to meet
customer demand. An effective system will, over time, generate a level of tension in the
manufacturing system which helps drive continuous improvement through the elimination of the
seven forms of waste.
The foundation of the pyramid, which is standard for each interdependent element, depicts the
following:
• Delphi Manufacturing System. The Delphi Manufacturing System is made up of six
interdependent elements. It is necessary to have a general knowledge of how each
element contributes to the overall system for successful implementation.
• Leadership. Committed leadership, knowledge, an effective planning process and a bias
towards action, facilitates the DMS system strategy. Leadership must have the
commitment and the necessary tools to successfully implement DMS.
The middle layers (2 through 5) introduce the Material Movement How To’s. The top two layers
of the pyramid, which are also standard for all DMS Interdependent Elements, depict the DMS
goal of becoming a Lean Enterprise and the characteristics that identify a company as agile, lean
and fast to market.
Agile/LEAN/Fast to Market
6 Build to Order Modularity
MM -1 Plan for Every Part MM-2 Ship to Schedule and Build to Plan
The Foundation
1 Leadership Knowledge Planning Action
Commitment Support Education/Training Communication Expectations Aligned Metrics Follow - up
Material Movement
Element Introduction
Appendices
Ideal Material Movement in a Plant
In reading this section, you should get a sense of walking virtually through a lean plant and
seeing and hearing the material movement activities that support the Delphi Manufacturing
System. You should also get a better sense of the interrelationship between the six
interdependent elements.
Shipping Dock
At the dock a scheduled window shipping board is used to coordinate each day’s shipping
activity. This board is a working tool that is used to communicate the planned daily ship
windows along with current changes and track carrier conformance to the plan. The board shows
that most customer shipments occur from the same dock door at the same designated times.
Actual customer trailer arrival times are posted on the board, noting early and late arrivals for
problem resolution.
Standardized work instructions are on display in the work area describing each dock worker’s
daily routine. This assures that dock schedules are supported and workloads are balanced for
unloading personnel.
Drivers are removing empty returnable containers from trailers and placing them in inbound
lanes. These containers are accumulated on trailers for movement by a tugger train, at regular
pre-determined times, to production areas. Congested inbound lanes highlight bottlenecks at the
dock operation.
A tugger train returns to the dock with a load of finished goods. Finished goods are picked up
from the assembly area on the driver’s return loop from delivering empty containers to
production. These containers are placed in the outbound staging lanes for subsequent loading
onto trailers that arrive at predetermined window times.
Production Areas
A tour of the production area finds operators with little or no non-value-added time required for
picking parts because parts are presented on chutes, slides, stands or other customized devices
located precisely where the operator needs them. This minimizes the number of operator motions
required to complete their work tasks. Visual aids are posted on each part presentation device to
assist in error proofing the material delivery process and aid the operator in properly identifying
the correct production part(s).
Traditional accumulator conveyors and large buffers between sub-assembly cells are gone. There
are no parts or sub-assemblies stacked on tables or on the floor. Wherever possible, the plant has
been instituting one-piece flow where each sub-assembly is made one at a time and installed
directly to the final assembly. The elimination of excess buffers has allowed sub-assembly
equipment to be placed very close together and adjacent to the install point of the main cell. This
has opened up the area enough to allow for no dead-end aisles. Fork trucks are now only used on
the docks.
Assembly Areas
Assembly areas are scheduled using production leveling by Production Control. Buffers are
developed and tracked by Production Control to smooth customer demand variation. The
production plan for the area is visible on the floor to all operators. Hourly production
performance to the sequenced plan is posted in the area.
Component Areas
Pull cards control component area production. Production Control establishes and maintains pull
loops and buffer sizes between areas. Pull boards in the area convey sequence, volume and mix.
Component storage areas are arranged by part number near the supplying process.
Material Delivery
At regular intervals, a material driver is observed delivering different parts/components on a
standardized route. Pull cards control the number of stops and quantity of parts delivered on each
route. The production workstation is labeled and parts are easily accessible within the production
operator’s work envelope. The operator installs the part without wasting time handling wrapping
paper, plastic bags, separators or other dunnage.
A material driver stops his tugger train at a material delivery address and off-loads cartons onto a
part presentation device customized to meet the operator’s requirements. Lifting and loading
containers onto the part presentation device meet ergonomic guidelines for the material driver.
The material driver retrieves empty containers and pull cards from their designated location at
each stop.
Any empty disposable container is dropped off at a baler or compactor in or en route to the
supermarket. Returnable containers are accumulated in a designated storage/sort area in the
supermarket and moved to the dock on a regular route for return to the suppliers.
A material driver is seen delivering indirect materials from General Stores directly to the
production department. All General Stores material is delivered to production on a pull system
delivery route. Previously, production utility personnel were required to leave their work areas
for long periods of time to walk to General Stores and wait to get their required items. Now the
production personnel are able to stay in their work areas to focus on building product.
Inventory minimums and maximums for each part number are identified at each storage location.
These minimums and maximums are maintained through a Plan for Every Part (PFEP). PC&L
operators trigger alarms whenever minimum or maximum container quantities are reached.
Near the receiving dock, there is a designated bulk material storage area. Storage is arranged by
part number and designed for FIFO. The part numbers requiring bulk delivery are kept to a
minimum.
A schedule is posted indicating when each delivery cycle begins on the timed standardized
delivery route. A material driver arrives on an easily mountable/dismountable tugger pulling a
train of empty carts. The driver has the withdrawal pull cards gathered on the last delivery cycle.
These cards are placed at a well-marked designated location where the supermarket attendant(s)
retrieves and uses them to prepare the next delivery with both hand carriable containers from the
supermarket and bulk containers from the bulk storage area. Another train of trailers or carts is
ready for delivery loaded with full containers each with its corresponding pull card.
Leaving the supermarket we see a different tugger train approaching. These carts are bigger and
are loaded with several pallets of full containers. This is the regular delivery of material unloaded
from trailers at the receiving dock. Previously, there would have been several fork truck drivers
coming and going with individual loads of material from the dock to several warehouse racks
located throughout the plant. The dock tugger driver unhooks from the loaded trailers, re-hooks
to the empty trailers and returns to the dock to park empty trailers for the next cycle.
Receiving Dock
At the receiving dock, a scheduled window receiving board coordinates each day’s receiving
activity. This board is a working tool that is used to communicate the planned daily
unload/reload windows (along with current changes) and track carrier conformance to the plan.
The board shows that receipts are balanced across the week.
Standardized work instructions are on display in the work area describing each dock worker’s
daily routine. This assures that dock schedules are supported and workloads are balanced for
unloading personnel. Supplier ship frequencies are coordinated to level flow to the receiving
dock. The ship frequencies for every part have been increased without increasing the cost of
inbound freight. Most parts are received at least once per day.
Drivers are removing material from trailers (preferably side-load trailers) and placing it in
inbound lanes. All material is received in small lot containers specified by the Delphi Packaging
Manual. Congested inbound lanes highlight bottlenecks at the dock or unplanned receipts. This
material is accumulated on trailers for movement to the supermarkets and the bulk storage area.
A tugger train returns to the dock with a load of empty returnable containers. A trailer loaded
with empty containers was picked up at the plant sort area on the driver’s return loop from
delivering material to the supermarket. These returnable containers are placed in the outbound
lanes for loading into the trailers and subsequent return to the suppliers as part of a closed loop
system.
Raw materials are replenished through an external pull system. The supplier’s delivery driver (or
receiving personnel) places each pull card that is removed from the on-delivery pull card box
onto its respective container. When the material is consumed from each container, the attached
card is removed and placed in a pull card post with the other cards indicating material to be
replenished. The cards are collected at prescribed times throughout the day and are entered into
the scheduling system as replenishment signals to the supplier. The supplier ships according to
the pull signal at the prescribed window time.
The plant PC&L team evaluates every part number used at the plant in the PFEP on a recurring
basis. They use the wall process in the plant communication center to help identify opportunities
and potential solutions. The intent of this activity is to best support the operator at each operation
and to economically handle, receive, transport and package the required parts.
General Standards
1. There will be a material flow plan for every part at every site.
2. The PFEP system will be common across divisions.
3. Part attribute data management will be the responsibility of the plant Production Control &
Logistics organization.
4. Standardized work instructions will be defined for all material handling operations, through
utilizing the wall process.
5. Standardized work instructions and lean material flow procedures will be posted in work
envelope.
6. Supplier and carrier non-conformance(s) will be tracked at each receiving location.
Plant Floor Material Delivery
7. All containers will be presented with the first piece of material available to the operator in the
required orientation.
8. Pull card loops will be calculated based on first piece consumption.
9. All parts or kits will be delivered to the operator via pull signal, or on timed standardized
delivery routes based on consumption, with direct line delivery from the supplier being the
goal.
10. Line side material should not exceed four hours.
11. Material will not be delivered line side by fork truck.
12. Material handlers will remove empty containers upon delivery of full containers.
13. Material handlers will transfer material from the existing container to the full container upon
delivery of bulk material.
Purchased Parts Storage
14. Storage will be governed by FIFO principles.
15. There will be one central supermarket and bulk storage area for each plant until material is
delivered directly to first point-of-use from the supplier (direct line delivery).
16. For each part there will be one storage area within the plant that accommodates the entire loop.
17. Layouts will follow common DMS (Delphi Manufacturing System) address schemes.
18. All storage locations will have DMS (Delphi Manufacturing System) visual controls.
19. Until it can be eliminated, overflow material will have a designated storage area, managed with
visual controls.
20. Hand carriable containers should be depalletized before storing.
21. Supermarkets will be arranged by supplier within an internal delivery route considering
ergonomic guidelines.
22. Planned inventory will be calculated utilizing PFEP data based on buffers required to cover
ship frequency, schedule variation, cumulative material lead time and risk.
Dock/Receiving
23. Unloading and reloading work content will be leveled across the production shifts.
24. Unloading and reloading of conveyances will be scheduled to windows displayed on a
scheduled window receiving board and the performance will be tracked for improvement
opportunities.
25. Live unload/reload versus drop and hook will be evaluated on a lane-by-lane basis.
26. Shipments will be received without checking or delays at the dock, unless specified by the
customer.
Transportation
27. Purchased parts will be picked up and delivered, at a minimum, once every day.
28. The pick up carrier’s driver will check standard package quantities at the time of pick up
against scheduled quantity (drop and hook will be a paper check).
29. Overshipments will be refused by the pick up carrier.
30. Undershipments and delays at the supplier(s) will be reported immediately by the carrier driver
to the receiving plant for follow up with the supplier.
31. Mode, frequency, cube and equipment type will be determined on the total system optimization
32. Logistics modeling capability will be used to optimize the total material pipeline.
33. Shipments will be available at the receiving plant dock at the designated window time.
34. Freight costs will be billed on a summary basis with individual shipment detail versus freight
bills for individual shipments.
35. Suppliers will use authorized carriers for all modes of transportation.
36. Carriers will notify the plant of any transportation delays.
Supplier Scheduling
37. Parts shipments will be authorized via a pull and should be based on level production required
to replenish a finished goods buffer.
38. All suppliers will meet Delphi electronic communication requirements.
39. Raw material commitment and fabrication authorization should be zero/zero.
40. All schedules will be in standard pack quantity, in the lowest level shippable container.
Suppliers
41. Suppliers will be selected considering quality, technology and least total part cost.
42. Suppliers will have shipping capability that matches receiving plant’s normal production
schedule.
43. Suppliers will notify the receiving plant if a shipment will be late or short prior to pick up.
44. Parts containers will be labeled according to Delphi common standards, with up-to-date dock
delivery (storage) locations.
45. Suppliers, at their cost, will make up all undershipments via premium transportation in order to
meet the original scheduled destination window.
46. Suppliers will deliver parts in the prescribed small lot containers.
47. Suppliers will be able to ship (and plants able to receive) mixed part numbers on a pallet.
Reference/Source Material
• Delphi Packaging Manual.
Material Movement
Element Introduction
How To’s
Appendices
MM-1 Plan for Every Part
Objectives
Listed below are the objectives of MM-1 Plan for Every Part:
• Create the PFEP database by collecting the current data describing each part (manual or
automatic downloads from existing information systems). Load the data into the
standard common shared electronic database.
• Use the PFEP database to create the material flow plan for each part in the supply
chain, from supplier to final use.
• Use the PFEP database and the material flow plan to identify and support continuous
improvement activities in the supply chain such as identifying and improving delivery
frequency, ergonomics, containerization, transportation, inventory control, etc.).
• Maintain and audit the PFEP database as changes occur.
Prerequisite
Prior to implementing MM-1 Plan for Every Part it is necessary to have the appropriate computer
hardware, software and communications.
How To (Summary/Detail)
Listed below is summary/detailed information on how to implement MM-1 Plan for Every Part:
1.5 Establish the business process to maintain, audit and update data as
required.
• Recruit functional areas to assist in obtaining and maintaining data.
• Timely updates, maintenance and audits are necessary to keep data accurate and
consistent.
Reference/Source Material
• Material Movement Standards (Ideal Material Movement in Plant), Lean Material
Flow Circle of Colleagues.
• Delphi Business System Manual. Available on Apollo, Delphi Business System Web
Site (http://apollo.delphiauto.net/customersatisfaction/bstt/dbs/dbs.htm)
Attachment
• Figure MM-1-A: PFEP Database Fields provides a description of the Delphi Global
PFEP Database Fields.
24 Secondary Container Type Description or code of the secondary pack, such as a pallet or basket.
25 Secondary Cont. (R/E) Designate the secondary container returnable or expendable.
26 Secondary Cont. (L) in Secondary container length in inches.
inches
27 Secondary Cont. (W) in Secondary container width in inches.
inches
28 Secondary Cont. (H) in Secondary container height in inches.
inches
29 Secondary Empty Cont. Secondary container weight when it is empty (lbs., ounces, kilos,
Weight grams, etc.).
30 Secondary Standard Pack The standard pack quantity of primary containers in a secondary
container.
31 Stack Qty - Secondary Pack The allowable stack height of secondary containers with a standard
pack.
32 Container Return Ratio The ratio between full and empty containers for return planning (ex:
collapsible totes).
33 Packaging Contact The engineer or packaging contact responsible for packaging on a
particular part number.
34 Packaging Contact Phone The telephone number of the engineer or packaging contact
responsible for packaging on a particular part number.
35 Packaging Contact Fax The fax number of the engineer or packaging contact responsible for
packaging on a particular part number.
36 Method to Secure Load Any special instructions for securing full or empty containers.
37 Material Category Description of the material being shipped and handled, especially
hazardous material.
38 Packaging Comments 1 Any other comments relative to packaging, containers, or handling.
39 Packaging Comments 2 Any other comments relative to packaging, containers, or handling.
40 Packaging Comments 3 Any other comments relative to packaging, containers, or handling.
47 Del. Route No. of Stops Total stops on the internal delivery route that includes this part
number.
48 Department The internal manufacturing departments that use this part number.
49 Empty Cont. Storage Add. The internal storage address for the empty containers of this part
number.
50 Max. Storage The maximum number of standard packs to be stored in the plant for
this part number.
51 Min. Storage The minimum number of standard packs to be stored in the plant for
this part number.
52 Purchasing Organization Denotes a Purchasing Organization.
53 Purchasing Group Buyer Code.
54 Order Unit Specifies the unit of measure in which the material is ordered.
55 Pc. Price The rate that determines how the system calculates pricing using this
condition.
56 Currency Currency in which the piece rate is maintained.
57 Vendor Alias An abbreviated name, acronym, or alphanumeric code for a vendor.
58 Transit Time in hours Total hours from supplier shipping dock to plant receiving operations
in hours (ex: 3 days = 72 hours).
How To (Summary)
Listed below is a summary of the implementation steps for MM-2 Ship to Schedule Build to
Plan:
2.1 Scheduled Window Shipping.
2.1.1 Define Shipping Windows.
2.1.1.1 Develop a cross-functional team (PC&L, Shipping, IE).
2.1.1.2 Collect window requirements for all customers by time and normal
shipment quantity.
2.1.1.3 Actively involve shipping dock personnel (all shifts) in establishing
priorities and identifying restrictions, constraints and issues.
2.1.1.4 Rationalize the number of required docks.
2.1.1.5 Develop preliminary window assignments.
2.1.1.6 Review preliminary assignments with office and dock personnel.
2.1.1.7 Contact customers.
2.1.1.8 Contact carriers.
2.1.1.9 Finalize dock assignments.
2.1.1.10 Implement window assignments.
2.1.1.11 Design Scheduled Window Shipping Board and develop guidelines
regarding procedures and Standardized Work with input from dock
personnel.
2.1.1.12 Design Scheduled Window Shipping Countermeasures Worksheet and
develop guidelines regarding procedures and Standardized Work with
input from dock personnel.
2.1.1.13 Implement Workplace Organization in the Shipping Area.
2.1.1.14 Update Plan for Every Part (PFEP) based on new shipping plan.
Delphi Confidential. Publication Date: 01/DE/01.
Uncontrolled Copy - For Reference Only.
33
MM-2 Shipping to Schedule Building to Plan
Overview
2.1.2 Design and implement process for staging and delivery of empty finished goods
containers and finished goods.
2.1.2.1 Develop a cross-functional team (PC&L, Shipping, IE).
2.1.2.2 Design the layout of the supermarket area (How To MM-3-1
Supermarkets) and dock staging area.
2.1.2.3 Develop a material delivery plan for moving material from the finished
goods supermarket to the dock staging area.
2.1.2.4 Develop a container delivery plan for returning empty containers from
the dock staging area to the empty container storage area.
2.1.2.5 Identify the type of equipment required to move material from the
finished goods storage to the dock staging area.
2.1.2.6 Identify the type of equipment required to move empty containers from
the dock staging area to the empty returnable container storage area.
2.1.2.7 Develop Standardized Work for material and dock personnel.
2.1.2.8 Establish process for monitoring the delivery of finished goods and
dunnage.
2.2 Production Leveling
2.2.1 Develop a cross-functional team (Mfg., PC&L, IE, ME).
2.2.2 Identify pacemaker process (generally final assembly) to be leveled from the future
state value stream.
2.2.3 Gather data.
2.2.4 Fill out the Changeover Frequency Worksheet.
2.2.5 Develop a Manufacturing Plan.
2.2.6 Determine Cycle Stock (Running Stock) Plan by part number.
2.2.7 Develop a buffer for each part number.
2.2.8 Develop a load leveling schedule.
2.2.9 Develop a plan to handle the exceptions and make continuous improvement.
2.2.10 Develop a schedule attainment metric.
Objectives
Listed below are the objectives of MM-2.1 Scheduled Window Shipping:
• Schedule all dock activities including Truckload, Milkrun, LTL, Railcar and Premium
(working within the requirements of the customer).
− Allow for specific assignments and improved utilization of dock personnel resulting
in more ownership and accountability in the process. These activities become the
basis for dock Standardized Work.
• Achieve levelness (working within the requirements of the customer).
− Utilize dock personnel efficiently.
− Balance multi-day shipments throughout the day.
− Even workload throughout the day and week for every dock.
− Allow for inventory reduction due to more predictable and level shipping schedule.
− Reduce equipment requirements.
− Improve control/coordination of drivers.
• Deliveries of empty containers and shipments of finished goods are verified for correct
identification and quantity.
• The number of drivers required has been determined based on the amount of work
content and the ship window time.
• Drivers are fully utilized by balancing unload/reload activity with non-cyclical activity
(stock rotation, load preparation, container storage, etc.).
Refer to Figure MM-2-A: Issues/Advice - Scheduled Window Shipping for tips on effective
implementation.
Issues/Advice
Scheduled Window Shipping
Prerequisites
Prior to implementing MM-2.1 Scheduled Window Shipping, obtain following information:
• Customers’ ship windows.
• Transportation information (carrier, mode and transit time).
• Estimated number of lifts per truck.
How To (Detail)
Listed below is detailed information on how to implement MM-2.1 Scheduled Window
Shipping:
Helpful
• Develop customer ship
Hint
windows first.
• Coordinate other plant
shipping windows with
customer ship windows.
Helpful
Hint
• Keep the Scheduled Window Shipping Board
simple and easy to maintain.
• Highlight the length of time allocated to
unload/reload each trailer on the board and
audit on a regular basis.
6:30 AM (Customer
(Customer F)F)
T
T
Carrier
Carrier 22
7:00 AM (Customer
(Customer C)C) P
P
T
T
Carrier
Carrier 11
Current
7:30 AM (Customer
(Customer B)B) D
D
Carrier
Carrier 33
Time Carrier
Carrier 33
Carrier
Carrier 44
(Customer
(Customer F)
8:30 AM F)
Carrier
Carrier 22
9:00 AM (Customer
(Customer D)D)
Carrier
Carrier 11
9:30 AM (Customer
(Customer H)H)
10:00 AM Carrier
Carrier 22
(Customer
(Customer D)D)
Carrier
Carrier 11 Carrier
Carrier 33
10:30 AM (Customer
(Customer G)G) (Customer
(Customer J) J)
11:00 AM
11:30 AM
etc.
= Met Window
P
P = Production Issue (Shortage)
KEY: T
T = Transpotation Issue (Late/Miss)
D
D = Dock Issue (Delay)
2.1.2 Design and implement process for staging and delivery of empty finished goods
containers and finished goods.
2.1.2.1 Develop a cross-functional team (PC&L, Shipping, IE).
2.1.2.2 Design the layout of the supermarket area (How To MM-3-1
Supermarkets) and dock staging area.
2.1.2.3 Develop a material delivery plan for moving material from the
finished goods supermarket to the dock staging area.
2.1.2.4 Develop a container delivery plan for returning empty containers
from the dock staging area to the empty container storage area.
2.1.2.5 Identify the type of equipment required to move material from the
finished goods storage to the dock staging area.
2.1.2.6 Identify the type of equipment required to move empty containers
from the dock staging area to the empty returnable container storage
area.
2.1.2.7 Develop Standardized Work for material and dock personnel.
2.1.2.8 Establish process for monitoring the delivery of finished goods and
dunnage.
Note: After this process has been implemented and is in full operation, address
continuous improvement opportunities. The monitoring tools described
will aid the dock, suppliers and carriers in recognizing possible problems
and taking appropriate action to solve them.
Reference/Source Material
• Material Movement Standards (Ideal Material Movement Plant), Delphi Lean Material
Flow Circle of Colleagues.
Time Time
Figure MM-2-D: Workload-With/Without Leveling
With regards to variation, the normal distribution describes situations where observations are
distributed symmetrically around the average (mean). 68% of all values under the curve lie
within +/- one standard deviation of the mean, 95% lie within +/- two standard deviations and
99.7% lie within +/- three standard deviations. (Refer to Figure MM-2-E: Normal
Distribution.)
+ 3 S T D E V
+ 2 S T D E V
+ 1 S T D E V
9 9 .7 % 9 5 % 6 5 % ----------- 5 0 % ------------------- ------ ------ ------ ------ ------ ------ ------ ----
-1 S T D E V
- 2 S T D E V
-3 S T D E V
T r a d it io n a l S c h e d u lin g
F in a l A s s e m b ly B u ild s to E x a c t D e m a n d
F in is h e d
G oods C u s to m e r
I n v e n to r y D em and
B ank V a r ia tio n
V a r ia tio n in s c h e d u le a n d in v e n to r y in c r e a s e s in e a c h u p s tr e a m p r o c e s s
L e v e l S c h e d u lin g
F in a l A s s e m b ly L e v e le d , B u ild s to R e p e titiv e S e q u e n c e a n d Q u a n tity
F in is h e d C u s to m e r
S c h e d u le v a r ia tio n is r e d u c e d a n d in v e n to r y b u ffe r s a r e m a n a g e d . G oods D em and
B u ffe r V a r ia tio n
V a r ia tio n is a b s o r b e d h e r e !
A good place to start to minimize inventory is to match individual part number build frequency
with ship window frequency Every Part Every Frequency EPE(x). In the example below, Figure
MM-2-G: Ship Windows, a good place to start with developing build frequencies would be to
build Part A four times per day, Part B twice per day, Part C once per day and Part D twice per
week.
A
B
A
B
A
C
A
B
A
B
A
C
A
D
A
A
B
A
B
A
C
A
B
B A
B
A
C
A
D
C
A
B
A
D
C
A
Mon Tue Wed Thu Fri Mon Tue Wed Thu Fri
Figure MM-2-H: Traditional (Batch) Scheduling Figure MM-2-I: Level Scheduling
Objectives
Listed below are the objectives of MM-2.2 Production Leveling:
• Fully utilize resources and reduce costs.
• Reduce variation in the value stream.
• Increase our ability to meet customer demand.
• Reduce inventory requirements throughout the value stream.
• Enable improved utilization of floor space.
• Increase the ability to flow small lots of material.
• Reduce transportation costs by consistent truck cube utilization.
• Reduce supplier costs through level supplier schedules.
• Reduce supplier finished goods requirements.
Prerequisites
Prior to initiating MM-2.2 Production Leveling, it is necessary to:
• Understand the current material and information flow (including the current scheduling
method) of the operation by using value stream mapping (current and future state).
(Refer to How To IG-2.)
How To (Detail)
Listed below are implementation steps with detailed information:
2.2.2 Identify pacemaker process (generally final assembly) to be leveled from the
future state value stream.
The pacemaker process sets the pace for all upstream processes based on how you
control production at this process. All processes after the
The goal is to have
pacemaker process should be able to flow material through
the pacemaker loop
to the final process; that is the pacemaker process supplies
as close to the front
parts FIFO or sequenced through to the end of the value
of the process as
stream. The goal is to have the pacemaker loop as close to
possible without
the front of the process as possible without disrupting the
disrupting the end
end process flow. (For more information on the pacemaker
process flow.
process, refer to the How To IG-2.)
1 P a rt N u m b er A B C D TOTAL
3 Q u a lity L o a d F a cto r % 1 .1 2 1 .0 1 .0 1 .0
5 E n g in eered C a p a city (p cs / h r) 60 60 60 60
7 E ffectiv e C a p a city (p cs / h r) 5 0 .4 5 0 .4 5 0 .4 5 0 .4
M u ltip ly L in e 5 B y L in e 6 TOTAL
8 R eq u ired P ro d u ctio n H o u rs 1 7 .8 6 .0 4 .0 3 .0 3 0 .7
L in e 4 D iv id ed B y L in e 7
9 T o ta l S ch ed u led P ro d u ctio n H o u rs 4 0 .0
11 A v a ila b le C h a n g eo v er T im e (h o u rs) 9 .3
E q u als L in e 9 M in u s L in e 8 M in u s L in e 1 0
13 T o ta l A v a ila b le C h a n g eo v ers 47
Figure MM-2-J: Changeover Frequency Worksheet
Helpful
Hint It is necessary to consider the
variation of lead time to get
product from the pacemaker to
ship when determining Cycle Stock
(Running Stock).
DAY H R P S B P S B P S B P S B
1 1 1 0
M 1 1 2 1 0 1 0
O 2 1 2 1 0 1 0
N 3 1 2 1 1 1 0
D 4 1 1 2 1 1 0
A 5 2 1 2 1 0 0
Y 6 2 2 2 2 0 0
7 2 1 1 1 1 0
8 1 1 2 1 1 2 0
T 1 1 3 1 0 2 0
U 2 2 1 1 1 2 0
E 3 1 2 1 2 0
S 4 1 1 2 1 2 2 0
D 5 2 2 1 2 1 0
A 6 1 2 1 2 1 0
Y 7 1 1 1 1 2 2
8 1 0 1 1 1 3
W 1 1 1 1 0 1 3
E 2 1 2 0 0 1 3
D 3 1 1 1 1 1 3 0
4 1 1 1 1 1 0
5 1 1 2 1 0 0
6 2 2 1 2 0 0
7 1 1 1 1 1 0
8 2 1 2 1 1 0
T 1 1 3 1 0 1 0
H 2 2 1 1 1 1 0
U 3 1 2 1 1 0
R 4 1 1 2 1 2 1 0
S 5 2 2 1 1 1 0
6 2 0 2 1 2 0
7 1 1 1 1 2 1 1
8 1 0 1 2 1 2
F 1 1 1 1 0 2 2
R 2 1 2 0 0 2 2
I 3 1 1 1 1 2 2 0
D 4 1 0 1 2 2 0
A 5 1 1 2 2 0 0
Y 6 1 2 0 2 1 1 0
7 1 1 1 1 1 0
8 1 1 1 1 1 0
Cycle
Stock
Demand
Variation
MIN
Manufacturing
Variation
If missed production
Temporary Helpful (manufacturing
Stock Hint variation) cannot be
made up, it needs to be
covered in a buffer. If
Emergency missed production can
Stock be recovered, it does
not need to be covered
in a buffer.
Figure MM-2-L: Design of a Buffer
6:36 7:12 7:48 8:24 9:00 9:36 10:12 10:48 11:24 12:00 12:36 1:12 1:48 2:00
part number
One row per
Part
A
Part
B
Part
C
Part
D
Standard Pack = 30
Listed below are some of the basic rules of operating a heijunka schedule:
• Manufacturing builds to the heijunka box pattern (volume, mix and sequence).
• If production cannot build required quantity of any part, the next part number is
built in its entirety provided there is adequate buffer to the customer of the pull
cards missed.
• Production attempts to build any missed pull cards from previously scheduled
part numbers before moving forward in the sequence.
• After making up missed pull cards, revert to the original sequence (build the
next part in the heijunka box).
• If there are any missed pull cards at the end of the shift or day, the following
shift or day resumes building missed pull cards before producing pull cards for
the new shift or day.
• Address reasons for missing pull cards on a production countermeasure board.
• Manufacturing attempts to make up missed pull cards at the earliest opportunity
(by the end of the shift, end of the day, next day) to avoid weekend overtime.
2.2.9 Develop a plan to handle the exceptions and make continuous improvement.
Reference/Source Material
• Material Movement Standards (Ideal Material Movement in Plant), Delphi Lean
Material Flow Circle of Colleagues.
• Quality Network (QN 1101-1102) Level Scheduling.
3.1.18 Establish a process to identify problems in the process and allow continuous
improvement.
3.1.19 Train employees on the advantages of the process and reasons to implement.
3.1.20 Implement the Supermarket.
3.1.21 Verify all data and update PFEP with any changes.
3.2 Empty Container Storage.
3.2.1 Develop a cross-functional team (Mfg., PC&L, IE).
3.2.2 Review the Returnable Container Process Flowchart.
3.2.3 Determine the number of parts that are in returnable containers from the PFEP.
3.2.4 Determine information from the PFEP.
3.2.5 Size the empty container storage area to determine space requirements.
3.2.5.1 Identify all supplier (customer) returnable containers.
3.2.5.2 Identify all returnable container types.
3.2.5.3 Determine the number of containers used daily for each supplier/container
(customer/container) combination.
3.2.5.4 Determine the best method of handling the accumulation of containers
based on space constraints (e.g., roller racks, individual pallet/special
container footprint, etc.).
3.2.5.5 For hand-carriable containers, separate high runners from the low runners
based on plant parameters.
3.2.5.6 Determine stack height for palletized and bulk containers and allocate
sufficient space to handle daily requirements (complying with local
restrictions, safety and ergonomic concerns).
3.2.5.7 If using roller racks, refer to How To MM-3.1 Supermarket/Bulk Storage
for roller rack sizing information.
3.2.5.8 Calculate actual floor space required.
3.2.6 Refer to the site planning process to identify locations for empty container storage
area.
3.2.7 Work with plant engineers to develop the empty container storage area.
3.2.8 Clear the area designated for empty container storage.
3.2.9 Develop and implement visual controls.
3.2.10 Load existing returnable containers into the area.
3.2.11 Establish a container shortage reaction process for customer containers.
3.2.12 Establish a process to identify problems in the process and allow continuous
improvement.
3.2.13 Train employees on the advantages of the process and reasons to implement.
3.2.14 Verify all data and update PFEP with any changes.
SUPERMARKET
Min____________ Max____________ Min____________ Max____________ Min____________ Max____________
Store Loc_______ Use Lo c________ Store Loc_______ Use Lo c________ Store Loc_______ Use Lo c________
Row
Suppli er ________________________ Suppli er ________________________ Suppli er ________________________
Deliv er y Date - M - T - W - T - F - S Deliv er y Dat e - M - T -W - T - F -S Deliv er y Dat e -M - T -W -T -F -S
Time___________________________ Time___________________________ Time___________________________
C C
2 B
B B
Supermarket address Part number Pack A A
T64 - A1 - A - 05 22152297 60 1 2 3
Name
Market Attendant
P90 Drum brake Adjusting screw
MIN Supplier MAX picks carton based
2 XYD Ind. 7 on Pull Card Order
Figure
Figure 3-A: Supermarket/Bulk
MM-3-A: Supermarket/Bulk Storage
Storage Layout
Layout Pictorial
Pictorial Representation
Representation
Objectives
Listed below are the objectives of MM-3.1 Supermarket/Bulk Storage:
• Organize and control inventory levels.
− Support flow.
− Minimize inventory and space.
− Support First In/First Out (FIFO).
• Support implementation of a standardized delivery process.
• Provide workplace organization for material. (For more information on Visual Controls
and Addressing, refer to How To’s WO-2 and WO-3.)
− Have a place for everything. − Improve housekeeping.
− Reduce non-value-added search and walk time. − Facilitate visual management.
− Minimize delivery and put away time.
Delphi Confidential. Publication Date: 01/DE/01.
Uncontrolled Copy - For Reference Only.
59
MM-3 Designated Storage
MM-3.1 Supermarket/Bulk Storage
• FIFO controls are implemented, maintained and used (multiple lanes of the same part
number use visual controls so parts are always selected from the oldest lane).
• Material is delivered from storage areas to operations using the most appropriate pull
signals.
• Returnable and disposable container, refuse and dunnage areas are:
− Located in relationship to the delivery path to standardize the workflow.
− Arranged to permit flow-through processing.
− Identified with appropriate visual controls.
• A written process is in place to handle out-of-stock, below minimum, over maximum
and overflow conditions.
Refer to Figure MM-3-B: Guidelines for Hand Carribles and Bulk Storage Area for
additional information.
Figure MM-3-B: Guidelines for Hand Carribles and Bulk Storage Area
Prerequisites
Prior to implementing MM-3.1 Supermarket/Bulk Storage, complete the following How To’s:
• IG-2 Site Plan.
• MM-1 Plan for Every Part.
• MM-2.2 Production Leveling.
• WO-3 Address System.
In addition to completing the How To's listed above, leadership must support and demonstrate a
commitment to the process by providing the necessary material/equipment, people and/or
financial resources.
How To (Detail)
Listed below is detailed information on how to implement MM-3-1 Supermarket/Bulk Storage:
3.1.3 Determine information from the Plan for Every Part (PFEP).
Determine the following information from the PFEP:
• Daily volume.
• Ship/delivery frequency.
• Standard pack quantity.
• Container measurements (Length x Width x Height).
• Orientation of container in supermarket (Length or Width).
Example 2 (Bulk):
Lane is 10 feet deep.
Each container is oriented 3 feet in depth.
Max stack height is 3.
Therefore, the number of containers per row equals 9.
3.1.5.5 Calculate linear footage of storage rack or bulk lane (width or pick-
face).
Linear footage of storage rack or bulk lane (width or pick-face) calculation:
= Σ ((Number of Rows per Individual P/N) * (P/N Orientation Width))
Note: Where racks are used, add footage for end posts and lane dividers.
Consider adding 10% footage per rack for future growth or part/route
adjustment.
Helpful • To maintain FIFO, design supermarkets that are loaded from the back and
picked from the front.
Hints
• Roller racks may be constructed and utilized to allow gravity feed of
containers to the route drivers and ensure FIFO.
• Consult plant engineering, safety and ergonomics to ensure load and unload
height and weight meet prescribed ergonomic and safety guidelines.
• Minimize the number of raw and finished material supermarkets; they need to
be in-line with the docks.
• In-process supermarkets need to be in-line with product flow and close to the
supplying area.
• Common parts are best located at the end of supermarket aisles for ease of
access.
3.1.8 Work with plant engineers to develop the supermarket area including aisles,
predetermined traffic flow patterns, etc. considering safety and ergonomic
issues.
3.1.9 Draw a layout of roller racks or lanes with part numbers mirroring current or
near future delivery routes.
3.1.10 Procure racks.
Helpful
Hint In plants with limited floor space where
bulk storage areas are against walls,
there must be a disciplined process and
schedule to rotate stock on a regular
basis.
3.1.17 Review the general considerations for Supermarkets, Pull Systems and
Delivery Routes. (Refer to Appendix A.)
3.1.18 Establish a process to identify problems in the process and allow continuous
improvement.
3.1.19 Train employees on the advantages of the process and reasons to implement.
3.1.21 Verify all data and update PFEP with any changes.
Reference/Source Material
• Material Movement Standards (Ideal Material Movement in Plant), Delphi Lean
Material Flow Circle of Colleagues.
• Delphi Automotive Ergonomic Guidelines Manual.
Objectives
Listed below are the objectives of MM-3.2 Empty Container Storage:
• Organize and control empty containers.
− Support flow.
− Minimize container inventory and space.
• Support implementation of a standardized container return process.
• Support timely return of containers.
• Provide workplace organization for empty containers.
− A place for everything.
− Facilitate visual management.
− Improve housekeeping.
Figure MM-3-C: Issues/Advice - Empty Container Storage provides helpful information for
successful implementation.
Issues/Advice
Empty Container Storage
• Everyone should understand that the empty returnable container is as important to the
supplier as parts are to the customer. Every step in the handling process should prepare the
containers for the next user.
• The process works best when used in conjunction with supplier-dedicated containers.
• Do not use shipping/delivery containers for:
− Maintenance storage.
− Rubbish, scrap, or recycle collection.
− Salvage or repair operation storage.
− Part or container (ergonomic) stands.
− Operator stools, chairs, lunch boxes, glove containers, etc.
• Outbound container return shipping frequency should match inbound parts receiving
frequency.
Prerequisites
Prior to implementing MM-3.2 Empty Container Storage, complete the following How To’s:
• IG-2 Site Plan.
• MM-1 Plan for Every Part.
• MM-2.1 Production Leveling.
• MM-2.2 Scheduled Window Shipping
• WO-3 Address System.
How To (Detail)
Listed below is detailed information on how to implement MM-3.2 Empty Container Storage:
3.2.3 Determine the number of parts that are in returnable containers from the
PFEP.
Include purchased parts, in-process material and finished goods.
3.2.5 Size the empty container storage area to determine space requirements.
Containerization
MM-4-1
Yes
Develop Container
No
Return Process
Examine off-site
rd
alternatives (eg. 3 party
Develop implementation sort/return)
plan for the plant
Determine container
loop size (number of
containers required)
Container Return Process
Communicate start-up
date to supplier, carrier
rd
(3 party)
Begin receiving in
returnables
3.2.5.5 For hand-carriable containers, separate high runners from the low
runners based on plant parameters.
For example: “high runners are greater than or equal to an average of a full
pallet per ship frequency."
Place high runners on pallets at a designated storage location.
Accumulate low runners in roller racks for space consideration.
3.2.5.6 Determine stack height for palletized and bulk containers and allocate
sufficient space to handle daily requirements (complying with local
restrictions, safety and ergonomic concerns).
3.2.6 Refer to the site planning process to identify locations for empty container
storage area.
Utilize existing internal delivery routes (refer to How To MM-6 Internal Delivery
Routes) and drivers for collection of empty containers and dunnage in order to:
• Provide more frequent removal from production envelope.
• Reduce in-plant traffic flow.
• Utilize return trip of route drivers and equipment.
3.2.7 Work with plant engineers to develop the empty container storage area.
This includes aisles, predetermined traffic flow patterns, etc. Consider safety and
ergonomic issues.
3.2.12 Establish a process to identify problems in the process and allow continuous
improvement.
3.2.13 Train employees on the advantages of the process and reasons to implement.
3.2.14 Verify all data and update PFEP with any changes.
Reference/Source Material
• Material Movement Standards (Ideal Material Movement in Plant), Delphi Lean
Material Flow Circle of Colleagues.
• Delphi Automotive Ergonomic Guidelines Manual.
How To (Summary)
Listed below is a summary of the implementation steps for MM-4 Container Right Sizing &
Supporting the Operator:
4.1 Containerization.
4.1.1 Develop a cross-functional team (Mfg. PC&L, IE, ME, Purchasing).
4.1.2 Review the Returnable Container Process flowchart.
4.1.3 Review part presentation requirements from the perspective of the operator.
4.1.4 Define container size and standard pack quantity.
4.1.5 Determine if the container change will be returnable or expendable based on a
cost/benefit analysis through the entire value stream. Conduct Total Cost Model
Analysis as required (see DBS procedures).
4.1.6 Make provisions for returnable containers.
4.1.6.1 Define the container return process.
4.1.6.2 Determine the number of containers required based on loop size for the
planned material delivery process.
4.1.6.3 Secure funding and acquire the proper number of containers.
4.1.6.4 Badge containers (supplier, receiving plant).
4.1.6.5 Contact supplier to communicate the plan for the returnable container
implementation.
4.1.7 Make provisions for expendable containers.
4.1.8 Send out an implementation letter with the approximate start-up date.
4.1.9 Supplier notifies the plant when containers are received; supplier and plant agree on
an exact date for the Product and Process Approval Plan (PPAP) and start-up.
4.1.10 Notify all involved parties of the implementation date.
Delphi Confidential. Publication Date: 01/DE/01.
Uncontrolled Copy - For Reference Only.
75
MM-4 Container Right Sizing &
Supporting the Operator
Overview
4.1.11 Update supermarkets and empty container storage areas to accommodate new
containers, including all visual controls and addressing.
4.1.12 Update manufacturing workstations to accommodate new containers.
4.1.13 Update Standardized Work for affected jobs.
4.1.14 Implement new containers.
4.1.15 Update the Plan for Every Part (PFEP) with new container and standard pack
information.
4.2 Repacking.
4.2.1 Develop a cross-functional team (Mfg., PC&L, IE, ME).
4.2.2 Determine part numbers to be repacked.
4.2.3 Determine the Daily Volume and Route Frequency from the Plan for Every Part
(PFEP).
4.2.4 Determine pack size and standard pack quantity. Utilize common lot strategy.
4.2.5 Provide the proper number of containers based on Production Pull calculations and
the repack lead-time. (Refer to MM-5 Pull Systems.)
4.2.6 Define the repack area.
4.2.7 Determine method for repack and develop Standardized Work.
4.2.8 Define labor requirements.
4.2.9 Train employees using Standardized Work documentation.
4.2.10 Implement repack.
4.2.11 Continue pursuing containerization strategy to eliminate repack.
4.3 Kitting.
4.3.1 Develop a cross-functional team (Mfg., PC&L, IE, ME).
4.3.2 Evaluate part presentation requirements and determine part numbers to be kitted.
4.3.3 Review information from the Plan for Every Part (PFEP).
4.3.4 Where possible, have supplier create the kit.
4.3.5 Define the kitting process.
4.3.5.1 Determine common lot quantity for parts to be kitted.
4.3.5.2 Establish part orientation and presentation to the operator utilizing
operator input.
4.3.5.3 Design kitting cart/container.
4.3.5.4 Design label.
4.3.6 Integrate kits into delivery route.
4.3.7 Determine the proper number of kit containers to support the loop.
4.3.8 Design kitting area layout and Standardized Work for loading kitting container.
4.3.9 Adjust the Standardized Work for delivery and production operators.
4.3.10 Measure total work content and define labor requirements.
4.3.11 Train kitting, route and production employees using Standardized Work.
4.3.12 Adjust manufacturing area layout and workplace organization/visual controls to
accommodate footprints for kitting.
4.3.13 After the operation is ready to accept kitting container and kitting cell is capable,
implement route and kitting.
4.3.14 Update the PFEP if required.
4.3.15 Continuously evaluate the need to kit and eliminate or move up the value stream.
MM-4.1 CONTAINERIZATION
Containerization is the process of packaging parts in the smallest The goal is to have the
lot possible resulting in the presentation of a quality part to supplier ship in a
eliminate waste of motion for the manufacturing operator. As container that can be
depicted in Figure MM-4-A: Containerization Transition, the used as part of the
goal is to have the supplier ship in a container that can be used as parts presentation
part of the parts presentation device. device.
Large
Container
Objectives
Listed below are the objectives of MM-4.1 Containerization:
• Eliminate non-value-added, non-cyclic work from the operator.
• Enable Standardized Work for the material movement process.
• Follow ergonomics guidelines during handling during shipping, storage, and delivery.
(See Delphi Manufacturing Engineering Guidelines and Delphi Ergonomics Worksheet
for Container Design at
http://apollo.delphiauto.net/health_safety/ergonomics/design-in.htm.)
• Ensure part quality.
• Support the operator in parts presentation, follow ergonomics guidelines. (See Delphi
Manufacturing Engineering Guidelines and Delphi Ergonomics Worksheet for
Container Design at
http://apollo.delphiauto.net/health_safety/ergonomics/design-in.htm.)
• Enable inventory reduction through small lot strategy.
Issues/Advice
Containerization
• Ensure that product quality is maintained when changing packaging design.
• Sub-optimization can occur when only packaging and transportation issues are considered in
packaging decisions.
• Consider ergonomics for all aspects of the pipeline (loading, movement and unloading).
• Keep dunnage to a minimum. Use dividers, compartments, etc. only when justified (to error
proof quantities, maintain quality, or assist in presenting parts to operator in an appropriate
manner).
• Align container design with logistics plan.
• It is best to have one standard pack quantity per part number that best meets the needs of
all customers, recognizing different customers will have different daily rates.
• It is best to have a single container for work-in-process through finished product.
• Do not wait for preferred containers to start implementing other material movement
concepts. Consider utilizing repacking, kitting, right sized expendable containers, etc. as
short-term solutions while implementing the containerization strategy. With timing in mind, it
is much easier to implement right sized packaging during phase 0-2 of the Product
Development Process.
• Work with the MSD team to identify the right container that supports the man, machine and
material balance of the manufacturing system. Communicate the requirements as part of the
sourcing requirements during phase 0-2 of the Product Development Process.
• The investment required for returnable containers should be identified in the appropriations
request for a new product program.
• Repacking should be an interim strategy until the right container can be received from the
customer.
Prerequisites
Prior to implementing MM-4.1 Containerization, complete the following:
• Define workstation parts presentation requirements (Flow MSD, Workplace
Organization).
How To (Detail)
Listed below are the implementation steps with detailed information:
4.1 Containerization.
4.1.1 Develop a cross-functional team (Mfg. PC&L, IE, ME, Purchasing).
4.1.3 Review part presentation requirements from the perspective of the operator.
Yes
Develop Container
No
Return Process
Examine off-site
rd
alternatives (eg. 3 party
Develop implementation sort/return)
plan for the plant
Determine container
loop size (number of
containers required)
Container Return Process
Communicate start-up
date to supplier, carrier
rd
(3 party)
Begin receiving in
returnables
No
Does the part weigh
2 lbs. (1 kg) or less? B
Yes
Determine whether part should be bulk Select manually handled container size
D packed or use mechanical assistance from standard container menu, C
(hoist, etc.) where possible
E
Is it possible
to orient the parts using the container
as part of the presentation
device?
Yes No
F
If error-proofing
of parts is needed, can process process
accommodate containers as part of the
presentation device?
Yes
Is number of containers
per 8 hour shift > 50? J
No
Container selected
Figure MM-4-D: Decision Process for Container Right Sizing and Material Movement Standards for Packaging
(Refer to the key on the following page.)
A. Review part presentation requirements from operator’s perspective. If parts are to be fed into a machine,
consider material handler interface with machine.
B. Determine weight of part being handled. Part weight is a major factor when determining standard pack
quantities. In general, if the part weight is two pounds (one kilogram) or less, a manually handled
container should be of primary consideration.
C. Choose a container from the Delphi Standard Container List. (The Standard Container List can be
found at the Delphi Packaging website: http://apollo.delphiauto.net/packaging). Deviations from the
standard container list should occur only when parts do not fit in a standard container.
D. If a part weighs more than two pounds (one kilogram) or if the number of containers per eight hour shift is
greater than fifty, determine whether part should be bulk packed or if mechanical assistance is required.
E. The goal is to present parts to the operator in the supplier container where possible to avoid double
handling of parts. Only when significant reductions in operator cycle time outweigh the non-value-added
work of unpacking each part should parts be removed from containers by a material handler.
F. Again the goal is to present the parts to the operator in the supplier container. Consideration should be
given to designing the error proofing system to include part presentation in the supplied container.
G. Container will be part of the parts presentation device to the operator.
H. While container may not be delivered directly to the point-of-use, container handling must still be
considered. Ergonomics must also be considered.
I. Use common lot strategy to develop standard container quantity. Refer to Figure MM-4-E: Strategy for
Determining Standard Container Quantities-Common Lots in the Attachments section for a
discussion on common lot strategy. Reference container recommendations for common purchased parts
if developed. Once established, this standard pack or multiples of the standard pack must be used in
every shipment of that part.
J. Fifty container moves per shift is a guideline for the maximum number of containers an operator should
handle in order to minimize non-value-added work content.
K. Analyze the manufacturing process to determine if special material handling requirements are needed for
the containers being selected. Obtain technical support from appropriate functional areas.
L. Determine amount of material to be located at each workstation, which is dependent upon the frequency
of deliveries to the workstation. Ensure adequate floor space is available when developing a material
handling plan.
M. The use of returnables is based on an economic analysis of the total system. Expendable containers
should be used when the economic analysis does not support returnable containers.
N. After the initial container selection is made, present the proposal to the operators and/or material
handlers for approval and feedback. Feedback from areas using containers may disclose concerns that
were not known previously. Refer to Delphi Manufacturing Engineering Ergonomics Guidelines and
Delphi Ergonomics Worksheet for Container Design
http://apollo.delphiauto.net/health_safety/ergonomics/design-in.htm.
Key to Figure MM-4-D: Decision Process for Container Right Sizing and Material Movement Standards for Packaging
Helpful
The process of choosing the right sized
Hint
container may require a few iterations to
balance the needs of the manufacturing
cell and the material handling costs.
4.1.8 Send out an implementation letter with the approximate start-up date.
Copy to following departments:
• Purchasing.
• Logistics.
• Plant representatives.
4.1.9 Supplier notifies the plant when containers are received; supplier and plant
agree on an exact date for the Product and Process Approval Plan (PPAP) and
start-up.
Pilot material must be shipped in production intent containers.
4.1.11 Update supermarkets and empty container storage areas to accommodate new
containers, including all visual controls and addressing.
4.1.15 Update the Plan for Every Part (PFEP) with new container and standard pack
information.
Reference/Source Material
• Delphi Automotive Systems Supplier Packaging Manual, Delphi Packaging COE.
• Delphi Automotive Systems Packaging Validation Manual, Delphi Packaging COE.
• Supplier Containerization & Process Integration Model, Delphi E&C.
• Material Movement Standards (Ideal Material Movement in Plant), Delphi Lean
Material Flow Circle of Colleagues.
• Delphi Manufacturing Engineering Ergonomics Guidelines, Delphi Ergonomics
Council.
• Quality Network (QN 1026-1028) Containerization.
• Quality Network (QN 1076-1077) Small Lot.
• Common Procedure Requirement – Total Cost Collection Process.
• Standard Container Listing, Available on Apollo, Packaging Engineering Web Site
(http://apollo.delphiauto.net/packaging).
Attachment
• Figure MM-4-E: Common Lot Strategy Example for a Cell.
1 2 3 5
CLIPS
60 PCS / 60 PCS /
BOX BOX
FA SC
10 ST RE 7
9 EN 8 WS PLC
SET ASM. ER
60 PCS / ASM.
S
SHIP SENSOR MOTOR SET END-
BOX
AIR PLAY &
& PACK ASM.
VALVE
SHIPPING VALVES
FASTENERS SENSORS MOTORS
CONTAINERS (unique part)
(unique part) (unique part)
15 PCS/BOX
60 PCS /BOX 20 PCS/BOX
= 4 BOXES/HOUR
= 1 BOX/HOUR = 3 BOXES/HOUR
CONSUMED
CONSUMED CONSUMED
The strategy of common lots means that ideally all material is delivered to a manufacturing cell in the same
quantity per container, which divide evenly into the finished pack quantity. This strategy eliminates partially
used containers lineside. However, in a manufacturing cell, more than one finished product may be produced,
where some parts may be used on all models (common parts), some parts may be used on some or one model
(unique parts). In order to facilitate part changeovers in the cell, it is necessary to have a strategy different for
unique parts than for common parts. For parts that are unique parts, standard pack quantities should be divided
evenly into the finished pack. For common parts, standard pack quantities should be factors of 60
(60,30,20,15,12,10,5,4,3,2,1) or multiples of the finished pack. Benefits of the common lot strategy include:
• Allows faster changeovers by reducing the number of partially filled containers that must be handled.
• Reduces variability in tugger route deliveries by matching consumption of parts with delivery
• Aids in error proofing by reducing partially filled containers.
• Allows sequencing of parts to line by not requiring every part to be stored at line.
• Reduces stock at the line.
• Minimizes overbuild.
• Calculations of kanban loops are easier since full packs are used.
MM-4.2 REPACKING
Repacking is the process of transferring parts from one container into a more appropriate size or
type of container to satisfy the needs of the next using customer. (Refer to Figure MM-4-G:
Repacking.) This is done as an interim solution to containerization.
Objectives
Listed below are the objectives of MM-4.2 Repacking:
• Eliminate non-value-added, non-cyclic work from the operator.
• Improve part presentation to the next using operation/operator.
• Reduce operator pick-face allowing operator envelope to be condensed.
• Provide opportunity to improve floor space utilization and reduce inventory in the
manufacturing area.
• Allow access to a greater variety of part numbers within the operator envelope.
• Support ergonomic parts presentation.
Issues/Advice
Repacking
• Repacking to downsize a delivery quantity should be an interim step while pursuing a
containerization strategy.
• Third party involvement is the last choice for repacking since it adds handling steps.
• It is difficult to compare benefits versus perceived/actual cost because the benefits
are in direct labor while the costs are in indirect.
• Never repack parts into a container that requires a fork truck to handle.
Prerequisites
Prior to implementing MM-4.2 Repack, complete the following:
• Workstation parts presentation requirements (Flow MSD, Workplace Organization).
• How To MM-2 Plan for Every Part.
How To (Detail)
Listed below are the implementation steps with detailed information:
4.2 Repacking
4.2.1 Develop a cross-functional team (Mfg., PC&L, IE, ME).
4.2.3 Determine the Daily Volume and Route Frequency from the Plan for Every
Part (PFEP).
4.2.4 Determine pack size and standard pack quantity. Utilize common lot strategy.
Use common lot quantities (60, 30, 15, etc.) for each commodity to standardize
delivery routes and times. (Refer to Figure MM-4-F: Common Lot Strategy
Example for a Cell in the previous Attachments section.)
4.2.7 Determine the method for repack and develop Standardized Work.
Reference/Source Material
• Material Movement Standards (Ideal Material Movement in Plant), Delphi Lean
Material Flow Circle of Colleagues.
• Material Handling Design Criteria (Appendix II).
• Delphi Automotive Ergonomic Guidelines Manual.
• Quality Network (QN 1076-1077) Small Lot.
MM-4.3 KITTING
Kitting is the process of grouping parts into sets that are used together in a downstream
operation. Kits can be delivered in different ways:
• On the conveyance device (e.g. paced conveyor, power and free conveyor).
• Directly to the parts presentation device.
• On a delivery device (e.g. cart).
Figure MM-4-I: Kitting Pictorial displays this concept.
Line Flow
Operation 1 Operation 2
Figure MM-4-I: Kitting Pictorial
Objectives
Listed below are the objectives of MM-4.3 Kitting:
• Improve presentation of parts with high proliferation.
− Reduce operator pick face allowing operator envelope to be condensed.
− Provide opportunity to improve floor space utilization and reduce inventory in the
manufacturing area.
• Achieve one piece part flow to the operators.
• Facilitate model changeovers.
− Allow access to a greater variety of part numbers within the operator envelope.
− Support ergonomic parts presentation.
• Eliminate operator non-value-added, non-cyclic dunnage handling work in the
manufacturing area.
• Reduce the number of delivery points in the manufacturing area.
Issues/Advice
Kitting
• Use kitting when all parts cannot be presented effectively to the operator.
• Investigate smaller packs before resorting to kitting.
• Kitting works best when schedule and quality variation is minimized.
• Kitting requires rebalancing of manufacturing labor to redeploy to kitting operation.
• Kitting requires additional handling of parts, which increases the risk of damage.
• Special kitting containers are usually required, which drives added investment.
• Special processing will be required for replacement of any damaged parts found in kits.
Prerequisites
Prior to implementing MM-4.3 Kitting, complete the following:
• Workstation parts presentation requirements (Flow MSD, Workplace Organization).
• How To MM-1 Plan for Every Part.
How To (Detail)
Listed below are the implementation steps with detailed information:
4.3 Kitting
4.3.1 Develop a cross-functional team (Mfg., PC&L, IE, ME).
4.3.3 Review information from the Plan for Every Part (PFEP).
• Daily volume.
• Route frequency.
• Standard pack.
• Ship frequency.
Helpful
Hint
Design part presentation
devices to support the operator
(lightweight and mobile).
4.3.7 Determine the proper number of kit containers to support the loop.
For loop calculations see Pull Systems (Pull Systems, MM-5). (Note: Remember
that the number of kitting containers must include allocation for both the
Production loop and the Withdrawal loop).
4.3.8 Design kitting area layout and Standardized Work for loading kitting
container.
Lay out kitting areas
Helpful
• Employ Flow Manufacturing cell design to hold all plant
Hint
concepts. inventory of the parts
being kitted. Storage
• Employ supermarket layout concepts.
of these parts in a
• Include error-proofing techniques. supermarket is a
redundant handling
step.
4.3.9 Adjust the Standardized Work for delivery and production operators.
4.3.11 Train kitting, route and production employees using Standardized Work.
4.3.13 After the operation is ready to accept kitting container and kitting cell is
capable, implement route and kitting.
4.3.15 Continuously evaluate the need to kit and eliminate or move up the value
stream.
Reference/Source Material
• Material Movement Standards (Ideal Material Movement in Plant), Delphi Lean
Material Flow Circle of Colleagues.
• Material Handling Design Criteria (Appendix II).
• Delphi Automotive Ergonomic Guidelines Manual.
• Quality Network (QN 1076-1077) Small Lot.
In conjunction with production leveling, internal pull systems serve as the nervous system for a
value stream. They provide the instruction for the model, mix and sequence of what is to be
produced. Well-designed pull systems provide this instruction in a clearly defined simple to
understand manner.
There are two basic types of internal pull systems. Withdrawal Pull authorizes the movement of
material from storage to the point-of-use. It provides clear instruction as to the point-of-storage
and a point-of-use via addressing. Additionally, pack quantities, product names and other
information can be provided by the pull system.
The second basic type of internal pull system is Production Pull, sometimes referred to as
Production Instruction Kanban. Production Pull authorizes the manufacture or assembly of
component parts or finished product at the request of the next point-of-use.
In simplest terms, the Withdrawal Pull provides the shopping list while the Production Pull
provides the instruction to replace what has been consumed. See Figure MM-5-A: Internal Pull
Systems. A system that uses both the Withdrawal and Production Pull is often referred to as a
two-card system. In some limited cases, where a dedicated stock person is provided and the
inventory and customer process are co-located, the withdrawal side of the pull system is not
needed. This type of system is referred to as a one-card system.
Super- Customer
Supplying
market
Process Process
High
amount of variation that exists in the system. (Refer
Probability of Success
to Figure MM-5-B: Variation vs. Probability of
Success.) The instability can come in the form of
process or demand variation. The demand variation
can often be minimized through the use of a
production leveling process at the pacemaker
Low
process. (Refer to How To IG-2 Value Stream
High Low
Mapping). Consequently, Production Leveling is a Variation
prerequisite to pull system implementation. The
Figure MM-5-B: Variation vs.
process variation must be minimized through basic Probability of Success
problem solving initiatives as found in the
Implementation Guide Introduction.
The existence of system variation does not necessarily prevent the implementation of a pull
system. Although the variation can impact the probability of a successful implementation, the
appropriate pull system design can overcome many problems.
Objectives
Listed below are the objectives of MM-5 Internal Pull Systems:
• Establish one simple standardized method of controlling and balancing the flow of
resources.
• Provide quantity control for production and conveyance of materials.
• Support transition from large to small lot production.
• Visually manage the information flow on the manufacturing floor.
• Minimize the number of steps required in the process.
• Eliminate the waste of handling, storage, tracking, obsolescence, repair, rework,
facilities, equipment, excess inventory and shortages.
• Replace only what has been consumed.
• Manufacture and ship only what is required.
• Support continuous improvement.
• Provide resources just-in-time based on customer demand.
• Reduce lead time from beginning to end of the process.
• Organize material handling and manufacturing processes to maximize throughput.
• Improve quality by reducing opportunities for defects and the time to detect.
• Create a cooperative environment.
The preferred There are a variety of different Withdrawal and Production Pull Systems that
method is the can be applied depending on the characteristics of the value stream and
use of a pull processes that are involved. Figure MM-5-C: Types of Internal Pull
card (Kanban Systems depicts options that exist for signaling the withdrawal or production
Card). pull. The preferred method is the use of a pull card (Kanban Card).
Card Pull
Pull cards (Figure MM-5-D: Pull Card) provide a visual flexible method of controlling quantity
and sequence of production in addition to providing very basic instruction. Although we provide
information about other types of pull signals, always consider the Card Pull System first when
designing a system.
505 DEPT.
505 DEPT PART #
2620
DOCK
Cell A
Primary
1804 QUANTITY
Cell B PROCESS
Secondary
ASSEMBLY 152
STORE
Helpful
PART NAME
MAKE
LOCATION J-Car LOCATION Use temporary pull
505 DEPT.
505 DEPT PART #
Hint signals for special
2620
DOCK situations like
Cell A
Primary
1804 QUANTITY engineering changes,
Cell B PROCESS
build ahead, or
Secondary
ASSEMBLY 152 construction downtime.
How To (Summary)
Listed below are the Implementation Steps for MM-5 Internal Pull Systems:
5.1 Implement a Production Pull System.
5.1.1 Develop a cross-functional team.
5.1.2 Review the Site Plan and identify the value stream in which to implement.
5.1.3 Review the Current and Future State Value Stream Maps to determine the pacemaker
process.
5.1.4 Verify that Production Leveling has been implemented at the pacemaker process and is
properly functioning.
5.1.5 Select a Production Pull System.
5.1.6 Determine the changeover frequency for each part number.
5.1.6.1 Determine the average daily demand.
5.1.6.2 Determine the time required to process the daily requirements at the process.
5.1.6.3 Determine the amount of Scheduled Run Time for the process.
5.1.6.4 Determine the time available for changeover.
5.1.6.5 Determine the number of changeovers possible.
5.1.6.6 Make adjustments (if necessary).
5.1.7 Verify that the appropriate pull system type has been selected.
5.1.8 Estimate the desired buffer for each part number and determine the number of pull
signals needed for that buffer.
5.1.8.1 Determine any Temporary Stock.
5.1.8.2 Determine the Cycle Stock (Running Stock).
5.1.8.3 Determine the Manufacturing and Demand Variation Stock.
5.1.8.4 Estimate the Emergency Stock that is needed.
5.1.8.5 Calculate the number of pull signals needed for buffer.
5.1.9 Determine the location for the production pull board.
5.1.10 Determine the drop-off and pick-up locations for the pull cards at the supplying
process.
5.1.11 Make the pull cards.
5.1.12 Design and build the production pull board.
5.1.13 Develop an education and training plan.
5.1.14 Implement any necessary changes to the supermarkets and containers.
5.1.15 Implement any required workplace organization changes.
5.1.16 Develop and post the pull system Standardized Work.
5.1.17 Conduct the pull system training.
5.1.17.1 Train employees.
5.1.17.2 Train affected supervisors.
5.1.18 Achieve target inventories.
5.1.19 Establish pull system maintenance procedures.
Super- Customer
Supplying
market
Process Process
As depicted in Figure MM-5-G: Types of Production Pull Systems there are four types of
production pull systems: Card Pull, Sequencing Pull, Lot Forming Pull and Container Exchange.
Card Pull
Sequencing Pull
Production
Pull Lot Forming Pull
Container Exchange
Card Pull
Card Pull is a system that uses production pull cards to authorize production of parts. (Refer to
Figure MM-5-H: Production Pull - Card Pull.)
1. As a container of parts is removed from the supermarket, the pull card is removed and
placed in a holding post/box.
2. At a predetermined frequency, the cards are transferred to the supplying process and
placed in sequence in a box.
3. Using the first card in sequence, the process operator produces the part number
specified in the designated quantity.
4. Upon completion of the quantity of parts specified on the card, the card is placed in or
on the container.
5. The card and container are placed into the supermarket to complete the cycle.
1
Supplying
Process 3
4 XX
Advantages
• Ability to easily assess and control production.
• Provides inventory control.
• Facilitates customer ownership of the withdrawal loop and supplier ownership of the
production loop.
• Most flexible of production pull systems.
• Better able to handle a wide range of products.
• Able to provide additional instruction to user.
Disadvantages
• Maintenance of cards (lost cards, damage, point-of-use location changes, part number
changes, etc.).
Best When
• A lot/batch is contained within one container.
• Managing multiple part numbers.
• Larger inventories of each part number are required.
Helpful
Hint A basic Card Pull system provides for production
of parts in the sequence that they are consumed
and in the quantity that they are consumed.
Sequencing Pull
Sequencing Pull is a system that uses the sequence of part numbers on a scheduling board or
wheel to sequence changeovers. This system is used when the supplying process cannot
efficiently changeover in the same sequence as the customer process. (Refer to Figure MM-5-I:
Sequencing Board.)
1. As a container of parts is removed from the supermarket, the pull card is removed and
placed into a holding post/box.
2. The cards are transferred to a board and placed into the next open slot for that part
number.
3. The parts are produced in sequence (left to right) assuming a predetermined lot quantity
is reached for that part number (the lot quantity designated may be “1”). If a part
number has not reached its designated lot quantity then it is skipped until the next
cycle. As with other card based systems, as each container of parts is produced, a
corresponding card is placed in the container.
• Production is continued for a part number until production is completed for all
posted cards.
• The production line is then changed over to the next part number in sequence that
has reached the designated lot size.
1
2
3
Dept.
P/N
1234
P/N
2345
P/N
3456
P/N
7890
P/N
8901
P/N
9102
Super-
market
Supplying
Process
Indicates
standard lot
quantity.
4
Figure MM-5-I: Sequencing Board
Advantages
• Minimizes changeover duration in situations where the duration of changeovers can
vary based on sequence.
• Can support batch type production.
• Provides for visual management of cards.
• Able to provide additional instruction to user.
Disadvantages
• Does not display inventory status.
• Generally requires more inventory to support than the Lot Forming system, due to the
increased time for replenishment.
• Maintenance of cards (lost cards, damaged cards, point-of-use location changes, part
number changes, etc.).
Best When
• A specific sequence of changeovers is preferred.
• Changeover improvements have failed to reduce lot/batch size to less than or equal to
one container.
art# #1
ratr#
PPa
art
1432
t #1
ratrt#
rrtt ##
PP
#112
PPaa
12
0
PPaa
rtrt#
#192 # 25
3
4
0
1 P art
8
9 P
Paarr
#11
10 tt ##
PParart t# 36
4
5
798
10
#
rt
PPa
t#
Pa
# 876
9
arrt
PPaa
ar
t##
P
rrtt #
rt
7546
Pa
#5876
1. As a container of parts is removed from the supermarket, the pull card is removed and
placed into a holding post/box.
2. Cards accumulate, by part number, on the holding post/box until a designated lot size is
reached.
3. The formed lots are transferred to a Signal Board and placed into a Signal Box (by part
number) and in sequence for the designated line/machine.
4. The lots are produced in the sequence designated on the board First In/First Out (FIFO).
As the preceding lot is completed, the cards are taken to the line for consumption and
the Signal Box is moved into the Running spot for the specified line on the Signal
Board.
1
4 3
2
SIGNAL BOARD
LINE STATUS SIGNAL STORAGE
Model A Model B
Schedule Running
MACHINE 1
Supplying Model C Model D
Super-
market
Process MACHINE 2
Model E Model F
5 MACHINE 3
7
A Signal 6
Box with
one lot of
cards Figure MM-5-J: Lot Forming Board
5. As with any card based system, a card is placed in each container as the production for
the container is completed.
6. The container with the card attached is placed into the supermarket.
7. As the production for the last card in the lot is completed, the empty signal box is
moved to the designated part number location on the inventory side of the Signal Board
completing the cycle.
Advantages
• Best method for displaying inventory status.
• Designed to support batch type production.
• Provides for visual management of cards.
• Able to provide additional instruction to user.
• Changeover schedule is visual.
Disadvantages
• Maintenance of cards (lost cards, damage, point-of-use location changes, part number
changes, etc.).
• Does not sequence changeovers based on supplier process requirements.
• Requires more inventory than a basic card pull system.
Best When
• Sequence of changeovers is not a significant factor.
• Changeover improvements have failed to reduce lot/batch size to less than or equal to
one container.
Container Exchange
Container Exchange is a system that uses an empty container or dolly as a physical signal to
authorize production of material. (Refer to Figure MM-5-K: Production Pull - Container
Exchange.)
1. As a container of parts is emptied it is cycled back to the designated production line and
put in sequence for production.
2. The production process produces in sequence based on the information specified on the
container.
3. Upon completion of the specified production, the completed container is placed into the
supermarket completing the cycle.
3
Completed
PART LIN
PART LIN
P-90 REAR DRUM-
LOCATIO
P-90 REAR DRUM-
LOCATIO
XX PART
XX XX PART
XX
XXXX-
XXXX-
container is
USER/STOR QUANTIT
USER/STOR QUANTIT
PROCES
XX
PROCES
STAM X XX STAM X
returned to
inventory.
2 Container
is empty.
1
XXXX- XX XX
container out to signal
PART
USER/STOR QUANTIT
PROCES
USER/STOR XXXX- QUANTIT
XX STAM X PROCES
XX STAM X
for production of
material.
Advantages
• Eliminates the need to maintain pull cards.
• Simple to apply when dealing with only one part number.
Disadvantages
• Can be difficult to assess production status.
• Application increases in difficulty when processes are further apart.
• Each container/dolly must be dedicated to a specific part number.
• Container information must be maintained.
• Becomes very cumbersome if part numbers increase.
• Requires more floor space and containers than other systems.
• Difficult to accommodate changes.
• Does not provide adequate control over the sequence and quantity of product produced.
Best When
• Low inventory quantity of each part number is required.
• Managing minimal part numbers.
• Container space and locations are available.
• Additional/dedicated containers are available.
Helpful
Hint Due to the inability to provide for adequate
control of the sequence and quantity of product
produced, this system is normally not
recommended.
Prerequisites
Prior to implementing MM-5 Internal Pull Systems, complete the following How To's:
• IG-1 Site Plan.
• IG-2 Value Stream Mapping.
• WO-3 Addressing.
• MM-1 Plan for Every Part (PFEP).
• MM-2.2 Production Leveling.
• MM-3 Designated Storage.
• MM-4.1 Containerization.
• MM-6 Internal Delivery Routes.
How To (Detail)
Listed below are the implementation steps with detailed information:
YES
Helpful
Hint Complete Steps 5.1.6 through 5.1.20 for each
production loop in the value stream beginning
with the process supplying the pacemaker
process and working back upstream.
5.1.6.2 Determine the time required to process the daily requirements at the
process. (Exclude any time consumed for changeovers.)
5.1.6.3 Determine the amount of Scheduled Run Time for the process.
(Refer to How To MSD-2.2.)
Helpful
Some processes require that changeovers be
Hint
accomplished in sequence to minimize changeover
durations. Be sure to consider this in the design
of the pull system.
5.1.7 Verify that the appropriate pull system type has been selected.
Base this on any changes made in the preceding step (How To MM-5-1-6-6).
5.1.8 Estimate the desired buffer for each part number and determine the number
of pull signals needed for that buffer.
G H J Changeover Frequency
1 1 1
1 2 1
1 4 1
…And so on………
1 8 3
Wk
1
2 1 1
Wk
2
Wk
1
5 1 1
Wk
2
− Enter the Daily Demand from the customer processes in the Data
Table (Column B) for the previous thirty days.
− Enter the Daily Production in the Data Table (Column C) for the
previous thirty days. Ensure that the daily production entered is
representative of long term process performance.
− Utilizing the formulas provided in the last row of the Data Table
Template [=2*STDEV(B2:B31) and =2*STDEV(C2:C31)],
determine the Demand Variation (Column B) and the
Manufacturing Variation (Column C).
Column B Column C
Day
Daily Demand Daily Production
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
=2*STDEV(B2:B31) =2*STDEV(C2:C31)
The production pull board should be located adjacent to the supplying process.
5.1.10 Determine the drop-off and pick-up locations for the pull cards at the
supplying process.
Reference/Source Material
• Ambrake Production System.
• Toyota Production System.
Super- Customer
Supplying
market
Process Process
As depicted in Figure MM-5-P: Types of Withdrawal Pull Systems, there are two types of
withdrawal pull systems: Card Pull and Container Exchange.
Card Pull
Withdrawal
Pull
Container Exchange
Card Pull
Card Pull is a system that uses withdrawal pull cards to authorize movement of parts. (Refer to
Figure MM-5-Q: Withdrawal Pull - Card Pull.)
2. The pull cards are picked up at designated time intervals from the post/box.
3. A designated person, using the instruction provided on the card, removes the
corresponding parts from the supermarket and places the withdrawal card in/on the
container. The production pull card is removed from the container at this time.
4. The parts with the withdrawal pull card are delivered to the customer process
completing the cycle.
I know what I
need, how many 1
I need and where
to find it.
3
Customer
Process
X 2
4
Supermarket
Figure MM-5-Q: Withdrawal Pull - Card Pull
Advantages
• Provides line side inventory control.
• Facilitates customer ownership of the withdrawal loop and supplier ownership of the
production loop.
• Functions as a pick-list.
• Most flexible of withdrawal pull systems.
• Better able to handle a wide range of products.
• Provides the foundation for the supermarket and internal delivery routes.
Disadvantages
• Maintenance of cards (lost cards, damage, point-of-use location changes, part number
changes, etc.).
Best When
• Managing multiple part numbers.
• Multiple customer processes.
Helpful
Hint A Withdrawal
Pull Card becomes the
second card in a
two-card system.
Container Exchange
Container Exchange is a system that uses an empty container or dolly as a physical signal to
authorize withdrawal of material from a supermarket. (Refer to Figure MM-5-R: Withdrawal
Pull - Container Exchange.)
2. The full container of parts is provided to the customer process for consumption.
2
PART LIN
PART LIN
P-90 REAR DRUM-
LOCATIO
P-90 REAR DRUM-
LOCATIO
XX
USER/STOR
PART
XX
XXXX- QUANTIT
Exchange is XX
USER/STOR
PART
XX
XXXX- QUANTIT
XX
PROCES
STAM X completed by XX
PROCES
STAM X
replacing empty
container.
Container
is empty.
PART LIN
1 PART LIN
P-90 REAR DRUM-
LOCATIO
P-90 REAR DRUM-
LOCATIO
XX PART
XX XX PART
XX
XXXX- XXXX-
Operator pushes empty
USER/STOR QUANTIT USER/STOR QUANTIT
PROCES
XX STAM X XX
PROCES
STAM X
container out to signal for
replenishment of material
Advantages
• Eliminates the need to manage/maintain pull cards.
• Can work well for kitting or repacking.
• Simple to apply when dealing with minimal part numbers.
Disadvantages
• Can be difficult to visually assess production/inventory status.
• Application increases in difficulty when processes are further apart.
• Each container/dolly must be dedicated to a specific part number/kit.
• Can become cumbersome if part numbers increase.
• Generally requires more floor space and containers than other systems.
• Can be difficult to accommodate changes.
Best When
• Low inventory quantities of each part number are required.
• Managing minimal part numbers.
• Container space and locations are available.
• Additional/dedicated containers are available.
Helpful
Hint Containers must be labeled with the same basic
information that is normally included on the Pull
Card. Additionally, the containers must be
serialized for each part number.
How To (Detail)
Listed below are the implementation steps with detailed information:
5.2.2 Review the Site Plan and identify the value stream in which to implement.
Refer to How to IG-1 Site Planning Process.
5.2.3 Review the Current and Future State Value Stream Maps to determine the type
of Production Pull System implemented at each loop.
YES
Use Container
Exchange
• Line Speed - The total number of assemblies that pass the operator in
an hour (breaks not included).
• Usage per Final Assembly - The maximum quantity of each part
number that an operator can use on a single end item.
• Delivery Cycle - The elapsed time (in hours) from one delivery until
the next delivery. (Refer to How To MM-6 Internal Delivery Routes.)
Helpful
Hint An alternative method of calculating the pull loop
signal/card quantities for Withdrawal Pull is the use of
Figure MM-5-M: Pull Signal Calculation Table.
5.2.6 Determine the parts presentation and required space at the point-of-use.
The amount of stock at the point-of-use must last until the next delivery at the
highest usage rate including some safety factor for variability of the delivery
process. The maximum amount of stock that could be at the point-of-use
corresponds to the Number of Cards in the loop plus one.
5.2.7 Determine the drop-off and pick-up locations for the pull cards at the
customer process.
Reference/Source Material
• Ambrake Production System.
• Toyota Production System.
Internal Delivery Routes, implemented effectively, convey all material (and empty containers)
through the entire value stream within the walls of the manufacturing facility. (Refer to Figure
MM-6-A: Internal Delivery Route.)
7 8 9
C1
5 4 3 2 1
7 8 9
C2
5 4 3 2 1
Internal
Delivery Route
Figure MM-6-A: Internal Delivery Route
Objectives
Listed below are the objectives of MM-6 Internal Delivery:
• Support the manufacturing operator through providing the right part at the right time in
the right quantity in the right container.
• Frequent deliveries in small lots.
• Improve material flow.
− Improve control.
− Reduce variation.
− Improve levelness.
− Reduce inventory.
− Standardize delivery frequency.
• Facilitate use of pull system.
• Facilitate changeover process.
• Support Standardized Work for material handlers.
Issues/Advice
Internal Delivery Routes
• Consider safety (traffic patterns) and ergonomics when developing tugger routes.
• Pilot area should be small enough to demonstrate success.
• Develop flexible staffing plans for weekends/overtime/volume shifts/equipment breakdown.
• Strictly adhere to scheduled delivery times.
• Requires production leveling for a sustainable route system.
• Requires the use of pull signals to trigger delivery.
• Requires tugger and trailer planned maintenance and safety checks.
• Requires workplace organization and visual controls.
• Best when containerization and common lot strategy is in place.
• Best when material is in hand carried containers.
Prerequisites
Listed below are the prerequisites of MM-6 Internal Delivery:
• How to IG-1 Site Planning Process. • How to MM-3 Designated Storage.
• How to WO-3 Address System. • How to MM-4 Container Right Sizing
• How to MM-1 Plan For Every Part PFEP. and Supporting the Operator.
How To (Summary)
Listed below is summary information on how to implement MM-6 Internal Delivery:
6.1 Identify owners, customers and implementation team.
6.2 Develop and implement Awareness Training for owners and customers.
6.3 Educate implementation team on delivery route implementation.
6.4 Develop implementation timing based on How To’s, resources and current environment.
6.5 Define scope of route implementation referring to Site Plan.
6.6 Obtain and validate information from the Plan for Every Part (PFEP).
6.7 Obtain layout of plant.
6.8 Identify customer points-of-use.
6.9 Identify and differentiate, on the layout, the designated storage locations (supermarket/bulk
storage, empty container storage).
6.10 Define Takt Time, line capacity and understand the production rate variability.
6.11 Determine the number of containers per hour/shift and mark on the layout.
6.12 Determine the work content (amount of time).
6.13 Brainstorm route loop candidates based on logical groupings of work content.
6.14 Optimize each route loop.
6.15 Define Withdrawal Pull System requirements to support route frequency.
6.16 Determine empty container return process delivery.
6.17 Finalize routes.
6.18 Determine number of route drivers and supermarket attendants required.
6.19 Define tugger and trailer equipment requirements. Place order.
6.20 Ensure part presentation devices can hold sufficient inventory to support the routes.
6.21 Develop changeover plan with appropriate error proofing and visual controls.
6.21.1 Categorize components.
6.21.2 Determine delivery technique.
6.22 Balance and optimize the work content for production route driver(s)/supermarket
attendant(s).
6.23 Develop Standardized Work for production route driver(s)/supermarket attendant(s).
6.24 Train route drivers and supermarket attendants on their responsibilities and how the system
works using Standardized Work documentation.
6.25 Complete workplace organization changes as required.
6.26 Develop and post plant-wide route layout.
6.27 Update containerization plan.
6.28 Train employees on Route Delivery and Pull System before implementing the loop.
6.29 Review Appendix A: General Considerations for Supermarkets, Pull Systems and Delivery
Routes.
6.30 Implement the System.
6.31 Track the number of pull cards delivered per cycle and route finish times for continuous
improvement.
6.32 Update Plan for Every Part (PFEP).
6.33 Update auditing and maintenance process to include route audits.
How To (Detail)
Listed below is detailed information on how to implement MM-6 Internal Delivery:
6.2 Develop and implement Awareness Training for owners and customers.
6.6 Obtain and validate information from the Plan for Every Part (PFEP).
6.10 Define Takt Time, line capacity and understand the production rate
variability.
6.11 Determine the number of containers per hour/shift and mark on the
layout.
Base on information from previous How To MM 6-10.
Stop 1: 2019
Get off of tugger x 3.9 85.72
Walk to middle of tugger 10 2.4 88.12
Obtain box x 0.8 88.92
Walk to drop area 5 1.2 90.12
Place box onto table x 1.5 91.62
Retrieve empty box x 0.8 92.42
Walk back to tugger 5 1.2 93.62
Place empty x 1.5 95.12
Repeat for (~2 boxes) x 14 109.12
Walk to stop sign 3 0.72 109.84
Obtain Kanban cards x 0.8 110.64
Walk back to tugger 10 2.4 113.04
Get on tugger x 3.9 116.94
Drive to next stop 240 65.45 182.39 35.12 65.45
Stop 2: 2048-Asm. 1
Get off of tugger x 3.9 186.29
Walk to middle of tugger 10 2.4 188.69
Obtain box x 0.8 189.49
Walk to roller rack 5 1.2 190.69
Place box onto roller rack x 1.5 192.19
Retrieve empty box x 0.8 192.99
Walk back to tugger 5 1.2 194.19
Place empty x 1.5 195.69
Repeat for (~5 boxes) x 35 230.69
Walk to stop sign 2 0.48 231.17
Obtain Kanban cards x 0.8 231.97
Walk back to tugger 10 2.4 234.37
Get on tugger x 3.9 238.27
Drive to next stop 20 5.45 243.72 55.88 5.45
6.21 Develop changeover plan with appropriate error proofing and visual
controls.
When developing a changeover plan, the objectives are to:
• Deliver material to the point-of-use to support the operator. The goal is to
display all part
• Support error-proofing techniques to ensure using the right numbers on the
component at the right time. operation and
• Promote small lot delivery of components. replenish what is
required by
• Eliminate need to take partially used containers off of the
using pull.
operation or back to the supermarket.
6.21.1 Categorize components.
There are two different categories of components - common and unique. (Refer to
Figure MM-6-D: Changeover - Common vs. Unique Parts.) For both common
and unique components, the goal is to display all part numbers on the operation
and replenish what is required by using pull.
• Common components are those that are common across all multiple finished
goods part numbers within a product family. Using pull cards, deliver them
directly from the supermarket to the point-of-use to support the operator.
• Unique components are those that are different for the various finished good
part numbers in a product family that are specifically used on one finished
goods part number.
Further categorize unique components into one of the following
subcategories:
− Small AND inexpensive.
− Small AND expensive.
− Bulky (Large) AND expensive.
− Bulky (Large) AND inexpensive.
Part Type
xxx1
xxx2
xxx3
xxx4
yyy1
yyy2
yyy3
yyy4
zzz1
zzz2
zzz3
zzz4
Final Assembly PN
FA001
FA002
FA003
FA004
FA005
UNIQUE COMMON
?
UNIQUE COMMON
• Few types
Parts
• Small Presentation
• Inexpensive
Common: The spring (PN zzz2) is a common part. The same part is used in all final assemblies.
Unique: The cover (PN xxx1 - xxx4) is a unique part. A different part is used for each final assembly.
The connectors (PN yyy1 and yyy2) are used in some, but not all final assemblies.
6.22 Balance and optimize the work content for production route
driver(s)/supermarket attendant(s).
Refer to Figure MM-6-F: Sample Operator Balance Chart.
OPERATOR DELIVERY
OPERATION NAME STOP TIME DRIVE TIME TOTAL CYCLE
1 Driver #1-Route 1 18.0 10.0 28.0 60.0
2 Driver #2-Route 3, Route 4 14.0 17.0 31.0 60.0
3 Driver #3-Route 2, Route 5 20.0 9.0 29.0 60.0
60.0
MINUTES
MINUTES
OPERATOR BALANCE CHART DRIVE TIME
70.0
STOP TIME
60.0
DELIVERY CYCLE
50.0
40.0
30.0
20.0
10.0
0.0
Driver #1-Route 1 Driver #2-Route 3, Route 4 Driver #3-Route 2, Route 5
5 3
1 2 3 4 5 6 7 8 9 1
0
60
0
6 0
7020
70020
106001
0
414
1
4402
4
4020
20
4
10 6
7440 1
989
832 1
04 0
7872 8
1998
41
440
414402
41
0
11 11 11 1
1 1
1 12 12 3
1 3
1 4
1 4
1 5
1 5
1 5
1 5
1 16
1 2 3 4 7 8 9 10 11 12 13 14 15 1
6 1
7 18
4
1095
332 4
106 5
949
1
3 3
1 3
1 14 4
1 15 15
1
0 1
1 12 13 14 15 16
11 1
1
1 2
1
1 1
1 11 1
1 12 1
2 2
1 5
1 16
3 4 5 6 7 8 9 17 18
4
10 3
7640 1
04 5
8887 4
1075
367 4
1090
868 4
1090
645 1
047
792
6 10
475
681 1
2 1
5698
4 5
12 1
6307
Tugger Route Diagram
Helpful
Hints • Train employees on the advantages of the
process and the reasons for implementation.
• Leaders must understand and support the
system. They must be able to teach.
6.31 Track the number of pull cards delivered per cycle and route finish
times for continuous improvement.
18
18
07
841
16
16
31
89
1256
19
17
17
6
84
072
15
15
619
10478
125
6
1
15
832
989
1
16
15
5
40
1
15
4746
10
5
3
14
15
5
1
5
1
4
14
4
13
1
14
5
13
3
14
12
14
12
13
2
1
1
13
11
13
10
13
1
10
13
9
12
9
6581
12
1047
8
8
26
12
12
4779
10
7
45
12
6
10490
6
68
7
11
4908
11
10 67
5
53
11
1047
4
587
11
10488
4
11
3
40
763
11
104
3
11
2
59
11
104694
2
11
1
2
49353
11
10
1
11
607002
0 4106
001 4144020 41
44020
6
070
020 4
106
001 4
144
020 4
144
020
Reference/Source Material
• Material Movement Standards (Ideal Material Movement in Plant), Delphi Lean Material
Flow Circle of Colleagues.
• Material Handling Design Criteria (Appendix B).
• Delphi Automotive Ergonomic Guidelines Manual.
Attachments
• Figure MM-6-J: Decoupled vs. Coupled Delivery Routes.
• Figure MM-6-K: Decoupled Delivery Routes.
• Figure MM-6-L: Double Decoupled Delivery Routes.
• Figure MM-6-M: Coupled Delivery Routes.
Decoupled delivery is where a supermarket attendant picks the parts according to the pull cards,
and a driver delivers the parts. Decoupled delivery is preferred because it forces the use of pull
cards between the route drivers and supermarket attendants to communicate what parts the
operator needs. In addition, decoupled delivery has the following advantages:
• Decoupled routes enable route drivers to deliver more containers per route and run more
routes per day, requiring less inventory at the production operations.
• Decoupled routes enables the supermarket attendant to become responsible for inventory
management.
However, decoupled routes have the following disadvantages
• Decoupled routes typically require more trailers and larger staging areas than coupled
routes.
• Decoupled routes usually require the supermarket attendant to perform a significant
amount of lifting, which could create ergonomics issues. Rotating jobs could address any
ergonomics problems.
Coupled delivery is where the route driver picks his/her own parts from the supermarket.
Coupled routes are preferred when there is insufficient route delivery work to fill drivers’ time.
In these situations, picking and loading their own trailers would balance the drivers’ jobs.
Pull Card
M
Route Driver
eliv ard
Supermarket/CMA
Consuming Operations
P
2.
Supermarket
P ic
• The route driver picks up new pull cards to be replenished while delivering parts for cards collected on the
previous route.
• On his/her return to the supermarket, these new cards are dropped at the supermarket where a supermarket
attendant picks parts for the next delivery.
• The supermarket attendant loads the trailers/dollies in route order according to the pull cards and places the
cards in or on the boxes of parts to be delivered on the next route.
• The driver then picks up the parts prepared by the supermarket attendant based on the cards dropped on the
last trip.
When calculating Withdrawal Pull loops, use three cycles for decoupled deliveries and add one cycle to buffer
route variation. Therefore, with this system the replenishment factor is four.
Double Decoupled
A double decoupled route is where a driver alternates routes every cycle. This technique works best when parts are
in larger containers and an hour’s worth (for example) of material for an entire route will not fit onto the trailers.
The route driver runs the first leg of the route in thirty minutes (for example) and returns to the supermarket and
gives an hour’s worth of cards to the supermarket attendant to pick.
While the driver runs the second leg, the supermarket attendant loads the carts in delivery order based on the pull
cards.
The route driver runs the second leg of the route delivering material set up on the carts by the supermarket attendant
while he was running the first leg and picking cards to give to the supermarket on his return.
Note: With Double Decoupled Delivery the replenishment factor is three.
ox
M ailb Route Driver Pull Card Boxes
Pull Card
1.
Located at Each Operation
Supermarket/CMA
Consuming Operations
Pull Card
The route driver, rather than a supermarket attendant, picks his/her own material from the supermarket. The route
driver loads carts and delivers material to the operators. The routes in a coupled process are generally much shorter
due to the many tasks the process requires the operator to perform. The use of coupled routes should be limited to
instances where only a small number of containers require delivery or when driver idle time cannot be eliminated.
How To (Summary)
Listed below is a summary of the implementation steps for MM-7 Supplier Delivery:
7.1 Scheduled Windows Receiving
7.1.1 Define receiving windows.
7.1.1.1 Develop a cross-functional team (PC&L, Receiving, IE).
7.1.1.2 Develop ship frequency plan by supplier and route based on level
production plan.
7.1.1.3 Determine number of windows based on transportation plan.
7.1.1.4 Develop dock workload based on number of lifts per shipment.
7.1.1.5 Actively involve all shifts of shipping dock personnel in establishing
priorities and identifying restrictions, constraints and issues.
7.1.1.6 Rationalize the number of required docks.
7.1.1.7 Develop preliminary window assignments.
7.1.1.8 Review preliminary assignments with office and dock personnel.
7.1.1.9 Contact suppliers.
7.1.1.10 Contact carriers.
7.1.1.11 Finalize dock assignments.
7.1.1.12 Implement window assignments.
7.1.1.13 Design visual aids with input from dock personnel.
7.1.1.14 Develop guidelines with dock personnel regarding procedures.
7.1.1.15 Implement Workplace Organization in the Receiving Area.
7.1.1.16 Update Plan for Every Part (PFEP) based on new shipping plan.
Delphi Confidential. Publication Date: 01/DE/01.
Uncontrolled Copy - For Reference Only.
155
MM-7 Supplier Delivery
Overview
7.1.2 Develop staging and delivery of purchased parts and empty supplier returnable
containers.
7.1.2.1 Develop cross-functional team (PC&L, Shipping, IE).
7.1.2.2 Design the layout of the empty container storage (sorting) area and dock
staging area.
7.1.2.3 Develop a material delivery plan for moving material from the dock
staging area and on to the supermarket.
7.1.2.4 Develop a container return plan for empty containers from the empty
container storage (sorting) and to the dock staging area.
7.1.2.5 Identify the type of equipment required to move material from the dock to
the staging area.
7.1.2.6 Identify the type of equipment to move empty containers from the empty
container storage (sorting) and to the dock staging area.
7.1.2.7 Develop Standardized Work for material handlers and dock personnel.
7.1.2.8 Establish process monitoring for delivery of purchased parts and the
return of empty containers.
Objectives
Listed below are the objectives of MM-7.1 Scheduled Window Receiving:
• Schedule all dock activity.
− Schedule Truckload, Milk run, LTL, Railcar and Premium.
− Allow for specific assignments and improved utilization of dock personnel resulting
in more ownership and accountability in the process – basis for dock Standardized
Work.
• Level material flow into the plant and supermarkets.
− Balance multi-day shipments throughout the day.
− Even workload throughout the shift, day and week for every dock.
− Allow for inventory reduction due to more predictable and level receiving schedule.
− Reduce equipment requirements.
− Better control/coordination of drivers.
• Highlight late or early shipments for problem solving.
Issues/Advice
Supplier Delivery
Prerequisites
Prior to implementing MM-7.1 Scheduled Window Receiving, it is necessary to complete the
following:
• How To IG-1 Site Planning Process.
• How To WO-3 Address System.
• How To MM-1 Plan For Every Part (PFEP).
• How To MM-2.2 Production Leveling.
• How To MM-3 Designated Storage.
• Define containerization and part presentation requirements. (Refer to How To MM-4
Container Right Sizing and Supporting the Operator).
• How To MM-5 Pull Systems.
• Obtain and document existing Receiving Times.
• Obtain and document existing Transportation information (carrier, mode, transit time).
How To (Detail)
Listed below is detailed information on how to implement MM-7.1 Scheduled Windows
Receiving:
6:30 AM (Supplier
(Supplier F)
F)
T
T
Carrier
Carrier 22
7:00 AM (Supplier
(Supplier C)
C) SS
T
T
Carrier
Carrier 11
Current
7:30 AM (Supplier
(Supplier B)
B) D
D
Carrier
Carrier 33
Time Carrier
Carrier 33
Carrier
Carrier 44
(Supplier
(Supplier F)
8:30 AM F)
Carrier
Carrier 22
9:00 AM (Supplier
(Supplier D)
D)
Carrier
Carrier 11
9:30 AM (Supplier
(Supplier H)
H)
10:00 AM Carrier
Carrier 22
(Supplier
(Supplier D)
D)
Carrier
Carrier 11 Carrier
Carrier 33
10:30 AM (Supplier
(Supplier G)
G) (Supplier
(Supplier J)
J)
11:00 AM
11:30 AM
etc.
= Met Window
SS = Supplier Issue (Shortage)
KEY: T
T = Transpotation Issue (Late/Miss)
D
D = Dock Issue (Delay)
7.1.2 Develop staging and delivery of purchased parts and empty supplier
returnable containers.
7.1.2.1 Develop cross-functional team (PC&L, Shipping, IE).
7.1.2.2 Design the layout of the Helpful
empty container storage Hint
(sorting) area and dock Eliminating dock staging
staging area. areas is preferred, since
it reduces one handling
Refer to How To MM-3.2 step.
Empty Container Storage.
7.1.2.3 Develop a material delivery plan for moving material from the dock
staging area and on to the supermarket.
7.1.2.4 Develop a container return plan for empty containers from the empty
container storage (sorting) and to the dock staging area.
7.1.2.5 Identify the type of equipment required to move material from the
dock to the staging area.
7.1.2.6 Identify the type of equipment to move empty containers from the
empty container storage (sorting) and to the dock staging area.
7.1.2.7 Develop Standardized Work and train material handlers and dock
personnel.
7.1.2.8 Establish process monitoring for delivery of purchased parts and the
return of empty containers.
Note: When this process is implemented and in full operation, continuous
improvement opportunities can be addressed. The monitoring tools
described will aid the dock, suppliers and carriers in recognizing possible
problems and taking appropriate action to solve them.
166 Delphi Confidential. Publication Date: 01/DE/01.
Uncontrolled Copy - For Reference Only.
MM-7 Supplier Delivery
MM-7.1 Scheduled Window Receiving
Reference/Source Material
• Material Movement Standards (Ideal Material Movement in Plant), Delphi Lean
Material Flow Circle of Colleagues.
Objectives
Listed below are the objectives of MM-7.2 Container Return Process:
Figure MM-7-D: Issues/Advice – Container Return Process provides helpful information for
successful implementation.
Issues/Advice
Container Return Process
• Utilize existing internal delivery routes (How To MM-6 Internal Delivery Routes) and drivers
for collection of empty containers and dunnage in order to:
− Provide more frequent removal from production areas.
− Reduce in-plant traffic flow.
− Utilize return trip of route drivers and equipment.
− Balance ergonomics of the delivery drivers.
• Use proper visual controls to support the process.
• Include empty packaging processing into Plan for Every Part (PFEP).
• Use containers only for shipment or delivery of parts.
Prerequisites
Prior to implementing MM-7.2 Container Return Process, complete the following:
• How To IG-1 Site Planning Process.
• How To WO-3 Address System.
• How To MM-1 Plan For Every Part (PFEP).
• How To MM-2.1 Scheduled Window Shipping.
• How To MM-2.2 Production Leveling.
• How To MM-3 Designated Storage.
• How To MM-3.1 Supermarket/Bulk Storage.
• How To MM-3.2 Empty Container Storage.
• Define containerization and part presentation requirements. (Refer to How To MM-4
Container Right Sizing and Supporting the Operator).
• How To MM-5 Pull Systems.
• How To MM-6 Internal Delivery Systems.
• How To MM-7.1 Scheduled Window Receiving.
How To (Detail)
Listed below are the implementation steps with detailed information.
7.2 Container Return Process.
7.2.1 Establish a cross-functional team (Mfg., PC&L, IE).
Containerization
MM-4-1
Identify part numbers being
converted to returnables and
specific containers selected
Yes
Develop Container
No
Return Process
Examine off-site
rd
alternatives (eg. 3 party
Develop implementation sort/return)
plan for the plant
Determine container
loop size (number of
containers required)
Container Return Process
Communicate start-up
date to supplier, carrier
rd
(3 party)
Begin receiving in
returnables
7.2.4 Use the empty container flow map to identify improvement opportunities.
Listed below are examples of improvement opportunities:
• Broken circles of work.
• Unclear assignments.
• Containers in the system for a long time.
• Imbalance between shipping and receiving quantities.
7.2.5 Use Empty Container Storage to identify storage and sorting location(s) for
empty returnable containers.
Refer to How To MM-3.2 Empty Container Storage.
7.2.6 Use Internal Delivery Routes to identify how empty containers are moved from
the manufacturing area to the empty container storage area.
Refer to How To MM-6 Internal Delivery Routes.
Helpful
Hint
To simplify handling, sorting and return, clearly
identify containers and dunnage with a supplier
identification label.
7.2.10 Identify problems using the 5 Alarm Process for Empty Containers.
Implement the 5 Alarm Process for Empty Containers at supplier and customer
locations. (Refer to Figure MM-7-F: 5 Alarm Process for Empty Containers.)
Each alarm is an indicator that requires investigation—the intent of each alarm is to cause action to take place to minimize
disruption. (Note: numbering of these alarms does not indicate a sequence or priority since returnable container movement is a
closed/continuous loop process.)
1. Customer supermarket.
• Parts arrive in incorrect container (e.g. expendable container or incorrect returnable).
When this occurs, the person responsible for loading containers into the supermarket informs supervisor of condition, who
then works with the proper personnel to solve the problem.
− Verify the compatibility of the expendable container within the customer plant material delivery/presentation system.
− Check if suppliers have returnable containers; setup special shipment, if required.
• Empty containers are received in pallet load.
When this occurs the person responsible for loading containers into the supermarket informs supervisor of condition, who
then works with the proper personnel to solve the problem.
− Send empties to sort or marshaling area.
− Check if suppliers have returnable containers; set up special shipment, if required.
2. Customer area where empty containers are palletized (sort, marshaling and/or staging area).
• Area is overflowing with containers.
When this occurs, the person creating the pallet informs supervisor of condition, who then works with the proper personnel
to solve the problem.
− Verify that correct containers are in the area where maximum is exceeded (e.g. possibly for another customer or
supplier).
− Check to see if returns missed last outbound shipment.
− Check if supplier needs special shipment; if so, set up special shipment.
• No empties available to build pallet at the time of shipment.
When this occurs, the person creating the pallet informs supervisor of condition, who then works with the proper personnel
to solve the problem.
− Look for containers in incorrect storage location (badging makes this possible).
− Check if supplier has an overabundance of containers.
3. Customer dock/lead logistics provider (LLP) (Lean Logistics, MM-7-4).
• No empty container pallets available for reloading into milk run truck, or,
• No empty container pallets available for a specific supplier.
When this occurs, the person unloading truck informs supervisor of condition, who then works with the proper personnel
to solve the problem.
− Look for containers or pallets out of position.
− Check with marshaling area to see if any pallets are in house.
− Contact supplier to advise that no containers are on the return shipment.
4. Supplier dock
• No containers or another supplier’s containers are in the truck from the customer plant.
When this occurs, the person unloading truck informs supervisor of condition, who then works with the proper personnel
to solve the problem.
− Call customer or lead logistics supplier to notify that incorrect or no containers were received.
− Notify operations that no additional containers were received in shipment.
− Send incorrect containers back to customer on return route.
5. Supplier designated storage area for returnable containers.
• Below minimum—not enough empties to support parts build schedule.
When this occurs, the person responsible for designated storage area informs supervisor who then works with the proper
personnel to solve the problem.
− Look for containers out of position.
− Inform the customer of shortage.
− Request expedited shipment of returnables.
− Ship parts in expendable of same size and standard pack.
Figure MM-7-F: 5 Alarm Process for Empty Containers
Reference/Source Material
• Material Movement Standards (Ideal Material Movement in Plant), Delphi Lean
Material Flow Circle of Colleagues.
Attachment
• Figure MM-7-G: Sample Returnable Container Manifest
Route:
Window:
Shipper: Delphi Plant Trailer:
Street Address Total Weight:
City, State, Country Booking #:
Seal #:
Fiamm Technologies
(Duns # 781356795)
(Duns # 60178092)
(Duns # 43352038)
(Duns # 62222047)
(Duns # 65870297)
(Duns # 60184496)
Fitzsimmons Mfg.
Delphi-E Cadillac
Michigan Rubber
Dura Automotive
Williamsburg, MI
Grand Traverse
East Jordan, MI
(Duns # 31603)
(Duns # 31996)
(In Load Order)
Big Rapids, MI
Big Rapids, MI
Federal Screw
Cadiallac, MI
Cadiallac, MI
Cadillac, MI
Cadillac, MI
SUPPLIERS
Supplier
Objectives
Listed below are the objectives of MM-7.3 Supplier Pull:
• Link material and information flow between supplier and customer.
• Establish one simple, visual method of controlling and balancing the flow of resources
with the consumption rate throughout the value stream.
• Eliminate the waste of handling, storage, tracking, obsolescence, repair, rework,
facilities, equipment, excess inventory and shortages.
• Allow for lower inventory levels and improved throughput when combined with small
lots and increased delivery frequency and level production.
• Production and PC&L personnel respond when there is variation in the system.
• Provide the basis for continuous improvement by implementing a standardized process.
• Support the application of Standardized Work.
• Provide a communication tool that supports Employee Environment and Involvement.
Delphi Confidential. Publication Date: 01/DE/01.
Uncontrolled Copy - For Reference Only.
179
MM-7 Supplier Delivery
MM-7.3 Supplier Pull
Issues/Advice
Supplier Pull
• Supplier pull works best when internal pull has already been effectively implemented on the
plant floor.
• Pull systems will be less effective in a batch production system.
• Pull systems will not be effective without a standard route delivery process.
• Do not use supplier pull for low volume/non-repeatable parts (e.g., past model service) where
replenishment would create excess inventory and potential obsolescence.
• Establish and implement the mechanics of pull before focusing on inventory reduction.
• Use the former parts expediting personnel to maintain the planning process (loop sizes).
• Card pull is a proven method, making it preferred over other methods.
• Pull systems require maintenance of cards (damage, point-of-use location changes, lost cards,
part number changes, etc.).
Prerequisites
Prior to implementing MM 7.3 Supplier Pull, complete the following:
• How To IG-1 Site Planning Process.
• How To WO-3 Address System.
• How To MM-1 Plan For Every Part (PFEP).
• How To MM-2.1 Scheduled Window Shipping.
• How To MM-2.2 Production Leveling.
• How To MM-3 Designated Storage.
• Define containerization and part presentation requirements. (Refer to How To MM-4
Container Right Sizing and Supporting the Operator).
• How To MM-5 Pull Systems.
• How to MM-6 Internal Delivery Routes.
• How To MM-7.1 Scheduled Window Receiving.
How To (Detail)
Listed below is detailed information on how to implement MM-7.3 Supplier Pull:
Helpful
Hint
CAUTION: BOM Explode DOES NOT
account directly for scrap or loss and relies
on the accuracy of the Bill of Material.
Helpful
Hint
Physical Card Pull is better
used for suppliers close to the
plant. Short card loops are
easier to manage manually.
• Fax Pull.
− As the container is pulled from the supermarket for delivery to the
operation, the supplier pull signal is removed from the container and
replaced by an internal plant withdrawal pull signal.
− Production Control collects the pull signals on a periodic basis at least as
frequent as supplier receipts and prepares a summary that is sent to the
supplier via a fax transmission on a predetermined schedule.
− The cards remain on the dock in a box corresponding to the planned window
receipt day/time for supplier replenishment.
− Upon receipt of the fax, the supplier simply replenishes the part number
quantities on the summary at the prescribed ship window date and time.
− During unloading at the window time, the cards are taken out of the box and
affixed to each container in the shipment. Extra containers without
corresponding cards are considered overshipments and are subject to PR&R.
Leftover cards represent a shortage and action must be taken with the
supplier immediately to determine status.
Helpful
Hint Fax Pull is NOT RECOMMENDED
because the ship authorization is
made outside of the MRP/ERP
System.
• Customer and supplier lead times are based on current container return
process. (Refer To MM-7.2 Container Return Process.)
− Customer lead time includes:
• Days of containers in supermarket (full and empty).
• Days of containers staged in empty container storage area.
• Days of containers in-process (full and empty).
− Supplier lead time includes:
• Days of containers at supplier (full and empty).
• Days of containers in transit (full and empty).
• Safety Factor—The amount of inventory required to respond
via premium transportation to a stock-out condition in the
supermarket buffer manufacturing variation between deliveries
(the difference between average daily volume and maximum
during the planning period). Buffer potential weather problems
(i.e. winter banks).
• Calculation Example:
− Average daily demand = 100 units
− Customer lead time = 1 day
− Production lead of the supplier = 1 day
− Safety factor = .2 days
− Standard pack quantity = 5
7.3.7.4 When using cards, mark all packs with a pull card.
7.3.7.5 Set aside pull cards equal to the amount of material in transit.
7.3.7.6 Develop and strictly enforce pull system rules and guidelines
(including loop sizes, signal control and operating procedures).
• Make card adjustments to increase pull loops prior to the volume
increase going into effect and spread evenly over deliveries. To
determine the number of cycles to use to spread the adjustment, add
one to the delivery delay portion of the kanban cycle.
• For example: If adding three cards to a loop with a 1-4-2 cycle, add
one to the delivery delay (2+1) and spread the adjustment over the last
three card returns that will get the material into the plant prior to the
increase going into effect.
• Begin card adjustments to decrease pull loops on the same day that the
volume decrease goes into effect. Spread adjustments over orders
using the same method as above.
• Control material in the system by loop size (and reorder points);
material in the system should not be impacted by operational goals
(hours or pieces).
• Commonize supplier pull signals to avoid confusion.
• The supplier must affix a pull signal to every standard pack.
• Both the supplier and the customer must use signals as intended.
• Establish rules to level pulls to your supplier during erratic production
periods to maintain level flow into your plant.
Helpful
Hint • Level signals across supplier ship windows to
level supplier shipments, logistics
requirements and dock workload.
• Level the part flow by increasing delivery
frequency and reducing lot size.
Reference/Source Material
• Delphi Delco (PC&L) External Pull Training.
• Quality Network (QN 501) External Pull Systems.
Lean Link
Objectives
Listed below are the objectives of MM-7.4 Lean Logistics:
• Deliver quality products in the most cost effective manner possible.
• Consider total cost.
• Reduce inventory in the total value stream.
• Level the receiving operation.
• Provide material to our manufacturing operations in the required quantity, at the
required place and time.
• Support required shipment frequencies.
• Implement scheduled pick-up and scheduled delivery windows.
• Optimize transit time.
• Simplify paperwork/audit/payment process.
• Re-quote as conditions change (volume, • Work with LLP to reduce costs (Price).
carrier performance, suppliers, etc.).
contaim ers Y es
Is
Shipm ent D o they Y es
Y es
R oute M anager R oute M anager T ruck m atch?
picks up Start R oute arrives @ O n tim e? Load?
route pick up sheets supplier No
No
No D river verifies # of standard
packs on dock against
pick up sheet
L LP docum ents
LL P investigates reason and im plem ents corrective
for delay S upplier Y es Rte M gr
action w ith error
quantity docum ents
D ock route board proofing steps
correct? authorization
updated pick up sheets
Freight is loaded into plant/
dock specific trailer
No
Y es
Supplier ship Y es R te M gr
Freight arrives at No quantity refuses
Is freight cross
plant at overshipm ent
docked? m ore?
delivery w indow
No
Y es
R te M gr checks in L A ST
ON Supplier loads or
w ith LLP plant/site S TO P ?
Y es releases trailer
T IM E? rep
Issues/Advice
Lean Logistics
Prerequisites
Although Lean Logistics can be implemented to support a plant that has not implemented lean
internally, the full true benefits will not be realized. Therefore, it is recommended that the plant
implement DMS before extending lean concepts back to its suppliers through Lean Logistics.
The following Material Movement prerequisites support that goal:
• How To IG-1 Site Plan.
• How To WO-3 Addressing.
• How To MM-1 Plan for Every Part (PFEP).
• How To MM-3 Designated Storage.
• How To MM-4 Containerization.
• How To MM-5 Pull Systems.
• How To MM-6 Internal Delivery Routes.
• How To MM-7.1 Scheduled Window Receiving.
• How To MM-7.2 Container Return Process.
How To (Detail)
To implement MM-7.4 Lean Logistics, it is essential to incorporate How To MM-1 Plan for
Every Part and MM-7-1 Scheduled Window Receiving into the process. Figure MM-7-M: Lean
Logistics Flow Chart is a flow chart depicting this process.
LLP Develops
Logistics Model
LLP Develops
Logistics Plan:
Lean Logistics
Plant/Site Yes
requote?
No
Scheduled Window Receiving
Plant/Site approve
LLP Plan
Windows
Plant/Site Updates
Standardized work (PFP)
Plant/Site Updates
Plan for Every Part Data
Lean Logistics
(PFEP)
MM-7-4
Reference/Source Material
• Quality Network (QN 976-978) Transportation.
The subsections MM-8.1 Hazardous Material Plan and MM-8.2 Indirect Material Plan include
objectives, prerequisites, How To (Detail) and additional information for both of these How To's.
How To (Summary)
Listed below is a summary of the implementation steps for MM-8 Other Material Plans:
Objectives
Listed below are the objectives of MM-8.1 Hazardous Material:
Issues/Advice
Hazardous Material Plan
• Best when leadership supports and demonstrates commitment to the process by providing
necessary material/equipment, people and/or financial resources.
• Store material should be stored in unique locations away from productive material storage areas
until it is disposed.
• Surface and deal with complexity during the planning process to assure a simple execution.
• Dedicate an assigned space for each material.
• Use ergonomic guidelines when designing layout, equipment and processes.
• Leaders must understand exactly how the process works, so that each member of the
leadership team can effectively teach the process.
• Communicate clearly established How To’s or methods of the process.
• Have only the most recently published methodology within a plant.
• Double handling of material is perceived as requiring increase in manpower.
• May require the rearrangement of floor space to allow for a proper storage and disposal.
• Requires that Continuous Improvement be rigorously applied to this area for constant
improvement.
Prerequisites
Prior to starting MM-8.1 Hazardous Material Plan, complete the following steps:
• Review the division’s hazardous material procedures.
• Review the plant’s hazardous material procedures.
• Review the plant’s business practices for compliance to divisional procedures.
• Develop any new plant business practices required to comply with divisional
procedures.
How To (Detail)
Listed below are implementation steps with detailed information:
Reference/Source Material
• Divisional Hazardous Material Plans.
Objectives
Listed below are the objectives of MM-8.2 Indirect Material Plan:
Figure MM-8-B: Issues/Advice – Indirect Material Plan provides helpful information relating
to MM-8-1 Hazardous Material Plan.
Issues/Advice
Indirect Material Plan
• Best when leadership supports and demonstrates commitment to the process by providing
necessary material/equipment, people and/or financial resources.
• Store material in unique locations away from productive material storage areas.
• Surface and deal with complexity during the planning process to ensure a simple execution.
• Dedicate an assigned space for each material.
• Use ergonomic guidelines when designing layout, equipment and processes.
• Leaders must understand exactly how the process works, so that each member of the
leadership team can effectively teach the process.
• Communicate clearly established How-To’s or methods of the process.
• Have only the most recently published methodology within a plant.
• Double handling of material is perceived as requiring increase in manpower.
• May require the rearrangement of floor space to allow for a proper storage.
• Requires that Continuous Improvement be rigorously applied to this area for constant
improvement.
Prerequisites
Prior to starting MM-8.2 Indirect Material Plan, complete the following steps:
• Review the division’s indirect material procedures.
• Review the plant’s Indirect Material procedures.
• Review the plant’s business practices for compliance to divisional procedures.
• Develop any new plant business practices required to bring the location into
compliance with divisional procedures.
How To (Detail)
Listed below are implementation steps with detailed information:
Reference/Source Material
• Divisional Acquisition Business Plan.
Material Movement
Element Introduction
How To’s
Appendices
Appendices
APPENDICES INDEX
The following MM forms are included in the Appendices:
APPENDIX A
General Considerations for Supermarkets, Pull Systems and Delivery Routes
• What is the overall layout and flow strategy (refer to site plan)?
Supermarkets
• How is material received into the supermarket?
• How is material put away?
• What prep activities are done in the supermarket and where?
• Detrashing?
• Re-packing?
• Kitting?
• Re-filling of partial totes, pans?
• What rules need to be posted relative to practices in the supermarket?
• Should the system in the supermarket for common parts, fab parts, and unique parts be
the same or different?
• How will you ensure First In/First Out (FIFO) in the supermarket?
• How will you organize material in the supermarket?
• By unique, fab, common parts?
• By kitting?
• Relative to the layout of the supermarket how do you stock and pick? Does the tugger
or handcart need to be able to move throughout the supermarket?
• How will you handle partial pans returned from the lines for re-filling?
• Where will this be done?
• How will you ensure the re-filled tote/pan material is used first on the next run?
Pull Systems
• What is the target inventory by part number?
• How many pulls are required by part number?
• How much space does this require and what types of racks or shelves are required?
• What needs to be communicated to your suppliers about the new system and who needs
to do it? Are standard pack sizes correct for the new system?
• Should we use common lot sizes?
Delivery Routes
• How will you respond to delivery routes of less than a one-hour cycle?
• Does the supermarket attendant work on filling an order while the previous order is
delivered (Decoupled vs. coupled)?
• How will you get the material onto the delivery route mechanism (trailer, etc.).
• How will the material be organized on the delivery mechanism so that it can be
sequentially unloaded?
• What practices have to be addressed in order to be responsive to the level scheduling
scenarios?
• How do the parts need to be presented to the operator so they fit in his work envelope
and require no wasted handling?
• How will the filling of orders be handled so they stay in sequence and don’t get mixed?
• What tells the supermarket person what to pick? How much?
• What format and content is required?
• What tells the supermarket person what to re-pack, kit and in what size containers or
standard pack?
• Do we need a kit pull card?
• Do we need a changeover pull card?
• How does the information get to the supermarket?
• How is the filling of the order kept timely?
• Where do the parts get placed once delivered to the line?
• Where does the next full tote get placed while waiting for the current tote to empty?
• What happens to the empty pan or box?
• How do empty pans or partially emptied totes get back to the supermarket?
• Where do the empty pans or partially emptied totes get sent back to a supplier or re-
filled?
• What are the specific delivery addresses for each part number? (line and workplace)
• What do you do with partially emptied containers?
• Where do cards get placed when they are pulled off of the material as it begins to be
consumed?
• Should the type a part dictate what how you handle partially emptied containers?
− Unique
− Kitted
− Fab
− Common
• When you are anticipating a changeover how do you trigger the preparation and
movement of this material from the supermarket?
• Where do you put the new material for the changeover when it arrives at the cell?
• If you end up with a full standard pack of material left from the previous run, what do
you do with it?
• When you make the changeover how does the material get onto the operator
workstation?
• What written operational rules need to be posted at the job site that tell how the system
is to work? Think about changeovers, where cards get stored, how they get used, when
they get placed on the parts, when they come off, etc.
• How do you ensure all parts for the next run are available before you deliver them to
the line? If one is missing what happens?
APPENDIX B
The following are some considerations when designing any type of material handling cart or
device to support the manufacturing operation.