Flyash Brick Masonry Works

Flat No : Date :

Reference Drawings : Location:

Sr. Particulars Yes / No / Remarks


No. N.A.

1 Approved architectural drawings available on site


2 RCC slab surface is cleaned properly
3 Line out checked as per drawing (first layer )
4 Fish wire pulled through conduits and beam bottom cleared
5 RCC column/wall surface roughened /mortar dash applied
6 Wetting of bricks done prior to use
7 Mortar proportion as specified ( )
8 M.S. trays used for mortar mixing
9 Mortar used within 45 minutes after mixing
10 Independent scaffolding system done for masonry
11 Provision for door openings/ windows openings /hold fasts/architectural feature
checked
12 For 150mm thick Wall R.C.C. band provided.
13 Staggering of brick joints ensured
14 Proper bond/ anchorage with cross wall checked
15 Masonry joints kept not more than 10mm
16 Racking of joints done
17 Rich mortar metal packing provided for RCC and masonry joint
18 Construction date marked on wall
19 Curing of masonry ensured minimum for 7 days.

Conclusion by Civil4M Representative - Activities Are Satisfactory / Not satisfactory

Contractor's Representative Civil4M Representative