JADWAL BIAYA PENGELUARAN

No Material Name
1
1 Kayu meranti papan (2/20) Rp 2,150,000.00
2 Kayu Meranti (Usuk 4/6) Rp 1,625,400.00
3 Kayu Meranti bekisting Rp 103,201,809.27
4 Paku Rp 51,600.00
5 Dolken kayu gelam 8-10/400 cm Rp -
6 Semen PC (Portland Cement) 40Kg
7 Pasir Beton / cor Rp 5,477,844.67
8 Pasir Pasang
9 Pasir Urug Rp 53,254,285.00
10 Tasirtu/Sirtu Rp -
11 Minyak Begisting Rp 536,285.00
12 Plywood tebal 9 mm Rp 137,592.00
13 Teakwood uk.122x244x3 mm Rp -
14 Kawat Ikat Beton Rp 8,107,040.00
15 Besi beton (polos/ulir) Rp 295,590,240.00
16 Batu Pecah mesin 1/2 cm Rp 1,113,740.00
17 Air (biaya air tawar) Rp 27,202.00
18 Dempul Tembok (Cat Dasar) Rp -
19 Cat Tembok Luar Rp -
20 Batu Bata Merah uk 22 x 11 x 4.5 cm Rp -
21 Plamir Rp -
22 Semen berwarna Yiyitan Rp -
23 Tegel keramik 40x40 (putih) Rp -
24 Tegel keramik 30x30 (bermotif) Rp -
25 Tegel keramik 20x20 (bermotif) Rp -
26 Tegel keramik 20x25 (dinding) Rp -
27 Waterproofing Rp -
28 Serat Fiber Rp -
29 Besi Profil WF Rp -
30 Genteng Karang Pilang Rp -
31 Genteng Wuwung Karang Pilang Rp -
32 Pipa PVC 4" panjang 4.00 Mt Rp -
33 Klem PVC Rp -
34 Paku Reng Rp -
35 Elektrode Baja Rp -
36 Kalsiboard Gypsum t.9mm Rp -
37 Besi Hollow 40/40 Rp -
38 Besi Hollow 20/20 Rp -
39 Tiang Pancang 25/25 cm Rp 396,547,500.00
40 kayu kamper usuk (5/7) Rp 384,000.00
41 Semen Portland ( 40 Kg ) Rp -
42 List Gypsum Rp -
43 Lem Gypsum Rp -
44 Paku Usuk Rp 1,094,400.00
45 Alkali Resisting Primer atau setara Rp -
46 Sekrup Rp -
47 Cat Tembok Dalam Rp -
48 Direksi keet Rp 21,451,240.00
49 Air Kerja Rp 5,000,000.00
50 Pembersihan Akhir Rp -
51 Ready Mix K300 Rp 82,030,756.74
52 Ready Mix K225 Rp -
Biaya Material Perminggu Rp 977,780,934.68
Biaya Material Perbulan BU
Total Biaya Material Rp 25,426,095,592.60

JADWAL BIAYA PENGELUARAN SUBKO

No Material Name
1
1 Frame Aluminium 4" Pintu Rp -
2 Frame Aluminium 4" Jendela Rp -
3 Daun Pintu Teakwood Rp -
4 Daun Pintu Triplek Rp -
5 Daun Jendela Kaca Slimar Almini Rp -
6 Pasang Kaca Mati tebal 5 mm Rp -
7 Pasang Kaca Nako Rp -
8 Pasang Kunci Tanam besar 2 kali putar Rp -
9 Engsel Pintu Kuningan Rp -
10 Engsel Jendela Kuningan Rp -
11 Hak Angin Sikutan Rp -
12 Grendel Tanam untuk pintu Rp -
13 Grendel Tanam Jendela Rp -
14 Pemasangan Ralling Tangga Besi Pipa Stainlesss 2" Rp -
15 Pemasangan Ralling Balkon Besi Pipa Stainlesss 2" Rp -
16 Pasang Sun Screen Finising cat Rp -

Pekerjaan Rangka Atap Baja Berat + Usuk Galvalum + Reng


17 Rp -
Biaya Subkontrak Perminggu Rp -
Biaya Subkontrak Perbulan BU
Total Biaya Subkon Rp 1,154,271,800.00

JADWAL BIAYA PENGELUARAN

No SEWA ALAT
1
1 excavator +operator Rp 10,000,000.00
2 Dump truck + Sopir Rp 3,000,000.00
3 Molen Rp -
4 Sewa Concrete Pump Rp -
5 Sewa Total Station Rp 7,500,000.00
6 Sewa Alat Pemecah Kepala Tiang Rp 2,000,000.00
7 Sewa Hammer Pemancang + Operator Rp 8,400,000.00
8 Sewa Crane Termasuk Mobilisasi + Operator Rp 6,720,000.00
9 Sewa Alat Pemadat Rp 4,550,000.00
Biaya Alat Perminggu Rp 42,170,000.00
Biaya Alat Perbulan BU
Total Biaya Alat Rp 62,620,000.00

JADWAL BIAYA PENGELUARAN

No NAMA PEKERJAAN
1
1 Uitset Rp 1,571,685.00
2 Pemasangan Bouwplank Rp 645,000.00
3 Direksi keet Rp 7,000,000.00
3 Pembongkaran bangunan Exsisting dan pembersihan Rp 5,175,000.00
4 Galian Tanah Poer & Sloof Rp 6,435,375.00
5 Urugan Tanah Kembali Rp 424,950.00
6 Urugan Pasir Bawah Sloof t. 10 cm Rp 234,450.00
7 Urugan Pasir Bawah Lantai t. 5 cm Rp -
8 Urugan Sirtu Bawah Lantai t.10 cm Rp -
9 Urugan Tanah Paras 50 cm Rp 2,811,418.75
10 Pile Cap (PA) 25/25 kedalaman 15 m Rp 1,575,000.00
11 Pile Cap (PB) 25/25 kedalaman 15 m Rp 870,000.00
12 Pile Cap (PC) 25/25 kedalaman 15 m Rp 210,000.00
13 Pile Cap (PD) 25/25 kedalaman 15 m Rp 120,000.00
14 Poer PA K-300 Besi 190.5 Kg Rp 35,280,000.00
15 Poer PB K-300 Besi 230.8 Kg Rp 11,418,750.00
16 Poer PC K-300 Besi 198 Kg Rp 2,205,000.00
17 Poer PD K-300 Besi 256 Kg Rp 1,312,500.00
18 Pekerjaan Pecah Kepala Tiang Pancang Rp 9,250,000.00
19 Rabatan Bawah Sloof t. 5 cm Rp 702,900.00
20 Rabatan Bawah Lantai t. 5 cm Rp -
21 Rabatan Ram t. 10 cm Rp -
22 Balok Sloof BS1 30/45 K-300 Besi 150 Kg Rp 20,996,500.00
23 Balok Sloof BS2 20/30 K-300 Besi 172 Kg Rp 9,556,400.00
24 Balok Tangga (BT) 30/45 K-300 Besi 150 Kg Rp 1,260,000.00
25 Balok Latai Rp -
26 Kolom Type K1 35/45 K-225 Besi 270 Kg Rp -
27 Kolom Type K2 30/30 K-225 Besi 250 Kg Rp -
28 Kolom Type KP 12/12 Rp -
29 Balok (B1) 30/55 K-225 Besi 200 Kg Rp -
30 Balok (B2) 20/30 K-225 Besi 185 Kg Rp -
31 Anak tangga K-300 Besi 160 Kg Rp -
32 Plat lantai t. 12 cm K-225 Besi 150 Kg Rp -
33 Plat Leuvel t.10 cm K-225 Besi 150 Kg Rp -
34 Plat Bordes & Plat Tangga t. 15 cm K-300 Besi 160 Kg Rp -
35 Pas. Dinding Trasram 1/2 Bata 1 Pc : 3 Ps Rp -
36 Pas. Dinding 1/2 Bata 1 Pc : 5 Ps Rp -
37 Pas. Dinding 1/2 Bata 1 Pc : 5 Ps (Railling Tangga ) Rp -
38 Plesteran Trasram 1/2 Bata 1 Pc : 3 Ps Rp -
39 Plesteran Dinding 1/2 Bata 1 Pc : 5 Ps Rp -
40 Benangan 1Pc:2Ps Rp -
41 Pas. Rollag Bata 1 Pc : 5 Ps Rp -
42 Keramik 40 x 40 putih polos (motif halus) Rp -
43 Keramik 40 x 40 putih (motif Kasar) Rp -
44 Keramik 30 x 30 putih (motif kasar) Rp -
45 Keramik 20 x 20 tektur kasar(KM) Rp -
46 Keramik 20 x 25 dinding KM Rp -
47 Cat Dinding Bangunan Out door Rp -
48 Cat Dinding Bangunan In door Rp -
49 Cat kolom & Balok & Plat Rp -
50 Kolom Type K1 35/45 K-225 Besi 270 Kg Rp -
51 Kolom Type K2 30/30 K-225 Besi 250 Kg Rp -
52 Kolom Type KP 12/12 Rp -
53 Balok (B1) 30/55 K-225 Besi 200 Kg Rp -
54 Balok (B2) 20/30 K-225 Besi 185 Kg Rp -
55 Balok Tangga (BT) 30/45 K-300 Besi 150 Kg Rp -
56 Balok Latai Rp -
57 Anak tangga K-300 Besi 160 Kg Rp -
58 Plat Bordes & Plat Tangga t. 15 cm K-300 Besi 160 Kg Rp -
59 Plat lantai t. 12 cm K-225 Besi 150 Kg Rp -
60 Plat Leuvel t.10 cm K-225 Besi 150 Kg Rp -
61 Pas. Dinding Trasram 1/2 Bata 1 Pc : 3 Ps Rp -
62 Pas. Dinding 1/2 Bata 1 Pc : 5 Ps Rp -
63 Pas. Dinding 1/2 Bata 1 Pc : 5 Ps (Railling Tangga ) Rp -
64 Pas. Dinding 1/2 Bata 1 Pc : 5 Ps (Railling Pagar ) Rp -
65 Plesteran Trasram 1/2 Bata 1 Pc : 3 Ps Rp -
66 Plesteran Dinding 1/2 Bata 1 Pc : 5 Ps Rp -
67 Benangan 1 Pc : 2 Ps Rp -
68 Keramik 40 x 40 putih polos (motif halus) Rp -
69 Keramik 40 x 40 putih (motif Kasar) Rp -
70 Keramik 30 x 30 tektur kasar(KM) Rp -
71 Keramik 20 x 25 dinding KM Rp -
72 Cat Dinding Bangunan Out door Rp -
73 Cat Dinding Bangunan In door Rp -
74 Cat kolom & Balok & Plat Rp -
75 Kolom Type K1 35/45 K-225 Besi 270 Kg Rp -
76 Kolom Type K2 30/30 K-225 Besi 250 Kg Rp -
77 Kolom Type KP 12/12 Rp -
78 Balok Konsol 20 / 30 K- 225 Besi 185 Kg Rp -
79 Ring Balok (RB1) 25/45 K-225 Besi 200Kg Rp -
80 Ring Balok (RB2) 20/30 K-225 Besi 185Kg Rp -
81 List Plank Beton 10/60 K-225 Besi 100 Kg Rp -
82 Balok Latai Rp -
83 Plat Atap t.10 cm K-225 Besi 160 Kg Rp -
84 Plat Atap t.15 cm K-225 Besi 110 Kg Rp -
85 Plat Leuvel t.10 cm K-225 Besi 150 Kg Rp -
86 Ring Balk Gewel 15/20 K-300 Besi 150 Kg Rp -
87 Kolom Gewel 15/15 K -300 Besi 230 Kg Rp -
88 Pas. Dinding Trasram 1/2 Bata 1 Pc : 3 Ps Rp -
89 Pas. Dinding 1/2 Bata 1 Pc : 5 Ps Rp -
90 Pas. Dinding 1/2 Bata 1 Pc : 5 Ps (Railling Tangga ) Rp -
91 Pas. Dinding 1/2 Bata 1 Pc : 5 Ps (Railling Pagar ) Rp -
92 Plesteran Trasram 1/2 Bata 1 Pc : 3 Ps Rp -
93 Plesteran Dinding 1/2 Bata 1 Pc : 5 Ps Rp -
94 Benangan 1 Pc : 2 Ps Rp -
95 Pas. Dinding Gewel 1/2 Bata 1 Pc : 5 Ps Rp -
96 Keramik 40 x 40 putih polos (motif halus) Rp -
97 Keramik 40 x 40 putih (motif Kasar) Rp -
98 Keramik 30 x 30 tektur kasar (KM) Rp -
99 Keramik 20 x 25 dinding KM Rp -
100 Penutup Atap Genteng Karang Pilang Rp -
101 Wuwung Genteng Karang Pilang Rp -
102 List Plank kayu Kamper 3/30 cm Rp -
103 Papan Ruiter Kayu Kamper 2/20 Rp -
105 Pasang Talang Pembuluh Pipa PVC 4" Rp -
106 Pasang Plafon Gypsum t.9mm rangka Hollow 4/4 Rp -
107 Pasang List Plafond Gypsum 5/5 cm Rp -
108 Cat Plafond Gypsum Rp -
109 Cat List Plafond Rp -
110 Cat Dinding Bangunan Out door Rp -
111 Cat Dinding Bangunan In door Rp -
112 Cet kolom & Balok & Plat Rp -
113 Cat Pelapisan Water proofing Rp -
114 Pembersihan Akhir Rp -
Biaya Tenaga Kerja Perminggu Rp 119,054,928.75
Biaya Tenaga Kerja Perbulan BU
Total Biaya Tenaga Kerja Rp 1,295,017,207.50

JADWAL BIAYA PENGELUARAN OV

No OVERHEAD
1
1 Gaji Karyawan Rp 69,230,769.23
2 ATK Rp 5,192,307.69
3 Biaya Lain Lain Rp 10,288,461.54
Biaya Overhead Perminggu Rp 84,711,538.46
Biaya Overhead Perbulan BU
Biaya Total Overhead Rp 397,000,000.00
WAL BIAYA PENGELUARAN BAHAN BULANAN

BULAN

2 3 4 5

Rp 246,296,640.15 Rp 658,198,990.59 Rp 70,571,398.80

Rp 105,697,704.00
Rp 53,309,449.59 Rp 46,802,355.80 Rp 35,879,326.42
Rp -
Rp 14,968,440.96 Rp 25,832,488.89 Rp 19,788,592,393.38
Rp 34,622,245.00
Rp 18,950,880.00
Rp 6,511,062.00 Rp 4,107,947.00 Rp 93,673.00 Rp -
Rp 37,821,532.00 Rp 26,226,141.00 Rp - Rp -
Rp - Rp - Rp - Rp -
Rp 25,841,771.00 Rp 22,592,090.00 Rp 4,107,570.00 Rp -
Rp 884,758,560.00 Rp 540,105,320.00 Rp 35,136,120.00 Rp -
Rp 12,544,720.00 Rp 3,560,240.00 Rp 1,528,480.00 Rp -
Rp 305,837.00 Rp - Rp - Rp -
Rp - Rp - Rp - Rp 17,520,855.00
Rp - Rp - Rp - Rp 13,698,592.00
Rp - Rp 139,175,266.00 Rp 67,649,586.00 Rp -
Rp - Rp - Rp - Rp 30,634,949.00
Rp - Rp - Rp - Rp 48,071,408.00
Rp - Rp - Rp - Rp 207,392,787.00
Rp - Rp - Rp - Rp 14,253,200.00
Rp - Rp - Rp - Rp 609,120.00
Rp - Rp - Rp - Rp 21,305,400.00
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp 87,283,000.00 Rp -
Rp - Rp - Rp 7,955,350.00 Rp -
Rp - Rp - Rp 1,116,300.00 Rp -
Rp - Rp - Rp 43,920.00 Rp -
Rp - Rp - Rp 262,500.00 Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp 6,437,695.00 Rp 19,313,085.00
Rp - Rp - Rp 4,245,694.00 Rp 12,737,081.00
Rp - Rp - Rp 12,579,750.00 Rp 37,739,250.00
Rp - Rp - Rp - Rp -
Rp 113,974,857.00 Rp 80,841,143.00 Rp 24,448,000.00 Rp -
Rp - Rp 45,593,101.00 Rp 36,216,810.00 Rp 31,608,990.00
Rp - Rp - Rp - Rp 4,536,770.00
Rp - Rp - Rp - Rp 49,400.00
Rp 8,774,010.00 Rp 6,240,170.00 Rp 224,010.00 Rp -
Rp - Rp - Rp - Rp 5,160,740.00
Rp - Rp - Rp 7,547,850.00 Rp 22,643,550.00
Rp - Rp - Rp - Rp 68,923,281.00
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp 6,356,000.00 Rp 8,960,000.00 Rp 4,305,000.00 Rp -
Rp 234,287,714.00 Rp 131,328,286.00 Rp - Rp -
### Rp 1,735,206,585.14 Rp 444,387,551.49 Rp 20,380,670,177.80
BULAN 1 Rp 25,274,788,781.27

AYA PENGELUARAN SUBKONTRAKTOR BULANAN

BULAN

2 3 4 5
Rp - Rp 28,179,200.00 Rp 12,276,800.00 Rp -
Rp - Rp 80,366,400.00 Rp 43,882,400.00 Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp 34,492,500.00 Rp 18,993,750.00 Rp -

Rp - Rp - Rp 748,140,000.00 Rp -
Rp - Rp 143,038,100.00 Rp 823,292,950.00 Rp -
BULAN 1 Rp 966,331,050.00
WAL BIAYA PENGELUARAN ALAT BULANAN

BULAN

2 3 4 5
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp 1,875,000.00 Rp 1,125,000.00 Rp -
Rp 5,000,000.00 Rp 10,000,000.00 Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp 2,450,000.00 Rp - Rp - Rp -
Rp 7,450,000.00 Rp 11,875,000.00 Rp 1,125,000.00 Rp -
BULAN 1 Rp 62,620,000.00

WAL BIAYA PENGELUARAN UPAH BULANAN

BULAN

2 3 4 5
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp 1,277,875.00 Rp - Rp - Rp -
Rp 2,530,750.00 Rp - Rp - Rp -
Rp 8,434,256.25 Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp 7,667,250.00 Rp - Rp - Rp -
Rp 235,500.00 Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp 4,322,400.00 Rp - Rp -
Rp 39,084,800.00 Rp - Rp - Rp -
Rp 5,076,000.00 Rp - Rp - Rp -
Rp - Rp 5,228,000.00 Rp - Rp -
Rp 35,607,000.00 Rp - Rp - Rp -
Rp 14,413,500.00 Rp - Rp - Rp -
Rp 1,515,500.00 Rp - Rp - Rp -
Rp 79,305,000.00 Rp - Rp - Rp -
Rp - Rp 2,121,000.00 Rp - Rp -
Rp 4,839,800.00 Rp - Rp - Rp -
Rp - Rp 14,374,000.00 Rp - Rp -
Rp - Rp 22,554,520.00 Rp - Rp -
Rp - Rp 1,164,000.00 Rp - Rp -
Rp - Rp 14,374,000.00 Rp - Rp -
Rp - Rp 22,554,520.00 Rp - Rp -
Rp - Rp 4,585,300.00 Rp - Rp -
Rp - Rp 5,894,460.00 Rp - Rp -
Rp - Rp - Rp - Rp 39,543,680.00
Rp - Rp - Rp - Rp 32,947,200.00
Rp - Rp - Rp - Rp 2,013,600.00
Rp - Rp - Rp - Rp 567,200.00
Rp - Rp - Rp - Rp 8,048,100.00
Rp - Rp - Rp - Rp 5,027,745.00
Rp - Rp - Rp - Rp 9,077,250.00
Rp - Rp - Rp - Rp 12,538,080.00
Rp 33,264,000.00 Rp - Rp - Rp -
Rp 4,320,000.00 Rp - Rp - Rp -
Rp - Rp 2,560,000.00 Rp - Rp -
Rp 26,705,250.00 Rp 8,901,750.00 Rp - Rp -
Rp 5,765,400.00 Rp 8,648,100.00 Rp - Rp -
Rp - Rp 2,604,000.00 Rp - Rp -
Rp - Rp 4,871,400.00 Rp - Rp -
Rp - Rp 1,515,500.00 Rp - Rp -
Rp - Rp 4,839,800.00 Rp - Rp -
Rp 59,478,750.00 Rp 19,826,250.00 Rp - Rp -
Rp - Rp 2,527,000.00 Rp - Rp -
Rp - Rp 8,872,240.00 Rp - Rp -
Rp - Rp 27,090,160.00 Rp - Rp -
Rp - Rp 1,164,000.00 Rp - Rp -
Rp - Rp 2,264,240.00 Rp - Rp -
Rp - Rp 8,872,240.00 Rp - Rp -
Rp - Rp 16,254,096.00 Rp 10,836,064.00 Rp -
Rp - Rp 4,955,850.00 Rp - Rp -
Rp - Rp - Rp - Rp 47,388,000.00
Rp - Rp - Rp - Rp 23,134,080.00
Rp - Rp - Rp - Rp 3,115,040.00
Rp - Rp - Rp - Rp 12,885,200.00
Rp - Rp - Rp - Rp 3,385,912.50
Rp - Rp - Rp - Rp 3,433,759.88
Rp - Rp - Rp - Rp 6,269,040.00
Rp - Rp 33,264,000.00 Rp - Rp -
Rp - Rp 4,320,000.00 Rp - Rp -
Rp - Rp - Rp 2,414,000.00 Rp -
Rp - Rp 3,341,250.00 Rp - Rp -
Rp - Rp 15,612,100.00 Rp - Rp -
Rp - Rp 11,272,800.00 Rp - Rp -
Rp - Rp 7,874,400.00 Rp - Rp -
Rp - Rp - Rp 4,871,400.00 Rp -
Rp - Rp 30,079,000.00 Rp - Rp -
Rp - Rp 1,410,500.00 Rp - Rp -
Rp - Rp 2,527,000.00 Rp - Rp -
Rp - Rp - Rp 3,818,500.00 Rp -
Rp - Rp - Rp 519,750.00 Rp -
Rp - Rp - Rp 8,872,240.00 Rp -
Rp - Rp - Rp 26,186,280.00 Rp -
Rp - Rp - Rp 56,400.00 Rp -
Rp - Rp - Rp 2,264,240.00 Rp -
Rp - Rp - Rp 8,872,240.00 Rp -
Rp - Rp - Rp 26,186,280.00 Rp -
Rp - Rp - Rp 4,955,600.00 Rp -
Rp - Rp - Rp 3,312,320.00 Rp -
Rp - Rp - Rp - Rp 47,388,000.00
Rp - Rp - Rp - Rp 23,134,080.00
Rp - Rp - Rp - Rp 3,115,040.00
Rp - Rp - Rp - Rp 12,885,200.00
Rp - Rp - Rp 19,950,400.00 Rp -
Rp - Rp - Rp 6,119,500.00 Rp -
Rp - Rp - Rp 7,266,000.00 Rp -
Rp - Rp - Rp 3,232,500.00 Rp -
Rp - Rp - Rp 73,200.00 Rp -
Rp - Rp - Rp - Rp 30,191,400.00
Rp - Rp - Rp - Rp 8,000.00
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp 329,520,631.25 Rp 332,639,876.00 Rp 139,806,914.00 Rp 326,095,607.38
BULAN 1 Rp 1,247,117,957.38

Rp -

BIAYA PENGELUARAN OVERHEAD MINGGUAN

Minggu

2 3 4 5
Rp 55,384,615.38 Rp 55,384,615.38 Rp 51,692,307.69 Rp 51,692,307.69
Rp 4,153,846.15 Rp 4,153,846.15 Rp 4,153,846.15 Rp 4,153,846.15
Rp 2,230,769.23 Rp 2,230,769.23 Rp 2,230,769.23 Rp 2,230,769.23
Rp 61,769,230.77 Rp 61,769,230.77 Rp 58,076,923.08 Rp 58,076,923.08
BULAN 1 Rp 324,403,846.15
6

Rp -
Rp 3,945,778.34 Rp 9,893,017,693.98 Rp 39,574,627,781.34

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp 14,678,895.00
Rp 5,512,000.00
Rp -
Rp 25,665,826.00
Rp -
Rp -
Rp -
Rp -
Rp -
Rp 17,654,500.00
Rp 5,993,643.00
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp 2,076,900.00
Rp -
Rp 65,779,269.00
Rp -
Rp -
Rp 10,000,000.00
Rp -
Rp -
Rp 151,306,811.34
BULAN 2

6
Rp -
Rp -
Rp 36,488,000.00
Rp 16,698,000.00
Rp 32,760,000.00
Rp 23,599,750.00
Rp 45,549,000.00
Rp 11,550,000.00
Rp 3,780,000.00
Rp 525,000.00
Rp 525,000.00
Rp 6,200,000.00
Rp 1,785,000.00
Rp 1,530,000.00
Rp 6,951,000.00
Rp -

Rp -
Rp 187,940,750.00
BULAN 2
6
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
BULAN 2

6
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp 1,848,947.63
Rp 6,269,040.00
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp 7,547,850.00
Rp 324,060.00
Rp 3,385,912.50
Rp 5,282,707.50
Rp 8,790,000.00
Rp 4,450,732.50
Rp 10,000,000.00
Rp 47,899,250.13
BULAN 2

6
Rp 64,615,384.62
Rp 5,192,307.69
Rp 2,788,461.54
Rp 72,596,153.85
BULAN 2
NO URAIAN

1 Biaya Tenaga Kerja


2 Biaya Bahan Material
3 Biaya Alat
4 Biaya Subkontraktor
5 Biaya Overhead
Total Pengeluaran Perbulan
BULAN
1 2 3 4 5
Rp 119,054,928.75 Rp 329,520,631.25 Rp 332,639,876.00 Rp 139,806,914.00 Rp 326,095,607.38
Rp 1,333,966,317.12 Rp 2,022,425,028.22 Rp 1,351,139,564.00 Rp 417,618,877.00 Rp 594,576,547.00
Rp 42,170,000.00 Rp 7,450,000.00 Rp 11,875,000.00 Rp 1,125,000.00 Rp -
Rp - Rp - Rp 143,038,100.00 Rp 823,292,950.00 Rp -
Rp 84,711,538.46 Rp 61,769,230.77 Rp 61,769,230.77 Rp 58,076,923.08 Rp 58,076,923.08
Rp 1,579,902,784.33 Rp 2,421,164,890.24 Rp 1,900,461,770.77 Rp 1,439,920,664.08 Rp 978,749,077.45

Rp 8,775,996,373.83
6
Rp 47,899,250.13
Rp 147,361,033.00
Rp -
Rp 187,940,750.00
Rp 72,596,153.85
Rp 455,797,186.97
RENCANA
NO URAIAN HARGA

1 LANTAI 1
A PEKERJAAN PERSIAPAN Rp 237,191,146.00
B PEKERJAAN TANAH / URUGAN Rp 137,508,316.00
C PEKERJAAN STRUKTUR BETON Rp 2,791,818,622.00
D PEKERJAAN PASANGAN DAN PLESTERAN Rp 272,213,707.00
E PEKERJAAN KUSEN, PINTU, JENDELA, & PARTISI Rp 166,821,521.00
F PEKERJAAN LANTAI Rp 235,205,618.00
G PEKERJAAN PENGECATAN Rp 124,271,106.00
2 LANTAI 2
A PEKERJAAN STRUKTUR BETON Rp 1,433,291,386.00
B PEKERJAAN PASANGAN DAN PLESTERAN Rp 250,208,931.00
C PEKERJAAN KUSEN, PINTU, JENDELA, & PARTISI Rp 185,372,897.00
D PEKERJAAN LANTAI Rp 243,459,480.00
E PEKERJAAN PENGECATAN Rp 98,888,900.00
3 LANTAI 3
A PEKERJAAN STRUKTUR BETON Rp 1,060,330,731.00
B PEKERJAAN PASANGAN DAN PLESTERAN Rp 251,772,736.00
C PEKERJAAN KUSEN, PINTU, JENDELA, & PARTISI Rp 183,626,857.00
D PEKERJAAN LANTAI Rp 243,474,340.00
E PEKERJAAN ATAP Rp 1,076,849,279.00
F PEKERJAAN PLAFOND Rp 207,799,239.00
G PEKERJAAN PENGECATAN Rp 113,072,390.00
H PEKERJAAN LAIN - LAIN Rp 16,000,000.00
TOTAL Rp 9,329,177,202.00
PERIODE
RENCANA
KUMULATIF
BULAN
BOBOT
1 2 3 4 5 6

2.54 2.54
1.47 1.11 0.37
29.93 8.98 13.47 7.48
2.92 2.9
1.79 0.48 0.48 0.48 0.34
2.52 0.63 1.89
1.33 1.33

15.36 3.84 11.52


2.68 2.01 0.67
1.99 0.30 0.70 0.70 0.30
2.61 2.61
1.06 1.06

11.37 8.52 2.84


2.70 2.70
1.97 0.59 0.79 0.59
2.61 2.61
11.54 11.54
2.23 0.33 1.56 0.33
1.21 0.61 0.61
0.17 0.02 0.02 0.02 0.02 0.02 0.05
Rp 100.00 1 2 3 4 5 6
PERIODE 12.65 17.70 33.26 20.51 13.66 2.22
UMULATIF 12.65 30.35 63.61 84.12 97.78 100.00
PENDAPATAN BULANAN
1 2 3 4
Rp 237,191,146.00
Rp 103,131,237.00 Rp 34,377,079.00
Rp 837,545,586.60 Rp 1,256,318,379.90 Rp 697,954,655.50
Rp 272,213,707.00
Rp 45,041,810.67 Rp 45,041,810.67
Rp 58,801,404.50

Rp 358,322,846.50 Rp 1,074,968,539.50
Rp 187,656,698.25 Rp 62,552,232.75
Rp 27,805,934.55 Rp 64,880,513.95

Rp 795,248,048.25 Rp 265,082,682.75
Rp 251,772,736.00
Rp 55,088,057.10

Rp 1,076,849,279.00
Rp 31,169,885.85

Rp 2,240,000.00 Rp 2,240,000.00 Rp 2,240,000.00 Rp 2,240,000.00

$ 1,180,107,969.60 $ 1,651,258,305.40 $ 3,103,129,393.72 $ 1,913,478,602.57


$ 9,329,177,202.00
5 6

Rp 45,041,810.67 Rp 31,696,088.99
Rp 176,404,213.50
Rp 124,271,106.00

Rp 64,880,513.95 Rp 27,805,934.55
Rp 243,459,480.00
Rp 98,888,900.00

Rp 73,450,742.80 Rp 55,088,057.10
Rp 243,474,340.00

Rp 145,459,467.30 Rp 31,169,885.85
Rp 56,536,195.00 Rp 56,536,195.00
Rp 2,240,000.00 Rp 4,800,000.00

$ 1,274,106,769.22 $ 207,096,161.49
MONTHLY CERTIFICATE

PROPINSI : JAWA TIMUR


KABUPATEN : SURABAYA
PROYEK : SDN 1 MOJO SURABAYA
PEKERJAAN : STRUKTUR DAN ARSITEKTUR
KONTRAKTOR : PT. GRADE C MANAGEMENT

SUMMARY
NOMOR
KONTRAK
JENIS
URAIAN PEKERJAAN
PEMBA
(Rp.) %
YARAN
1 LANTAI 1
A PEKERJAAN PERSIAPAN 237,191,146 2.542
B PEKERJAAN TANAH / URUGAN 137,508,316 1.474
C PEKERJAAN STRUKTUR BETON 2,791,818,622 29.926

D PEKERJAAN PASANGAN DAN PLESTERAN 272,213,707 2.918

PEKERJAAN KUSEN, PINTU, JENDELA, &


E PARTISI
166,821,521 1.788

F PEKERJAAN LANTAI 235,205,618 2.521


G PEKERJAAN PENGECATAN 124,271,106 1.332
2 LANTAI 2
A PEKERJAAN STRUKTUR BETON 1,433,291,386 15.364

B PEKERJAAN PASANGAN DAN PLESTERAN 250,208,931 2.682

PEKERJAAN KUSEN, PINTU, JENDELA, &


C
PARTISI
185,372,897 1.987

D PEKERJAAN LANTAI 243,459,480 2.610


E PEKERJAAN PENGECATAN 98,888,900 1.060
3 LANTAI 3
A PEKERJAAN STRUKTUR BETON 1,060,330,731 11.366

B PEKERJAAN PASANGAN DAN PLESTERAN 251,772,736 2.699

PEKERJAAN KUSEN, PINTU, JENDELA, &


C
PARTISI
183,626,857 1.968

D PEKERJAAN LANTAI 243,474,340 2.610


E PEKERJAAN ATAP 1,076,849,279 11.543
F PEKERJAAN PLAFOND 207,799,239 2.227
G PEKERJAAN PENGECATAN 113,072,390 1.212
H PEKERJAAN LAIN - LAIN 16,000,000 0.172

JUMLAH 9,329,177,202.00 100.000


PPN 10 % 932,917,720.20
TOTAL 10,262,094,922.20
DIBULATKAN 10,262,094,000.00

1. TOTAL KEMAJUAN FISIK 1,298,118,766.560


2. MATERIAL ON SITE 0.000

3. NILAI MONTHLY CERTIFICATE S/D BULAN INI 1,298,118,766.560


4. NILAI MONTHLY CERTIFICATE S/D BULAN LALU 0.000
5. NILAI MONTHLY CERTIFICATE BULAN INI 1,298,118,766.560

6. POTONGAN - POTONGAN
6.1 PENGEMBALIAN UANG MUKA (20 %) 259,623,753.312
6.2 JAMINAN PEMELIHARAAN (5%) 64,905,938.328
6.3 JUMLAH PENGURANGAN 324,529,691.640

7. JUMLAH PEMBAYARAN MC BULAN INI 973,589,074.920


PEMBAYARAN BAP INI (Termasuk PPN) 973,589,074.920

8. RINCIAN PEMBAYARAN
8.1 PPN 10 % 88,508,097.720
8.2 JUMLAH PEMBAYARAN NETTO MC BULAN INI 885,080,977.200
DIBULATKAN 885,081,000.00
TERBILANG : Delapan Ratus Delapan Puluh Lima Juta Delapan Puluh Satu Ribu Rupiah

DISETUJUI : DIPERIKSA :
PEMIMPIN PROYEK : KONSULTAN

( ) ( )
ATE

M. C. NO : 01

TANGGAL :

KONSULTAN :

KEMAJUAN

(Rp.) %

237,191,146.000 2.542
103,131,237.000 1.105
837,545,586.600 8.978

2,240,000.00 0.024

1,180,107,969.600 12.650
118,010,796.96
1,298,118,766.560
1,298,119,000.00

KEMAJUAN (%)
- S/D BULAN LALU 0.000
- BULAN INI 12.650
- S/D AKHIR BULAN INI 12.650

PEMBAYARAN (Rp)

- S/D BULAN LALU 0.000


- BULAN INI 973,589,074.920
- S/D AKHIR BULAN INI 973,589,074.920

DIAJUKAN :
KONTRAKTOR

( )
MONTHLY CERTIFICATE

PROPINSI : JAWA TIMUR


KABUPATEN : SURABAYA
PROYEK : SDN 1 MOJO SURABAYA
PEKERJAAN : STRUKTUR DAN ARSITEKTUR
KONTRAKTOR : PT. GRADE C MANAGEMENT

SUMMARY
NOMOR
KONTRAK
JENIS
URAIAN PEKERJAAN
PEMBA
(Rp.) %
YARAN
1 LANTAI 1
A PEKERJAAN PERSIAPAN 237,191,146 2.542
B PEKERJAAN TANAH / URUGAN 137,508,316 1.474
C PEKERJAAN STRUKTUR BETON 2,791,818,622 29.926

D PEKERJAAN PASANGAN DAN PLESTERAN 272,213,707 2.918

PEKERJAAN KUSEN, PINTU, JENDELA, &


E PARTISI
166,821,521 1.788

F PEKERJAAN LANTAI 235,205,618 2.521


G PEKERJAAN PENGECATAN 124,271,106 1.332
2 LANTAI 2
A PEKERJAAN STRUKTUR BETON 1,433,291,386 15.364

B PEKERJAAN PASANGAN DAN PLESTERAN 250,208,931 2.682

PEKERJAAN KUSEN, PINTU, JENDELA, &


C
PARTISI
185,372,897 1.987

D PEKERJAAN LANTAI 243,459,480 2.610


E PEKERJAAN PENGECATAN 98,888,900 1.060
3 LANTAI 3
A PEKERJAAN STRUKTUR BETON 1,060,330,731 11.366

B PEKERJAAN PASANGAN DAN PLESTERAN 251,772,736 2.699

PEKERJAAN KUSEN, PINTU, JENDELA, &


C
PARTISI
183,626,857 1.968

D PEKERJAAN LANTAI 243,474,340 2.610


E PEKERJAAN ATAP 1,076,849,279 11.543
F PEKERJAAN PLAFOND 207,799,239 2.227
G PEKERJAAN PENGECATAN 113,072,390 1.212
H PEKERJAAN LAIN - LAIN 16,000,000 0.172

JUMLAH 9,329,177,202.00 100.000


PPN 10 % 932,917,720.20
TOTAL 10,262,094,922.20
DIBULATKAN 10,262,094,000.00

1. TOTAL KEMAJUAN FISIK 3,114,502,902.500


2. MATERIAL ON SITE 0.000

3. NILAI MONTHLY CERTIFICATE S/D BULAN INI 3,114,502,902.500


4. NILAI MONTHLY CERTIFICATE S/D BULAN LALU 1,298,118,766.560
5. NILAI MONTHLY CERTIFICATE BULAN INI 1,816,384,135.940

6. POTONGAN - POTONGAN
6.1 PENGEMBALIAN UANG MUKA (20 %) 363,276,827.188
6.2 JAMINAN PEMELIHARAAN (5%) 90,819,206.797
6.3 JUMLAH PENGURANGAN 454,096,033.985

7. JUMLAH PEMBAYARAN MC BULAN INI 1,362,288,101.955


PEMBAYARAN BAP INI (Termasuk PPN) 1,362,288,101.955

8. RINCIAN PEMBAYARAN
8.1 PPN 10 % 123,844,372.905
8.2 JUMLAH PEMBAYARAN NETTO MC BULAN INI 1,238,443,729.050
DIBULATKAN 1,238,444,000.00
TERBILANG : Satu Milyar Dua Ratus Tiga Puluh Delapan Juta Empat Ratus Empat Puluh Empat Ribu Rupiah

DISETUJUI : DIPERIKSA :
PEMIMPIN PROYEK : KONSULTAN

( ) ( )
ATE

M. C. NO : 02

TANGGAL :

KONSULTAN :

KEMAJUAN

(Rp.) %

237,191,146.000 2.542
137,508,316.000 1.474 34377079
2,093,863,966.500 22.444 1256318379.9

358,322,846.500 3.841 358322846.5

4,480,000.00 0.048 2240000

2,831,366,275.000 30.350
283,136,627.50
3,114,502,902.500
3,114,503,000.00

KEMAJUAN (%)
- S/D BULAN LALU 12.650
- BULAN INI 17.700
- S/D AKHIR BULAN INI 30.350

PEMBAYARAN (Rp)

- S/D BULAN LALU 973,589,074.920


- BULAN INI 1,362,288,101.955
- S/D AKHIR BULAN INI 2,335,877,176.875

DIAJUKAN :
KONTRAKTOR

( )
MONTHLY CERTIFICATE

PROPINSI : JAWA TIMUR


KABUPATEN : SURABAYA
PROYEK : SDN 1 MOJO SURABAYA
PEKERJAAN : STRUKTUR DAN ARSITEKTUR
KONTRAKTOR : PT. GRADE C MANAGEMENT

SUMMARY
NOMOR
KONTRAK
JENIS
URAIAN PEKERJAAN
PEMBA
(Rp.) %
YARAN
1 LANTAI 1
A PEKERJAAN PERSIAPAN 237,191,146 2.542
B PEKERJAAN TANAH / URUGAN 137,508,316 1.474
C PEKERJAAN STRUKTUR BETON 2,791,818,622 29.926

D PEKERJAAN PASANGAN DAN PLESTERAN 272,213,707 2.918

PEKERJAAN KUSEN, PINTU, JENDELA, &


E PARTISI
166,821,521 1.788

F PEKERJAAN LANTAI 235,205,618 2.521


G PEKERJAAN PENGECATAN 124,271,106 1.332
2 LANTAI 2
A PEKERJAAN STRUKTUR BETON 1,433,291,386 15.364

B PEKERJAAN PASANGAN DAN PLESTERAN 250,208,931 2.682

PEKERJAAN KUSEN, PINTU, JENDELA, &


C
PARTISI
185,372,897 1.987

D PEKERJAAN LANTAI 243,459,480 2.610


E PEKERJAAN PENGECATAN 98,888,900 1.060
3 LANTAI 3
A PEKERJAAN STRUKTUR BETON 1,060,330,731 11.366

B PEKERJAAN PASANGAN DAN PLESTERAN 251,772,736 2.699

PEKERJAAN KUSEN, PINTU, JENDELA, &


C
PARTISI
183,626,857 1.968

D PEKERJAAN LANTAI 243,474,340 2.610


E PEKERJAAN ATAP 1,076,849,279 11.543
F PEKERJAAN PLAFOND 207,799,239 2.227
G PEKERJAAN PENGECATAN 113,072,390 1.212
H PEKERJAAN LAIN - LAIN 16,000,000 0.172

JUMLAH 9,329,177,202.00 100.000


PPN 10 % 932,917,720.20
TOTAL 10,262,094,922.20
DIBULATKAN 10,262,094,000.00

1. TOTAL KEMAJUAN FISIK 6,527,945,235.592


2. MATERIAL ON SITE 0.000

3. NILAI MONTHLY CERTIFICATE S/D BULAN INI 6,527,945,235.592


4. NILAI MONTHLY CERTIFICATE S/D BULAN LALU 3,114,502,902.500
5. NILAI MONTHLY CERTIFICATE BULAN INI 3,413,442,333.092

6. POTONGAN - POTONGAN
6.1 PENGEMBALIAN UANG MUKA (20 %) 682,688,466.618
6.2 JAMINAN PEMELIHARAAN (5%) 170,672,116.655
6.3 JUMLAH PENGURANGAN 853,360,583.273

7. JUMLAH PEMBAYARAN MC BULAN INI 2,560,081,749.819


PEMBAYARAN BAP INI (Termasuk PPN) 2,560,081,749.819

8. RINCIAN PEMBAYARAN
8.1 PPN 10 % 232,734,704.529
8.2 JUMLAH PEMBAYARAN NETTO MC BULAN INI 2,327,347,045.290
DIBULATKAN 2,327,348,000.00
TERBILANG : Dua Milyar Tiga Ratus Dua Puluh Tujuh Tiga Ratus Empat Puluh Delapan Ribu Rupiah

DISETUJUI : DIPERIKSA :
PEMIMPIN PROYEK : KONSULTAN

( ) ( )
ATE

M. C. NO : 03

TANGGAL :

KONSULTAN :

KEMAJUAN

(Rp.) %

2 3
237,191,146.000 2.542
137,508,316.000 1.474 34377079
2,791,818,622.000 29.926 1256318379.9 Rp 697,954,655.50
272,213,707.000 2.918
Rp 272,213,707.00
45,041,810.670 0.483
Rp 45,041,810.67

1,433,291,386.000 15.364 358322846.5 Rp 1,074,968,539.50


187,656,698.250 2.012
Rp 187,656,698.25
27,805,934.55 0.298
Rp 27,805,934.55

795,248,048.25 8.524 Rp 795,248,048.25

6,720,000.00 0.072 2240000 Rp 2,240,000.00

5,934,495,668.720 63.612
593,449,566.87
6,527,945,235.592
6,527,946,000.00

KEMAJUAN (%)
- S/D BULAN LALU 30.350
- BULAN INI 33.263
- S/D AKHIR BULAN INI 63.612

PEMBAYARAN (Rp)

- S/D BULAN LALU 2,335,877,176.875


- BULAN INI 2,560,081,749.819
- S/D AKHIR BULAN INI 4,895,958,926.694

DIAJUKAN :
KONTRAKTOR

( )
4 5 6
MONTHLY CERTIFICATE

PROPINSI : JAWA TIMUR


KABUPATEN : SURABAYA
PROYEK : SDN 1 MOJO SURABAYA
PEKERJAAN : STRUKTUR DAN ARSITEKTUR
KONTRAKTOR : PT. GRADE C MANAGEMENT

SUMMARY
NOMOR
KONTRAK
JENIS
URAIAN PEKERJAAN
PEMBA
(Rp.) %
YARAN
1 LANTAI 1
A PEKERJAAN PERSIAPAN 237,191,146 2.542
B PEKERJAAN TANAH / URUGAN 137,508,316 1.474
C PEKERJAAN STRUKTUR BETON 2,791,818,622 29.926

D PEKERJAAN PASANGAN DAN PLESTERAN 272,213,707 2.918

PEKERJAAN KUSEN, PINTU, JENDELA, &


E PARTISI
166,821,521 1.788

F PEKERJAAN LANTAI 235,205,618 2.521


G PEKERJAAN PENGECATAN 124,271,106 1.332
2 LANTAI 2
A PEKERJAAN STRUKTUR BETON 1,433,291,386 15.364

B PEKERJAAN PASANGAN DAN PLESTERAN 250,208,931 2.682

PEKERJAAN KUSEN, PINTU, JENDELA, &


C
PARTISI
185,372,897 1.987

D PEKERJAAN LANTAI 243,459,480 2.610


E PEKERJAAN PENGECATAN 98,888,900 1.060
3 LANTAI 3
A PEKERJAAN STRUKTUR BETON 1,060,330,731 11.366

B PEKERJAAN PASANGAN DAN PLESTERAN 251,772,736 2.699

PEKERJAAN KUSEN, PINTU, JENDELA, &


C
PARTISI
183,626,857 1.968

D PEKERJAAN LANTAI 243,474,340 2.610


E PEKERJAAN ATAP 1,076,849,279 11.543
F PEKERJAAN PLAFOND 207,799,239 2.227
G PEKERJAAN PENGECATAN 113,072,390 1.212
H PEKERJAAN LAIN - LAIN 16,000,000 0.172

JUMLAH 9,329,177,202.00 100.000


PPN 10 % 932,917,720.20
TOTAL 10,262,094,922.20
DIBULATKAN 10,262,094,000.00

1. TOTAL KEMAJUAN FISIK 8,632,771,698.419


2. MATERIAL ON SITE 0.000

3. NILAI MONTHLY CERTIFICATE S/D BULAN INI 8,632,771,698.419


4. NILAI MONTHLY CERTIFICATE S/D BULAN LALU 6,527,945,235.592
5. NILAI MONTHLY CERTIFICATE BULAN INI 2,104,826,462.827

6. POTONGAN - POTONGAN
6.1 PENGEMBALIAN UANG MUKA (20 %) 420,965,292.565
6.2 JAMINAN PEMELIHARAAN (5%) 105,241,323.141
6.3 JUMLAH PENGURANGAN 526,206,615.707

7. JUMLAH PEMBAYARAN MC BULAN INI 1,578,619,847.120


PEMBAYARAN BAP INI (Termasuk PPN) 1,578,619,847.120

8. RINCIAN PEMBAYARAN
8.1 PPN 10 % 143,510,895.193
8.2 JUMLAH PEMBAYARAN NETTO MC BULAN INI 1,435,108,951.928
DIBULATKAN 1,435,109,000.00
TERBILANG : Satu Milyar Empat Ratus Tiga Puluh Lima Juta Seratus Sembilan Ribu Rupiah

DISETUJUI : DIPERIKSA :
PEMIMPIN PROYEK : KONSULTAN

( ) ( )
ATE

M. C. NO : 04

TANGGAL :

KONSULTAN :

KEMAJUAN

(Rp.) %

2 3
237,191,146.000 2.542
137,508,316.000 1.474 34377079
2,791,818,622.000 29.926 1256318379.9 Rp 697,954,655.50
272,213,707.000 2.918
Rp 272,213,707.00
90,083,621.340 0.966
Rp 45,041,810.67
58,801,404.500 0.630

1,433,291,386.000 15.364 358322846.5 Rp 1,074,968,539.50


250,208,931.000 2.682
Rp 187,656,698.25
92,686,448.50 0.994
Rp 27,805,934.55

1,060,330,731.00 11.366 Rp 795,248,048.25


251,772,736.00 2.699

55,088,057.10 0.590

1,076,849,279.00 11.543
31,169,885.85 0.334

8,960,000.00 0.096 2240000 Rp 2,240,000.00

7,847,974,271.290 84.123
784,797,427.13
8,632,771,698.419
8,632,772,000.00

KEMAJUAN (%)
- S/D BULAN LALU 63.612
- BULAN INI 20.511
- S/D AKHIR BULAN INI 84.123

PEMBAYARAN (Rp)

- S/D BULAN LALU 4,895,958,926.694


- BULAN INI 1,578,619,847.120
- S/D AKHIR BULAN INI 6,474,578,773.814

DIAJUKAN :
KONTRAKTOR

( )
4 5 6

45041810.67
58801404.5

62552232.75

64880513.95

265082682.75

251772736

55088057.1

1076849279
31169885.85

2240000
MONTHLY CERTIFICATE

PROPINSI : JAWA TIMUR


KABUPATEN : SURABAYA
PROYEK : SDN 1 MOJO SURABAYA
PEKERJAAN : STRUKTUR DAN ARSITEKTUR
KONTRAKTOR : PT. GRADE C MANAGEMENT

SUMMARY
NOMOR
KONTRAK
JENIS
URAIAN PEKERJAAN
PEMBA
(Rp.) %
YARAN
1 LANTAI 1
A PEKERJAAN PERSIAPAN 237,191,146 2.542
B PEKERJAAN TANAH / URUGAN 137,508,316 1.474
C PEKERJAAN STRUKTUR BETON 2,791,818,622 29.926

D PEKERJAAN PASANGAN DAN PLESTERAN 272,213,707 2.918

PEKERJAAN KUSEN, PINTU, JENDELA, &


E PARTISI
166,821,521 1.788

F PEKERJAAN LANTAI 235,205,618 2.521


G PEKERJAAN PENGECATAN 124,271,106 1.332
2 LANTAI 2
A PEKERJAAN STRUKTUR BETON 1,433,291,386 15.364

B PEKERJAAN PASANGAN DAN PLESTERAN 250,208,931 2.682

PEKERJAAN KUSEN, PINTU, JENDELA, &


C
PARTISI
185,372,897 1.987

D PEKERJAAN LANTAI 243,459,480 2.610


E PEKERJAAN PENGECATAN 98,888,900 1.060
3 LANTAI 3
A PEKERJAAN STRUKTUR BETON 1,060,330,731 11.366

B PEKERJAAN PASANGAN DAN PLESTERAN 251,772,736 2.699

PEKERJAAN KUSEN, PINTU, JENDELA, &


C
PARTISI
183,626,857 1.968

D PEKERJAAN LANTAI 243,474,340 2.610


E PEKERJAAN ATAP 1,076,849,279 11.543
F PEKERJAAN PLAFOND 207,799,239 2.227
G PEKERJAAN PENGECATAN 113,072,390 1.212
H PEKERJAAN LAIN - LAIN 16,000,000 0.172

JUMLAH 9,329,177,202.00 100.000


PPN 10 % 932,917,720.20
TOTAL 10,262,094,922.20
DIBULATKAN 10,262,094,000.00

1. TOTAL KEMAJUAN FISIK 10,034,289,144.561


2. MATERIAL ON SITE 0.000

3. NILAI MONTHLY CERTIFICATE S/D BULAN INI 10,034,289,144.561


4. NILAI MONTHLY CERTIFICATE S/D BULAN LALU 8,632,771,698.419
5. NILAI MONTHLY CERTIFICATE BULAN INI 1,401,517,446.142

6. POTONGAN - POTONGAN
6.1 PENGEMBALIAN UANG MUKA (20 %) 280,303,489.228
6.2 JAMINAN PEMELIHARAAN (5%) 70,075,872.307
6.3 JUMLAH PENGURANGAN 350,379,361.536

7. JUMLAH PEMBAYARAN MC BULAN INI 1,051,138,084.607


PEMBAYARAN BAP INI (Termasuk PPN) 1,051,138,084.607

8. RINCIAN PEMBAYARAN
8.1 PPN 10 % 95,558,007.692
8.2 JUMLAH PEMBAYARAN NETTO MC BULAN INI 955,580,076.915
DIBULATKAN 955,581,000.00
TERBILANG : Sembilan Ratus Lima Puluh Lima Juta Lima Ratus Delapan Puluh Satu Ribu Rupiah

DISETUJUI : DIPERIKSA :
PEMIMPIN PROYEK : KONSULTAN

( ) ( )
ATE

M. C. NO : 05

TANGGAL :

KONSULTAN :

KEMAJUAN

(Rp.) %

2 3
237,191,146.000 2.542
137,508,316.000 1.474 34377079
2,791,818,622.000 29.926 1256318379.9 Rp 697,954,655.50
272,213,707.000 2.918
Rp 272,213,707.00
135,125,432.010 1.448
Rp 45,041,810.67
235,205,618.000 2.521
124,271,106.000 1.332

1,433,291,386.000 15.364 358322846.5 Rp 1,074,968,539.50


250,208,931.000 2.682
Rp 187,656,698.25
157,566,962.45 1.689
Rp 27,805,934.55
243,459,480.00 2.610
98,888,900.00 1.060

1,060,330,731.00 11.366 Rp 795,248,048.25


251,772,736.00 2.699

128,538,799.90 1.378

243,474,340.00 2.610
1,076,849,279.00 11.543
176,629,353.15 1.893
56,536,195.00 0.606
11,200,000.00 0.120 2240000 Rp 2,240,000.00

9,122,081,040.510 97.780
912,208,104.05
10,034,289,144.561
10,034,290,000.00

KEMAJUAN (%)
- S/D BULAN LALU 84.123
- BULAN INI 13.657
- S/D AKHIR BULAN INI 97.780

PEMBAYARAN (Rp)

- S/D BULAN LALU 6,474,578,773.814


- BULAN INI 1,051,138,084.607
- S/D AKHIR BULAN INI 7,525,716,858.421

DIAJUKAN :
KONTRAKTOR

( )
4 5 6

45041810.67 45041810.67
58801404.5 176404213.5
124271106

62552232.75

64880513.95 64880513.95
243459480
98888900

265082682.75

251772736

55088057.1 73450742.8
243474340
1076849279
31169885.85 145459467.3
56536195
2240000 2240000
MONTHLY CERTIFICATE

PROPINSI : JAWA TIMUR


KABUPATEN : SURABAYA
PROYEK : SDN 1 MOJO SURABAYA
PEKERJAAN : STRUKTUR DAN ARSITEKTUR
KONTRAKTOR : PT. GRADE C MANAGEMENT

SUMMARY
NOMOR
KONTRAK
JENIS
URAIAN PEKERJAAN
PEMBA
(Rp.) %
YARAN
1 LANTAI 1
A PEKERJAAN PERSIAPAN 237,191,146 2.542
B PEKERJAAN TANAH / URUGAN 137,508,316 1.474
C PEKERJAAN STRUKTUR BETON 2,791,818,622 29.926

D PEKERJAAN PASANGAN DAN PLESTERAN 272,213,707 2.918

PEKERJAAN KUSEN, PINTU, JENDELA, &


E PARTISI
166,821,521 1.788

F PEKERJAAN LANTAI 235,205,618 2.521


G PEKERJAAN PENGECATAN 124,271,106 1.332
2 LANTAI 2
A PEKERJAAN STRUKTUR BETON 1,433,291,386 15.364

B PEKERJAAN PASANGAN DAN PLESTERAN 250,208,931 2.682

PEKERJAAN KUSEN, PINTU, JENDELA, &


C
PARTISI
185,372,897 1.987

D PEKERJAAN LANTAI 243,459,480 2.610


E PEKERJAAN PENGECATAN 98,888,900 1.060
3 LANTAI 3
A PEKERJAAN STRUKTUR BETON 1,060,330,731 11.366

B PEKERJAAN PASANGAN DAN PLESTERAN 251,772,736 2.699

PEKERJAAN KUSEN, PINTU, JENDELA, &


C
PARTISI
183,626,857 1.968

D PEKERJAAN LANTAI 243,474,340 2.610


E PEKERJAAN ATAP 1,076,849,279 11.543
F PEKERJAAN PLAFOND 207,799,239 2.227
G PEKERJAAN PENGECATAN 113,072,390 1.212
H PEKERJAAN LAIN - LAIN 16,000,000 0.172

JUMLAH 9,329,177,202.00 100.000


PPN 10 % 932,917,720.20
TOTAL 10,262,094,922.20
DIBULATKAN 10,262,094,000.00

1. TOTAL KEMAJUAN FISIK 10,262,094,922.200


2. MATERIAL ON SITE 0.000

3. NILAI MONTHLY CERTIFICATE S/D BULAN INI 10,262,094,922.200


4. NILAI MONTHLY CERTIFICATE S/D BULAN LALU 10,034,289,144.561
5. NILAI MONTHLY CERTIFICATE BULAN INI 227,805,777.639

6. POTONGAN - POTONGAN
6.1 PENGEMBALIAN UANG MUKA (20 %) 45,561,155.528
6.2 JAMINAN PEMELIHARAAN (5%) 11,390,288.882
6.3 JUMLAH PENGURANGAN 56,951,444.410

7. JUMLAH PEMBAYARAN MC BULAN INI 170,854,333.229


PEMBAYARAN BAP INI (Termasuk PPN) 170,854,333.229

8. RINCIAN PEMBAYARAN
8.1 PPN 10 % 15,532,212.112
8.2 JUMLAH PEMBAYARAN NETTO MC BULAN INI 155,322,121.118
DIBULATKAN 155,323,000.00
TERBILANG : Seratus Lima Puluh Lima Juta Tiga Ratus Dua Puluh Tiga Ribu Rupiah

DISETUJUI : DIPERIKSA :
PEMIMPIN PROYEK : KONSULTAN

( ) ( )
ATE

M. C. NO : 06

TANGGAL :

KONSULTAN :

KEMAJUAN

(Rp.) %

2 3
237,191,146.000 2.542
137,508,316.000 1.474 34377079
2,791,818,622.000 29.926 1256318379.9 Rp 697,954,655.50
272,213,707.000 2.918
Rp 272,213,707.00
166,821,521.000 1.788
Rp 45,041,810.67
235,205,618.000 2.521
124,271,106.000 1.332

1,433,291,386.000 15.364 358322846.5 Rp 1,074,968,539.50


250,208,931.000 2.682
Rp 187,656,698.25
185,372,897.00 1.987
Rp 27,805,934.55
243,459,480.00 2.610
98,888,900.00 1.060

1,060,330,731.00 11.366 Rp 795,248,048.25


251,772,736.00 2.699

183,626,857.00 1.968

243,474,340.00 2.610
1,076,849,279.00 11.543
207,799,239.00 2.227
113,072,390.00 1.212
16,000,000.00 0.172 2240000 Rp 2,240,000.00

9,329,177,202.00 100.000
932,917,720.20
10,262,094,922.20
10,262,095,000.00

KEMAJUAN (%)
- S/D BULAN LALU 97.780
- BULAN INI 2.220
- S/D AKHIR BULAN INI 100.000

PEMBAYARAN (Rp)

- S/D BULAN LALU 7,525,716,858.421


- BULAN INI 170,854,333.229
- S/D AKHIR BULAN INI 7,696,571,191.650

DIAJUKAN :
KONTRAKTOR

( )
4 5 6

45041810.67 45041810.67 31696088.99


58801404.5 176404213.5
124271106

62552232.75

64880513.95 64880513.95 27805934.55


243459480
98888900

265082682.75

251772736

55088057.1 73450742.8 55088057.1


243474340
1076849279
31169885.85 145459467.3 31169885.85
56536195 56536195
2240000 2240000 4800000
MONTHLY CERTIFICATE

PROPINSI : JAWA TIMUR


KABUPATEN : SURABAYA
PROYEK : SDN 1 MOJO SURABAYA
PEKERJAAN : STRUKTUR DAN ARSITEKTUR
KONTRAKTOR : PT. GRADE C MANAGEMENT

SUMMARY
NOMOR
KONTRAK
JENIS
URAIAN PEKERJAAN
PEMBA
(Rp.) %
YARAN
1 LANTAI 1
A PEKERJAAN PERSIAPAN 237,191,146 2.542
B PEKERJAAN TANAH / URUGAN 137,508,316 1.474
C PEKERJAAN STRUKTUR BETON 2,791,818,622 29.926

D PEKERJAAN PASANGAN DAN PLESTERAN 272,213,707 2.918

PEKERJAAN KUSEN, PINTU, JENDELA, &


E PARTISI
166,821,521 1.788

F PEKERJAAN LANTAI 235,205,618 2.521


G PEKERJAAN PENGECATAN 124,271,106 1.332
2 LANTAI 2
A PEKERJAAN STRUKTUR BETON 1,433,291,386 15.364

B PEKERJAAN PASANGAN DAN PLESTERAN 250,208,931 2.682

PEKERJAAN KUSEN, PINTU, JENDELA, &


C
PARTISI
185,372,897 1.987

D PEKERJAAN LANTAI 243,459,480 2.610


E PEKERJAAN PENGECATAN 98,888,900 1.060
3 LANTAI 3
A PEKERJAAN STRUKTUR BETON 1,060,330,731 11.366

B PEKERJAAN PASANGAN DAN PLESTERAN 251,772,736 2.699

PEKERJAAN KUSEN, PINTU, JENDELA, &


C
PARTISI
183,626,857 1.968

D PEKERJAAN LANTAI 243,474,340 2.610


E PEKERJAAN ATAP 1,076,849,279 11.543
F PEKERJAAN PLAFOND 207,799,239 2.227
G PEKERJAAN PENGECATAN 113,072,390 1.212
H PEKERJAAN LAIN - LAIN 16,000,000 0.172

JUMLAH 9,329,177,202.00 100.000


PPN 10 % 932,917,720.20
TOTAL 10,262,094,922.20
DIBULATKAN 10,262,094,000.00

1. TOTAL KEMAJUAN FISIK 10,262,094,922.200


2. MATERIAL ON SITE 0.000

3. NILAI MONTHLY CERTIFICATE S/D BULAN INI 10,262,094,922.200


4. NILAI MONTHLY CERTIFICATE S/D BULAN LALU 10,262,094,922.200
5. NILAI MONTHLY CERTIFICATE BULAN INI 513,104,746.110

6. PEMASUKAN
6.1 PENGEMBALIAN JAMINAN PEMELIHARAAN 513,104,746.110

7. JUMLAH PEMBAYARAN MC BULAN INI 513,104,746.110


PEMBAYARAN BAP INI (Termasuk PPN) 513,104,746.110

8. RINCIAN PEMBAYARAN
8.1 PPN 10 % 46,645,886.010
8.2 JUMLAH PEMBAYARAN NETTO MC BULAN INI 466,458,860.100
DIBULATKAN 466,459,000.00
TERBILANG : Empat Ratus Enam Puluh Enam Juta Empat Ratus Lima Puluh Sembilan Ribu Rupiah

DISETUJUI : DIPERIKSA :
PEMIMPIN PROYEK : KONSULTAN

( ) ( )
ATE

M. C. NO : 07

TANGGAL :

KONSULTAN :

KEMAJUAN

(Rp.) %

2 3
237,191,146.000 2.542
137,508,316.000 1.474 34377079
2,791,818,622.000 29.926 1256318379.9 Rp 697,954,655.50
272,213,707.000 2.918
Rp 272,213,707.00
166,821,521.000 1.788
Rp 45,041,810.67
235,205,618.000 2.521
124,271,106.000 1.332

1,433,291,386.000 15.364 358322846.5 Rp 1,074,968,539.50


250,208,931.000 2.682
Rp 187,656,698.25
185,372,897.00 1.987
Rp 27,805,934.55
243,459,480.00 2.610
98,888,900.00 1.060

1,060,330,731.00 11.366 Rp 795,248,048.25


251,772,736.00 2.699

183,626,857.00 1.968

243,474,340.00 2.610
1,076,849,279.00 11.543
207,799,239.00 2.227
113,072,390.00 1.212
16,000,000.00 0.172 2240000 Rp 2,240,000.00

9,329,177,202.00 100.000
932,917,720.20
10,262,094,922.20
10,262,095,000.00

KEMAJUAN (%)
- S/D BULAN LALU 100.000
- BULAN INI 0.000
- S/D AKHIR BULAN INI 100.000

PEMBAYARAN (Rp)

- S/D BULAN LALU 7,696,571,191.650


- BULAN INI 513,104,746.110
- S/D AKHIR BULAN INI 8,209,675,937.760

DIAJUKAN :
KONTRAKTOR

( )
4 5 6

45041810.67 45041810.67 31696088.99


58801404.5 176404213.5
124271106

62552232.75

64880513.95 64880513.95 27805934.55


243459480
98888900

265082682.75

251772736

55088057.1 73450742.8 55088057.1


243474340
1076849279
31169885.85 145459467.3 31169885.85
56536195 56536195
2240000 2240000 4800000
C

Real cost Rp 9,329,177,202.00


Nilai Kontrak Rp 10,262,094,922.20
Pembayaran dengan termin

No Uraian
1 2
1 Prestasi Pek Kumulatif 12.65
2 Penerimaan
2.1 Uang Muka (20%) Rp 1,865,835,440.40 This chart isn't available in your version of
2.2 MC Pekerjaan Rp 885,080,977.20
Editing this shape or saving this workbook
2.3 Pengembalian Retensi 5% permanently break the chart.
Total Penerimaan Rp 1,865,835,440.40 Rp 885,080,977.20
3 Pengeluaran
3.1 Bahan Rp 1,333,966,317.12 Rp 2,022,425,028.22
3.2 Upah Rp 119,054,928.75 Rp 329,520,631.25 C
3.3 Alat Rp 42,170,000.00 Rp 7,450,000.00
3.4 Subtontraktor Rp - Rp -
3.5 Overhead Rp 84,711,538.46 Rp 61,769,230.77
Total Pengeluaran Rp 1,579,902,784.33 Rp 2,421,164,890.24

Kumulatif Penerimaan Rp 1,865,835,440.40 Rp 2,750,916,417.60


Kumulatif Pengeluaran Rp 1,579,902,784.33 Rp 4,001,067,674.56
selisih penerimaan dan pengeluaran Rp 285,932,656.07 -Rp 1,250,151,256.96
Saldo akhir

1.8658354404 2.7509164176
1.5799027843 4.0010676746
0 Rp 1,865,835,440.40 Rp 2,750,916,417.60

CASH FLO

Real cost Rp 9,329,177,202.00


Nilai Kontrak Rp 10,262,094,922.20
Pembayaran dengan termin

No Uraian
1 2
1 Prestasi Pek Kumulatif 12.65
2 Penerimaan
2.1 Uang Muka (20%) Rp 1,865,835,440.40
2.2 MC Pekerjaan Rp 885,080,977.20
2.3 Pengembalian Retensi 5%
Total Penerimaan Rp 1,865,835,440.40 Rp 885,080,977.20
3 Pengeluaran
3.1 Bahan Rp 1,333,966,317.12 Rp 606,727,508.46
3.2 Upah Rp 119,054,928.75 Rp 329,520,631.25
3.3 Alat Rp 42,170,000.00 Rp 7,450,000.00
3.4 Subtontraktor Rp - Rp -
3.5 Overhead Rp 84,711,538.46 Rp 61,769,230.77
Total Pengeluaran Rp 1,579,902,784.33 Rp 1,005,467,370.48
BULAN KE 1 2
Kumulatif Penerimaan Rp 1,865,835,440.40 Rp 2,750,916,417.60
Kumulatif Pengeluaran Rp 1,579,902,784.33 Rp 2,585,370,154.81
selisih penerimaan dan pengeluaran Rp 285,932,656.07 Rp 165,546,262.79
Saldo akhir

1.87 2.75
1.58 2.59

CASH FLO

Real cost Rp 9,329,177,202.00


Nilai Kontrak Rp 10,262,094,922.20
Pembayaran dengan termin

No Uraian
1 2
1 Prestasi Pek Kumulatif 12.65
2 Penerimaan
2.1 Uang Muka (20%) Rp 1,865,835,440.40
2.2 MC Pekerjaan Rp 885,080,977.20
2.3 Pengembalian Retensi 5%
2.4. Pinjaman Bank Rp 500,000,000.00
Total Penerimaan Rp 1,865,835,440.40 Rp 1,385,080,977.20
3 Pengeluaran
3.1 Bahan Rp 1,333,966,317.12 Rp 2,022,425,028.22
3.2 Upah Rp 119,054,928.75 Rp 329,520,631.25
3.3 Alat Rp 42,170,000.00 Rp 7,450,000.00
3.4 Subtontraktor Rp - Rp -
3.5 Overhead Rp 84,711,538.46 Rp 61,769,230.77
3.6. Pengembalian
3.7. Bunga Pinjaman (5%)
3.8. Administrasi awal pinjaman Rp 40,000,000.00
Total Pengeluaran Rp 1,579,902,784.33 Rp 2,461,164,890.24
BULAN KE 1 2
Kumulatif Penerimaan Rp 1,865,835,440.40 Rp 3,250,916,417.60
Kumulatif Pengeluaran Rp 1,579,902,784.33 Rp 4,041,067,674.56
selisih penerimaan dan pengeluaran Rp 285,932,656.07 -Rp 790,151,256.96
Saldo akhir

1.8658354404 3.2509164176
1.5799027843 4.0410676746

CASH FLO

Real cost Rp 9,329,177,202.00


Nilai Kontrak Rp 10,262,094,922.20
Pembayaran dengan termin

No Uraian
1 2
1 Prestasi Pek Kumulatif 12.65
2 Penerimaan
2.1 Uang Muka (20%) Rp 1,865,835,440.40
2.2 Modal Kontraktor Rp 100,000,000.00
2.3 MC Pekerjaan Rp 885,080,977.20
2.4 Pengembalian Retensi 5%
Total Penerimaan Rp 1,965,835,440.40 Rp 885,080,977.20
3 Pengeluaran
3.1 Bahan Rp 1,333,966,317.12 Rp 606,727,508.46
3.2 Upah Rp 119,054,928.75 Rp 329,520,631.25
3.3 Alat Rp 42,170,000.00 Rp 7,450,000.00
3.4 Subtontraktor Rp - Rp -
3.5 Pengembalian modal kontraktor
3.6 Overhead Rp 84,711,538.46 Rp 61,769,230.77
Total Pengeluaran Rp 1,579,902,784.33 Rp 1,005,467,370.48
BULAN KE 1 2
Kumulatif Penerimaan Rp 1,965,835,440.40 Rp 2,850,916,417.60
Kumulatif Pengeluaran Rp 1,579,902,784.33 Rp 2,585,370,154.81
selisih penerimaan dan pengeluaran Rp 385,932,656.07 Rp 265,546,262.79
Saldo akhir

1.97 2.85
1.58 2.59
CASH FLOW REAL

Bulan
3 4 5 6
30.35 63.61 84.12 97.78

art isn't available in your version of Excel.

this shape orRp


saving this1,238,443,729.05
workbook into a Rp 2,327,347,045.29 Rp
different file format will 1,435,108,951.93 Rp 955,580,076.92
ently break the chart.
B IAYA (M ILYA R R U PIA H )

Rp 1,238,443,729.05 Rp 2,327,347,045.29 Rp 1,435,108,951.93 Rp 955,580,076.92

Rp 1,351,139,564.00 Rp 417,618,877.00 Rp 594,576,547.00 Rp 147,361,033.00


Rp CASH FLOW
332,639,876.00 Rp MC 139,806,914.00
REAL Rp 326,095,607.38 Rp 47,899,250.13
Rp 11,875,000.00 Rp 1,125,000.00 Rp - Rp -
Rp 143,038,100.00 Rp 823,292,950.00 Rp - Rp 187,940,750.00
Rp 61,769,230.77 Rp 58,076,923.08 Rp 58,076,923.08 Rp 72,596,153.85
Rp 1,900,461,770.77 Rp 1,439,920,664.08 Rp 978,749,077.45 Rp 455,797,186.97

Rp 3,989,360,146.65 Rp 6,316,707,191.94 Rp 7,751,816,143.87 Rp 8,707,396,220.78


BULAN
Rp 5,901,529,445.33 Rp 7,341,450,109.41 Rp 8,320,199,186.86 Rp 8,775,996,373.83
-Rp 1,912,169,298.68 -Rp 1,024,742,917.47 -Rp 568,383,042.99 -Rp 68,600,153.05

3.9893601467 6.3167071919 7.7518161439 8.7073962208


5.9015294453 7.3414501094 8.3201991869 8.7759963738
Rp 3,989,360,146.65 Rp 6,316,707,191.94 Rp 7,751,816,143.87 Rp 8,707,396,220.78

CASH FLOW REAL ALTERNATIVE 1

Bulan
3 4 5 6
30.35 63.61 84.12 97.78

Rp 1,238,443,729.05 Rp 2,327,347,045.29 Rp 1,435,108,951.93 Rp 955,580,076.92

Rp 1,238,443,729.05 Rp 2,327,347,045.29 Rp 1,435,108,951.93 Rp 955,580,076.92

Rp 1,012,069,377.66 Rp 1,423,121,318.99 Rp 1,046,553,537.60 Rp 444,649,306.50


Rp 332,639,876.00 Rp 139,806,914.00 Rp 326,095,607.38 Rp 47,899,250.13
Rp 11,875,000.00 Rp 1,125,000.00 Rp - Rp -
Rp 143,038,100.00 Rp 823,292,950.00 Rp - Rp 187,940,750.00
Rp 61,769,230.77 Rp 58,076,923.08 Rp 58,076,923.08 Rp 72,596,153.85
Rp 1,561,391,584.43 Rp 2,445,423,106.06 Rp 1,430,726,068.05 Rp 753,085,460.47
3 4 5 6
Rp 3,989,360,146.65 Rp 6,316,707,191.94 Rp 7,751,816,143.87 Rp 8,707,396,220.78
Rp 4,146,761,739.25 Rp 6,592,184,845.31 Rp 8,022,910,913.36 Rp 8,775,996,373.83
-Rp 157,401,592.60 -Rp 275,477,653.37 -Rp 271,094,769.49 -Rp 68,600,153.05
3.99 6.32 7.75 8.71
4.15 6.59 8.02 8.78

CASH FLOW REAL ALTERNATIVE 2

Bulan
3 4 5 6
30.35 63.61 84.12 97.78

Rp 1,238,443,729.05 Rp 2,327,347,045.29 Rp 1,435,108,951.93 Rp 955,580,076.92

Rp 1,238,443,729.05 Rp 2,327,347,045.29 Rp 1,435,108,951.93 Rp 955,580,076.92


Rp 405,341,869.20 Rp 822,960,746.20 Rp 1,135,032,372.60 Rp 147,361,033.00
Rp 332,639,876.00 Rp 139,806,914.00 Rp 326,095,607.38 Rp 47,899,250.13
Rp 11,875,000.00 Rp 1,125,000.00 Rp - Rp -
Rp 143,038,100.00 Rp 823,292,950.00 Rp - Rp 187,940,750.00
Rp 61,769,230.77 Rp 58,076,923.08 Rp 58,076,923.08 Rp 72,596,153.85
Rp 83,333,333.33 Rp 83,333,333.33 Rp 83,333,333.33 Rp 83,333,333.33
Rp 4,166,666.67 Rp 4,166,666.67 Rp 4,166,666.67 Rp 4,166,666.67

Rp 1,042,164,075.97 Rp 1,932,762,533.28 Rp 1,606,704,903.05 Rp 543,297,186.97


3 4 5 6
Rp 4,489,360,146.65 Rp 6,816,707,191.94 Rp 8,251,816,143.87 Rp 9,207,396,220.78
Rp 5,083,231,750.53 Rp 7,015,994,283.81 Rp 8,622,699,186.86 Rp 9,165,996,373.83
-Rp 593,871,603.88 -Rp 199,287,091.87 -Rp 370,883,042.99 Rp 41,399,846.95

4.4893601467 6.8167071919 8.2518161439 9.2073962208


5.0832317505 7.0159942838 8.6226991869 9.1659963738

CASH FLOW REAL ALTERNATIVE 3

Bulan
3 4 5 6
30.35 63.61 84.12 97.78

Rp 1,238,443,729.05 Rp 2,327,347,045.29 Rp 1,435,108,951.93 Rp 955,580,076.92

Rp 1,238,443,729.05 Rp 2,327,347,045.29 Rp 1,435,108,951.93 Rp 955,580,076.92

Rp 1,012,069,377.66 Rp 1,423,121,318.99 Rp 1,046,553,537.60 Rp 444,649,306.50


Rp 332,639,876.00 Rp 139,806,914.00 Rp 326,095,607.38 Rp 47,899,250.13
Rp 11,875,000.00 Rp 1,125,000.00 Rp - Rp -
Rp 143,038,100.00 Rp 823,292,950.00 Rp - Rp 187,940,750.00

Rp 61,769,230.77 Rp 58,076,923.08 Rp 58,076,923.08 Rp 72,596,153.85


Rp 1,561,391,584.43 Rp 2,445,423,106.06 Rp 1,430,726,068.05 Rp 753,085,460.47
3 4 5 6
Rp 4,089,360,146.65 Rp 6,416,707,191.94 Rp 7,851,816,143.87 Rp 8,807,396,220.78
Rp 4,146,761,739.25 Rp 6,592,184,845.31 Rp 8,022,910,913.36 Rp 8,775,996,373.83
-Rp 57,401,592.60 -Rp 175,477,653.37 -Rp 171,094,769.49 Rp 31,399,846.95

4.09 6.42 7.85 8.81


4.15 6.59 8.02 8.78
7 8
100.00

Rp 155,322,121.12
Rp 466,458,860.10
Rp 155,322,121.12 Rp 466,458,860.10

Rp 8,862,718,341.90 Rp 9,329,177,202.00
Rp 8,775,996,373.83 Rp 8,775,996,373.83
Rp 86,721,968.07 Rp 553,180,828.17

8.8627183419 9.329177202
8.7759963738 8.7759963738
Rp 8,862,718,341.90 Rp 9,329,177,202.00

BULAN
7 8 1
100.00
2

Rp 155,322,121.12 Rp 9,329,177,202.00
Rp 466,458,860.10 3
Rp 155,322,121.12 Rp 466,458,860.10

7 8
Rp 8,862,718,341.90 Rp 9,329,177,202.00
Rp 8,775,996,373.83 Rp 8,775,996,373.83
Rp 86,721,968.07 Rp 553,180,828.17
Rp 553,180,828.17

8.86 9.33
8.78 8.78

BULAN
7 8 1
100.00
2

Rp 155,322,121.12
Rp 466,458,860.10
3

Rp 155,322,121.12 Rp 466,458,860.10
Rp 405,341,869.20
Rp 540,455,825.60

Rp 83,333,333.33 Rp 83,333,333.33
Rp 4,166,666.67 Rp 4,166,666.67

Rp 87,500,000.00 Rp 87,500,000.00
7 8
Rp 9,362,718,341.90 Rp 9,829,177,202.00
Rp 9,253,496,373.83 Rp 9,340,996,373.83
Rp 109,221,968.07 Rp 488,180,828.17
Rp 488,180,828.17

9.3627183419 9.829177202
9.2534963738 9.3409963738

BULAN
7 8 1
100.00
2

Rp 155,322,121.12 Rp - 3
Rp 466,458,860.10
Rp 155,322,121.12 Rp 466,458,860.10
4

Rp - Rp -
5
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 100,000,000.00
Rp - Rp -
Rp - Rp 100,000,000.00
7 8
Rp 8,962,718,341.90 Rp 9,429,177,202.00
Rp 8,775,996,373.83 Rp 8,875,996,373.83
Rp 186,721,968.07 Rp 553,180,828.17
Rp 553,180,828.17

8.96 9.43
8.78 8.88
KEBIJAKAN
PEMBAYARAN BAHAN LUNAS
PEMBAYARAN BAHAN DICICIL TIGA KALI PADA
BULAN KE 2 DIBAYAR 30% BULAN KETIGA 30%
DAN BULAN KE 4 40%
PEMBAYARAN BAHAN DICICIL TIGA KALI PADA
BULAN KE 3 DIBAYAR 30% BULAN KE 4 30% DAN
BULAN KE 5 40%
PEMBAYARAN BAHAN DICICIL 2 KALI PADA
BULAN KE 4 DIBAYAR 50% BULAN KE 5 50%
PEMBAYARAN BAHAN DICICIL 2 KALI PADA
BULAN KE 5 DIBAYAR 50% BULAN KE 6 50%

1
1

KEBIJAKAN
PEMBAYARAN BAHAN LUNAS

PINJAMAN BANK SEBESAR 500 JUTA DENGAN


BUNGA SEBESAR 5%

PEMBAYARAN BAHAN DICICIL TIGA KALI PADA


BULAN KE 3 DIBAYAR 30% BULAN KE 4 30% DAN
BULAN KE 5 40%
1

KEBIJAKAN
PEMBAYARAN BAHAN LUNAS
PEMBAYARAN BAHAN DICICIL TIGA KALI PADA
BULAN KE 2 DIBAYAR 30% BULAN KETIGA 30%
DAN BULAN KE 4 40%
PEMBAYARAN BAHAN DICICIL TIGA KALI PADA
BULAN KE 3 DIBAYAR 30% BULAN KE 4 30% DAN
BULAN KE 5 40%
PEMBAYARAN BAHAN DICICIL 2 KALI PADA
BULAN KE 4 DIBAYAR 50% BULAN KE 5 50%
PEMBAYARAN BAHAN DICICIL 2 KALI PADA
BULAN KE 5 DIBAYAR 50% BULAN KE 6 50%
1 2
CASH FLOW MC ALTERNATIVE 1
PENERIMAAN PENGELUARAN

10.00

BIAYA (MILYAR RUPIAH)


9.00

8.00

7.00

6.00

5.00

4.00

3.00

2.00

1.00

0.00
1 2 3 4 5 6 7 8

BULAN
2.00

1.00

0.00
1 2 3 4 5 6 7 8

BULAN

CASH FLOW MC ALTERNATIVE 2


PEMASUKAN PENGELUARAN

10
BIAYA (MILYAR RUPIAH)

5
9

BIAYA (MILYAR RU
8

0
1 2 3 4 5 6 7 8

BULAN

CASH FLOW MC ALTERNATIVE 3


PEMASUKAN PENGELUARAN

10.00
BIAYA (MILYAR RUPIAH)

9.00

8.00

7.00

6.00

5.00

4.00
BIAYA
7.00

6.00

5.00

4.00

3.00

2.00

1.00

0.00
1 2 3 4 5 6 7 8

BULAN
10.00
BIAYA (MILYAR RUPIAH)

9.00

8.00

7.00

6.00

5.00

4.00

3.00

2.00

1.00

0.00
8
8

5
6
7
8
9
10
BIAYA (MILYAR RUPIAH)

0.00
1.00
2.00
9

BIAYA (MILYAR RU
8

10.00
BIAYA (MILYAR RUPIAH)

9.00

8.00

7.00

6.00

5.00

4.00
BIAYA
7.00

6.00

5.00

4.00

3.00

2.00

1.00

0.00
CASH FLOW REAL
Real cost Rp 9,329,177,202.00
Nilai Kontrak Rp 10,262,094,922.20
Pembayaran dengan termin

No Uraian
1 2
1 Prestasi Pek Kumulatif 12.65
2 Penerimaan
2.1 Uang Muka (20%) Rp 1,865,835,440.40
2.2 Termin Pekerjaan
2.3 Pengembalian Retensi 5%
Total Penerimaan Rp 1,865,835,440.40 Rp -
3 Pengeluaran
3.1 Bahan Rp 1,333,966,317.12 Rp 2,022,425,028.22
3.2 Upah Rp 119,054,928.75 Rp 329,520,631.25
3.3 Alat Rp 42,170,000.00 Rp 7,450,000.00
3.4 Subtontraktor Rp - Rp -
3.5 Overhead Rp 84,711,538.46 Rp 61,769,230.77
Total Pengeluaran Rp 1,579,902,784.33 Rp 2,421,164,890.24
BULAN KE 1 2
Kumulatif Penerimaan Rp 1,865,835,440.40 Rp 1,865,835,440.40
Kumulatif Pengeluaran Rp 1,579,902,784.33 Rp 4,001,067,674.56
selisih penerimaan dan pengeluaran Rp 285,932,656.07 -Rp 2,135,232,234.16
Saldo akhir
CASH FLOW TERMIN A
Real cost Rp 9,329,177,202.00
Nilai Kontrak Rp 10,262,094,922.20
Pembayaran dengan termin

No Uraian
1 2
1 Prestasi Pek Kumulatif 12.65
2 Penerimaan
2.1 Uang Muka (20%) Rp 1,865,835,440.40
2.2 Pinjaman
2.2 Termin Pekerjaan
2.3 Pengembalian Retensi 5%
Total Penerimaan Rp 1,865,835,440.40 Rp -
3 Pengeluaran
3.1 Bahan Rp 1,333,966,317.12 Rp 202,242,502.82
3.2 Upah Rp 119,054,928.75 Rp 329,520,631.25
3.3 Alat Rp 42,170,000.00 Rp 7,450,000.00
3.4 Subtontraktor Rp - Rp -
3.5 Overhead Rp 84,711,538.46 Rp 61,769,230.77
3.5 Administrasi Pinjaman
3.6 Pengembalian Pinjaman
3.7 Bunga 5%
Total Pengeluaran Rp 1,579,902,784.33 Rp 600,982,364.84
BULAN KE 1 2
Kumulatif Penerimaan Rp 1,865,835,440.40 Rp 1,865,835,440.40
Kumulatif Pengeluaran Rp 1,579,902,784.33 Rp 2,180,885,149.17
selisih penerimaan dan pengeluaran Rp 285,932,656.07 -Rp 315,049,708.77
Saldo akhir

CASH FLOW TERMIN A


Real cost Rp 9,329,177,202.00
Nilai Kontrak Rp 10,262,094,922.20
Pembayaran dengan termin

No Uraian
1 2
1 Prestasi Pek Kumulatif 12.65
2 Penerimaan
2.1 Uang Muka (10%) Rp 932,917,720.20
2.2 Modal Rp 500,000,000.00
2.3 Termin Pekerjaan
2.4 Pengembalian Retensi 5%
Total Penerimaan Rp 500,000,000.00 Rp 932,917,720.20
3 Pengeluaran
3.1 Bahan Rp 333,491,579.28 Rp 1,202,717,240.66
3.2 Upah Rp 119,054,928.75
3.3 Alat Rp 42,170,000.00 Rp 7,450,000.00
3.4 Subtontraktor Rp - Rp -
3.5 Overhead Rp 84,711,538.46 Rp 61,769,230.77
3.6 Pengembalian Modal
Total Pengeluaran Rp 460,373,117.74 Rp 1,390,991,400.18
BULAN KE 1 2
Kumulatif Penerimaan Rp 500,000,000.00 Rp 1,432,917,720.20
Kumulatif Pengeluaran Rp 460,373,117.74 Rp 1,851,364,517.92
selisih penerimaan dan pengeluaran Rp 39,626,882.26 -Rp 418,446,797.72
Saldo akhir
CASH FLOW REAL

Bulan
3 4 5 6
30.35 63.61 84.12 97.78

Rp 1,399,376,580.30 Rp 1,399,376,580.30 Rp 1,399,376,580.30 Rp 1,399,376,580.30

Rp 1,399,376,580.30 Rp 1,399,376,580.30 Rp 1,399,376,580.30 Rp 1,399,376,580.30

Rp 1,351,139,564.00 Rp 417,618,877.00 Rp 594,576,547.00 Rp 147,361,033.00


Rp 332,639,876.00 Rp 139,806,914.00 Rp 326,095,607.38 Rp 47,899,250.13
Rp 11,875,000.00 Rp 1,125,000.00 Rp - Rp -
Rp 143,038,100.00 Rp 823,292,950.00 Rp - Rp 187,940,750.00
Rp 61,769,230.77 Rp 58,076,923.08 Rp 58,076,923.08 Rp 72,596,153.85
Rp 1,900,461,770.77 Rp 1,439,920,664.08 Rp 978,749,077.45 Rp 455,797,186.97
3 4 5 6
Rp 3,265,212,020.70 Rp 4,664,588,601.00 Rp 6,063,965,181.30 Rp 7,463,341,761.60
Rp 5,901,529,445.33 Rp 7,341,450,109.41 Rp 8,320,199,186.86 Rp 8,775,996,373.83
-Rp 2,636,317,424.63 -Rp 2,676,861,508.41 -Rp 2,256,234,005.56 -Rp 1,312,654,612.23
CASH FLOW TERMIN ALT 1

Bulan
3 4 5 6
30.35 63.61 84.12 97.78

Rp 500,000,000.00
Rp 1,399,376,580.30 Rp 1,399,376,580.30 Rp 1,399,376,580.30 Rp 1,399,376,580.30

Rp 1,899,376,580.30 Rp 1,399,376,580.30 Rp 1,399,376,580.30 Rp 1,399,376,580.30

Rp 674,712,918.44 Rp 883,522,356.94 Rp 1,180,810,630.44 Rp 1,119,362,224.94


Rp 332,639,876.00 Rp 139,806,914.00 Rp 326,095,607.38 Rp 47,899,250.13
Rp 11,875,000.00 Rp 1,125,000.00 Rp - Rp -
Rp 143,038,100.00 Rp 823,292,950.00 Rp - Rp 187,940,750.00
Rp 61,769,230.77 Rp 58,076,923.08 Rp 58,076,923.08 Rp 72,596,153.85
Rp 40,000,000.00

Rp 1,264,035,125.21 Rp 1,905,824,144.02 Rp 1,564,983,160.90 Rp 1,427,798,378.91


3 4 5 6
Rp 3,765,212,020.70 Rp 5,164,588,601.00 Rp 6,563,965,181.30 Rp 7,963,341,761.60
Rp 3,444,920,274.38 Rp 5,350,744,418.40 Rp 6,915,727,579.30 Rp 8,343,525,958.21
Rp 320,291,746.32 -Rp 186,155,817.40 -Rp 351,762,398.00 -Rp 380,184,196.61

CASH FLOW TERMIN ALT 2

Bulan
3 4 5 6
30.35 63.61 84.12 97.78

Rp 1,585,960,124.34 Rp 1,585,960,124.34 Rp 1,585,960,124.34 Rp 1,585,960,124.34

Rp 1,585,960,124.34 Rp 1,585,960,124.34 Rp 1,585,960,124.34 Rp 1,585,960,124.34


Rp 809,826,874.84 Rp 883,522,356.94 Rp 1,180,810,630.44 Rp 1,045,681,708.44
Rp 329,520,631.25 Rp 332,639,876.00 Rp 139,806,914.00 Rp 326,095,607.38
Rp 11,875,000.00 Rp 1,125,000.00 Rp - Rp -
Rp 143,038,100.00 Rp 823,292,950.00 Rp - Rp 187,940,750.00
Rp 61,769,230.77 Rp 58,076,923.08 Rp 58,076,923.08 Rp 72,596,153.85

Rp 1,356,029,836.86 Rp 2,098,657,106.02 Rp 1,378,694,467.52 Rp 1,632,314,219.66


3 4 5 6
Rp 3,018,877,844.54 Rp 4,604,837,968.88 Rp 6,190,798,093.22 Rp 7,776,758,217.56
Rp 3,207,394,354.78 Rp 5,306,051,460.80 Rp 6,684,745,928.32 Rp 8,317,060,147.99
-Rp 188,516,510.24 -Rp 701,213,491.92 -Rp 493,947,835.10 -Rp 540,301,930.43
7
100.00

Rp 1,399,376,580.30
Rp 466,458,860.10
Rp 1,865,835,440.40

7
Rp 9,329,177,202.00
Rp 8,775,996,373.83
Rp 553,180,828.17
7
100.00 e 10,20,20,20,20,10
f 20,20,20,20,20
g 50,50
h 50,50
Rp 1,399,376,580.30
Rp 466,458,860.10
CASH FLOW TERMIN
Rp 1,865,835,440.40
1 2 3 4
PENERIMAAN 5 6
PENGELUARAN 7
Rp 472,470,415.62 Rp10,000,000,000.00 Rp10,000,000,000.00

Rp9,000,000,000.00 Rp9,000,000,000.00

Rp8,000,000,000.00 Rp8,000,000,000.00

BIAYA
Rp7,000,000,000.00 Rp7,000,000,000.00

Rp 500,000,000.00 Rp6,000,000,000.00 Rp6,000,000,000.00


Rp 25,000,000.00
Rp5,000,000,000.00 Rp5,000,000,000.00
Rp 997,470,415.62
7 Rp4,000,000,000.00 Rp4,000,000,000.00
Rp 9,829,177,202.00
Rp3,000,000,000.00 Rp3,000,000,000.00
Rp 9,340,996,373.83
Rp 488,180,828.17 Rp2,000,000,000.00 Rp2,000,000,000.00

Rp1,000,000,000.00 Rp1,000,000,000.00

Rp- Rp-
1 2 3 4 5 6 7

BULAN

pembayaran bahan
D 40,60
7 E 10,20,20,20,20,10
100.00 F 30,20,20,20,10
G 50,50
H 50,50
I 50,50
Rp 1,585,960,124.34 Modal Awal bln 1 500 jt
Rp 466,458,860.10 uang muka bln 2 10%
Rp 2,052,418,984.44 pembayaran upah
Rp 411,036,975.72
Rp 47,899,250.13
Rp -
Rp -
Rp -
Rp 500,000,000.00
Rp 958,936,225.85
7
Rp 9,829,177,202.00
Rp 9,275,996,373.83
Rp 553,180,828.17
MIN
6
GELUARAN 7
Rp10,000,000,000.00

Rp9,000,000,000.00

Rp8,000,000,000.00
BIAYA

Rp7,000,000,000.00

Rp6,000,000,000.00

Rp5,000,000,000.00

Rp4,000,000,000.00

Rp3,000,000,000.00

Rp2,000,000,000.00

Rp1,000,000,000.00

Rp-
7
REAL COST

NILAI KONTRAK

TERMIN

TERMIN 1

TERMIN 2

TERMIN 3

TERMIN 4

TERMIN 5

REAL COST

NILAI KONTRAK

TERMIN

TERMIN 1

TERMIN 2

TERMIN 3

TERMIN 4

TERMIN 5
TERMIN

Rp 9,329,177,202.00

Rp 10,262,094,000.00
PROGRES PENGURANGAN
KUMULATIF PROGRES
PEKERJAAN NILAI TERMIN
PERBULAN Uang Muka (20%)

20% 20% Rp 1,865,835,440.40 Rp 373,167,088.08

20% 40% Rp 1,865,835,440.40 Rp 373,167,088.08

20% 60% Rp 1,865,835,440.40 Rp 373,167,088.08

20% 80% Rp 1,865,835,440.40 Rp 373,167,088.08

20% 100% Rp 1,865,835,440.40 Rp 373,167,088.08

TERMIN

Rp 9,329,177,202.00

Rp 10,262,094,000.00
PROGRES PENGURANGAN
KUMULATIF PROGRES
PEKERJAAN NILAI TERMIN
PERBULAN
Uang Muka (20%)

20% 20% Rp 1,865,835,440.40 Rp 186,583,544.04

20% 40% Rp 1,865,835,440.40 Rp 186,583,544.04

20% 60% Rp 1,865,835,440.40 Rp 186,583,544.04

20% 80% Rp 1,865,835,440.40 Rp 186,583,544.04

20% 100% Rp 1,865,835,440.40 Rp 186,583,544.04


PENGURANGAN
TERMIN YANG
DITERIMA
Biaya Ritensi (5%)

Rp 93,291,772.02 Rp 1,399,376,580.30

Rp 93,291,772.02 Rp 1,399,376,580.30

Rp 93,291,772.02 Rp 1,399,376,580.30

Rp 93,291,772.02 Rp 1,399,376,580.30

Rp 93,291,772.02 Rp 1,399,376,580.30

PENGURANGAN
TERMIN YANG
DITERIMA
Biaya Ritensi (5%)

Rp 93,291,772.02 Rp 1,585,960,124.34

Rp 93,291,772.02 Rp 1,585,960,124.34

Rp 93,291,772.02 Rp 1,585,960,124.34

Rp 93,291,772.02 Rp 1,585,960,124.34

Rp 93,291,772.02 Rp 1,585,960,124.34

You might also like