Dbplgoverning System Final
Dbplgoverning System Final
4.0 Safety.
9.0 Staffing
11.0 Appendices:
Signature
NTPC BHEL
STATION: NTPC- RIHAND NTPC ref:RH/Stg-II/TS/B/05 SHEET
Unit # 3: stage –II (2x500 MW) BHEL ref:PW/TSX/RIT/TUR/TS/001/Rev00 OF
Signature
NTPC BHEL
STATION: NTPC- RIHAND NTPC ref:RH/Stg-II/TS/B/05 SHEET
Unit # 3: stage –II (2x500 MW) BHEL ref:PW/TSX/RIT/TUR/TS/001/Rev00 OF
2.1 OBJECTIVE:
2.2 PROPOSAL:
Signature
NTPC BHEL
STATION: NTPC- RIHAND NTPC ref:RH/Stg-II/TS/B/05 SHEET
Unit # 3: stage –II (2x500 MW) BHEL ref:PW/TSX/RIT/TUR/TS/001/Rev00 OF
Signature
NTPC BHEL
STATION: NTPC- RIHAND NTPC ref:RH/Stg-II/TS/B/05 SHEET
Unit # 3: stage –II (2x500 MW) BHEL ref:PW/TSX/RIT/TUR/TS/001/Rev00 OF
Signature
NTPC BHEL
STATION: NTPC- RIHAND NTPC ref:RH/Stg-II/TS/B/05 SHEET
Unit # 3: stage –II (2x500 MW) BHEL ref:PW/TSX/RIT/TUR/TS/001/Rev00 OF
Signature
NTPC BHEL
STATION: NTPC- RIHAND NTPC ref:RH/Stg-II/TS/B/05 SHEET
Unit # 3: stage –II (2x500 MW) BHEL ref:PW/TSX/RIT/TUR/TS/001/Rev00 OF
6.8 Control oil, Trip oil & Test oil lines are erected &
Hydro tested after oil flushing.
Signature
NTPC BHEL
STATION: NTPC- RIHAND NTPC ref:RH/Stg-II/TS/B/05 SHEET
Unit # 3: stage –II (2x500 MW) BHEL ref:PW/TSX/RIT/TUR/TS/001/Rev00 OF
Signature
NTPC BHEL
STATION: NTPC- RIHAND NTPC ref:RH/Stg-II/TS/B/05 SHEET
Unit # 3: stage –II (2x500 MW) BHEL ref:PW/TSX/RIT/TUR/TS/001/Rev00 OF
7.1.12 Ensure that the Boiler stop valves are fully closed
and the main steam line is not charged with
steam.
Signature
NTPC BHEL
STATION: NTPC- RIHAND NTPC ref:RH/Stg-II/TS/B/05 SHEET
Unit # 3: stage –II (2x500 MW) BHEL ref:PW/TSX/RIT/TUR/TS/001/Rev00 OF
Signature
NTPC BHEL
STATION: NTPC- RIHAND NTPC ref:RH/Stg-II/TS/B/05 SHEET
Unit # 3: stage –II (2x500 MW) BHEL ref:PW/TSX/RIT/TUR/TS/001/Rev00 OF
Signature
NTPC BHEL
STATION: NTPC- RIHAND NTPC ref:RH/Stg-II/TS/B/05 SHEET
Unit # 3: stage –II (2x500 MW) BHEL ref:PW/TSX/RIT/TUR/TS/001/Rev00 OF
Signature
NTPC BHEL
STATION: NTPC- RIHAND NTPC ref:RH/Stg-II/TS/B/05 SHEET
Unit # 3: stage –II (2x500 MW) BHEL ref:PW/TSX/RIT/TUR/TS/001/Rev00 OF
Signature
NTPC BHEL
STATION: NTPC- RIHAND NTPC ref:RH/Stg-II/TS/B/05 SHEET
Unit # 3: stage –II (2x500 MW) BHEL ref:PW/TSX/RIT/TUR/TS/001/Rev00 OF
Signature
NTPC BHEL
STATION: NTPC- RIHAND NTPC ref:RH/Stg-II/TS/B/05 SHEET
Unit # 3: stage –II (2x500 MW) BHEL ref:PW/TSX/RIT/TUR/TS/001/Rev00 OF
Signature
NTPC BHEL
STATION: NTPC- RIHAND NTPC ref:RH/Stg-II/TS/B/05 SHEET
Unit # 3: stage –II (2x500 MW) BHEL ref:PW/TSX/RIT/TUR/TS/001/Rev00 OF
Signature
NTPC BHEL
STATION: NTPC- RIHAND NTPC ref:RH/Stg-II/TS/B/05 SHEET
Unit # 3: stage –II (2x500 MW) BHEL ref:PW/TSX/RIT/TUR/TS/001/Rev00 OF
Signature
NTPC BHEL
STATION: NTPC- RIHAND NTPC ref:RH/Stg-II/TS/B/05 SHEET
Unit # 3: stage –II (2x500 MW) BHEL ref:PW/TSX/RIT/TUR/TS/001/Rev00 OF
Bellow lift.
Auxiliary secondary fluid pressure.
HP secondary fluid pressure.
IP secondary fluid pressure.
Starting device travel.
7.2.59 Plot the following curve
Signature
NTPC BHEL
STATION: NTPC- RIHAND NTPC ref:RH/Stg-II/TS/B/05 SHEET
Unit # 3: stage –II (2x500 MW) BHEL ref:PW/TSX/RIT/TUR/TS/001/Rev00 OF
7.2.64 Check whether all stop and control valves are full
open and Auxiliary secondary fluid pressure, HP
secondary fluid pressure, IP secondary fluid
pressure, trip fluid pressure, and Auxiliary trips
fluid pressure reads maximum
Signature
NTPC BHEL
STATION: NTPC- RIHAND NTPC ref:RH/Stg-II/TS/B/05 SHEET
Unit # 3: stage –II (2x500 MW) BHEL ref:PW/TSX/RIT/TUR/TS/001/Rev00 OF
Signature
NTPC BHEL
STATION: NTPC- RIHAND NTPC ref:RH/Stg-II/TS/B/05 SHEET
Unit # 3: stage –II (2x500 MW) BHEL ref:PW/TSX/RIT/TUR/TS/001/Rev00 OF
7.4.10 Increase the set point voltage and hold the power
piston lift KA 08 of EHC MAX 45 BY 001 about 6
to 7mm as obtained in Hydraulic Governor
setting.
Signature
NTPC BHEL
STATION: NTPC- RIHAND NTPC ref:RH/Stg-II/TS/B/05 SHEET
Unit # 3: stage –II (2x500 MW) BHEL ref:PW/TSX/RIT/TUR/TS/001/Rev00 OF
Signature
NTPC BHEL
STATION: NTPC- RIHAND NTPC ref:RH/Stg-II/TS/B/05 SHEET
Unit # 3: stage –II (2x500 MW) BHEL ref:PW/TSX/RIT/TUR/TS/001/Rev00 OF
7.5.1.1 Check and ensure that all the drain valves in trip
fluid lines are kept closed.
Signature
NTPC BHEL
STATION: NTPC- RIHAND NTPC ref:RH/Stg-II/TS/B/05 SHEET
Unit # 3: stage –II (2x500 MW) BHEL ref:PW/TSX/RIT/TUR/TS/001/Rev00 OF
Signature
NTPC BHEL
STATION: NTPC- RIHAND NTPC ref:RH/Stg-II/TS/B/05 SHEET
Unit # 3: stage –II (2x500 MW) BHEL ref:PW/TSX/RIT/TUR/TS/001/Rev00 OF
Signature
NTPC BHEL
STATION: NTPC- RIHAND NTPC ref:RH/Stg-II/TS/B/05 SHEET
Unit # 3: stage –II (2x500 MW) BHEL ref:PW/TSX/RIT/TUR/TS/001/Rev00 OF
Signature
NTPC BHEL
STATION: NTPC- RIHAND NTPC ref:RH/Stg-II/TS/B/05 SHEET
Unit # 3: stage –II (2x500 MW) BHEL ref:PW/TSX/RIT/TUR/TS/001/Rev00 OF
7.7.1.15 Repeat the test two to three times as per the steps
7.7.1.1 to 7.7.1.14 and check whether test oil
pressure comes to a steady valve
Signature
NTPC BHEL
STATION: NTPC- RIHAND NTPC ref:RH/Stg-II/TS/B/05 SHEET
Unit # 3: stage –II (2x500 MW) BHEL ref:PW/TSX/RIT/TUR/TS/001/Rev00 OF
Signature
NTPC BHEL
STATION: NTPC- RIHAND NTPC ref:RH/Stg-II/TS/B/05 SHEET
Unit # 3: stage –II (2x500 MW) BHEL ref:PW/TSX/RIT/TUR/TS/001/Rev00 OF
Signature
NTPC BHEL
STATION: NTPC- RIHAND NTPC ref:RH/Stg-II/TS/B/05 SHEET
Unit # 3: stage –II (2x500 MW) BHEL ref:PW/TSX/RIT/TUR/TS/001/Rev00 OF
NTPC BHEL
STATION: NTPC- RIHAND NTPC ref:RH/Stg-II/TS/B/05 SHEET
Unit # 3: stage –II (2x500 MW) BHEL ref:PW/TSX/RIT/TUR/TS/001/Rev00 OF
ITEM 11 REMARK
RESPONSIBILITY & COMMUNICATION
Signature
NTPC BHEL
STATION: NTPC- RIHAND NTPC ref:RH/Stg-II/TS/B/05 SHEET
Unit # 3: stage –II (2x500 MW) BHEL ref:PW/TSX/RIT/TUR/TS/001/Rev00 OF
11.2 Communications:
NTPC BHEL
STATION: NTPC- RIHAND NTPC ref:RH/Stg-II/TS/B/05 SHEET
Unit # 3: stage –II (2x500 MW) BHEL ref:PW/TSX/RIT/TUR/TS/001/Rev00 OF
BHEL
Mechanical erection ____________________
Electrical erection ____________________
C & I erection ____________________
Commissioning team: __________________
RhSTPP
Mechanical erection ____________________
Electrical erection ______________________
C & I erection ____________________
Commissioning–mechanical ________________
Commissioning–electrical __________________
Commissioning–C & I____________________
NTPC BHEL
STATION: NTPC- RIHAND NTPC ref:RH/Stg-II/TS/B/05 SHEET
Unit # 3: stage –II (2x500 MW) BHEL ref:PW/TSX/RIT/TUR/TS/001/Rev00 OF
Valve schedule
Valve no DISCRIPTION TYPE MODE OF REMARK
OPERATION
Signature
NTPC BHEL
STATION: NTPC- RIHAND NTPC ref:RH/Stg-II/TS/B/05 SHEET
Unit # 3: stage –II (2x500 MW) BHEL ref:PW/TSX/RIT/TUR/TS/001/Rev00 OF
Signature
NTPC BHEL
STATION: NTPC- RIHAND NTPC ref:RH/Stg-II/TS/B/05 SHEET
Unit # 3: stage –II (2x500 MW) BHEL ref:PW/TSX/RIT/TUR/TS/001/Rev00 OF
Signature
NTPC BHEL
STATION: NTPC- RIHAND NTPC ref:RH/Stg-II/TS/B/05 SHEET
Unit # 3: stage –II (2x500 MW) BHEL ref:PW/TSX/RIT/TUR/TS/001/Rev00 OF
Signature
NTPC BHEL