You are on page 1of 6

Document Number

OFD 5 Electrical heat tracing NG-018-D5-NGD-XXXXXX


Revision: 01 Status : AFC
Document Type: DTS System / Subsystem: 00 Discipline: PRO Rev Date: '27-Feb-2012
Contractor Document Number: Page 2 of 4

1
2 TRACING
3
4
5 GENERAL DATA
6
7 TYPES OF TRACING FORSEEN
8
9 - VAPOR NO
10 VERY LOW PRESSURE
11 LOW PRESSURE
12 * OTHERS : .
13
14 - HOT OIL NO
15 - HOT WATER NO
16 - ELECTRIC YES
17
18
19
20
21 JACKETING OF CERTAIN PIPELINES NO
22
23 - FLUIDS USED:
24 *
25 *
26 *
27 *
28
29
30 SPECIFIC CONSTRAINTS OF SELECTION
31
32 NA
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
PDS 202 - 4 / 9 - Rev. 1 - ANG -XL97 G:\EPC Projects\02 OFON Project\OFD 5-detail eng\01-Calculation note\38 - Gas lift\heat tracing\[heat tracing datasheet.xls]PD202A11 PD202F41
Document Number
OFD 5 Electrical heat tracing NG-018-D5-NGD-XXXXXX
Revision: 01 Status : AFC
Document Type: DTS System / Subsystem: 00 Discipline: PRO Rev Date: '27-Feb-2012
Contractor Document Number: Page 2 of 4

1
2 EXAMINED OBJECTIVES
3
4 WINTERIZING NO
5
6 - PROCESS CONDITIONS
7
8 SERVICE TRACING OPERATING MAINTENANCE MAX. TRACING
9 FLUID TEMPERATURE TEMPERATURE AUTHORIZED CODE
10 MIN / MAX ( °C ) °C TEMP.
11 (1) (2) (3)
12
13
14
15
16
17
18
19
20
21
22
23 MAINTENANCE TEMPERATURE
24
25 PROCESS CONDITIONS
26
27 SERVICE TRACING OPERATING MAINTENANCE MAX. TRACING
28 FLUID TEMPERATURE TEMPERATURE AUTHORIZED CODE
29 MIN / MAX ( °C ) °C TEMP.
30 (1) (2) (3)
31 Gas lift discharge liquid 19 -26 note 4 45
32 control valve outlet liquid + gas -8.7 4.5 45
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52 NOTES
53 (1) INDICATIVE (ORDER OF MAGNITUDE).FOR FLEXIBILITY,THE DESIGN TEMPERATURE AND MAXIMUM TEMPERATURE ARE
54 SPECIFIED FOR EACH LINE IN THE LINES LIST.
55 (2) IF NOT SPECIFIED, THE MAINTENANCE TEMPERATURE WILL BE THE OPERATING TEMPERATURE
56 (3) FOR REINFORCED TRACING, SPECIFY A MAINTENANCE TEMPERATURE GREATER THAN THE OPERATING TEMPERATURE.
57 THE USE OF A CONDUCTIVE CEMENT IS RECOMMENDED.
58 4 Set point for electrical heat tracing is the temperature donwstream the control valve.
59
60
61
62
63
64
65
66
67
68
PDS 202 -5 / 9 - Rev. 1 - ANG -XL97 G:\EPC Projects\02 OFON Project\OFD 5-detail eng\01-Calculation note\38 - Gas lift\heat tracing\[heat tracing datasheet.xls]PD202A11 PD202F51
Document Number
OFD 5 Electrical heat tracing NG-018-D5-NGD-XXXXXX
Revision: 01 Status : AFC
Document Type: DTS System / Subsystem: 00 Discipline: PRO Rev Date: '27-Feb-2012
Contractor Document Number: Page 2 of 4

1
2 COMPLEMENTARY CONSTRAINTS SPECIFIC TO TRACING
3
4 IN GENERAL , HEAT LOSSES ALLOWED FOR TRACED AND INSULATED LINES WILL BE THE SAME AS THOSE
5 LINES HAVING INSULATION ONLY( SAME INSULATION THICKNESS )
6
7 FOR THE OPPOSITE CASE , THE MAXIMUM ALLOWABLE LOSSES FOR TRACED AND INSULATED LINES WILL BE
8 SPECIFIED HERE - BELOW
9
10
11 OPERATING OPERATING OPERATING
12 T LOSSES T LOSSES T LOSSES
13 °C kcal/h/m2 °C kcal/h/m2 °C kcal/h/m2
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29 THE EXTERIOR TEMPERATURE OF THE INSULATION OF THE TRACED LINES SHOULD
30 REMAIN INFERIOR TO THAT REQUIRED FOR PERSONNEL PROTECTION
31
32 PARTICULAR PROCESS CONSTRAINT DUE TO TRACING MATERIAL CHOICE NO
33
34 IF YES SPECIFY THIS CONSTRAINT:
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
PDS 202 - 6 / 9 - Rev. 1 - ANG -XL97 G:\EPC Projects\02 OFON Project\OFD 5-detail eng\01-Calculation note\38 - Gas lift\heat tracing\[heat tracing datasheet.xls]PD202A11 PD202F61
Document Number
OFD 5 Electrical heat tracing NG-018-D5-NGD-XXXXXX
Revision: 01 Status : AFC
Document Type: DTS System / Subsystem: 00 Discipline: PRO Rev Date: '27-Feb-2012
Contractor Document Number: Page 2 of 4

1
2 SPECIFIC TRACING FLUID DATA , PROPERTIES OF FLUIDS USED NOT applicable, electrical heat tracing is choosed
3
4 REFER TO INDICATIONS IN THE GENERAL SPECIFICATION
5
6 COMPLEMENTARY SPECIFIC DATA FOR TRACING DESIGN ARE SPECIFIED HERE-AFTER
7
8 VAPOR ...
9 NETWORK OPERATING PRESSURE bar g.
10 OPERATING PRESSURE / CLARINET INLET bar g.
11 TRACING PRESSURE DROP bar
12 PURGER PRESSURE DROP bar
13 OPERATING PRESSURE / CLARINET OUTLET bar g.
14 OPERATING TEMPERATURE °C
15 SATURATION TEMPERATURE °C
16 DESIGN PRESSURE bar g.
17 DESIGN TEMPERATURE °C
18
19 VAPOR ...
20 NETWORK OPERATING PRESSURE MIN / NORM / MAX bar g.
21 OPERATING PRESSURE / CLARINET INLET MIN / NORM / MAX bar g.
22 TRACING PRESSURE DROP bar
23 PURGER PRESSURE DROP bar
24 OPERATING PRESSURE / CLARINET OUTLET MIN / NORM / MAX bar g.
25 OPERATING TEMPERATURE MIN / NORM / MAX °C
26 SATURATION TEMPERATURE MIN / NORM / MAX °C
27 DESIGN PRESSURE bar g.
28 DESIGN TEMPERATURE °C
29
30 VAPOR ...
31 NETWORK OPERATING PRESSURE MIN / NORM / MAX bar g.
32 OPERATING PRESSURE / CLARINET INLET MIN / NORM / MAX bar g.
33 TRACING PRESSURE DROP bar
34 PURGER PRESSURE DROP bar
35 OPERATING PRESSURE / CLARINET OUTLET MIN / NORM / MAX bar g.
36 OPERATING TEMPERATURE MIN / NORM / MAX °C
37 SATURATION TEMPERATURE MIN / NORM / MAX °C
38 DESIGN PRESSURE bar g.
39 DESIGN TEMPERATURE °C
40
41 HEAT CARRIER
42 INLET OPERATING PRESSURE bar g.
43 MAX. ALLOWABLE TRACING PRESSURE DROP bar
44 INLET TEMPERATURE MIN / NORM / MAX °C
45 MAX. TEMPERATURE DROP °C
46 MIN. RETURN TEMPERATURE °C
47
48 FLUID PROPERTIES
49
50
51 TMAX = °C TMIN = °C
52
53
54 SPECIFIC GRAVITY AT T
55
56 VISCOSITY cP
57
58 SPECIFIC HEAT kcal / kg°C
59
60 THERMAL CONDUCTIVITY kcal / hm°C
61
62
63 DESIGN PRESSURE bar g.
64 DESIGN TEMPERATURE °C
65
66 OTHER DATA
67
68
PDS 202 - 7 / 9 - Rev. 1 - ANG -XL97 G:\EPC Projects\02 OFON Project\OFD 5-detail eng\01-Calculation note\38 - Gas lift\heat tracing\[heat tracing datasheet.xls]PD202A11 PD202F71
Document Number
OFD 5 Electrical heat tracing NG-018-D5-NGD-XXXXXX
Revision: 01 Status : AFC
Document Type: DTS System / Subsystem: 00 Discipline: PRO Rev Date: '27-Feb-2012
Contractor Document Number: Page 2 of 4

1
2 HOT WATER
3
4 INLET OPERATING PRESSURE bar g.
5 MAXIMUM ALLOWABLE TRACING PRESSURE DROP bar
6 INLET TEMPERATURE MIN / NORM / MAX °C
7 MAX. TEMPERATURE DROP °C
8 MINIMUM RETURN TEMPERATURE °C
9 DESIGN PRESSURE bar g.
10 DESIGN TEMPERATURE °C
11
12
13
14
15 ELECTRICITY
16
17 - CHARACTERISTICS: REFER TO GENERAL SPECIFICATION AND RP ELECTRIC TRACING
18
19 - PROCESS CONDITIONS : SEE GENERAL NOTE 1
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49 GENERAL NOTES REGARDING TRACING
50
51 1 - THE CONDITIONS OF EACH PIPELINE ARE SPECIFIED IN THE LINE LIST. THIS INCLUDES SPECIFICATION OF THE
52 OPERATING TEMPERATURE , THE DESIGN TEMPERATURE , AND THE MAXIMUM TEMPERATURE FOR FLEXIBILITY DESIGN.
53 IF NECESSARY , THE MAINTENANCE TEMPERATURE (MIN) AND THE MAXIMUM TEMPERATURE NOT TO BE EXCEEDED
54 BY THE PROCESS FLUID FOR TRACING DESIGN ARE SPECIFIED IN NOTE FORM.
55
56 2 - THE INSULATION AND TRACING CODES WILL BE FINALIZED AFTER HEAT EXCHANGE DEPARTMENT DESIGN
57 WHO WILL ASSURE DESIRABLE LAYOUT.
58
59
60
61
62
63
64
65
66
67
68
PDS 202 - 8 / 9 - Rev. 1 - ANG -XL97 G:\EPC Projects\02 OFON Project\OFD 5-detail eng\01-Calculation note\38 - Gas lift\heat tracing\[heat tracing datasheet.xls]PD202A11 PD202F81
Document Number
OFD 5 Electrical heat tracing NG-018-D5-NGD-XXXXXX
Revision: 01 Status : AFC
Document Type: DTS System / Subsystem: 00 Discipline: PRO Rev Date: '27-Feb-2012
Contractor Document Number: Page 2 of 4

1
2 INSULATION AND TRACING CODES SUMMARY CODE
3
4 HEAT CONSERVATION
5
6
7
8 PERSONNEL PROTECTION
9
10
11
12 COLD CONSERVATION
13
14
15
16 ANTI - CONDENSATION PROTECTION
17
18
19
20 ANTI - FREEZE PROTECTION
21
22
23
24 TEMPERATURE RANGE
25 TRACING °C
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42 ANTI - SOLAR PROTECTION
43
44
45 SOUND PROTECTION
46
47
48
49 NON INSULATING
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
PDS 202 - 9 / 9 - Rev. 1 - ANG -XL97 G:\EPC Projects\02 OFON Project\OFD 5-detail eng\01-Calculation note\38 - Gas lift\heat tracing\[heat tracing datasheet.xls]PD202A11 PD202F91