Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

SERVICE

STEAM NOTES:
SET @ 30 mbar SET @ 400°C SET @ 400°C SET @ 30 mbar 1. CIRCULATION PUMPS TO BE
TAH TAH ON DUTY / STAND-BY MODE.
301 301 401 402 302 302
2. TO LOCAL MOTOR CONTROL PANEL.
TIT TIT
3. PRV DISCHARGE TO BE ROUTED
TE TT
401 401 402 402 TO A SAFE LOCATION.
N N
601 602 4. LINES WITH DIAMETER SMALLER
DN25 DN25 THAN DN50 TO BE SITE RUN.
NOTE 3 BAV- BAV- 5. LEVEL ALARMS TO BE MANUALLY
028 029 OVERRIDDEN DURING RUN DRY
SET @ 10 bar g 15-AV-CS-NA-010 OPERATION.
NOTE 3 40-STW-CS- DN700 DN750
PP-012A PRV- 6. EXISTING STEAM LINES, NOT IN
021A GLV-022
HP SCOPE.
SET @ 10 bar g
DN25 DN15 7. SAMPLING TO BE CONNECTED TO
PRV- N6A N3

NOTE 6
DN100 EXISTING SHIP SAMPLING LINE.
40-STW-CS- 021B N8 15-N-CS-NA-011 FROM
HH N11 8. PRESSURE SWITCH SIGNAL TO BE
PP-012B N6B N2 PURG
DN25 GLV-023 INHIBITED FOR MAX. 30 SEC., DURING

100-STW-CS-HC-006
DN25 PRESSURE BUILD UP / START UP.
PIT N5B N2
303 DN100 GLV-016
BAV-027
NOTE 6 TIT TE
BAV-024 PI
N5A N5C
403 403 304
HC
GLV-019
100-STW-CS-HC-008 HARRIS PYE 100-STW-CS-HC-008 100-STW-CS-HC-007

M/E GLV-020 WHRU DN25 25-BFW-CS-PP-013


GLV-017 GLV-018
N10 TO
EGB GLV-025 SAMPLING A/B
NOTE 7
LS DN80
80-BFW-CS-HC-002

LAL N9 N1
GLV-001 201 201 LL
GLV-015
NOTE 5 N7A/B DN40 GLV-003
DN100 N4
HH KEY:
40-BFW-CS-PP-009
GLOBE STOP VALVE
TO
GLOBE SDNR VALVE
DN700 DN750 GLV-026 DRAIN
GATE VALVE
TIT TE TE TIT
404 405 BALL VALVE
404 405
DN25 DN25
GLOBE ANGLE STOP
BAV- BAV- / SDNR
030 031 PRV

FROM FROM
ENGINE EXHAUST ENGINE EXHAUST LOCAL INSTRUMENT

PI PI CONTROL ROOM / DCS


305 306
NOTE 2 P-101 A/B
BAV- M BAV-
80-BFW-CS-HC-004A LOCAL GAUGE BOARD /
603A SERVICE : CIRCULATION PUMP
006 008A CONTROL PANEL
80-BFW-CS-HC-003A

RATED FLOW : 17.8 m 3 /h


SET @ 6.5 bar
PS NOTE 8 PUMP DIFF. HEAD : 15.0 m
GAV- GLV- 309 SCOPE OF SUPPLY: CLIENT HARRISPYE
GAV- CIRCULATION 010A 011A POWER : 1.2 KW
GLV- 005A PUMP A BAV- NPSHa : 2.0 m
002 BAV- P-101A BAV-013
009A
007A
80-BFW-CS-HC-005
NOTE 1
A1 24/03/2017 RE-ISSUED FOR REVIEW J.O D.S/G.N S.K
80-BFW-CS-HC-004B

GLV- GLV-
80-BFW-CS-HC-003B

PI PI A0 21/03/2017 ISSUED FOR REVIEW J.O D.S/G.N S.K


307 308 012 014
REV. DATE DESCRIPTION DRAWN CHECKED APPROVED
GLV- BAV- M BAV-
603B PROJECT NO: CLIENT: VESSEL:
004 006 008B CMA CGM MARCO POLO
J-4904
To be signed by PM/Client

filing, project records and


any requested amendment

DOCUMENT REVIEW
and send back to DO for

TITLE:
ANY COMMENTS GAV- GLV-
NO YES GAV- CIRCULATION 010B 011B
Date .........................................
005B PUMP B
BAV- P-101B
BAV-
009B
WHRU INTEGRATION P&ID
Sign. ......................................... 007B
80-BFW-CS-HC-001 DRAWING NO: Scale: N.T.S Size: A3
HPJ-4904-PR-PD-002 Sheet: 01 of 1

You might also like