This document is a quotation for ducting exhaust installation work at ARKADIA GREEN PARK in Jakarta. It contains 3 items: [1] preparation work including mobilization, measurement, cleaning and coordination; [2] installation of ground floor and basement ducting, fans, supports and electrical work; [3] installation of gas control solenoids. The total cost is Rp29,480,000 with a 10% VAT. The work is estimated to take 10 calendar days excluding electricity and fabrication space which will be provided by the owner.
This document is a quotation for ducting exhaust installation work at ARKADIA GREEN PARK in Jakarta. It contains 3 items: [1] preparation work including mobilization, measurement, cleaning and coordination; [2] installation of ground floor and basement ducting, fans, supports and electrical work; [3] installation of gas control solenoids. The total cost is Rp29,480,000 with a 10% VAT. The work is estimated to take 10 calendar days excluding electricity and fabrication space which will be provided by the owner.
This document is a quotation for ducting exhaust installation work at ARKADIA GREEN PARK in Jakarta. It contains 3 items: [1] preparation work including mobilization, measurement, cleaning and coordination; [2] installation of ground floor and basement ducting, fans, supports and electrical work; [3] installation of gas control solenoids. The total cost is Rp29,480,000 with a 10% VAT. The work is estimated to take 10 calendar days excluding electricity and fabrication space which will be provided by the owner.
Management building No : 012/QT-DMK/2019 ARKADIA GREEN PARK Jakarta Up : Bp syauqi
Subyek : pekerjaan instalasi ducting Exaust
No U R A I AN PEKERJAAN Qty Vol Harga Jumlah 1 Pekerjaan persiapan Mobilisasi de mobilisasi alat kerja dan material ls ls 500,000 500,000 pengukuran ulang ls ls 250,000 250,000 pembersihan berkala ls ls 300,000 300,000 koordinasi lapangan ls ls 500,000 500,000 sub-total 1,550,000
2 Pekerjaan Instalasi ground floor-basement
Pabrikasi dan instalasi ducting uk 400x350 bjls 0,5 20 m' 565,000 11,300,000 fan centrifugal 2000cfm ex cke 1 unit 9,000,000 9,000,000 bracket support unit fan 4 ttk 550,000 550,000 hanger suppor ducting besi siku 3x3 10 ttk 75,000 750,000 cooring flat lantai 1 ttk 500,000 500,000 panel power + instalasi wearing kabel 3x2,5 1 ls 2,000,000 2,000,000 drain dan penampungan 1 ls 250,000 250,000 sub-total 24,350,000
3 instalasi control selenoid gas 1 ls 900,000 900,000
sub-total 900,000 JUMLAH 26,800,000 PPN 10% 2,680,000 TOTAL 29,480,000
Terbilang : Dua puluh sembilan juta empat ratus delapan puluh ribu rupiah
NOTE : listrik dan ruang pabrikasi By owner
waktu pelaksanaan 10 hari kalender