China Harbour Engineering Co.L.L.C. INSPECTION AND TESTING PLAN (ITP): CONCRETE BLINDING WORKS
Contractor: Date:
Contract No. & Location:
Description of Activity:
Legend for acceptance criteria: *AR = Approval *H = Hold Point *M = Monitoring *S = Surveillance *A = Actual Inspection *T/C = Test Certificate Reqd.
3.5 Curing and protection of concrete clause 3.10 of page 69 ,volume 2 part A
Contractor: (Name, Signature & Date) Consultant: Approved By (Name, Signature
& Date)
CC: PM, RE, QA/QC, RE